The present invention relates to a method for drawing a strip initially cast by means of a twin roll strip casting apparatus, and more particularly to a method for drawing a strip initially cast by means of a twin roll strip casting apparatus, which is capable of safely drawing the strip cast by means of the twin roll strip casting apparatus, by which the strip is directly cast from molten metal, to a coiler with a leader strip when a strip casting process is initiated, whereby not only a casting process but also a coiling process is safely carried out.
As well known to those skilled in the art, molten metal maintained at a prescribed temperature passes between rotating rolls of a twin roll strip casting apparatus so that a strip having a thickness desired by users is manufactured. In the case of casting a strip having such desired thickness, it is very important to accurately control a gap defined between the rolls of the twin roll strip casting apparatus. Moreover, it is very important to safely draw the cast strip to a coiler.
According to the conventional method for drawing a strip initially cast by means of the twin roll strip casting apparatus, the strip having passed between the rolls of the twin roll strip casting apparatus is drawn via the discharge line 11. When the strip casting process is initiated, the stopper 5 is moved upward so that the stopper 5 is disengaged from the tundish hole 6 of the tundish 3. Consequently, the molten metal is supplied from the tundish 3 to the molten metal receiving space 7. At this time, a first portion of the molten metal passes between the rolls 1 and 2 while being solidified. Subsequently, the solidified strip 10, which follows the first solidified portion of the molten metal, is successively rolled between the rolls 1 and 2, drawn along the discharge line 11, and wound onto the coiler 12.
In the conventional method for drawing the initially cast strip, however, timing of the drawing is not accurately established. In the case that a solidification transition procedure of the molten metal is unstable as described above, all subsequent normal operations may not be carried out. Especially when excessive solidification of the strip occurs in the course of initial solidification, the rolls may be damaged. When the strip is not appropriately solidified, on the other hand, the strip may be broken, or the molten metal may flow out, which leads to suspension of the operations. Furthermore, a leader strip may be molten due to the molten metal having a high temperature in the case that the above-mentioned procedure is not smoothly carried out.
The process of drawing the initially cast strip, which is carried out when the strip casting process is initiated, is very important, and therefore a method for efficiently carrying out the above-mentioned process is increasingly required.
Therefore, the present invention has been made in view of the above problems, and it is an object of the present invention to provide a method for drawing a strip initially cast by means of a twin roll strip casting apparatus, which is capable of safely drawing an initial strip solidified to a leader strip disposed above a roll nip when a strip casting process is initiated to a coiler under consideration of a starting speed of each of rolls, a roll repulsive force while the leader strip passes between the rolls, and a casting speed.
In accordance with the present invention, the above and other objects can be accomplished by the provision of a method for drawing a strip initially cast by means of a twin roll strip casting apparatus, comprising: a roll gap maintenance step where roll gap is maintained so that a leader strip having a length l0 disposed above roll nip does not fall between rolls; a casting initiation step where a stopper is disengaged from a tundish hole of a tundish so that molten metal is poured into a space between the rolls, and the rolls are rotated at the same speed as an initial starting speed v0 of each of the rolls if the position of the stopper is higher than the actually poured position of the molten metal (rod_offset); a casting speed acceleration step where a roll repulsive force (rolling force) is detected when the molten metal is solidified to the leader strip and passes between the rolls, and the casting speed is accelerated if the roll repulsive force reaches a load threshold; and a normal control step where the casting speed is detected, and if the casting speed reaches a target value, i.e., a normal casting speed, the casting speed is maintained at the normal casting speed.
Preferably, the casting speed acceleration step comprises a rolling force control step where the rolling force is controlled if the roll repulsive force (rolling force) reaches the load threshold.
Preferably, the length l0 of the leader strip is set to complete the initial solidification before the leader strip completely passes through the roll nip, and the initial starting speed v0 is previously set to satisfy the following equation: v0=l0/Δt (Δt: the time period from the time where the casting process is initiated to the time where the roll repulsive force reaches the load threshold).
The above and other objects, features and other advantages of the present invention will be more clearly understood from the following detailed description taken in conjunction with the accompanying drawings, in which:
Now, a preferred embodiment of the present invention will be described in detail with reference to the accompanying drawings.
Before the strip casting process is initiated, a thin steel plate, having a thickness equal to a gap between the rolls 1 and 2, is arranged from the rolls 1 and 2 to the coiler 12. The steel plate serves to guide the solidified metal attached to the leader strip 20 to the coiler 12 when the strip casting process is initiated. At this time, it is preferable that the thickness of the leader strip 20 is small, if possible. This is because a small load is applied to the rolls while the solidified metal attached to the leader strip having a small thickness passes between the rolls 1 and 2. It should be noted, however, that the steel plate might be molten by means of the molten metal if the thickness of the steel plate is too small. The leader strip 20, to which the molten metal is attached, is provided with a plurality of small holes. Consequently, the molten metal can be quickly solidified when the molten metal is attached to the leader strip 20.
The strip drawing process will now be described with reference to
At the casting initiation step, the stopper 5 is disengaged from the tundish hole 6 of the tundish 3, and therefore the molten metal stored in the tundish 3 is supplied to the space between the rolls. As shown in
Subsequently, it is determined whether the position of the stopper 5 is higher than the position where the molten metal is poured (rod_offset) r0 after the stopper 5 is disengaged from the tundish hole 6 of the tundish 3. From the time t1 at which the position of the stopper 5 is higher than r0, the rolls are rotated at a prescribed speed, i.e., the initial starting speed of each of the rolls v0 (Refer to
When the position of the stopper 5 is higher than r0, the leader strip 20 previously disposed between the rolls 1 and 2 is moved downward at the same speed as the rotating speed of each of the rolls. At this time, the rolling force is gradually increased. It is required that the casting speed and roll gap be maintained so as to the complete the initial solidification before the leader strip having the length l0 completely passes through the roll nip since the length of the leader strip 20 over the roll nip is l0.
Subsequently, the molten metal, which is discharged from the tundish 3, is solidified between the rolls while being attached to the leader strip 20, passes between the rolls, and is then moved downward. The solidified metal is formed in the shape of a strip. The strip passes between the rolls along with the leader strip 20. At this time, the roll repulsive force (rolling force) RSF is created. It is determined whether the roll repulsive force is larger than a load threshold f0.
At the time t2 at which the roll repulsive force is larger than the load threshold f0 as shown in
The rolling force control is continuously maintained at the rolling force control step. When the casting speed reaches the target value, i.e., the normal casting speed vtarget (the time t3) as shown in
As described above, the leader strip is disposed between the rolls prior to the strip casting process, the molten metal initially discharged from the tundish 3 is solidified while being attached to the leader strip when the strip casting process is initiated, and the subsequently cast strip is successively drawn to the coiler. In this way, the strip manufactured by means of the twin roll strip casting apparatus is drawn from the roll nip to the coiler 12. As can be seen from the above description, the casting initiation control using the leader strip is a very important process since the whole strip casting process fails if the casting initiation control is not properly carried out.
The present invention provides a method for drawing the strip that is capable of successfully accomplishing the above-mentioned process. As described above in detail, the molten metal is stably solidified and attached to the leader strip at the early stage of the strip casting process, and is then safely and securely drawn to the coiler 12.
The stopper 5 is disengaged from the tundish hole 6 of the tundish 3 at the casting initiation step (S42). As the stopper 5 is disengaged from the tundish hole 6 of the tundish 3, the molten metal stored in the tundish 3 is supplied to the space between the rolls. At this time, the roll gap g0 is maintained, and the rolls are not rotated. It is determined whether the position of the stopper 5 is higher than the position where the molten metal is discharged r0 as the stopper 5 is disengaged from the tundish hole 6 of the tundish 3 (S43). When the position r of the stopper 5 is higher than r0, the rolls are rotated at the initial starting speed v0 (S44). As the rolls are rotated, the leader strip disposed between the rolls is slowly moved downward at the same speed as the rotating speed v0 of each of the rolls. At this time, it is required that, the condition be established to complete the initial solidification before the length l0 of the leader strip completely passes through the roll nip.
As the strip casting process is carried out, the rolling force f is measured, and it is determined whether the rolling force is larger than the load threshold f0 (S45). When the rolling force f is larger than the load threshold f0, the casting initiation step is switched to the rolling force control step, and the casting speed is accelerated (S46). The rolling force is controlled at the above-mentioned rolling force control step so that damage to the rolls due to excessive solidification is prevented.
It is determined whether the casting speed v reaches the target value, i.e., the normal casting speed vtarget as the casting speed is gradually increased (S47). When it is determined that the casting speed v has reached vtarget at the above step (S47), the rolling force control step is switched to the thickness control step, and the roll gap is controlled (S48). The thickness of the strip is uniformly maintained by means of the roll gap control. At the same time, the ratio of rolling force to the casting speed is controlled so that the rolling force is uniformly maintained on the basis of change of the casting speed.
Subsequently, it is determined whether the roll gap reaches the final target thickness gn (S49). When the roll gap reaches the final target thickness gn, the thickness control step is switched to the normal operation step at which the normal operation is carried out. At the normal operation step, the roll eccentricity control is carried out so that the thickness deviation is compensated for.
Through the above-mentioned courses, the strip cast by means of the twin roll strip casting apparatus can be safely drawn from the roll nip to the coiler. In the case that the leader strip is disposed above the roll nip, and the cast strip is drawn to the coiler, the process is accurately controlled on the basis of various conditions, such as the position of the stopper, the casting speed, the rolling force, and the roll gap, so that the strip is safely drawn without error at the casting process.
The above detailed description of the preferred embodiment of the present invention with reference to the accompanying drawings has been given only for illustrative purposes. Therefore, the protective scope of the present invention is not limited by the above detailed description but the accompanying claims.
As apparent from the above description, the present invention provides a method for safely drawing an initially cast strip to a coiler with a leader strip when a strip casting process is initiated, whereby not only a casting process but also a subsequent process is safely carried out.
Furthermore, molten metal is poured while rolls are rotated, whereby no excessive load is applied to the rolls. Also, most functions are processed on the basis of an algorithm, whereby the strip drawing process is economically carried out.
Although the preferred embodiment of the present invention has been disclosed for illustrative purposes, those skilled in the art will appreciate that various modifications, additions and substitutions are possible, without departing from the scope and spirit of the invention as disclosed in the accompanying claims.