The present invention relates to the field of power generation technologies, and specifically to a method of a mobile power generation system.
The oil and gas industry generally adopts hydraulic fracturing to promote the production of hydrocarbon wells (for example, oil or gas wells). Conventional fracturing equipment generally has the problems of occupying a large area, causing severe environmental pollution and so on, failing to satisfy the increasingly serious environmental requirements and the requirements on the area occupied by well-site operations.
A complete set of electric drive fracturing equipment will effectively reduce the discharge of environmental pollutants, the occupied area, noise and the operation and maintenance costs. With the use of a complete set of electric drive fracturing equipment and the continuous increase of the power of electric drive fracturing equipment, higher requirements are imposed on power supply at the operation site. At the well-site, the power supply for fracturing equipment generally cannot be realized by using a power grid. Moreover, the fracturing operation has the characteristic of short operation cycle, and fracturing equipment needs to be moved among different well-sites. Generally, because various parts of a power supply system require different assembly, transportation and installation methods, the installation time of the power supply system will be up to half to one month.
Therefore, how to provide a mobile power supply system which can be quickly and conveniently installed at the electric drive fracturing operation site is currently a great challenge for electric drive fracturing operations.
To overcome the defects of the prior art, an objective of the present invention is to provide a method of a mobile power generation system. A power generation apparatus is respectively quickly connected, through expansion joints, to an intake assembly and an exhaust duct which are separately transported, to implement the quick installation and connection of the power generation system at the fracturing operation site. Two conveyances are respectively provided for the intake assembly and the exhaust duct to achieve more flexible adjustment during connection. While the position of the power generation apparatus is fixed, the intake assembly is moved to connect to an intake chamber of the power generation apparatus, and the exhaust duct is moved to connect to an exhaust collector of the power generation apparatus.
The objective of the present invention is achieved by the following technical measures: A method of a mobile power generation system, including the following steps:
1) mounting, on a first conveyance, a gas turbine, an intake chamber, an exhaust collector, a generator, an electric power unit, a control system and an auxiliary system;
2) mounting, on a second conveyance, an intake expansion joint and an intake assembly configured to provide combustion air and gas-turbine-chamber ventilation air, and connecting the intake expansion joint to the intake assembly;
3) mounting an exhaust duct and an exhaust expansion joint on a third conveyance;
4) moving the first conveyance to a designated position at a user site, and moving the second conveyance and the third conveyance to predetermined positions, then adjusting horizontal and vertical positions of the second conveyance by using an intake hydraulic shifter unit to connect the intake expansion joint to the intake chamber on the first conveyance, and adjusting horizontal and vertical positions of the third conveyance by using an exhaust hydraulic shifter unit to connect the exhaust expansion joint to the exhaust collector on the first conveyance; and
5) rotating the exhaust duct on the third conveyance from a horizontal position to a vertical position, connecting the exhaust duct to the exhaust expansion joint, and discharging exhaust gas to the atmosphere through the exhaust duct.
Further, the electric power unit is configured to output electric power from the generator, and the control system includes a gas turbine control unit and a generator control unit.
Further, the intake transport apparatus and the exhaust transport apparatus are connected to at least one side of the power generation transport apparatus through the expansion joints.
Further, the intake assembly includes an intake filter, an intake silencer and a ventilation fan.
Further, the intake expansion joint includes a combustion expansion joint and a gas-turbine-chamber ventilation expansion joint, the combustion expansion joint is connected to the intake chamber connection, and the gas-turbine-chamber ventilation expansion joint is connected to the gas turbine chamber.
Further, according to different orientations of the intake chamber on the first conveyance, the second conveyance and the third conveyance are disposed on the same side, opposite sides or adjacent sides of the first conveyance when the mobile power generation system is in working state.
Further, during connection, the second conveyance and the third conveyance are connected to the first conveyance simultaneously or sequentially through the hydraulic shifter units respectively.
Further, the first conveyance, the second conveyance and the third conveyance are each at least one of a trailer, a truck, a skid or a barge.
Further, the exhaust duct is horizontally disposed on the third conveyance during transportation.
Further, the exhaust duct includes an exhaust silencer, an exhaust stack and an exhaust elbow; the exhaust expansion joint, the exhaust elbow, the exhaust silencer and the exhaust stack are sequentially connected; and when the exhaust duct is in working state, the exhaust stack is hydraulically rotated to a vertical position.
Compared with the prior art, the present invention has the following beneficial effects: Three conveyances are respectively arranged for the power generation apparatus, the exhaust duct, and the intake assembly, and are connected to each other through expansion joints, to implement the quick installation and connection of the power generation system at the fracturing operation site. Two conveyances are respectively provided for the intake assembly and the exhaust duct to achieve more flexible adjustment during connection. While the position of the power generation apparatus is fixed, the intake assembly is moved to connect to the intake chamber of the power generation apparatus, and the exhaust duct is moved to connect to the exhaust collector of the power generation apparatus. Whereby, the onsite installation of the mobile power generation system is completed.
The present invention will be described in detail below with reference to the accompanying drawings and specific implementations.
Wherein: 100. exhaust transport apparatus; 101. exhaust expansion joint; 102. exhaust duct; 200. intake transport apparatus; 201. gas-turbine-chamber ventilation expansion joint; 202. combustion expansion joint; 203. intake assembly; 300. power generation transport apparatus; 301. noise reduction room; gas turbine chamber 302; generator chamber 303; control chamber 304; electric power unit 305; control system 306; generator 307; exhaust collector 308; gas turbine 309; intake chamber 310.
A mobile power generation system includes an intake transport apparatus 200, an exhaust transport apparatus 100 and a power generation transport apparatus 300. The power generation transport apparatus 300 includes a gas turbine 309, an intake chamber 310, an exhaust collector 308, a generator 307, an electric power unit 305, a control system 306 and a first conveyance.
The intake transport apparatus 200 includes an intake assembly 203 and a second conveyance. The intake assembly 203 is configured to provide combustion air and gas-turbine-chamber ventilation air.
The exhaust transport apparatus 100 includes an exhaust duct 102 and a third conveyance. The intake transport apparatus 200 and the exhaust transport apparatus 100 are connected to one side of the power generation transport apparatus 300. Plentiful and inexpensive hydrocarbon fuels (for example, natural gas) at the oil and gas well-site are used as fuels for the gas turbine 309, which transforms chemical energy of hydrocarbon fuels to mechanical energy. Then the generator 307 transforms the mechanical energy into electric energy, thus achieving an efficient, stable, environmentally friendly, mobile supply of electric energy to the electric drive fracturing operation site. The mobile power generation system does not require any additional auxiliary equipment (for example, crane), thereby effectively reducing the installation time. The intake transport apparatus 200 and the exhaust transport apparatus 100 are small in volume and can be transported in multiple ways, and can be easily aligned and mounted. The intake transport apparatus 200 and the exhaust transport apparatus 100 can be mounted at the same time, thereby reducing the installation time. The system can be quickly assembled together to generate electric power after being transferred to another site, thereby satisfying the electric power requirements of fracturing operations.
The intake transport apparatus 200 and the exhaust transport apparatus 100 are connected to at least one side of the power generation transport apparatus 300 through the expansion joints. According to different interface orientations of the intake chamber 310 on the power generation transport apparatus 300, the intake transport apparatus 200 and the exhaust transport apparatus 100 may be disposed on the same side, opposite sides or adjacent sides.
The exhaust duct 102 is horizontally disposed on the exhaust transport apparatus 100 during transportation.
The exhaust duct 102 is hydraulically rotated to a vertical direction of the exhaust transport apparatus 100 when in working state.
The first conveyance, the second conveyance and the third conveyance are each at least one of a trailer, a truck, a skid or a barge.
The power generation transport apparatus 300 further includes an auxiliary system. The auxiliary system is configured to assist in the operation of the power generation transport apparatus 300.
The intake transport apparatus 200 further includes an intake hydraulic shifter unit. During installation and connection, the intake hydraulic shifter unit is configured to adjust relative positions of the intake transport apparatus 200 and the power generation transport apparatus 300.
The exhaust transport apparatus 100 further includes an exhaust hydraulic shifter unit. During installation and connection, the exhaust hydraulic shifter unit is configured to adjust relative positions of the exhaust transport apparatus 100 and the power generation transport apparatus 300.
A method of the mobile power generation system includes the following steps:
1) mounting, on the first conveyance, the gas turbine 309, the intake chamber 310, the exhaust collector 308, the generator 307, the electric power unit 305 and the control system 306;
2) mounting, on the second conveyance, the intake expansion joint and the intake assembly 203 configured to provide combustion air and gas-turbine-chamber ventilation air, and connecting the intake expansion joint to the intake assembly 203;
3) mounting the exhaust duct 102 and the exhaust expansion joint 101 on the third conveyance;
4) moving the first conveyance to a designated position at a user site, and moving the second conveyance and the third conveyance to predetermined positions, then adjusting horizontal and vertical positions of the second conveyance by using the intake hydraulic shifter unit to connect the intake expansion joint to the intake chamber 310 on the first conveyance, and adjusting horizontal and vertical positions of the third conveyance by using the exhaust hydraulic shifter unit to connect the exhaust expansion joint 101 to the exhaust collector 308 on the first conveyance; and
5) rotating the exhaust duct 102 on the third conveyance from the horizontal position to the vertical direction, connecting the exhaust duct 102 to the exhaust expansion joint 101, and discharging exhaust gas to the atmosphere through the exhaust duct 102.
During connection, the exhaust expansion joint 101 can be stretched toward the exhaust collector 308, and the intake expansion joint can be stretched toward the intake chamber 310 and the gas turbine chamber 302. After operation is completed and the system needs to be disassembled at the user site, the exhaust expansion joint 101 can be retracted away from the exhaust collector 308, and the intake expansion joint can be retracted away from the intake chamber 310 and the gas turbine chamber 302.
The intake hydraulic shifter unit and the exhaust hydraulic shifter unit have the same structure including supporting legs, outriggers, a vertical hydraulic cylinder and a horizontal hydraulic cylinder which can implement movement of the conveyance. The supporting legs are connected to the outriggers. The vertical hydraulic cylinder is configured to implement vertical movement of the supporting legs. The horizontal hydraulic cylinder is configured to implement horizontal movement of the supporting legs. The intake hydraulic shifter unit and the exhaust hydraulic shifter unit lower the requirements on the positioning precision of the second conveyance and the third conveyance, thereby lowering the installation difficulty and reducing the installation time.
Number | Date | Country | Kind |
---|---|---|---|
201910552708.0 | Jun 2019 | CN | national |