The present invention relates to a method of securing and transferring a load between a vessel and an offshore installation and an apparatus therefor. In particular, the present invention relates to transferring a load between a vessel and an offshore jack-up installation.
In the offshore industry operations are performed from specialised platforms or vessels, known colloquially as “rigs”. Multiple types of rig exist, such as fixed platforms, jack-ups, semi-submersibles, ships, barges and the like. The particular type of rig used can depend on a number of factors, such as water depth, rig availability, operational requirements and the like.
Offshore jack-up rigs can be used for different purposes. Some offshore jack-up rigs are used to drill and extract oil and gas. However, in order to reduce the dependence on limited fossil fuel resources around the world, there has been an increasing demand for renewable energy generation. One such source of renewable energy that has become increasingly reliable is wind energy generation.
Typically, electricity is generated from the wind with wind turbine generators (WTG) installed in locations with a reliable prevailing wind. Some wind turbine generators have been installed on land in windy areas such as on hilltops. Wind turbine generators installed on land are also known as “onshore” wind turbine generators. However, larger wind turbine generators can be installed in coastal waters. Wind turbine generators installed in coastal waters, the sea or deep ocean are also known as “offshore” wind turbine generators.
Accordingly, offshore jack-up rigs can be used for other offshore installations such as offshore WTGs. Offshore wind turbine generator installation is typically carried out in separate stages. One current method of installation is to anchor a foundation to the seabed using a monopile foundation. This is a steel and/or concrete tube which is fixed to and protrudes from the seabed. A transition piece (TP) is fixed to the monopile foundation and the transition piece projects out of the water. The offshore wind turbine generator is then fixed to the transition piece.
One such jack-up rig for installing WTGs is disclosed in EP 2 886 722. This discloses a plurality of WTG components stored on the deck of the jack-up rig ready for installation at a designated offshore area. A problem with the jack-up rig is that the WTG components are loaded on the deck of the jack-up rig in port. When all the WTG components are installed, the jack-up rig must sail back to port to be replenished with more WTG components. This reduces the amount of time that the jack-up rig can be used to install offshore WTGs in the designated offshore area.
KR20170109094 shows a jack-up vessel with a detachable deck comprising the WTG components. Once the jack-up vessel is in the designated offshore area, the legs extend and lift up a platform from the vessel using a rail system. A problem with this is that legs and platform require the jack-up vessel to move the legs and platforms between installation sites. Furthermore, when the vessel sails away from the legs, the vessel requires very calm weather in order not to collide with the legs (e.g. due to heave, roll or sway of the vessel due to the waves.
Alternatively, a jack-up rig can be supplied with WTG components via a supply vessel. One such supply vessel is shown in KR20180003214. A problem with the supply vessel is that the transfer of the WTG components to the jack-up vessel can be difficult especially in bad weather. This means that the jack-up vessel cannot be resupplied until there is a suitably long calm weather window.
Examples described hereinafter aim to address the aforementioned problems.
According to an aspect of the present invention there is a method of securing a vessel with an offshore jack-up having a hull and a plurality of moveable legs engageable with the seafloor and the offshore jack-up is arranged to move the legs with respect to the hull to position the hull out of the water, wherein the method comprises: moving at least a portion of a vessel underneath the hull of the offshore jack-up or within a cut-out of the hull when the hull is positioned out of the water and the legs engage the seafloor; engaging a stabilizing mechanism mounted on the jack-up against the vessel; pushing the stabilizing mechanism down on the vessel to increase the buoyant force acting on the vessel; and lifting a cargo from the vessel with a plurality of lifting arms mounted on the jack-up after the stabilizing mechanism pushes down on the vessel.
Optionally, the stabilizing mechanism can push against the deck of the vessel.
Optionally the stabilizing mechanism may be a plurality of stabilizing arms.
Optionally the vessel can be substantially fixed with respect to the hull when stabilizing mechanism pushes down on the vessel.
Optionally the vessel may be accessible from above when the vessel is within the cut-out.
Optionally the offshore jack-up may comprises a crane with a working area extending over the cut-out portion of the hull.
Optionally the hull may comprises at least one guide structure for laterally positioning the vessel underneath the hull or within the cut-out.
Optionally the at least one guide structure may be a first guide structure and a second guide structure and the plurality of stabilizing arms are mounted along the first guide structure and the second guide structure.
Optionally the hull may comprises at least one stop structure for limiting the extent the vessel moves forward underneath the hull.
Optionally the stabilizing mechanism may be extendible underneath the hull.
Optionally each of the stabilizing arms may comprise a self-seating head for engaging in a reciprocal hole in the deck of the vessel.
Optionally at least one pair of stabilizing arms may engage the vessel on opposites sides of the centre of buoyancy of the vessel.
Optionally the plurality of the stabilizing arms may engage the vessel at substantially the same time.
Optionally the cargo load may be one or more of a wind turbine tower, a nacelle, wind turbine blades, a wind turbine generator component, equipment, personnel, supplies, a transition piece, a monopile, a jacket and/or any other components of an offshore wind turbine generator or wind turbine generator farm.
Optionally the method may comprise placing cargo on the deck of the vessel whilst the stabilizing mechanism pushes down on the vessel.
Optionally the method may comprise engaging a bow of the vessel with a moveable coupling mechanism mounted on the hull.
Optionally the vessel may be pivotable about the moveable coupling mechanism before the stabilizing mechanism engages the vessel.
Optionally the vessel may comprise a plurality of hulls.
In another aspect of the invention there is provided an offshore jack-up comprising: a hull; a plurality of moveable legs engageable with the seafloor, wherein the offshore installation is arranged to move the legs with respect to the hull to position the hull out of the water when the legs engage the seafloor; a stabilizing mechanism mounted on the jack-up engageable with a vessel positioned underneath the hull of the offshore jack-up or within a cut-out in the hull when the hull is positioned out of the water; wherein when the stabilizing mechanism push down on the vessel, the buoyant force acting on the vessel increases; and a plurality of lifting arms mounted on the jack-up arranged to lift a cargo on the vessel after the stabilizing mechanism pushes down on the vessel.
In yet another aspect of the invention there is provided a method of securing a vessel with an offshore installation fixed to the seabed having an above-water structure, the method comprising: moving at least a portion of a vessel underneath the above-water structure of the offshore installation or within a cut-out of the above-water structure; engaging a stabilizing mechanism mounted on the above-water structure on the vessel; pushing the stabilizing mechanism down on the vessel to increase the buoyant force acting against the vessel; and lifting a cargo from the vessel with a plurality of lifting arms mounted on the offshore installation after the stabilizing mechanism pushes down on the vessel.
Various other aspects and further examples are also described in the following detailed description and in the attached claims with reference to the accompanying drawings, in which:
Examples of the present disclosure relate to methods and apparatus for securing and transferring a load between a vessel and an offshore jack-up. In some examples, any form of offshore installation and any form of vessel may be utilised. However, for the illustrative purposes only, the following description is provided with reference to an offshore jack-up such as a jack-up rig, a jack-up barge, a lifting vessel or a jack-up vessel.
The jack-up 100 comprises a hull 102 and a plurality of moveable legs 104a, 104b, 104c, 104d. In the example as shown in
The moveable legs 104a, 104b, 104c, 104d extend downwardly through the hull 102 via respective jacking mechanisms 106a, 106b, 106c, 106d. The jacking mechanisms 106a, 106b, 106c, 106d comprise a casing for protecting the jacking mechanisms 106a, 106b, 106c, 106d. The jacking mechanisms 106a, 106b, 106c, 106d, in some examples, are hydraulically operated rack and pinion mechanisms. The operation of a jack-up 100 is known and will not be discussed in further detail.
In
The moveable legs 104a, 104b, 104c, 104d are moveable between the extended position and a retracted position, such that the hull 102 may float on the surface 202 of a body of water 204, and may be transported to a desired location. In some examples, the jack-up 100 comprises one or more propulsors 210 such as an azimuthing thruster (as shown in
The jack-up 100 as shown in
The crane 108 comprises a boom 110 which is resting on a boom rest 112. The boom 110 of the crane 108 is positioned on the boom rest 112 when the jack-up 100 is sailing between locations. The boom rest 112 is mounted on an accommodation block 114. In examples, there are additional accommodation blocks (not show) arranged on a deck 116 of the hull 102. The boom 110 is moveable to an operational position as shown in e.g.
The hull 102 comprises a deck 116 for storing equipment for the offshore installation operation. In some examples, one or more WTG components 220 are stored on the deck 116. For the purposes of clarity, no WTG components 220 have been shown in
A problem with existing jack-up rigs which are used to install multiple WTGs in a designated area is that the jack-up rigs must sail back to port to be resupplied. This means that the jack-up rig spends time sailing to port which could be used installing more WTGs. Examples described in this disclosure provide methods and apparatuses for resupplying the jack-up 100 without requiring the jack-up 100 to sail back to port.
Turning to
The jack-up 100 as shown in
The vessel 206 comprises a barge 212 tethered to an anchor handling vessel 214. The anchor handling vessel 214 is arranged to transport the barge 212 into the vicinity of the jack-up 100. In some examples, the vessel 206 is a barge 212 which comprises propulsors (not shown) for moving the barge 212 under its own power and no anchor handling vessel 214 is required. In some examples the anchor handling vessel 214 is instead another powered vessel such as platform supply vessel (PSV), multipurpose support vessel (MSV) tug boats, ice breaker, patrol boat, coast guard vessel, navy vessel, fire-fighting vessel, or any other suitable vessel for managing the movement the barge 212. The term “vessel” 206 is a powered barge 212, an unpowered barge 212, or a combination of a barge 212 and another powered vessel 214 such as an anchor handling vessel 214.
The barge 212 comprises a deck 216 for securing and transporting loads to the jack-up 100. As shown in
Optionally, the WTG components 220 are securely mounted to a cargo carrying platform 228 comprises a frame 230 for surrounding the cargo load 218. The cargo carrying platform 228 and the frame 230 will be discussed in further detail below.
In an example (not shown), the WTG components 220 are mounted directly on the barge deck 216. However, as shown in
As shown in
This means that if the weather conditions are too rough, the barge 212 and the anchor handling vessel 214 cannot approach the jack-up 100. Once there is a suitably calm weather window, the barge 212 and the anchor handling vessel 214 move towards the jack-up 100.
Turning to
At least a portion 300 of the barge 212 is moved underneath the hull 102 of the offshore jack-up 100 when the hull 102 is positioned out of the water 204 and the moveable legs 104a, 104b engage the seafloor 200. The jack-up 100 is in the operational configuration and the hull 102 is above the surface 202 of the water 204. In this way, there is clearance between the bottom 302 of the hull 102 and the surface 202 of the water 204 for receiving the portion 300 of the barge 212.
The hull 102 of the jack-up 100 may comprise at least one guide structure 304 for laterally positioning the portion 300 of the barge 212 underneath the hull 102 or within a cut-out 400 of the hull 102. The cut-out 400 is described in further detail below. In some examples, there is a first lateral guide structure 304a and a second lateral guide structure 304b for limiting the lateral movement of the barge 212 with respect to the hull 102 or with respect to the cut-out 400. The first and second lateral guide structures 304a, 304b are best shown in
This means that if the barge 212 is moving sideways with respect to the hull 102, for example due to currents, the first and second lateral guide structures 304a, 304b will prevent the barge 212 from colliding with the moveable legs 104a, 104b, 104c, 104d when the barge 212 is underneath the hull 102. In addition, the first and second lateral guide structures 304a, 304b limit the movement of the barge 212 with respect to the hull 102 and therefore this prevents the frame 230 and the WTG components 220 from colliding with the jack-up 100. The first and second lateral guide structures 304a, 304b extend downwardly from the hull 102 and project towards the surface 202 of the water 204.
In an example, optionally the hull 102 of the jack-up 100 comprises at least one stop structure 306 for limiting the extent the barge 212 moves forward underneath the hull 102. In another example, there are several stop structures 306 for limiting the extent the barge 212 moves forward underneath the hull 102. In another example, there is not a stop structure 306 and the anchor handling vessel 214 maintains the position of the barge 212 with respect to the jack-up 100 before the barge 212 is secured to the jack-up 100. Similarly, in another example, there are no first and second lateral guide structures 304a, 304b and the anchor handling vessel 214 maintains the position of the barge 212 with respect to the jack-up 100.
The at least one stop structure 306 extends downwardly from the hull 102 and projects towards the surface 202 of the water 204. In some examples, the at least one stop structure 306 and the first and second lateral guide structures 304a, 304b comprise an open lattice structure. This allows the water 204 to flow through the at least one stop structure 306 and the first and second lateral guide structures 304a, 304b and reduce the drag on the jack-up 100 when the jack-up 100 is being moved.
As shown in
The jack-up 100 will now be described in further detail with respect to
The hull 102 comprises a cut-out 400 at one end of the jack-up 100. In this way, a portion of the hull 102 comprises first arm 402 and a second arm 404 which project out and define the cut-out 400. The cut-out 400 is arranged to receive a portion of the barge 212 or the cargo carrying platform 228.
This means the hull 102 comprises a cut-out portion 400 whereby the deck 216 of the barge 212 is accessible from above when at least a portion 300 of the barge 212 is underneath the hull 102 of the offshore jack-up 100. This means that the cargo load 218, for example the cargo carrying platform 228 comprising the WTG components 220 can be lifting vertically off the deck 216 of the barge 212. In some examples, the cargo carrying platform 228 is lifted through the cut-out 400 in the hull 102.
In the example shown in
In an example, the crane 108 comprises a working area A extending over the cut-out 400 of the hull 102. Accordingly, the crane 108 can hoist objects from the deck 216 of the barge 212 and lower them on to the deck 116 of the jack-up 100. The working area A covers most of the deck 116 of the jack-up 100 and the location of the TP 118. In other examples, the working area A of the crane 108 covers the entire deck 116 of the jack-up 100. This means that the crane 108 can hoist WTG components 220 from the deck 116 of the jack-up 100 and/or the deck 216 of the barge 212. The crane 108 can then lower the WTG components 220 onto the deck 116 of the jack-up 100 or the TP 118.
In an example, the lifting mechanism 406 lifts the cargo carrying platform 228 in a vertical distance D1 (as shown in
Accordingly, as soon as the lifting mechanism 406 lifts the cargo carrying platform 228 off the barge 212, the barge 212 can be moved out from underneath the hull 102. This means that there can be a quick transfer of the cargo load 218 and the WTG components 220 to the jack-up 100 from the barge 212. This means that the barge 212 and the anchor handling vessel 214 can wait near the jack-up 100 and transfer the cargo load 218 to the jack-up 100 in a small calm weather window.
Turning to
In an example, a stabilizing mechanism 502, 504, 506, 508, 510, 512 is mounted on the jack-up 100. In an example, the stabilizing mechanism 502, 504, 506, 508, 510, 512 comprises a plurality of stabilizing mechanisms 502, 504, 506, 508, 510, 512. In an example, the stabilizing mechanism 502, 504, 506, 508, 510, 512 is a plurality of stabilizing arms 502, 504, 506, 508, 510, 512. In an example, a plurality of stabilizing arms 502, 504, 506, 508, 510, 512 are mounted on the hull 102. The stabilizing arms 502, 504, 506, 508, 510, 512 are engageable with the barge 212. In an example, the stabilizing arms 502, 504, 506, 508, 510, 512 are engageable with the structure of the barge 212 such as the deck 216 or any other suitable portion of the barge 212. The stabilizing arms 502, 504, 506, 508, 510, 512 are engageable with the deck 216 of the barge 212 positioned underneath the hull 102 or within the cut-out 400. The stabilizing arms 502, 504, 506, 508, 510, 512 push down on the deck 216 of the barge 212 and this reduces the relative movement of the barge 212 with respect to the jack-up 100. When the stabilizing arms 502, 504, 506, 508, 510, 512 push down on the deck 216 of the barge 212, the buoyant force acting on the barge 212 increases. This results in the barge 212 being engaged with the jack-up 100 stops or limits the relative movement therebetween. In other words, the waves and current of the water 204 acting on the barge 212 do not cause the barge 212 to move relative to the jack-up 100 when the stabilizing arms 502, 504, 506, 508, 510, 512 engage the deck 216 of the barge 212.
In an example, when the stabilizing arms 502, 504, 506, 508, 510, 512 engage with the deck 216, the stabilizing arms 502, 504, 506, 508, 510, 512 dampen the movement of the barge 212. The stabilizing arms 502, 504, 506, 508, 510, 512 comprise a dampener such as a hydraulic piston 700, 704 (described in further detail below). In some examples, the dampener 700, 704 is coupled to the stabilizing mechanism and can be one or more of a spring, a resilient material, or an electro-mechanical dampener, cables and a winch or any other suitable means for dampening the movement of the barge 212.
In an example, the stabilizing mechanism 502 is a single pad (not shown) that engages the deck 216 of the barge 212. The single pad is a substantially flat planar surface that engages a substantial area of the deck 216. Since the single pad is of a large area, the pad can push down on the deck 216 of the barge 212 along most of the barge 212. In this way, the stabilizing mechanism 502 comprises a single engaging element for stabilizing the barge 212.
In some examples, the stabilizing arms 502, 504, 506, 508, 510, 512 are mounted on the underside of the hull 102. Each of the stabilizing arms 502, 504, 506, 508, 510, 512 are extendible underneath the hull 102 towards the surface 202 of the water 204.
In an example, the stabilizing arms 502, 504, 506, 508, 510, 512 are spaced along the hull 102. The stabilizing arms 502, 504, 506, 508, 510, 512 are arranged to engage both sides of the barge 212 along the longitudinal length of the barge 212. As shown in
In an example, the jack-up 100 comprises a moveable coupling mechanism (not shown) mounted on cut-out 400. The moveable coupling mechanism is configured to releasably engage with the bow of the barge 212 when the barge 212 abuts the stop structure 306. In some examples, the coupling mechanism is mounted to the stop structure 306. In some examples, a first part of the coupling mechanism is mounted on the stop structure 306 and a second part of the coupling mechanism is mounted on the bow of the barge 212. In some examples, the first part of the coupling mechanism and the second part of the coupling mechanism are a latch and catch mechanism. In some examples, the barge 212 is pivotable about the moveable coupling mechanism before the plurality of stabilizing arms 502, 504, 506, 508, 510, 512 engage the deck 216 of the barge 212.
In an example, at least one pair of stabilizing arms 502, 504, 506, 508, 510, 512 engages the deck 216 on opposites sides of the centre of buoyancy B of the barge 212. In an example, there are at least two pairs of stabilizing arms 502, 504, 506, 508, 510, 512 engages the deck 216 on opposites sides of the centre of buoyancy B of the barge 212. In an example, one stabilizing arm 514 can be part of two pairs 514, 502 and 514, 504 of stabilizing arms on opposites sides of the centre of buoyancy B of the barge 212. This means that when the stabilizing arms 502, 504, 506, 508, 510, 512 push down on the deck 216 of the barge 212, the turning moments about the centre of buoyancy B are balanced. Accordingly, the barge 212 is not subjected to a rolling or a pitching motion due to the force of the stabilizing arms 502, 504, 506, 508, 510, 512 acting on the deck 216 of the barge 212.
In an example, the plurality of stabilizing arms 502, 504, 506, 508, 510, 512 are mounted adjacent to the first lateral guide structure 304a and the second lateral guide structure 304b. This means that when the barge 212 is aligned between the first lateral guide structure 304a and the second lateral guide structure 304b, the stabilizing arms 502, 504, 506, 508, 510, 512 are aligned correctly for engaging with the deck 216 of the barge 212. In some examples, the stabilizing arms 502, 504, 506, 508, 510, 512 are mounted to the first lateral guide structure 304a and the second lateral guide structure 304b. The stabilizing arms 502, 504, 506, 508, 510, 512 each comprise an engagement head 516 projecting inwardly towards the barge 212. For the purposes of clarity only one engagement head 516 has been labelled in
As can be seen from
The barge 212 has been pushed into position and abuts the stop structure 306 (not shown in
The WTG components 220 are shown mounted on the frame 230. In particular, the blades 226 may extend out sideways beyond the footprint of the hull 102. Of course, the WTG components 220 can be orientated in any direction as required. If the WTG components 220 are oversized e.g. wider than the cut-out 400 width W (as shown in
The steps of the securing and transferring method will now be described in further detail with respect to
Turning briefly to
The cargo carrying platform 228 is substantially planar and comprises a plurality of securing mechanisms 604 or lashing points.
The frame 230 comprises an elevated fastening position 1002 for securing the blades 226. The elevated fastening position 1002 is adjacent to the footprint of the cargo carrying platform 228. This can be seen in
The cargo carrying platform 228 comprises a plurality of vertical posts 1004. Each of the vertical posts 1004 comprises a lateral projection 1006 each engageable with one of the lifting arms 406. In some examples, the lateral projections 1006 are optional. Indeed, the lifting arms 406 can lift the cargo carrying platform 228 from underneath the cargo carrying platform 228. Alternatively in other examples, the cargo carrying platform 228 comprises holes for receiving reciprocal pegs mounted on the lifting arms 406.
In some examples, the frame 230 is optional. Indeed, the cargo carrying platform 228 is only a flat horizontal platform. In other examples, the cargo carrying platform 228 is a securely removeable top deck 216 of the barge 212.
Turning back to
In
This means that the barge 212 can move relative to the jack-up 100. The position of the cargo carrying platform 228 is the same as shown in
In an example, the stabilizing arms 502, 504 and the lifting arms 406a, 406b are actuated with hydraulics. Each of the stabilizing arms 502, 504 and the lifting arms 406a, 406b are respectively coupled to a hydraulic actuator 700, 704, 702, 706. The hydraulic actuators 700, 702, 704, 706 are coupled to a hydraulic system (not shown) for controlling and actuating the hydraulic actuators 700, 702, 704, 706. In an example, each of the stabilizing arms 502, 504 and the lifting arms 406a, 406b are coupled to another mechanism for actuating and extending the stabilizing arms 502, 504 and the lifting arms 406a, 406b. For example, the mechanism can be a rack and pinion mechanism, mechanical linkage, or any other suitable mechanism for extending and retracting the stabilizing arms 502, 504 and the lifting arms 406a, 406b.
Whilst reference in
Once the barge 212 is in position, the stabilizing arms 502, 504 are extended to secure the barge 212 as shown in step 1300 in
As can be seen from
In some examples, the plurality of the stabilizing arms 502, 504 engage the deck 216 at substantially the same time. This means that the barge 212 does not experience a turning moment about the centre of buoyancy as the stabilizing arms push down on the barge 212. In other examples, the stabilizing arms 502, 504 engage the deck 216 at slightly different times in order to accommodate different parts of the barge 212 moving at different rates.
This means that the stabilizing arms 502, 504 push the barge 212 into the water 204 by a vertical distance D2. This prevents the barge 212 from moving with respect to the jack-up 100. This means that the barge 212 is secured to the jack-up 100. In some examples, the vertical distance D2 is between 0.1 to 2 m. In some other examples, the vertical distance D2 is between 0.3 to 1.5 m. In some other examples, the vertical distance D2 is between 0.5 to 1 m.
In some examples the barge 212 is a monohulled vessel. In some examples, the barge 212 is a multihull vessel as shown in
After the barge 212 is secured with respect to the jack-up 100, the
In some examples, the steps 1302 and 1304 can be one continuous movement. Alternatively, there can be a pause between steps 1302 and 1304 in order to check that the lifting arms 406a, 406b are engaged correctly with the cargo carrying platform 228.
In some examples, the plurality of the lifting arms 406a, 406b engage the lateral projections 1006a, 1006b at substantially the same time. This means that the cargo carrying platform 228 is lifted in a stable manner. In some examples, the lifting arms 406a, 406b move at different rates in order ensure that the cargo remains balanced on the cargo carrying platform 228.
As shown in
In some examples, once the cargo carrying platform 228 is in the second position, the crane 108 hoists the cargo carrying platform 228. The crane 108 may hoist the cargo carrying platform 228 to another part of the deck 116 of the jack-up 100 as shown in
In some examples, when the barge 212 is secured to the jack-up 100 as described in step 1204, the crane 108 can place a load on the deck 216 of the barge 212. The load can be an empty cargo carrying platform 232 as described above.
In some examples, the engagement heads 516 on the stabilizing arms 502, 504, 506, 508, 510, 512, 514 comprise optional self-seating engagement heads.
Another example will now be described with respect to
The cargo carrying platform 228 as shown in
Similarly, the stabilizing mechanism 1500 operates in the same way at the stabilizing mechanism 502, 504, 506, 508, 510, 512 as discussed in reference to the previous examples shown in
In another example, the shape, size, orientation, extension, and placement of the stabilizing mechanisms 502, 504, 506, 508, 510, 512, 1502, 1504, 1506, 1508 and the lifting mechanism 406 are configurable and adaptable to different vessels 212. For example, different barges 212 can have different shape, sizes and draft depending on the cargo and other factors.
In another embodiment two or more embodiments are combined. Features of one embodiment can be combined with features of other embodiments.
Embodiments of the present invention have been discussed with particular reference to the examples illustrated. However it will be appreciated that variations and modifications may be made to the examples described within the scope of the invention.
Number | Date | Country | Kind |
---|---|---|---|
PA 2019 00389 | Apr 2019 | DK | national |
The present application is a Continuation of U.S. application Ser. No. 16/738,323, filed Jan. 9, 2020, which is a Continuation of U.S. application Ser. No. 16/434,844, filed Jun. 7, 2019, which claims priority under 35 U.S.C. § 119 to Danish Patent Application No. PA 2019 00389, filed Apr. 1, 2019, the entire contents of each of which are incorporated herein by reference.
Number | Name | Date | Kind |
---|---|---|---|
1520150 | Skougor | Dec 1924 | A |
2540878 | Hayward | Feb 1951 | A |
2881590 | Zaskey | Apr 1959 | A |
2916002 | Hunsucker | Dec 1959 | A |
2963179 | Kanady et al. | Dec 1960 | A |
3078680 | Wepsala | Feb 1963 | A |
3138931 | Brinkmann | Jun 1964 | A |
3139197 | Bylo | Jun 1964 | A |
3276211 | Drake | Oct 1966 | A |
3463114 | Jack | Aug 1969 | A |
3623444 | Lang | Nov 1971 | A |
3727414 | Davies | Apr 1973 | A |
3740957 | McKenzie | Jun 1973 | A |
3753552 | Barron | Aug 1973 | A |
3793974 | Bylo | Feb 1974 | A |
3804268 | Barron et al. | Apr 1974 | A |
3826384 | Cecce | Jul 1974 | A |
4048937 | Heyman | Sep 1977 | A |
4085695 | Bylo | Apr 1978 | A |
4111144 | Ingvason | Sep 1978 | A |
4180362 | Stair | Dec 1979 | A |
4227831 | Evans | Oct 1980 | A |
4632622 | Robinson | Dec 1986 | A |
4744697 | Coppens | May 1988 | A |
5215024 | McAllister | Jun 1993 | A |
5713710 | Strong et al. | Feb 1998 | A |
5997217 | Verret | Dec 1999 | A |
6309160 | Greene, Jr. | Oct 2001 | B1 |
7131388 | Moise, II et al. | Nov 2006 | B2 |
7513713 | Thomas et al. | Apr 2009 | B2 |
8070388 | Thomas | Dec 2011 | B2 |
8678733 | Thomas et al. | Mar 2014 | B2 |
8757954 | Roy | Jun 2014 | B1 |
8899879 | Foo et al. | Dec 2014 | B2 |
9080299 | Springett et al. | Jul 2015 | B2 |
9725134 | Eriksen | Aug 2017 | B2 |
10569977 | Hammer | Feb 2020 | B1 |
11136206 | Hammer | Oct 2021 | B2 |
20100293781 | Foo et al. | Nov 2010 | A1 |
20150375831 | Taylor | Dec 2015 | A1 |
20160001858 | Johnson | Jan 2016 | A1 |
Number | Date | Country |
---|---|---|
201092380 | Jul 2008 | CN |
102464213 | May 2012 | CN |
105648996 | Jun 2016 | CN |
205998100 | Mar 2017 | CN |
53770 | Jun 1982 | EP |
1739005 | Aug 2008 | EP |
2514913 | Oct 2012 | EP |
2752361 | Jul 2014 | EP |
2886722 | Jun 2015 | EP |
2123776 | Feb 1984 | GB |
2144375 | Mar 1985 | GB |
101164227 | Jul 2012 | KR |
20130141163 | Dec 2013 | KR |
10-2017-0107628 | Sep 2017 | KR |
10-2017-0109094 | Sep 2017 | KR |
10-2017-0142652 | Dec 2017 | KR |
10-2018-0003214 | Jan 2018 | KR |
2015623 | Oct 2016 | NL |
WO-08094171 | Aug 2008 | WO |
WO-2010033083 | Mar 2010 | WO |
WO-12175091 | Dec 2012 | WO |
WO-2014070024 | May 2014 | WO |
WO-2014098605 | Jun 2014 | WO |
Entry |
---|
Chinese Office Action and an English translation thereof dated Dec. 27, 2021. |
Examination and Search Report dated Oct. 18, 2019 in Danish Application No. PA 2019 00389. |
Non-Final Office Action dated Sep. 26, 2019 in U.S. Appl. No. 16/434,844. |
Notice of Allowance dated Nov. 29, 2019 in U.S. Appl. No. 16/434,844. |
Examination and Search Report dated Oct. 1, 2019 in Danish Application No. PA 201900391. |
2nd Technical Examination dated Apr. 7, 2020 in Danish Application No. PA 2019 00391. |
Invitation to Pay Additional Fees and Partial Search Report dated Apr. 27, 2020 in International Application No. PCT/DK2020/050077. |
Non-Final Office Action dated May 8, 2020 in U.S. Appl. No. 16/434,717. |
Non-Final Office Action dated Feb. 20, 2020 in U.S. Appl. No. 16/738,323. |
International Search Report and Written Opinion dated Jun. 15, 2020 in International Application No. PCT/DK2020/050077. |
International Search Report and Written Opinion dated Jul. 1, 2020 in International Application No. PCT/DK2020/050076. |
Final Office Action dated Jul. 21, 2020 in U.S. Appl. No. 16/434,717. |
Non-Final Office Action dated Sep. 2, 2020 in U.S. Appl. No. 16/738,323. |
Notice of Allowance dated Sep. 17, 2020 in U.S. Appl. No. 16/738,323. |
Non-Final Office Action dated Oct. 30, 2020 in U.S. Appl. No. 16/434,717. |
Non-Final Office Action dated Dec. 4, 2020 in U.S. Appl. No. 16/738,323. |
First Office Action dated Apr. 1, 2021 in Chinese Application No. 201910897700.8. |
1st Technical Examination and Search Report dated Jul. 20, 2021 in Danish Application No. PA 2021 00345. |
Notice of allowance dated Jun. 11, 2020 in U.S. Appl. No. 16/738,323. |
Notice of allowance dated Jul. 27, 2020 in U.S. Appl. No. 16/738,323. |
Non-Final Office Action dated May 10, 2021 in U.S. Appl. No. 16/738,323. |
Notice of allowance dated May 25, 2021 in U.S. Appl. No. 16/738,323. |
English translation of Korean Office Action dated Nov. 26, 2021. |
Singapore Examination and Search Report dated Mar. 9, 2022 in Singapore Application No. 11202110299V. |
Singapore Examination ad Search Report dated Mar. 9, 2022 in Singapore Application No. 11202110297T. |
Number | Date | Country | |
---|---|---|---|
20210371219 A1 | Dec 2021 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 16738323 | Jan 2020 | US |
Child | 17393733 | US | |
Parent | 16434844 | Jun 2019 | US |
Child | 16738323 | US |