The present invention is directed to a “drilling-flushing-slotting” coupled pressure relief and permeability increasing method for a high gas outburst coal seam, which is more particularly suitable for pressure relief and permeability increasing when gas of a roadway band of the high gas outburst coal seam is pre-extracted through crossing boreholes.
The pre-extraction of a coal seam gas through a crossing borehole is one of main gas control measures at present; however, most of the coal seams in China have the characteristics of micro pores, high adsorption and low permeability, so that the gas is difficult to effectively extract, and measures must be taken to increase the gas permeability of the coal seam. Therefore, various borehole pressure relief and permeability increasing technologies have been researched by scholars at home and abroad for pressure relief and permeability increasing of the high gas outburst coal seam; by modifying a coal reservoir, the effective stress of the coal seam and the gas flowing resistance are reduced, so that the gas extraction effect is improved; and the technologies mainly include a loosening blasting technology, a gas injection permeability increasing technology, a hydraulic slotting technology, a hydraulic flushing technology and the like. These technologies all have good pressure relief, permeability increasing and flow increasing effects, but are restricted by various factors in the on-site large-scale application, which are summarized herein as follows:
{circle around (1)} some technologies directly act on the original high outburst coal seam to form serious disturbances which are likely to induce dynamic phenomena such as gas outburst;
{circle around (2)} high-energy mediums adopted by some technologies are uncontrollable, so that construction security is difficult to ensure;
{circle around (3)} the process is complicated, the effective influence radius is small, and the regional permeability increasing effect are non-ideal; and
{circle around (4)} the application condition of the single technology is limited, so that the permeability increasing requirements of coal under different conditions are difficult to meet. Therefore, there is an urgent need for researching new pressure relief and permeability increasing technologies, so that on the basis of integrating the advantages of the prior art, the limitation of single technology is broken through, the application range of the permeability increasing technology is enlarged, and the gas extraction effect of the regional coal is improved.
The present invention aims to overcome the weaknesses in the prior art and provide a “drilling-flushing-slotting” coupled pressure relief and permeability increasing method for a high gas outburst coal seam, which is simple in process, safe and reliable, can break through the limitation of a single technology, can effectively enlarge the application range of a permeability increasing technology, and can improve the gas extraction effect of the regional coal.
In order to realize the above objective, the “drilling-flushing-slotting” coupled pressure relief and permeability increasing method for the high gas outburst coal seams of the present invention adjusts the water inlet pressure of a water jet at different stages according to different positions where the borehole construction is carried out; when drilling, the water jet is controlled to respectively perform low pressure water flow drilling and medium pressure water flow flushing; when a drill bit is withdrawn, the high pressure water flow slotting is performed; and the pressure is gradually released level by level according to the low pressure water flow, the medium pressure water flow and the high pressure water flow, thereby implementing the “drilling-flushing-slotting” coupled pressure relief and permeability increasing integrated operation inside a crossing borehole. The method includes specific steps as follows:
The present invention has the beneficial effects: in view of the problems of the various existing drilling pressure relief and permeability increasing measures that the gas outburst is likely to induce when the original high outburst coal seam is directly constructed, the high-energy medium is uncontrollable, the security is poor, the process is complicated, the effective influence radius is small, the regional permeability increasing effect is non-ideal, the application condition of the single technology is limited, the permeability increasing requirements of the coal under different conditions are difficult to meet, and the like, the hydraulic flushing and the hydraulic slotting are reasonably combined, and a “drilling-flushing-slotting” dedicated device is utilized to implement the coupled operation of “low pressure drilling-medium pressure flushing-high pressure slotting” in a borehole, so that the coal in the pre-extraction area is deformed and moved to form network cracks, passages are provided to the desorption flow of the gas, the single-hole pressure relief influence range is enlarged, the gas permeability of the coal seam is increased, the gas is easier to extract, and the gas extraction efficiency is improved. On the basis of adopting the crossing borehole pre-extraction measure for the coal seam gas, the technological advantages of the hydraulic flushing and the hydraulic slotting are integrated, the coupled integrated operation of the “low pressure drilling-medium pressure flushing-high pressure slotting” is implemented, and the influence range of the pressure relief borehole is enlarged; after the “drilling-flushing-slotting” coupled pressure relief, the coal in the pre-extraction area is deformed and moved to form network cracks, and passages are provided to the desorption flow of the gas, so that the gas is easier to extract; by controlling the water jet to gradually release the pressure level by level, the internal energy of the coal can be gradually released, the power for the gas outburst is eliminated, and construction security is ensured; by utilizing the method, the single-hole pressure relief influence range can be enlarged, the gas permeability of the coal seam is increased, the gas extraction efficiency is improved, the number of the pre-extraction boreholes is reduced, and the pre-extraction time is shortened; and moreover, the construction process is simple, the device is safe and reliable, and the method has good applicability to different coal seams in different occurrence states. The present invention can reduce the number of the crossing boreholes by 32.5% and can reduce the length of each crossing borehole by 42.9%; the coal roadway regional outburst eliminating effect is remarkable; the tunneling speed is obviously increased; a good pressure relief and permeability increasing effect is achieved; reliable technical support is provided for the gas extraction of the high outburst coal seam, and the adoption value is extremely high.
In the drawings: 1—floor rock roadway; 2—coal seam; 3—crossing borehole; 4—coal roadway; 5—coal seam floor; 6—coal seam roof; 7—pressure control integrated drill bit; 8—drill stem; 9—pressure relief hole; 10—pressure relief slot; 11—crossing extraction borehole of particular shape.
The present invention is further described below in combination with embodiments in the drawings:
A “drilling-flushing-slotting” coupled pressure relief and permeability increasing method for a high gas outburst coal seam of the present invention adjusts the water inlet pressure of a water jet at different stages according to different positions where the borehole construction is carried out; when drilling, the water jet is controlled to respectively perform the low pressure water flow drilling and the medium pressure water flow flushing; when a drill bit is withdrawn, high pressure water flow slotting is performed; and the pressure is gradually released level by level according to the low pressure water flow, the medium pressure water flow and the high pressure water flow, thereby implementing the “drilling-flushing-slotting” coupled pressure relief and permeability increasing integrated operation inside a crossing borehole 3. The method includes specific steps as follows:
The coal seam 2 is a high gas outburst coal seam, a coal roadway 4 is high in outburst danger when in tunneling. In order to eliminate the outburst danger, the coal seam gas of a roadway band is pre-extracted, the upward crossing borehole 3 is constructed to the coal seam 2 in the floor rock roadway 1 at the lower portion of the coal seam 2 to pre-extract the gas of the coal seam 2 so as to protect the tunneling of the coal roadway 4; multiple crossing boreholes 3 are arranged to a pre-extraction area of the coal seam 2 from the floor rock roadway 1; the multiple crossing boreholes 3 arranged in the pre-extraction area are gradually constructed one by one by utilizing a pressure control integrated drill bit 7, when the pressure control integrated drill bit 7 does not drill to reach the coal seam 2, as shown in
For the coal seam 2 having a hard sublayer or a parting, homogeneous coal output is difficult to implement through a single borehole, and the pressure relief effect is difficult to ensure; however, the pressure is further released by means of the slotting, the influence area of the borehole 3 is increased, the coal is homogeneous in pressure relief, and the extraction effect is better; and after the slotting is completed in the coal seam 2, the crossing extraction borehole 11 of a particular shape is formed, the high-pressure water is stopped being conveyed to the pressure control integrated drill bit 7, and the pressure control integrated drill bit 7 and a drill stem 8 are withdrawn from the borehole 3 while keeping rotating.
By virtue of the superposed effect of the water jet in different directions, the range of a plastic zone surrounding the borehole 3 is increased, a great number of secondary cracks are developed, expanded and penetrated, and the number of gas flowing passages is rapidly increased, so that the gas permeability of the coal is remarkably increased. Thus it can be seen that after the crossing borehole 3 adopts the “drilling-flushing-slotting” coupled pressure relief technology, the single-hole pressure relief influence range is enlarged, the gas permeability of the coal seam 2 is increased, gas extraction efficiency is improved, the number of the pre-extraction boreholes 3 is further reduced, the pre-extraction time is shortened, and the technology has good applicability to the coal seams 2 in different formation states.
Number | Date | Country | Kind |
---|---|---|---|
201510866018.4 | Nov 2015 | CN | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/CN2016/077971 | 3/31/2016 | WO | 00 |