Claims
- 1. A method of rehabilitating an existing bulkhead located between a body of water and land comprising the steps of:
- (a) reinforcing the existing bulkhead by:
- (i) installing a plurality of substantially vertical piles at horizontally spaced locations in front of the existing bulkhead;
- (ii) connecting said vertical piles to the existing bulkhead;
- (iii) installing tiebacks through the existing bulkhead and into the land behind the existing bulkhead; and
- (iv) connecting the tiebacks to the vertical piles;
- (b) installing a new bulkhead facing a predetermined distance in front of the existing bulkhead and supporting the new bulkhead in part with the reinforced existing bulkhead by:
- (i) inserting the bottom of said facing into the earthen bottom below the body of water;
- (ii) securing connecting members between said vertical piles and said new bulkhead facing; and
- (iii) backfilling the area between the existing bulkhead and said new bulkhead facing.
- 2. A method in accordance with claim 1 wherein said facing extends generally vertically upward to a level above the body of water, and said connecting members are installed and secured between said vertical piles and said new bulkhead facing in a substantially horizontal orientation adjacent the top of said piles and facing.
Parent Case Info
This application is a continuation of Ser. No. 700,800, filed Feb. 11, 1985, now abandoned.
US Referenced Citations (13)
Foreign Referenced Citations (1)
Number |
Date |
Country |
2942428 |
Apr 1981 |
DEX |
Continuations (1)
|
Number |
Date |
Country |
Parent |
700800 |
Feb 1985 |
|