Claims
- 1. A method of operating a gas turbine group, having at least one compressor, at least a high pressure gas turbine, a low pressure gas turbine and at least one electrical machine, comprising the steps of:
- operating a first heat generator upstream of the high pressure gas turbine;
- operating a second heat generator downstream of the high pressure gas turbine;
- extracting a partial mass flow from the high-pressure turbine;
- cooling this partial mass flow by a cooler medium; and,
- passing the cooled partial mass flow through the structures of at least one of the second heat generator and a low pressure turbine as a cooling medium.
- 2. The method as claimed in claim 1, wherein the partial mass flow for cooling is passed through a heat exchanger through which flows an airflow.
- 3. The method as claimed in claim 2, wherein the airflow originates from at least one of a compressor of the gas turbine group and an air storage installation.
- 4. The method as claimed in claim 1, wherein the gas turbine group includes a steam turbine circuit, and wherein the partial mass flow for cooling is passed through a heat exchanger through which flows at least a partial flow of the steam circuit.
- 5. The method as claimed in claim 1, wherein the partial mass flow for cooling is passed through a heat exchanger through which flows a fuel flow.
- 6. The method as claimed in claim 1, wherein the partial mass flow is cooled by spraying in at least one of water and steam.
- 7. The method as claimed in claim 1, wherein the second heat generator an low pressure turbine to be cooled are cooled by the mass flow in parallel.
- 8. The method as claimed in claim 1, wherein the cooled partial mass flow is passed through a heat generator at the low-pressure end and a low-pressure turbine.
- 9. The method as claimed in claim 1, wherein the partial mass flow is passed through a cleaning unit before flowing through the structures to be cooled.
- 10. The method as claimed in claim 1, wherein the partial mass flow is passed through a fan before flowing through the structures to be cooled.
- 11. The method as claimed in claim 1, wherein the second heat generator and low pressure turbine are cooled in series.
- 12. The method as claimed in claim 1, wherein the partial mass flow is passed through a jet apparatus, in which steam is injected into the mass flow to cool the mass flow and increase the pressure, before the mass flow is passed through the structures to be cooled.
- 13. The method of operating a gas turbine group as claimed in claim 1, wherein the cooling medium is passed through the structures of the second heat generator and to the low pressure turbine in series before mixing with a working gas flowing through the low pressure turbine.
- 14. The method of operating a gas turbine group as claimed in claim 1, wherein the cooling medium is passed through the structure of the low pressure turbine before mixing with a working gas flowing through the low pressure turbine.
Priority Claims (1)
Number |
Date |
Country |
Kind |
4213023 |
Apr 1992 |
DEX |
|
Parent Case Info
This application is a continuation of application Ser. No. 08/036,270, filed Mar. 24, 1993 (abandoned).
US Referenced Citations (2)
Foreign Referenced Citations (7)
Number |
Date |
Country |
2102770 |
Aug 1972 |
DEX |
2335594 |
Aug 1974 |
DEX |
2702440 |
Jul 1978 |
DEX |
3447717A1 |
Jul 1985 |
DEX |
4106752A1 |
Sep 1991 |
DEX |
4109259A1 |
Oct 1991 |
DEX |
4103228A1 |
Aug 1992 |
DEX |
Continuations (1)
|
Number |
Date |
Country |
Parent |
36270 |
Mar 1993 |
|