Not applicable.
Not applicable.
This application claims the benefit of U.S. patent application Ser. No. 13/033,587 filed Feb. 22, 2011. That application is entitled “Downhole Hydraulic Jetting Assembly, and Method for Stimulating a Production Wellbore.” That application is incorporated by reference herein in its entirety.
The above non-provisional patent application claimed the benefit of U.S. Provisional Patent Application 61/308,060 filed Feb. 25, 2010. That application is also entitled “Downhole Hydraulic Jetting Assembly, and Method for Stimulating a Production Wellbore.” That application is incorporated by reference herein as well.
This section is intended to introduce selected aspects of the art, which may be associated with various embodiments of the present disclosure. This discussion is believed to assist in providing a framework to facilitate a better understanding of particular aspects of the present disclosure. Accordingly, it should be understood that this section should be read in this light, and not necessarily as admissions of prior art.
The present disclosure relates to the field of well stimulation. More specifically, the present disclosure relates to the stimulation of a hydrocarbon-producing formation by the formation of small lateral boreholes from an existing wellbore using a jetting assembly.
In the drilling of oil and gas wells, a wellbore is formed using a drill bit that is urged downwardly at a lower end of a drill string. After drilling to a predetermined depth, the drill string and bit are removed and the wellbore is lined with a string of casing. An annular area is thus formed between the string of casing and the formation penetrated by the wellbore. A cementing operation is typically conducted in order to fill or “squeeze” part or all of the annular area with columns of cement. The combination of cement and casing strengthens the wellbore and facilitates the zonal isolation, and subsequent completion, of certain sections of potentially hydrocarbon-producing formations (or “pay zones”) behind the casing.
It is common to place several strings of casing having progressively smaller outer diameters into the wellbore. A first string may be referred to as a conductor pipe or surface casing. Such casing string serves to isolate and protect the shallower, fresh water-bearing aquifers from contamination by any other wellbore fluids. Accordingly, these casing strings are almost always cemented entirely back to the surface. The process of drilling and then cementing progressively smaller strings of casing is repeated several times until the well has reached total depth. In some instances, the final string of casing is a liner, that is, a string of casing that is not tied back to the surface. The final string of casing, referred to as a production casing, is also typically cemented into place.
Additional tubular bodies may be included in a well completion. These include one or more strings of production tubing placed within the production casing or liner. Each tubing string extends from the surface to a designated depth proximate a production interval, or “pay zone.” Each tubing string may have a packer attached at a lower end. The packer serves to seal off the annular space between the production tubing string(s) and the surrounding casing.
In some instances, the pay zones are incapable of flowing fluids to the surface efficiently. When this occurs, the operator may include artificial lift equipment as part of the wellbore completion. Artificial lift equipment may include a downhole pump connected to a surface pumping unit via a string of sucker rods run within the tubing. Alternatively, an electrically-driven submersible pump may be placed at the bottom end of the production tubing. Gas lift valves, plunger lift systems, or various other types of artificial lift equipment and techniques may also be employed to assist fluid flow to the surface.
As part of the completion process, a wellhead is installed at the surface. The wellhead serves to contain wellbore pressures and direct the flow of production fluids at the surface. Fluid gathering and processing equipment such as pipes, valves, separators, dehydrators, gas sweetening units, and oil and water stock tanks may also be provided. Subsequent to completion of the pay zone(s) followed by installation of any requisite downhole tubulars, artificial lift equipment, and the wellhead, production operations may commence. Wellbore pressures are held under control, and produced wellbore fluids are segregated and distributed appropriately.
Within the United States, many wells are now drilled principally to recover oil and/or natural gas, and potentially natural gas liquids, from pay zones previously thought to be too impermeable to produce hydrocarbons in economically viable quantities. Such “tight” or “unconventional” formations may be sandstone, siltstone, or even shale formations. Alternatively, such unconventional formations may include coalbed methane. In any instance, “low permeability” typically refers to a rock interval having permeability less than 0.1 millidarcies.
In order to enhance the recovery of hydrocarbons, particularly in low-permeability formations, subsequent (i.e., after perforating the production casing or liner) stimulation techniques may be employed in the completion of pay zones. Such techniques include hydraulic fracturing and/or acidizing. In addition, “kick-off” boreholes may be formed from a primary wellbore in order to create one or more new directional or horizontally completed wellbores. This allows a well to penetrate along the plane of a subsurface formation to increase exposure to the pay zone. Where the natural or hydraulically-induced fracture plane(s) of a formation is vertical, a horizontally completed wellbore allows the production casing to intersect multiple fracture planes.
It is contemplated that there are thousands of pay zones in thousands of existing vertical wells that could be enhanced by the addition of horizontal boreholes. Such wells could be drilled radially from the existing primary or vertical wellbores. However, the existing wellbores likely have substantial technical constraints that make the process of forming lateral boreholes either physically difficult or completely cost-prohibitive. Such constraints to the conventional horizontal kick-off/build-angle/case-and-cement process may include:
(b) Existing wellbore integrity. The existing production casing may not be capable of withstanding the equivalent circulating densities (“ECD's”) of the casing milling/formation drilling fluids required to complete a lateral borehole. Similarly, an open set of shallow, uphole perforations may impose the same constraint.
Given the above, it is understandable why there are generally more attempts at drilling new horizontal wells than there are recompletion attempts to add horizontal laterals to existing vertical wellbores.
A relatively new technique that has been developed to address the above-listed constraints involves the use of hydraulic jetting forces. Jetting forces have been employed to erosionally “drill” relatively small diameter lateral boreholes from an existing vertical well into a pay zone. In this technique, the “drilling equipment” is run into the existing wellbore and down to the pay zone, and then exits the wellbore perpendicular to its longitudinal axis. Depending on the specific technique employed, the transition from a vertical orientation to a horizontal orientation may not be accomplished entirely within the inner diameter of the existing production casing or liner at the level or depth of the pay zone.
According to the jetting technique, lateral boreholes are generally formed by placing a nozzle at the end of a string of “jetting hose.” The jetting hose is typically ¼″ to ⅝″ O.D. flexible tubing that is capable of withstanding relatively high internal pressures. The parent well is “killed,” and the production tubing is pulled out of the wellbore. A hose-bending “shoe” is attached to the end of the production tubing string, which is then re-run into the wellbore. The shoe is comprised of an assembly having an entry port at the top, and an exit port located below, providing a substantially 90-degree turn. Thus, in a vertical wellbore, the jetting hose is run through the tubing, and is directed into the shoe vertically. The jetting hose bends along the shoe, and then exits the shoe where it is directed against the I.D. of the casing at the point of the desired casing exit.
In this known jetting technique, the entirety of the required angle is typically “built” within the walls of the existing borehole. More specifically, the entire angle is built within the guide shoe itself. By necessity, the shoe has a smaller O.D. than the production casing's I.D. This serves as a significant limitation to the size of the jetting hose. In addition, the thickness of the guide shoe material itself further reduces the I.D. of the guide shoe and, hence, the bend radius available to the jetting hose. An example of such a limited-bend lateral jetting device is described in U.S. Pat. Publ. No. 2010/0243266 entitled “System and Method for Longitudinal and Lateral Jetting in a Wellbore.”
In operation, the production tubing is landed at a point within the production casing (or liner) such that the exit port of the hose-bending shoe is adjacent to the pay zone of interest. A small casing milling device or under-reaming tool is attached to the end of the jetting hose, and run down inside the tubing. Some configurations involve a mechanically-driven mill, but most are configured such that the mill is rotated by use of hydraulic forces. The casing milling device is directed through the guide shoe and against the wall of the casing so as to form a casing exit.
Once a window is milled through the casing wall, milling typically continues through the cement sheath, and a few inches into the pay zone itself. The mill and milling assembly is then tripped out of the hole by “spooling up” the jetting hose, and is replaced by a hydraulic jetting nozzle. The jetting nozzle and jetting hose are then spooled back into the tubing, passed through the guide shoe, run through the new casing exit, and then urged laterally through the pay zone, beginning at the point milling operations previously ceased.
A high pressure pump capable of pumping fluids at discharge pressures of several thousand psi, and at rates of several gallons per minute, is an integral part of the surface equipment for this configuration. The high-pressure pump must discharge an adequate volume of fluid at sufficient pressures as to overcome the significant friction losses through the small I.D. jetting hose, and generate sufficient hydraulic horsepower exiting the small holes in the jetting nozzle to erode, or “jet,” a borehole in the formation itself. As the borehole is eroded in the selected pay zone, the jetting hose is continuously fed to enable the jetted opening to extend radially from the original wellbore, out into the pay zone.
Once either the desired or maximum achievable length of the horizontal borehole is reached, the jetting nozzle and hose are “spooled up” and retrieved from the borehole. Fluid may continue to be injected during retrieval so as to allow rearward thrusting jets in the jetting nozzle to clean the new borehole and possibly expand its diameter. The jetting nozzle and hose are further reeled back through the guide shoe and tubing, and back to the surface. Upon retrieval, the production tubing (with the guide shoe still attached) is then rotated, say, a quarter-turn. Assuming the downhole rotation of the guide shoe is directly proportional to the surface rotation of the production tubing (an assumption that decreases in likelihood in direct proportion to a parent wellbore's increasing depth and tortuosity), the guide shoe is then also reoriented at the desired 90-degrees from the azimuth of the original borehole, and the process is repeated. Commonly, the process would be repeated three times, yielding four new perpendicular boreholes, or “mini-laterals.”
It is significant to note that the two known commercially-available forms of this process do not contemplate either measurement or control of the exact path of the mini-laterals, though they do claim lateral lengths of 300 to 500 feet from the original wellbore. In actuality, neither real-time measurement nor control of the lateral path may be necessary, as deviations from the original trajectory of the horizontal path from the wellbore may be insignificant. Authors, such as Summers, et al. (2002), have noted that fluid jet systems are “not susceptible to the geologically induced deviations encountered with mechanical bits, since no mechanical contact is made with the rock while drilling.” While Kolle (1999) has beneficially noted “jet erosion requires no torque or thrust, high pressure jet drilling provides a unique capability for drilling constant radius directional hole without the need for steering corrections.”
Darcy and Volumetric calculations may be made to determine the anticipated increase in production rates and recoverable reserves from the formation of horizontal mini-lateral boreholes off of an existing vertical wellbore. First, using a gas well as an example, the Darcy equation may be used to compute gas production rate:
where
S=−ln(rw′/rw)
The Volumetric Equation can be employed to compute the recoverable gas reserves:
G
p=0.001*(π*re2)*h*φ*(1−Sw)*[(1/Bgi)−(1/Bga)]
where
where
An example of a projection may be taken from an actual gas well in Hemphill County, Tex. This is the Centurion Resources, LLC's Brock “A” #4-63. The subject well was completed in the Granite Wash ‘A’ formation, at a mid-point depth of perforations at a depth of 10,532 feet. The pay zone is 68 feet thick, having an original reservoir pressure of 4,000 psia. The deliverability coefficient, “n”, is equal to 0.704.
The average formation porosity is assumed to be 10%, while the water saturation is about 40.9%. The average reservoir pressure at abandonment was 200 psia.
Given the “μ” and “Z” values obtained from correlations for the actual gas sampled, and using the actual bottom-hole temperature and pressures observed, solving for “k” suggests a formation permeability of 4.37 millidarcies. Note that these “original condition” calculations reflect an rw′=rw=0.328 feet, or half of the original 7⅞ inch hole diameter.
For purposes of the calculation, it is assumed that the well has been, and will continue to be, produced at a constant bottom-hole flowing pressure of 100 psia. It is further assumed that the well will drain a perfectly radial reservoir volume, and that the reservoir is cylindrical. It is still further assumed that, after perforating, the subsequent acid job eliminated all formation damage induced by drilling and cementing such that the subsequent post-acid (pre-frac) skin factor, “S”, was equal to zero, at which point the steady-state flow rate was 213 MCFPD.
Table 1, below, is provided as a columnar summary of the data from the above Darcy and Volumetric equations.
A can be seen, four columns of data are provided. These are:
As with the modeling of the hydraulic fracture upon initial completion (Column 2), the effective wellbore radius, rw′, is increased geometrically in proportion to the amount of additional sand face exposure. Note, whereas a fracture half-length (i.e., “wing” length, xf) of 76.4 feet penetrating the entire 68 foot reservoir thickness makes a significant impact upon rw′ (increasing it from 0.328 feet to 48.96 feet), the incremental increase in rw′ from the 8 mini-laterals addition is relatively small (48.96 feet to 51.41 feet, for a net increase of 2.451 feet). Also note, however, had the subject well never been fractured, a 2.451 feet increase in the original rw′=0.328 would have been significant, increasing same by 647%.
Accordingly, from the calculations in the column of Table 1 labeled “Depletion Case (Post Frac+Laterals)” (Column 4), a theoretically anticipated increase in production rate of 42% (e.g., from 77 MCFPD to 109 MCFPD) would be expected. This represents an increase of 32 MCFPD. Of even greater significance would be the correlative anticipated increase in remaining reserves from 371,018 MCF to 1,133,419 MCF. This is an increase of 762,401 MCF, or 205%. Note that the addition of the 8 boreholes would thereby raise the overall (post-frac) EUR from 2,648,858 MCF to 3,411,259, for an increase of 29%.
The above example of Table 1 demonstrates how the creation of small, jetted, radial boreholes in an existing well can enhance production from the primary wellbore, even in the final stages of the well's productive life. A significant increase in daily production and remaining reserves is achieved even though the parent well was stimulated by both acidizing and hydraulic fracturing upon initial completion.
The hydraulic jetting of “mini-laterals” may be conducted to enhance fracture and acidization operations during completion. As noted, in a fracturing operation, fluid is injected into the formation at pressures sufficient to separate or part the rock matrix. In contrast, in an acidization treatment, an acid solution is pumped at bottom-hole pressures less than the pressure required to break down, or fracture, a given pay zone. Examples where the jetting of min-lateral boreholes may be beneficial include:
(a) Jetting radial laterals before hydraulic fracturing in order to confine fracture propagation within a pay zone and to deliver fractures a significant distance from the wellbore before any boundary beds are ruptured. Preferably, fractures would propagate from the mini-lateral wellbores in a vertical orientation. This would be expected in formations that are deeper than about 3,000 feet.
There are also situations in which hydraulic jetting of lateral boreholes may be the preferred reservoir stimulation technique in place of hydraulic fracturing. In hydraulic fracturing, an operator generally has rather limited control over the final geometric configuration of a hydraulic fracture as it is generated radially from a given wellbore. Certainly, the operator can control such things as pumping rates, pumping pressures, fluid rheology, proppant type, and fluid concentrations. These parameters can influence the dimensions of the fractures, primarily their length. However, many of the final determinants of fracture geometry are indigenous to the pay zone and the boundary formations themselves. For example, for shale gas formations at depths greater than about 3,000 feet, fractures tend to form vertically. This is because fractures tend to propagate in a given pay zone in a direction that is perpendicular to the rock matrix's plane of least principal stress. Thus, a hydraulic fracture may undesirably grow beyond the pay zone and into the boundary formations above and/or below the pay zone.
A related situation in which geometric control issues may come into play with reservoir stimulation is in reservoirs having fluid “contacts.” For example, when an oil/water or gas/water contact exists, either fracturing or acidizing can result in creating a direct, enhanced flow path for unwanted water. Similarly, when a gas/oil contact exists, and gas cap expansion is the primary reservoir drive mechanism, fracturing or acidizing may result in excessive, unwanted gas production along with, or in place of, the oil. Accordingly, in these situations it is not uncommon to see pay zone completions without any stimulation subsequent to perforating. These are particularly strong candidates for receiving benefits from hydraulic jetting of “mini-lateral” boreholes.
Other situations exist where jetting a lateral borehole is preferred over known hydraulic fracturing operations. These may include:
(b) Reservoirs where pay zones are relatively thin, and/or aerially irregular, and/or spread vertically over a large vertical interval, such that hydraulic fracturing is not an effective (and particularly, not cost-effective) means of stimulation.
(c) Reservoirs where the pay zone has a significant indigenous heterogeneity in its permeability system, such as natural fractures that are either directional and/or discontinuous in nature. Here, the main objective is not so much to create a secondary flow path with a large permeability contrast to the pay zone's matrix, but to simply “link-up” the indigenous preferential flow paths that already exist.
Hence, in situations where controlling the direction of stimulation (particularly, in the vertical), and/or controlling the distance (radially, away from the wellbore) of stimulation is critical, hydraulic jetting of lateral boreholes may be more beneficial, and cost-effective, than conventional stimulation techniques.
A foundational work in the area of rock removal using hydraulic jets is that of Maurer, in his 1969 paper entitled “Hydraulic Jet Drilling.” Later, in 1980, Maurer expanded and updated his work in a book entitled Advanced Drilling Techniques, particularly in Chapter 12 entitled “High Pressure Jet Drills—Continuous.” In these works, Maurer compiled, analyzed, and discussed laboratory, and actual field trials of various rock drilling operations with hydraulic jets. Maurer highlighted the fundamental relationship between a rock's “drillability” to its commensurate “Specific Energy Requirement.” In this context, “Specific Energy Requirement” is denoted as “SER” and is defined as follows:
SER={[the power input required to erode a unit volume of rock]×[the time required to erode a unit volume of rock]}/[the volume of rock eroded]
The units of SER will be presented herein as:
Given the above definition of SER, a linear plot of Required Power Output (at the jetting nozzle), or “P.O.” (in units of hydraulic horsepower), versus Erosion Rate, “ER” (in units of cubic feet per hour), will yield a relationship whose slope [or first derivative, d(P.O.)/d(ER)] equals the Specific Energy Requirement, SER, to erode a unit volume of a given rock (in units of horsepower-hours per cubic feet).
The lines showing the correlations for the Darley Dale Sandstone and the Berea Sandstone are shown at 110A and 110B, respectively.
In
P.O.=12+45(ER)1.85 horsepower.
In
P.O.=51+5.5(ER)1.70 horsepower.
Note that for both formations, the general form of the relationship for P.O. is:
P.O.=(P.O.)th+a(ER)b
The Specific Energy Requirement (SER) can be computed by taking the derivative of the P.O. equation, above. The SER values are defined by the equation:
The lines showing the SER values are seen at 220A and 220B for
Technical literature has suggested that, for a fixed P.O. or SER, increasing the erosional penetration rate of a given rock (which would correspond to reductions of the “a” and/or “b” coefficients) may be accomplished by one or more of the following:
Maurer's objective was not to maximize hole diameter, but to optimize penetration rates and power requirements for a fixed hole diameter. He defined his “optimum pressure” as the point at which the Specific Energy passed through a minimum as the pressure through a hydraulic jet was increased, corresponding to the pressure at which maximum drilling rate would occur for a given size pump. The optimum pressure for Berea Sandstone is about 5,000 psi. Thus, Maurer concluded that “the optimum drilling pressure is not necessarily the maximum pressure rating of the available pumps.”
Maurer related the drilling rate, “R” (in inches per minute) to the Specific Energy required to remove a unit volume of rock, “E”, by the equation:
where
Technical literature also suggests that sandstone and limestone formations will tend to exhibit an elastic-plastic failure response. This indicates that an erosion process using hydraulic jetting corresponds to the compressive strength of the rock.
In a work published by Labus in 1976 entitled, “Energy Requirements for Rock Penetration by Water Jets,” a close correlation was demonstrated between the log-log relationships of Specific Energy to a term Labus quantified empirically as “Specific Pressure.” Labus defined Specific Pressure as:
where
Labus found that the Specific Energy (“SE”) data can be normalized by plotting it against the Specific Pressure (ratio of jet pressure to rock compressive strength). Labus hypothesized that Specific Energy (SE) varies to the −1.035 power of Specific Pressure (PSp). Labus expressed his correlation of Specific Energy to Specific Pressure as follows:
SE(joules/cc)=146,500×PSp−1.035
Converting the above to the units of Specific Energy Requirement (SER) in horsepower-hours per cubic feet yields:
SER (hp-hrs/ft3)=1,545×PSp−1.035
This is of the form:
SER=cPSpd
Accordingly, we now have two independent relationships for the SER. Note that by equating these two relationships, a relationship for the Erosion Rate, ER, can be derived:
Terms “a,” “b,” “c,” and “d” are coefficients. Note that the above relationship should hold true for any set of operating conditions within which PJ>PTh.
As applied to the context of hydraulic jetting, Bernoulli's Equation provides:
P.O.=PJ×Q
where
The equation may be written in terms of horsepower as follows:
P.O. (hp)=0.00007273PJ (psi)×Q (ft3/hr).
This may be substituted into an erosion rate calculation in the following manner:
where
It is believed that the achievable Erosion Rate, ER, of a radial lateral borehole being hydraulically eroded will be exponentially proportional to the difference by which the jetting pressure (PJ) exceeds the threshold pressure (PTh). It is also believed that the achievable Erosion Rate, ER, of a lateral borehole being hydraulically eroded will be exponentially inversely proportional to the compressive strength (σM) of the rock being bored. In addition, assuming that the jet impact pressure (PJ) is greater than the threshold pressure of the rock (PTh), the achievable Erosion Rate (ER) of a borehole being hydraulically jetted will be linearly proportional to the pump rate (Q) that can be achieved.
For both rocks for which hydraulic drilling penetration (e.g., P.O. vs. ER) data could be compiled, (Darley Dale and Berea sandstones) the coefficient b is greater than 1.0. As long as:
P
J
>P
Th, and
b>1.0,
the dominant determinant of ER will not be the jetting pressure (PJ), but will be the pump rate (Q). Hence, the ultimate success of any lateral borehole erosional system will be governed by how effectively the system can put the maximum hydraulic horsepower output (P.O.) at the jetting nozzle, and specifically, by how well the system can maximize the pump rate (Q) at jetting pressures (PJ) greater than the threshold pressure (PTh).
It is noted here that the units of Erosion Rate, ER, are in units of rock volume per unit of time (e.g., ft3/hour), as opposed to technical literature that typically deals in penetration rates (i.e., distance per unit of time, such as ft/hour). The latter presupposes a fixed hole diameter. The motivation of basing a system model on ER is to provide for optimization of both penetration rate and hole diameter for a given system. In this respect, it may be more effective to hydraulically form lateral boreholes at lower penetration rates if substantial gains can be made in resultant borehole diameters. This optimization process, as applied to the subject method and invention for a given oil and/or gas reservoir rock of compressive strength (σM) and threshold pressure (PTh), will then be a process of utilizing the pressure and rate capacities of a given coiled tubing and jetting hose configuration to maximize the Power Output (P. O.) at the jetting nozzle.
Once maximum P.O. is delivered to the jetting nozzle, the selection of a particular nozzle design will dictate corresponding values of the coefficients “a” and “b,” for a given rock compressive strength (σM). Optimum nozzle selection will then be based upon obtaining a maximum hole diameter at a satisfactory penetration rate. As discussed further below, nozzle design refers primarily to the selection of the number, spacing, and orientation of the nozzle's fluid portals.
A rate-pressure hydraulic horsepower optimization process presumes, as previously stated, a PJ>PTh. In addition, it assumes a minimum pump rate (Qmin) that will provide sufficient annular velocities in the horizontal borehole that provides for sufficient hole cleaning of the generated “cuttings,” that is, the jetted rock debris. Hence, limitations relevant to optimum jetted-hole configuration in a given oil and/or gas reservoir are those limitations imposing losses of hydraulic horsepower at the jetting nozzle. However, other limitations to hydraulic jetting systems, particularly those for creating lateral boreholes, exist. Those limitations generally include:
(a) limited hydraulic horsepower (P.O.) at the jetting nozzle;
(b) vertical depth limitations for candidate pay zones; and
(c) wellbore geometry limitations.
These are discussed separately, below.
Limited Hydraulic Horsepower at the Jetting Nozzle.
Anything that diminishes or restricts the jetting pressure (PJ), or the jetting fluid's “pump rate” (QJ) constitutes a limitation to the hydraulic horsepower (P.O.) of the fluid jet impacting the target rock. Working from the jetting nozzle back toward the surface equipment, these limiting factors include:
Vertical Depth Limitations for Candidate Pay Zones.
At present, the commercial processes available for executing a complete vertical-to-horizontal transition within a well casing, exiting the casing, and jetting the horizontal lateral(s) limit themselves to depths of approximately 5,000 feet or less. There are two plausible reasons for this depth limitation:
Wellbore Geometry Limitations.
The current methods for executing a vertical-to-horizontal transition within a well casing, exiting the casing, and subsequently jetting a horizontal borehole requires full casing inner diameter access. This means that a workover rig (or, “pulling unit”) is required to trip existing production tubing out of the hole. U.S. Pat. No. 5,853,056 issued to Landers, for example, then requires attachment of a deflection shoe to the end of the production tubing. The shoe is landed at the depth of the intended casing exit.
In order to conduct this operation, either the well is “killed,” such that it cannot flow during the tripping operation, or a rather expensive and time-consuming “snubbing unit” is employed to snub the production tubing in and out of the wellbore. Note that in the first case, the well cannot be produced throughout the entire operation. Further, killing the well introduces a risk of possible formation damage. In this respect, it is not uncommon (particularly in somewhat pressure-depleted reservoirs) for kill fluids themselves to partially invade the producing formation in the near-wellbore area, and unfavorably alter the relative permeability to oil and/or gas. In partially depleted tight gas producing formations, this is frequently evidenced by a substantial portion of the kill fluid never being recovered.
Therefore, a need exists for a system that provides for substantially a 90-degree turn of the jetting hose opposite the point of casing exit, while utilizing the entire casing inner diameter as the bend radius for the jetting hose, thereby providing for the maximum possible inner diameter of jetting hose, and thus providing the maximum possible hydraulic horsepower to the jetting nozzle. A need further exists for a system that includes a whipstock that can be conveyed, set, operated, re-oriented, re-set, and retrieved on the end of a string of coiled tubing. An additional need exists wherein the whipstock system can be conveyed through a “slimhole” region, and then set in a string of production casing having a relatively larger inner diameter, and then once again retrieved through the slimhole region. Such slimhole regions may include not only strings of intermediate repair casing, but also strings of production tubing. A need further exists for a method of forming lateral boreholes using hydraulically directed forces, wherein production of a flowing well may continue throughout the process of jetting lateral boreholes, thereby allowing any uplifts in production rates to be observed in real time.
The systems and methods described herein have various benefits in the conducting of oil and gas production activities. First, a downhole tool assembly for forming a lateral borehole from a parent wellbore is provided. The lateral borehole is formed using hydraulic forces that are directed through a jetting hose. The parent wellbore has been completed with a string of production casing defining an inner diameter. The parent wellbore may also have a slimhole region having an inner diameter that is less than the inner diameter of the production casing.
The downhole tool assembly serves to direct a jetting assembly. Generally, the downhole tool first includes a whipstock member. The whipstock member includes a curved face configured to bend a jetting hose across the entire inner diameter of the production casing. In this way, the jetting hose may be re-directed within the wellbore to a desired point of casing exit through the production casing adjacent a targeted pay zone.
The downhole tool assembly also includes a pin. The whipstock member is configured to rotate about the pin from a first run-in position, to a second set position in response to a force applied to the downhole tool assembly within the wellbore.
The downhole tool assembly further includes a set of slips. The individual slips are configured to pivot from a first run-in position to a second set position. When the whipstock and the slips are in their respective run-in positions, the tool assembly has an outer diameter that is less than the inner diameter of the slimhole region. When the jetting assembly reaches the desired pay zone, the slips are pivoted outwardly in response to the force applied to the downhole tool assembly to engage an inner wall of the production casing and to anchor the assembly.
The downhole tool assembly may further include a plurality of disc springs. The disc springs are disposed along a lower end of the downhole tool assembly. The disc springs provide an upward force against the slips, biasing them in their run-in position.
Still further, the downhole tool assembly may include a hose-guiding section. The hose-guiding section directs the jetting hose within the wellbore. In one embodiment, the hose-guiding section comprises a series of descending deflection faces that translate from a first run-in position that permits the tool assembly to pass through a slimhole region, to a second set position in response to hydraulic forces, wherein the deflection faces extend from the tool assembly towards the production casing in the set position to direct the jetting hose towards an upper end of the whipstock member.
Still further, the downhole tool assembly may include a hose-bending section. The hose-bending section is designed to guide the jetting hose such that the bend radius of the jetting hose is equivalent to the full available I.D. of the production casing.
A method for forming a lateral borehole from a parent wellbore is also provided herein. The parent wellbore has been completed with a string of production casing defining an inner diameter. In addition, the parent wellbore has a slimhole region defining an inner diameter that is less than the inner diameter of the production casing.
In one embodiment, the method includes providing a downhole tool assembly. The tool assembly serves to direct a jetting assembly in accordance with the assembly described above. The tool assembly includes a whipstock member having a curved face. The face is configured to bend a jetting hose across the entire available inner diameter of the production casing. In this way, the jetting hose may be re-directed within the wellbore to a desired point of casing exit through the production casing adjacent a selected pay zone. Because the burst strength, working pressure ratings, and bend radii for a given family of jetting hoses are inversely proportional to their inner diameters, utilizing the full production casing I.D. as the bend radii for the jetting hose serves to maximize the I.D. of the jetting hose that can be employed for a given jetting operation. This maximized jetting hose I.D., for any set of fixed operating pressure and bend radius constraints, provides for maximized Power Output to be delivered to a nozzle at the end of the hose.
The tool assembly also includes a pin. The whipstock member is configured to rotate about the pin from a first run-in position, to a second set position in response to a force applied to the downhole tool assembly within the wellbore.
The downhole tool assembly further includes a set of slips. The individual slips are configured to pivot from a first run-in position to a second set position. When the whipstock and the slips are in their respective run-in positions, the tool assembly has an outer diameter that is less than the inner diameter of the slimhole region. The slips pivot outwardly in response to the force applied to the downhole tool assembly to engage an inner wall of the production casing and to anchor the assembly.
The method can also accommodate running the downhole tool assembly through a slimhole region of the parent wellbore. The tool assembly is run into the wellbore adjacent the targeted pay zone. Thereafter, a force is applied to the tool assembly within the wellbore to cause the whipstock member to rotate from its first run-in position to its second set position. The force also causes the slips to pivot from their run-in positions to their set positions.
The method further includes running the jetting hose into the parent wellbore. The hose is also run down to and against the curved face of the whipstock member of the downhole tool assembly within the production casing. The jetting hose, with either a jetting nozzle or mill at its end, is further run down to a position to perform a first casing exit in the production casing.
In addition, the method includes injecting hydraulic fluid through the hose. In one embodiment, hydraulic fluid is used to actually create an opening in the production casing. Alternatively, an initial casing exit is milled into the casing using a milling tool and milling bit at the end of the hose, and then removing the milling tool and milling bit and attaching a suitable jetting nozzle for jetting.
The method also includes further running the jetting hose, with a jetting nozzle at its end, into the wellbore and through the newly formed casing exit. At the same time, hydraulic fluid is injected through the hose under pressure to create a first lateral borehole in the subsurface formation. This first borehole may extend from about 10 feet to 500 feet from the wellbore. The first borehole is preferably formed at a wellbore depth greater than 400 feet, or even greater than 5,000 feet.
In one embodiment, the wellbore is substantially horizontal at a depth of the subsurface formation. The first lateral borehole then extends substantially normal to the wellbore. In another embodiment of the method, the wellbore is substantially vertical at a depth of the subsurface formation. The first lateral borehole then extends substantially normal to the wellbore and along the plane of the subsurface formation.
The method preferably includes an additional step of changing the radial orientation of the whipstock member. This is done when the whipstock member is within the wellbore below the slimhole region. Changing the radial orientation may be accomplished by re-engaging the downhole tool assembly with the setting tool, and then transmitting a force that incrementally rotates the upper portion of the downhole tool assembly (including the whipstock member) about its longitudinal axis to a new orientation. Beneficially, this may be done without disengaging the slips from the inner wall of the production casing.
The method may optionally include the steps of pulling the hose out of the lateral borehole and the casing exit, discontinuing injecting hydraulic fluid through the hose, spooling up the coiled tubing and jetting hose to the surface, disconnecting the jetting hose and reconnecting the setting tool, re-entering the parent wellbore with the coiled tubing and setting tool and re-engaging the downhole tool assembly, incrementally rotating the upper portion of the downhole tool assembly (including the whipstock member) a selected number of degrees, disengaging the setting tool from the downhole tool assembly, retrieving the coiled tubing and setting tool to the surface to disconnect the setting tool and reconnect the jetting hose, re-entering the parent wellbore with the jetting hose and coiled tubing, forming a second casing exit in the production casing, then continuing high pressure injection of hydraulic fluid through the jetting hose and nozzle while simultaneously feeding the jetting hose through the downhole tool assembly and the second casing exit. This is done by advancing the coiled tubing from surface. Feeding the jetting hose through the second casing exit serves to erosionally “drill” a second lateral borehole in the subsurface formation.
So that the manner in which the present inventions can be better understood, certain illustrations, charts and/or flow charts are appended hereto. It is to be noted, however, that the drawings illustrate only selected embodiments of the inventions and are therefore not to be considered limiting of scope, for the inventions may admit to other equally effective embodiments and applications.
In
In
In
In
In
As used herein, the term “hydrocarbon” refers to an organic compound that includes primarily, if not exclusively, the elements hydrogen and carbon. Hydrocarbons generally fall into two classes: aliphatic, or straight chain hydrocarbons, and cyclic, or closed ring hydrocarbons, including cyclic terpenes. Examples of hydrocarbon-containing materials include any form of natural gas, oil, coal, and bitumen that can be used as a fuel or upgraded into a fuel.
As used herein, the term “hydrocarbon fluids” refers to a hydrocarbon or mixtures of hydrocarbons that are gases or liquids. For example, hydrocarbon fluids may include a hydrocarbon or mixtures of hydrocarbons that are gases or liquids at formation conditions, at processing conditions, or at ambient conditions (15° C. and 1 atm pressure). Hydrocarbon fluids may include, for example, oil, natural gas, coal bed methane, shale oil, pyrolysis oil, pyrolysis gas, a pyrolysis product of coal, and other hydrocarbons that are in a gaseous or liquid state.
As used herein, the term “fluid” refers to gases, liquids, and combinations of gases and liquids, as well as to combinations of gases and solids, and combinations of liquids and solids.
As used herein, the term “condensable hydrocarbons” means those hydrocarbons that condense at about 15° C. and one atmosphere absolute pressure. Condensable hydrocarbons may include, for example, a mixture of hydrocarbons having carbon numbers greater than 4.
As used herein, the term “subsurface” refers to geologic strata occurring below the earth's surface.
The term “subsurface interval” refers to a formation or a portion of a formation wherein formation fluids may reside. The fluids may be, for example, hydrocarbon liquids, hydrocarbon gases, aqueous fluids, or combinations thereof.
The terms “zone” or “zone of interest” refer to a portion of a formation containing hydrocarbons. Sometimes, the terms “target zone,” “pay zone,” or “interval” may be used.
As used herein, the term “wellbore” refers to a hole in the subsurface made by drilling or insertion of a conduit into the subsurface. A wellbore may have a substantially circular cross section, or other cross-sectional shape. As used herein, the term “well,” when referring to an opening in the formation, may be used interchangeably with the term “wellbore.”
The term “jetting fluid” refers to any fluid pumped through a jetting hose and nozzle assembly (typically at extremely high pressures) for the purpose of erosionally boring a lateral borehole from an existing parent wellbore. The jetting fluid may or may not contain an abrasive material.
The term “abrasive material” refers to small, solid particles mixed with or suspended in the jetting fluid to enhance erosional penetration of: (1) the pay zone, (2) the cement sheath between the production casing and pay zone, and/or (3) the wall of the production casing at the point of desired casing exit.
The term “repair casing” means any tubular body installed along the inner diameter of a pre-existing casing to repair or seal a previous casing. The term “repair casing” includes a repair liner.
The terms “tubular” or “tubular member” refer to any pipe, such as a joint of casing, a portion of a liner, a joint of tubing, or a pup joint.
The wellbore 200 has been formed for the purpose of producing hydrocarbons for commercial sale. A string of production tubing 230 is provided in the bore 205 to transport production fluids from the producing formation 208 up to the surface 201. The wellbore 200 may optionally have a pump (not shown) along the producing formation 208 to artificially lift production fluids up to the surface 201.
The wellbore 200 has been completed by setting a series of pipes into the subsurface 110. These pipes include a first string of casing 222, sometimes known as conductor pipe. These pipes also include a second string of casing 224. The second string of casing 224, sometimes known as surface casing, has the primary purpose of isolating the wellbore 200 from any potential fresh water strata. Hence, casing strings 222 and 224 are typically required to be cemented completely back to surface 201.
Possibly a third 226 or more strings of casing, sometimes known as intermediate pipe, may be required to safely and/or efficiently drill the wellbore to total depth by providing support for walls of the wellbore 200. Cement sheath 227 covers at least a part of the intermediate casing string 226. Note that cement columns 227, 229 do not extend to the surface 201, as is common for these casing strings, particularly in deeper wellbores.
The intermediate casing string 226 may be hung from the surface 201, or may be hung from a next higher casing string 224 (if the next higher casing string is not the conductor pipe 222 or surface casing 224) using a liner hanger. It is understood that a pipe string that does not extend back to the surface (not shown) is normally referred to as a “liner.” In the illustrative arrangement of
Each string of casing 222, 224, 226, and the production tubing string 230, is connected to, sealed, and isolated by various valves and fittings comprising a wellhead 250. The wellhead 250 is located immediately above and/or slightly below the surface 201. Immediately atop, and connected to the wellhead 250, is a well tree (not shown). The well tree is comprised of various valves and possibly a choke capable of limiting, completely shutting in, and/or redirecting flow from the wellbore 200.
In the wellbore 200 of
In
Note the inner diameters of both the production tubing 230 and packer 232 may be equal, or nearly so; but both will be significantly less than the inner diameter of production casing 220.
The downhole packer 232 serves to anchor the tubing string 230. The packer 232 also isolates the pressures and flows of fluids through the lower set of perforations 225″ from an annular region between the production casing 220 and the production tubing 230. In addition, within
The operator of wellbore 200 may desire to stimulate the subsurface formation 208 to increase the production of valuable hydrocarbons. Specifically, the operator may desire to stimulate the producing formation 208 by forming a series of small, radial, boreholes through the production casing 220 and outward into the formation 208. Accordingly, an assembly system for controllably forming lateral boreholes from a parent wellbore is provided herein. The lateral boreholes are formed using hydraulic forces that are directed through a flexible jetting hose. Beneficially, the assembly allows the operator to complete a vertical-to-horizontal transition within a well casing, exit the casing, and subsequently jet horizontal lateral boreholes using the entire casing inner diameter (“ID”) as the bend radius for the jetting hose.
Using the full I.D. of the production casing 220 (that is, below the production tubing 130) allows the operator to use a jetting hose having a larger diameter. This, in turn, allows the operator to pump a higher volume of jetting fluid, thereby generating higher hydraulic horsepower at the jetting nozzle at a given pump pressure. This will provide for substantially more P.O. at the jetting nozzle, that is, the nozzle at the end of the jetting hose. These P.O. benefits will enable:
Because of open perforations 225″ to a partially depleted pay zone, and because of casing leaks 234 providing an open path for the corrosive brines of formation 238, removal of packer 232 in order to perform the stimulation could induce cross-flow (with associated well control issues) and/or formation damage to the pay zone associated with the lower perforations 225″. Accordingly, the operator may choose to consider only those stimulation techniques that do not require removal of the packer 232. This represents a viable scenario played out numerous times in wells completed through corrosive strata, such as wells in the panhandles of Texas and Oklahoma completed through the Brown Dolomite formation.
Even if packer 232 was, by design, retrievable, it is more than likely trapped within the wellbore 200 by accumulated debris atop it from casing leak 234. Thus, even if cross-flow or formation damage were not factors, the mere expense to ‘wash over’ the debris and retrieve the packer 232 could far outweigh the perceived benefit of stimulating the pay zone adjacent lower perforations 225″. Further, even in the absence of a casing failure or the upper perforations 225′, there could be a risk of formation damage to “kill” the well. Absent such formation damage risk, the operator would certainly desire to forego the expense of killing the well, and pulling and re-installing production tubing 130, if at all possible. Hence, in virtually any wellbore configuration scenario, if two stimulation techniques provide relatively equal production enhancement at similar service costs, and have relatively equal chances of success, and one of them can be performed “through tubing” (i.e., does not require removal of packer 232 and/or tubing string 230), the through-tubing alternative will be the least total cost alternative, and therefore the preferred alternative. Note, however, in some wellbore situations, such as those depicted in
In each of
Referring to both
The downhole tool assembly 300 first includes a locking/retrieving section. In this section there is a retrieving mandrel 301. The retrieving mandrel 301 is fashioned as a fishing neck, having a bulbed upper end 30, an undercut region 31, and an elongated rod 32 there below. The retrieving mandrel 301 may have threads (not shown) at a lower end for securing the retrieving mandrel 301 within the tool assembly 300.
The downhole tool assembly 300 also includes a collet 302. The collet 302 is positioned around the retrieving mandrel 301 below the bulbed upper end 30. Together with the retrieving mandrel 301, the collet 302 forms a part of a locking/retrieving section of the tool assembly 300.
The downhole tool assembly 300 further includes a collet lock sleeve 303. The collet lock sleeve 303 generally circumscribes the collet 302. In this way, the collet 302 resides between the retrieving mandrel 301 and the surrounding collet lock sleeve 303. In the arrangement of
The collet 302 has an internal upset 33 and an external upset 34. The external upset 34 forms a shoulder which limits upward travel of the surrounding collet lock sleeve 303.
The tool assembly 300 further includes a retrieving sleeve 309. The retrieving sleeve 309 defines a tubular body that resides below the collet lock sleeve 303 and around a portion of the retrieving mandrel 301. The retrieving sleeve 309 includes an external shoulder 35. The retrieving sleeve 309 transfers movement from a setting tool (shown in
The downhole tool assembly 300 also includes a biasing spring 308. The biasing spring 308 resides below the collet lock sleeve 303 and around the retrieving mandrel 301. The biasing spring 308 acts against the external shoulder 35 at the upper end of the retrieving sleeve 309. The biasing spring 308 provides an upward force against the collet lock sleeve 303 to urge against the external upset 34 at the upper end of the collet 302.
Also as part of the locking/retrieving section of the tool assembly 300, retrieving dogs 307 are provided. The retrieving dogs 307 are positioned in slots at the lower end of the collet lock sleeve 303. The retrieving dogs 307 are attached to the collet lock sleeve 303 by means of pins 305. In addition, retaining rings 306 are provided at each end of the pins 305 to keep the pins 305 in place. The retaining rings 306 are seen in
The retrieving dogs 307 have an internal upset 37. The internal upset 37 extends through slots 36 in the collet lock sleeve 303 and contact the outer diameter of the retrieving mandrel 301. The retrieving dogs 307 also have an external upset 38 which extends beyond the outer diameter of the downhole tool assembly 300.
Also seen in
The downhole tool assembly 300 also has a pair of pins. First, pin 310 extends through the rod 32 of the retrieving mandrel 301. The pin 310 also extends into the whipstock mandrel 313 to rotationally lock the pieces together. Second, pin 311 extends through holes at the lower end of the retrieving sleeve 309, through slots at the upper end of the whipstock mandrel 313, connecting the retrieving sleeve 309 to the whipstock rod 312.
Below the pair of slots 39 is a first stepped slot 41. The stepped slot 41 resides around a portion of the upper whipstock rod 312. Immediately below the first stepped slot 41 is a second slot 42. The second slot 42 extends through the wall of the whipstock mandrel 313. In addition to the first stepped slot 41 and the second slot 42, the tool assembly 300 provides a set of two additional stepped slots. The additional stepped slots are not seen as they are located immediately below the first stepped slots 41 but are equally radially spaced clockwise and counterclockwise around the circumference of the downhole tool assembly 300. Additional sets of two stepped slots are located further down on the whipstock mandrel 313, each also equi-radially spaced clockwise and counterclockwise around the circumference of the whipstock mandrel 313 from the set immediately above it.
Below the various stepped slots is an external shoulder 43. Below the external shoulder 43 is an angled opening 50. The angled opening 50 is formed through the whipstock mandrel 313 and is dimensioned to receive a whipstock 322. As will be discussed more fully below, the whipstock 322 is movable from a collapsed position (shown in
In the arrangement of
The downhole tool assembly 300 also includes a guide sleeve 314. The guide sleeve 314 defines a tubular body that resides concentrically around an upper portion of the whipstock mandrel 313. The guide sleeve 314 is positioned on the whipstock mandrel 313 over the stepped slots 41, 42. The guide sleeve 314 has matching sets of pockets which fit over the stepped slots 41, 42 in the whipstock mandrel 313.
The purpose of the guide sleeve 314 is to carry sets of hose guides 316, 317, 318, 319. Hose guides 316, 317, 318, 319 reside in the pockets and are seen in
In the run-in position of
As noted above, the upper end of the whipstock rod 312 is attached to the retrieving sleeve 309 with a pin 311. In this way, the retrieving sleeve 309 and the whipstock rod 312 move together. The whipstock rod 312 includes a longitudinal flat surface 44, or “flat.” A dog 320 is positioned in a slot in the whipstock mandrel 313 below the top stepped slot 41 and along the flat 44. A hex socket screw 321 is made up in the dog 320, with the screw head sunken into a recess in the guide sleeve 314. The dog 320 is positioned against an upper shoulder 45 on the flat 44. When the upper whipstock rod 312 is moved upward, a shoulder 46 at the lower end of the flat 44 contacts the dog 320 and moves the guide sleeve 314 upward. Reciprocally, when the whipstock rod 312 is moved downward, the shoulder 45 at the upper end of the flat 44 contacts the dog 320 and moves the guide sleeve 314 downward.
The whipstock mandrel 313 extends below the opening 50. Threads are placed at the lower end of the whipstock mandrel 313 for connection with an outer indexing sleeve 327.
As also noted, a whipstock 322 is positioned in the opening 50 machined in the whipstock mandrel 313. The whipstock 322 is connected to the whipstock mandrel 313 with a pin 323. The whipstock 322 has a machined radius which guides the flexible jetting hose from one side of the casing 220 to the other when rotated to the set position (seen in
The view is taken across line R-R of
The downhole tool assembly 300 also includes an indexing section. Components of the indexing section are seen in
As part of the indexing section, the tool assembly 300 first has an outer indexing sleeve 327. The outer indexing sleeve 327 is connected to the lower end of the whipstock mandrel 313. The middle of the outer indexing sleeve 327 has two short longitudinal slots 61 spaced 180 degrees apart. The outer indexing sleeve 327 also has an internal upset 62 at the lower end which is captured between an external upset 63 on the lower end of an indexing mandrel 336 and the upper end of an indexing spring mandrel 337. The indexing mandrel 336 and the indexing spring mandrel 337 are connected with a thread.
Above the external upset 63 on the lower end of the indexing mandrel 336 are two longitudinal slots 64 spaced 180 degrees apart. Two holes (not visible) are located 180 degrees apart and 90 degrees from the slots 64. Above these slots 64 are two short shallow slots 65 and at the upper end of the indexing mandrel 336 are two holes (not seen). These holes provide a housing for additional pins (not seen) that are located through the circumferential slots in a lower indexing ratchet 334 and in the two longitudinal slots 64. The holes allow limited rotational movement of the lower indexing ratchet 334 relative to the indexing mandrel 336 while preventing longitudinal movement.
The lower indexing ratchet 334 is positioned against the upper end of the external upset 63 on the indexing mandrel 336. The middle of the lower indexing ratchet 334 has two slots 66 spaced 180 degrees apart. The upper ends of the slots 66 are machined on a lead and the lower ends are straight.
The upper end of the lower indexing ratchet 334 contains ratchet teeth (not visible). The ratchet teeth are configured to have an angle on one side and an opposing side that is parallel to the centerline of the downhole tool assembly 300. An inner indexing sleeve 331 is positioned above the lower indexing ratchet 334 on the indexing mandrel 336. The lower end of the inner indexing sleeve 331 has ratchet teeth identical to and mating with the ratchet teeth on the upper end of the lower indexing ratchet 334.
In the middle of the inner indexing sleeve 331 are two threaded holes spaced 180 degrees apart. The upper end of the inner indexing sleeve 331 has ratchet teeth which are opposite to those on the lower end. An upper indexing ratchet 328 is positioned on the indexing mandrel 336 above the inner indexing sleeve 331. The lower end of the upper indexing ratchet 328 has ratchet teeth that mate with the ratchet teeth on the upper end of the inner indexing sleeve 331.
In the middle of the upper indexing ratchet 328 are two short longitudinal slots 67 spaced 180 degrees apart. The upper end of the upper indexing ratchet 328 has in internal upset. 68. A spring 326 is positioned above the upper indexing ratchet 328 to keep the upper indexing ratchet 328 and the inner indexing sleeve 331 pushed downward against the lower indexing ratchet 334. Pins 329 are located through the two slots 67 on the upper indexing ratchet 328 and the two holes in the upper end of the indexing mandrel 336. These allow longitudinal movement for the upper indexing ratchet 328 relative to the indexing mandrel 336.
Screws 330 are made up in threaded holes in the inner indexing sleeve 331. Heads for the screws 330 are sunken into slots 69 in the outer indexing sleeve 327. The slots 69 allow longitudinal movement of the inner indexing sleeve 331 relative to the outer indexing sleeve 327, and also allow torque to be transmitted from the inner indexing sleeve 331 to the outer indexing sleeve 327. Additional pins (not seen) are located through the circumferential slots in the lower indexing ratchet 334 and in the two holes in the indexing mandrel 336 between the two longitudinal slots 64. These allow limited rotational movement of the lower indexing ratchet 334 relative to the indexing mandrel 336 but prevent longitudinal movement.
The outer indexing sleeve 327 is seen around the lower indexing ratchet 334, the indexing mandrel 336, and an indexing rod 335. The indexing rod 335 is located along a portion of the indexing mandrel 336. The indexing rod 335 has a radial hole 70 at the upper end. An indexing pin 333 is located through the slots 66 machined on a lead in the lower indexing ratchet 334, the longitudinal slots 64 in the indexing mandrel 336, and the hole 70 in the indexing rod 335.
Below the threads at the upper end of the indexing spring mandrel 337 are two sets of two longitudinal slots 71. The slots 71 are located 180 degrees apart. At the lower end of the indexing spring mandrel 337 is a thread which connects the indexing spring mandrel 337 to a slip mandrel 342. This is seen in
Upper and lower spring sleeves 338 are located on the indexing spring mandrel 337. A spring 341 is disposed between the spring sleeves 338. The spring sleeves 338 each have two holes 72 located 180 degrees apart. Pins 339 are located through the holes 72 in the spring sleeves 338 and through the longitudinal slots 71 in the indexing spring mandrel 337. A spring rod 340 is then located in the middle of the indexing spring mandrel 337 between the two pins 339. The spring rod 340 limits compression of spring 341 and transfers downward load to the pin 339 and the slip rod 343 after the spring 341 is compressed.
As noted, the downhole tool assembly 300 also has a slip section. Components of the slip section are generally seen in
A thread is located at the lower end of the slip mandrel 342. An upper slip sleeve 349 is located on the slip mandrel 342. The upper slip sleeve 349 has three slots 75 spaced 120 degrees apart on the upper end. In addition, the upper slip sleeve 349 has two short slots 76 spaced 180 degrees apart on the lower end. The upper slip sleeve 349 also has an internal undercut 77 on the lower end.
A lower slip sleeve 351 is located below the upper slip sleeve 349. The lower slip sleeve 351 has an external undercut 78 on the upper end which is located in the internal undercut 77 in the lower end of the upper slip sleeve 349. The lower slip sleeve 351 also has two holes spaced 180 degrees apart at the upper end, and multiple holes at the lower end. A slip rod 343 with a radial hole 79 at the lower end is located in the slip mandrel 342. A pin 350 is located through the slots 75 at the lower end of the upper slip sleeve 349, the holes at the upper end of the lower slip sleeve 351, and the hole 79 at the lower end of the slip rod 343.
Slips 345 are located in the three longitudinal slots 73 in the slip mandrel 342. The slips 345 are connected at the upper end to the slip mandrel 342 with pins 344. Each slip 345 is connected at the lower end to two slip arms 347. This connection is via pins 346. Each slip 345 also has multiple hardened sharp teeth 82 machined on the end on a radius so that as the slip 345 rotates outward and contacts the casing I.D., the teeth 82 will bite into the casing 220. In this manner the slips 345, slip arms 347 and pins 344, 346 form an anchor.
The lower ends of the slips 345 are connected to the upper end of the upper slip sleeve 349. This connection is via pins 348. In operation, upward movement of the upper slip sleeve 349 extends the slips 345 outward by rotation around the pins 344, 346, 348. Reciprocally, downward movement of the upper slip sleeve 349 pulls the slips 345 inward into the slots 73 in the slip mandrel 342 flush with the O.D. of the tool assembly 300.
A slip spring mandrel 354 is connected to the lower end of the slip mandrel 342 with threads. A pin 352 inserted through holes in the slip mandrel 342 and the slip spring mandrel 354 rotationally locks the slip mandrel 342 and the slip spring mandrel 354 together.
An upper spring shoe 355 is located in the lower end of the lower slip sleeve 351 on the slip spring mandrel 354. The upper spring shoe 355 has a pair of holes 83 at the upper end which match holes 84 at the lower end of the lower slip sleeve 351. The upper spring shoe 355 and the lower slip sleeve 351 are held together with shear pins 353 located through holes 83, 84.
The upper spring shoe 355 has an external upset 85 at the lower end. Multiple sets of disc springs 356 are located on the slip spring mandrel 354. Each set of disc springs 356 is separated by spacers 357. A thread is located at the lower end of the slip spring mandrel 354. The thread connects the slip spring mandrel 354 to the lower spring shoe 358. The spacers 357 and disc springs 356 extend from
In order to set and to manipulate the tool assembly 300 of
The setting tool 600 generally includes:
The setting tool 600 first includes a slip joint section. The slip joint section allows opposing forces to be directed into the tool 600. Specifically, weight may be set down on an inner section of the setting tool 600 while tension is applied to an outer section. The slip joint section also allows rotation of the setting tool 600 with upper sections of the downhole tool assembly 300 without rotating the coiled tubing.
This slip joint section is generally seen in
The slip joint rod 603 also defines an elongated tubular body. The slip joint rod 603 serves to allow telescoping motion for the setting tool 600. O-rings 602 are provided at opposing ends of the slip joint rod 603. The o-rings 602 provide a fluid seal. The slip joint rod 603 also has an external upset 653. The external upset 653 serves as a shoulder for receiving the lower end of a retaining shoe 604. The retaining shoe 604 covers a portion of the slip joint rod 603 and serves to limit the travel of the slip joint rod 603.
The retaining shoe 604 is threadedly connected to an upper barrel 605. The upper barrel 605 defines an elongated tubular body forming an outer wall for a portion of the setting tool 600. The upper barrel 605 has an internal upset 654 at a lower end. An annular region 655 is formed between the slip rod 603 and the surrounding upper barrel 605. The annular region 655 is generally bounded by the external upset 653 and the internal upset 654.
The upper barrel 605 has threads at upper and lower ends. Through-openings 656 are provided along the upper barrel 605 below the threads at the upper end. These through-openings 656 allow fluid movement out of the contained annular region 655 as well as pressure equalization. The upper barrel 605 also has an o-ring 607 outside of the internal upset 654.
The setting tool 600 also includes a rod/barrel section. The rod/barrel section is generally seen in
The rod/barrel section first includes a barrel 606. The barrel 606 also defines an elongated tubular body forming an outer wall for a portion of the setting tool 600. The barrel 606 is threadedly connected to the lower end of the upper barrel 605. The barrel 606 has internal threads at an upper end.
The barrel 606 is generally dimensioned in the same way as the upper barrel 605. In this respect, the barrel 606 also has an internal upset 658 at a lower end as well as o-rings 602, or seals. Through-openings 657 are provided below the threads which allow fluid movement and pressure equalization.
The lower end of the barrel 606 is attached to a next barrel in series. This means that the rod/barrel section preferably comprises two or more barrels 606.
The rod/barrel section also includes a series of rods. The first rod (seen in
The lower end of the upper rod 608 also has internal threads. The internal threads mate with threads of an elongated rod 609.
The lower end of each rod 609 has an external upset 660. The external upsets 660 also receive o-rings 607. The last rod 609 in the series is attached to a lower rod 610.
The setting tool 600 also includes a lock section. The lock section is generally seen in
The lock section first includes a lock barrel 615. The lock barrel 615 defines an elongated tubular body that forms an outer wall for a portion of the setting tool 600. The lock barrel 615 as threadedly connected to the last barrel with threads. Through-openings 661 are provided below the threads at the upper end. The through-openings 661 allow fluid movement and pressure equalization.
Below the through-openings 661 are threaded holes for receiving shear pins 611. The shear pins 611 hold a lock sleeve 612 in place. Below the shear pins 611 is an internal sealing surface contacting o-rings 602 and 607. At the lower end of the lock barrel 615 is an external thread. A lower barrel 620 is attached to the lower end of the lock barrel 615 with the threads.
The lower barrel 620 has an undercut 662 below the threads. Near the lower end of the undercut 662 are threaded holes 663. A dog retainer 618 is positioned at the end of the internal undercut 662. The dog retainer 618 is held in place with hex socket head screws 619. The head screws 619 are placed through through-openings 664 in the lower barrel 620 into threaded holes in the dog retainer 618. The dog retainer 618 and head screws 619 help retain the lower barrel 620.
Returning again to the lower rod 610, the lower rod 610 comprises an elongated bore 665. The bore 665 is in fluid communication with the through-openings 659. The bore 665 is also in fluid communication with a radial hole 675. Below the radial hole 675 is an external groove in which a lock ring 613 is placed. The lock ring 613 secures a locking rod 667.
The lock ring 613 is used when running the downhole setting tool 600 into a wellbore with the tool assembly 300 attached. The lock ring 613 is used to lock the setting tool 600 in its extended position, and to keep the retrieving dogs 307, hose guides 316, 317, 318, 319, whipstock 322, and slips 345 collapsed on the tool assembly 300 when running into the wellbore.
An external seal 614 is placed around the locking rod 667. Below the seal 614 is an external undercut, or reduced outer diameter portion 668. At a lower end of the locking rod 667 is an external upset 669. The external upset 669 defines an enlarged outer diameter portion with three slots 670. The slots 670 are cut in the lower end of the locking rod 667 120 degrees apart.
The lock sleeve 612 is positioned on the lower rod 610. The lock sleeve 612 has an internal seal 602 at the upper end and an external seal 607. The lock sleeve 612 also receives the shear pins 611. The shear pins 611 hold the lock sleeve 612 in place. The lock sleeve 612 has an internal undercut 669 at the lower end. The lock ring 613 is placed along the internal undercut 669 and below the radial hole 665.
A set of locking dog segments is positioned between the lower end of the lock barrel 615 and the dog retainer 618. The locking dog segments are not seen in
The setting tool 600 also includes a centralizer section. The centralizer section is also generally seen in
The upper end of the centralizer section represents the three slots 670 on the lower end of the locking rod 667. A collet mandrel 622 is connected to the lower end of the locking rod 667 with threads (not shown). The collet mandrel 622 has an external upset 671 at the lower end with external threads (also not shown).
A centralizer sleeve 629 is positioned on the lower end of the collet mandrel 622. The centralizer sleeve 629 has three slots 670. The slots 670 are disposed 120 degrees apart and are located on the upper end of the centralizer sleeve 629. The slots 670 receive and hold the ends of lower centralizer arms 626. A spring 630 is positioned between the centralizer sleeve 629 and the external upset 671 at the lower end of the collet mandrel 622.
Upper centralizer arms 623 are located in the three slots 670 at the lower end of the locking rod 667. The upper centralizer arms 623 are connected at upper ends with pins 621′. Each upper centralizer arm 623 is connected at a lower end to a lower centralizer arm 626. The connection is via pins 624. A retaining ring (not numbered) is inserted into grooves at each end of the pins 624 to hold them in place in the centralizer arms 626.
The lower centralizer arms 626 are connected to the centralizer sleeve 629 via pins 621″. The lower centralizer arms 626 extend through the three longitudinal slots 670 in the lower barrel 620. A spring pin 627 located in a hole in the collet mandrel 622 limits upward travel of the centralizer sleeve 629 and outward expansion of the centralizer arms 626.
The setting tool 600 also includes a collet section. The collet section is shown in
The collet section consists of a collet 632. The collet 632 has an internal thread (not shown) at an upper end which connects to the lower end of the collet mandrel 622. The collet 632 has a plurality of radially spaced-apart fingers 633. At the end of each finger 633 is an internal upset 634 and an external upset 635.
The collet section also consists of the lower end of the lower barrel 620. At the lower end of the lower barrel 620 is an internal undercut 636. Above the lower thread on the collet mandrel 622 are shallow holes 637 which will align with holes 639 through the lower end of the lower barrel 620. Shear pins (seen at 738 in
In order to run the downhole tool assembly 300 into a wellbore and to set the assembly 300 at the desired location, a series of steps is taken. First, the setting tool 600 is positioned in its run-in position.
In its run-in position, the setting tool 600 is connected to the tool assembly 300 by the collet 632. More specifically, the collet fingers 633 latch over the bulbed upper end 30 of the retrieving mandrel 301. To do this, the collet mandrel 622 first moves down towards the internal undercut 636 in the lower barrel 620. This is seen in
As the collet fingers 633 are latched over the bulbed upper end 30 of the retrieving mandrel 301, they expand outward below the internal undercut 636. The collet fingers 633 then collapse back to the original position as the fingers 633 move over the bulbed end 30. The lower barrel 620 is then moved downward so that the inner diameter of the lower barrel 620 is over the external upset 635 of the collet 632. Because the inner diameter of the lower barrel 620 is smaller than the expanded outer diameter of the collet fingers 633, the collet 632 is locked around the bulbed upper end 30 of the retrieving mandrel 301.
Upon latching the retrieving mandrel 301, the lower barrel 620 moves downward over the collet 302 of the tool assembly 300. The lower barrel 620 contacts the collet lock sleeve 303, moving it downward against the biasing spring 308. The lower end of the lower barrel 620 has an I.D. that is large enough to go over the large O.D. of the collet 302, but small enough that the collet 302 cannot back over the bulbed end 30 of the retrieving mandrel 301.
The collet lock sleeve 303 will shoulder against the retrieving sleeve 309. When this happens, a groove 638 machined into the lower end of the lower barrel 620 is positioned over the large O.D. of the collet 302. The collet 302, the collet lock sleeve 303, the retrieving sleeve 309 and the upper whipstock rod 312 are together moved downward. This downward movement causes the internal upset 33 of the collet 302 to move down the retrieving mandrel 301. This position is shown in
As the lower barrel 620 moves further downward, the lower end of the upper whipstock rod 312 contacts the whipstock 322, causing the whipstock 322 to rotate inward to the collapsed position. This is demonstrated in
In
As the slips 345 are collapsed, a shoulder 45 at the upper end of upper whipstock rod 312 contacts the dog 320. The dog 320 is connected to the guide sleeve 314 above the whipstock 322 and pushes the guide sleeve 314 downward. This unlocks the extended hose guides 316, 317, 318, 319 and allows the guides 316, 317, 318, 319 to collapse inward into the pockets in the guide sleeve 314 and whipstock mandrel 313. This position also moves slots in the retrieving mandrel 301 to be positioned beneath the retrieving dogs 307, allowing the retrieving dogs 307 to collapse inwardly.
The setting tool 600 is assembled with the lock ring 613 in a groove on the locking rod 667. This serves to keep the lower barrel 620 in the fully extended position. This also keeps the retrieving dogs 307, the guides 316, 317, 318, 319, the whipstock 322, and slips 345 in a collapsed position. The lock sleeve 612 is positioned over the lock ring 613 to lock the lock ring 613 in place when running into a wellbore. Shear pins 611 prevent the lock sleeve 612 from moving until pressure is applied to shear the pins 611.
As noted, below the lock ring 613 represents three sets of centralizer arms 623. When actuated, the centralizer arms 623 centralize the setting tool 600. During run-in, each of the centralizer arms 623 is constrained in a collapsed position. In this way the setting tool 600 can clear a slimhole region (such as production tubing 130 having a small I.D.). Spring 630 is collapsed. In
After the centralizer arms 623 have passed through the slimhole region and have entered the larger I.D. production casing 220, the spring 617 expands the centralizer arms 623 outward and holds them in an expanded position under the weight of the setting tool 600. This is shown in
Later, when the setting tool 600 is retrieved, the upper centralizer arms 623 contact the small I.D. of the production tubing 130 (or other slimhole region) and are collapsed. In this respect, upward force on the setting tool 600 overcomes the force from the spring 617 on the centralizer arms 623.
Above the lock ring 613 and lock sleeve 612 are multiple rods (e.g., rods 608 and 609 seen in
At the top of the setting tool 600 is the slip joint section. The slip joint section allows tubing weight to be applied to the rods 608, 609 in the setting tool 600 and the tool assembly 300 when applying hydraulic pressure to operate the tool assembly 300. The slip joint section also applies upward force to the barrels 605, 606 when retrieving the setting tool 600 after setting and rotationally indexing the tool assembly 300.
After the setting tool 600 and connected tool assembly 300 are run into a wellbore and through the slimhole region, hydraulic pressure is applied through the coiled tubing. The hydraulic pressure acts on the rods (608, 609), barrels (605, 606), and lock sleeve 612. Pressure is increased until the force on the lock sleeve 612 shears the shear pins 619. The lock sleeve 612 then moves upward, releasing the lock ring 613.
The hydraulic pressure should be high enough that when the shear pins 619 are sheared, the downward force acting on the barrels (605, 606) is close to that of the force from the disc springs 356. As a result, there is little or no movement to expand the slips 345, the whipstock 322, the hose guides 316, 317, 318, 319, or the retrieving dogs 307. Hydraulic pressure is then relieved. This allows the disc springs 356 to push upward on the upper spring shoe 355, the lower 351 and upper 349 slip sleeves, and slip arms 347. This, in turn, rotates the slips 345 outward against the production casing 220.
The force from the disc springs 356 also applies a load to the expanded slips 345. This causes the teeth 82 of the slips 345 to at least partially penetrate into the wall of the casing 220. Any additional downward load on the slip mandrel 342 causes the teeth 82 to penetrate deeper into the casing 220. The slips 345 will hold an upward load until the force of the disc springs 356 is exceeded.
The disc springs 356 exert an upward force on other components of the tool assembly 300. These include the slip rod 343, the spring sleeves 338, the spring rod 340, the indexing rod 335, the lower whipstock rod 324, the upper whipstock rod 312, the retrieving sleeve 309, the collet lock sleeve 303, and the collet 302. The disc springs 356 also exert an upward force on the barrels 605, 606 of the setting tool 600 until the slips 345 are set. The retrieving dogs 307 are also moved out of the slots 36 in the collet lock sleeve 303 and expand outward, increasing their O.D. This is shown in
Once the slips 345 are set, the slip rod 343, the lower spring sleeve 338, and the spring rod 340 remain stationary. However, the spring 341 between the two spring sleeves 338 continues to apply an upward load to the other components and move them upward until the lower whipstock rod 324 contacts the whipstock 322. At this point, an upward load is applied to the setting tool 600 to continue moving these components upward. The upward load is applied by pulling the coiled tubing 1070. When the lower barrel 620 is moved upward, the lower shoulder 636 of the groove 638 contacts the external shoulder 635 of the expanded collet 632 and pulls the collet fingers 633 back inward. This is shown in
Also occurring upon setting of the slips 345, the upper whipstock rod 312 withdraws from the opening 55 in the whipstock 322. This allows the disc springs 356 to act on the lower whipstock rod 324. This, in turn, causes the whipstock 322 to rotate into its open or set position. This is seen in
Continued upward movement of the lower whipstock rod 324 moves the longitudinal flat surface 44, or “flat.” on the upper whipstock rod 312. The flat 44 is moved into contact with the dog 320. The dog 320 is connected to the guide sleeve 314 above the whipstock 322. The dog 320 pushes the guide sleeve 314 upward. This, in turn, moves the respective upper ends of the hose guides 316, 317, 318, 319 into contact with the ends of the slots 41, 42 going through the whipstock mandrel 313, and rotates them outwardly 90 degrees. This is shown in the cross-sectional views of
The upper ends of the hose guides 316, 317, 318, 319 move into the slots that don't extend through the wall thickness. The guides 316, 317, 318, 319 are then locked into their respective extended positions. As the hose guides 316, 317, 318, 319 are locked in their extended positions, the collet 302 retracts back into the undercut 30 on the retrieving mandrel 301, and the lower barrel 620 moves off the collet 632. The lower barrel 620 contacts the collet lock sleeve 303, moving it downward against the biasing spring 308. The biasing spring 308 pushes the collet lock sleeve 303 over the external upset 34 of the collet 302, locking the collet 302 in place. This is seen in
After the downhole tool assembly 300 has been set in a wellbore, the operator releases the setting tool 600 from the tool assembly 300. This is done by continuing the upward movement of the setting tool 600 by pulling tension on the coiled tubing 1070. Do so enables the lower barrel 620 of the setting tool 600 to move upward until the internal undercut 638 on its lower end moves over the external upset 635 on the collet 632. This unlocks the collet 632 from the bulbed end 30 on the retrieving mandrel 301 and allows the setting tool 600 to be disengaged from the tool assembly 300.
After the tool assembly 300 has been set in a wellbore and the setting tool 600 has been released, the setting tool 600 is removed from the wellbore. The setting tool 600 is also detached from the coiled tubing 1070. Thereafter, a flexible hydraulic jetting hose 1080 is attached to the end of the coiled tubing 1070 and run into the wellbore to the depth of the tool assembly 300. The process for forming lateral boreholes may then commence.
After one or more lateral boreholes is completed, the setting tool 600 must be run back into the wellbore. The setting tool 600 is placed in its retrieving position.
First,
The wellbore 1000 is completed with a string of production casing 1020. In the arrangement of
The wellbore 1000 may, and almost certainly is, completed with additional strings of casing. These typically include casing strings such as conductor pipe 222 and surface pipe 224 of
The production casing 1020 has been perforated. Perforations are shown at 1025. Production has already taken place through the perforations 1025. A string of production tubing 1030 is provided for receiving production fluids. In one aspect, the production tubing 1030 is a string of 2.375-inch OD (1.995-inch I.D.) tubing.
A packer 1032 seals an annular region between the production tubing 1030 and the surrounding production casing 1020. The packer 1032 directs production fluids entering the wellbore 1000 through the perforations 1025 into the production tubing 1030. The packer 1032 also isolates the perforations 1025 from any wellbore fluids that may be invading the wellbore 1005 behind the tubing 1030.
In accordance with the present inventions, the operator desires to stimulate the producing formation 1060 by forming one or more lateral boreholes from the wellbore 1000. The boreholes will be formed by running a hydraulic jetting hose and connected nozzle down the wellbore 1000, through a window in the production casing 1020, and out into the formation 1060. However, it can be seen that the production tubing 1030 and packer 1032 create a restriction, or slimhole region,” in the wellbore 1000. Therefore, a tool assembly such as downhole tool assembly 300 is desired that may be deployed through the slimhole region (tubing 1030 and packer 1032), and then expanded, set, operated, reoriented, and re-operated in the production casing 1020 at any desired depth below the slimhole region (tubing 1030). Preferably, the downhole tool assembly 300 is then released and moved to other target depths below the slimhole region, and the aforementioned process repeated as many times as desired.
Also seen in
In the view of
The jetting hose 1080 is connected to the string of coiled tubing 1070. As the coiled tubing 1070 is run into the wellbore 1000, the flexible jetting hose 1080 is also introduced. The jetting hose 1080 will ultimately be used to form a lateral borehole (seen at 1090 in
It is understood that the coiled tubing 1070 will most likely be several thousand feet long and will be carried on a conventional coiled tubing unit's spool (not shown) at the surface 1001. Indeed, the jetting hose 1080 may be 20 to 100 feet long and the coiled tubing string 1070 may be 250 feet to 15,000 feet long.
A jetting nozzle 1085 is disposed on the end of the flexible hose 1080. The nozzle 1085 contacts the hose guides 316, 317, 318, 319 spaced around the tool assembly 300 circumference during run-in. The hose guides 316, 317, 318, 319 have faces ‘f’ that direct the flexible hose to the whipstock 322.
The jetting nozzle 1085 may be a conventional fluid nozzle. Preferably, however, the jetting nozzle 1085 defines a hydraulic nozzle equipped with inner baffles and/or bearings that interface with ports or slots in the nozzle 1085. As fluid is pumped through the hose 1080, the baffles or bearings rotate along a longitudinal axis of the jetting hose 1080. In one aspect, the ports reside at the leading edge of the nozzle 1085 so that maximum fluid is directed against the formation 1060 being cut. The ports may be disposed radially around the leading edge of the nozzle 1085 to facilitate cutting a radial borehole.
In another embodiment, a hydraulic collar or seat is placed in the jetting hose 1080 proximate the nozzle 1085. In addition, rearward-directed ports may be placed proximate the collar or along the jetting hose 1080 just a few inches to a few feet up-string of the jetting nozzle 1085. In operation, the operator may pump a small ball down the jetting hose 1080. The ball will land on the collar, which in turn will open the reward-directed ports. This provides for expulsion of some fraction of the jetting fluid in a rearward direction, thereby providing thrust to advance the jetting nozzle 1085 forward into the newly generated lateral borehole 1090 while helping to enlarge the borehole and to keep it clear of cuttings.
It can also be seen in
As an alternative, the window 1035 may be formed using jetting forces directed from the nozzle 1085 itself. In this instance, the hydraulic fluid will preferably include a suspended abrasive material such as sand to form an abrasive slurry. The abrasive slurry cuts a hole through the casing wall, through a cement sheath 1023 around the casing 1020, and into the producing formation 1060. After the window 1025 is formed through the production casing 1020 and cement sheath 1023, the flexible hose 1080 with jetting nozzle 1085 is advanced. During this time, high pressure jetting fluid continues to be injected through the jetting nozzle 1085. In this way, the lateral borehole 1090 is erosionally “drilled” substantially perpendicular to the longitudinal axis of the wellbore 1050 within the target pay zone 1060.
Other techniques for forming the window 1035 may be used. These may include extensive perforating using multiple explosive charges. Also, the use of pyro-chemicals is known for melting a window out of the casing. Regardless of the method for forming the window 1035, the whipstock 322 guides the flexible jetting hose 1080 from one side of the casing 1020 I.D. to the other. The whipstock 322 face spans substantially the entire inner diameter of the production casing 1020, causing the jetting nozzle 1085 to enter the window 1035 substantially perpendicular to the casing 1020. Fluid is then pumped through the flexible hose 1080 under high pressure where it exits through ports in the jetting nozzle 1085.
In forming the lateral borehole, it is preferred that the jetting nozzle 1085 be specially designed to employ backwards thrust forces. Such forces are largely distributed to the wall of the production casing 220 as the jetting nozzle 1085 first enters the window 1035. The thrust forces urge the jetting nozzle 1085 forward as a lateral borehole is formed. In one aspect, a ported collar (not shown) is incorporated into the jetting hose 1080 just upstream of the jetting nozzle 1085 to provide reverse hydraulic forces. Such forces are sufficient to create a borehole up to at least 500 feet from the wellbore 1000 without need of compression on the coiled tubing 1070.
It is again noted that once a window 1035 is created and a first lateral borehole 1090 is formed, the jetting hose 1070 is withdrawn from the lateral borehole 1090 and the downhole tool assembly 300 may be indexed. This means that the tool assembly 300 is radially moved a desired number of degrees within the wellbore. This is done by rotating the upper indexing ratchet 328 relative to the indexing mandrel 336.
In operation, when the downhole tool assembly 300 is set in casing, the slips 345 are moved outward to contact the casing ID and to hold the tool assembly 300 in place. To rotationally index the tool assembly 300, the setting tool 600 is set back down on the tool assembly 300. The collets 632 on the lower end of the setting tool 600 then engage an external upset on the upper end of the retrieving mandrel 301. Pressure is then applied to the setting tool 600, moving the lower barrel 620 of the setting tool 600 downward and over the collets 632, locking them to the external upset on the upper end of the retrieving mandrel 301.
The lower barrel 620 continues to move downward and to apply force to and through a series of parts for the tool assembly 300. These include the collet lock sleeve 303, the retrieving sleeve 309, the pin 311, the whipstock rod 312, the whipstock 322, the lower whipstock rod 324, the indexing rod 335, and to the indexing pin 333. The indexing pin 333 moves in slots machined on a lead in the lower indexing ratchet 334. Movement of the indexing pin 333 applies a rotational force to the lower indexing ratchet 334, which in turn rotates the inner indexing sleeve 331.
The inner indexing sleeve 331 is connected to the outer indexing sleeve 327 by means of a screw 330. The screw 330 transfers rotation from the inner indexing sleeve 331 to the outer indexing sleeve 327. The outer indexing sleeve 327 is free to rotate relative to the components of the tool assembly 300 below the indexing section, but is connected to the components of the tool assembly 300 above the indexing section. When the outer indexing sleeve 327 is rotated, the upper section of the tool assembly 300 also rotates. The slips 345 remain set during this operation and provide the resistance to rotation for the lower section of the tool assembly 300.
When the indexing rod 335 moves downward, the rod 335 pushes against pins 339 and spring sleeve 338. This mechanical action compressing a spring 341. When pressure is released on the setting tool 600, the spring 338 pushes upward on the spring sleeve 338, the pins 339, the indexing rod 335, and the indexing pin 333. The indexing pin 333 moves in the slots in the lower indexing ratchet 334, turning the ratchet 334 in the opposite direction and moving the ratchet 334 against the inner indexing sleeve 331. The inner indexing sleeve 331 is prevented from rotating with the lower indexing ratchet 334 by the upper indexing ratchet 328.
Selectively applying and releasing pressure on the setting tool 600 creates downstrokes and upstrokes. During a downstroke and upstroke cycle, the indexing section rotates the upper sections of the tool assembly 300, including the locking/retrieving section and guide/ramp section, through a set number of degrees relative to the lower sections of the tool assembly 300. The number of degrees is determined by the number of teeth and the design of the slots on the lower indexing ratchet. Rotating the guide/ramp section changes the radial orientation of the whipstock 322. This, in turn, allows multiple radial holes to be jetted through the casing into the formation without unsetting the slips 345.
As can be seen, improved methods for forming lateral boreholes from a parent wellbore are provided. Improved systems for forming lateral boreholes are also provided. The systems and methods allow for delivery and setting of a hydraulic tool assembly through a slimhole region in a wellbore using coiled tubing. It is no longer required to kill the well or to use well control equipment. Further, it is no longer required to pull the production tubing, nor are there concerns of retrieving a stuck packer or tubing anchor. Further, a conventional coiled tubing unit may be used.
The method provides for running a jetting hose through a first window by turning the jetting hose across a bend radius equivalent to the full inner diameter of the production casing. The production casing may be, for example, standard 4.5- to 7-inch O.D. production casing (including a production liner) having inner diameters of about 3.83 to 6.54 inches (9.7 to 16.6 cm). Tool configurations for larger casing sizes are possible, depending on the I.D. of the slimhole region through which the casing must be accessed. In one embodiment, the production casing has a 4.5-inch O.D. and an I.D. ranging from 3.83 to 4.1 inches (9.7 to 10.4 cm), able (in run-in position) to pass through a slimhole region comprised of 2⅜ths inch O.D. (1.85 to 1.99-inch I.D.) standard oilfield tubing coupled with either a 1.78 to 1.87-inch I.D. seating nipple, packer, or both.
The method further provides jetting a lateral borehole into the subsurface formation. This is done by using hydraulic fluid. In one embodiment, the borehole is jetted at a depth of greater than 400 feet, and to a length of at least 50 feet (15.2 meters) from the wellbore. The tool assembly 300 can also be rotated around the casing I.D. allowing multiple radial boreholes to be created while still anchored in the casing.
Use of the downhole tool assembly 300 and the steps shown in
Given the subject method and invention, no cement squeezes are required to remediate wells in these situations. A slimhole recompletion, where the casing leaks are isolated by running a packer on the end of the production tubing and/or cementing the production tubing in place inside the well's production casing, can immediately isolate the producing formation from the casing leak. Any drilling mud left in the wellbore opposite the producing formation can then be jetted out with the same coiled tubing unit that will subsequently perform the lateral jetting operations. The hydraulically jetted horizontal lateral boreholes will then be able to access “fresh rock” either: (1) well beyond the damaged area within the pay zone invaded by mud and/or mud filtrate; or, (2) along a different azimuth altogether from that of a mud-damaged interface of an original hydraulic fracture plane.
In addition to these benefits, the systems and methods allow the operator to maximize power output, as a larger jetting hose may be deployed as compared to the hose size that the operator could use with previously known systems and methods. The system utilizes substantially the entire inner diameter of the casing as the bend radius for a hydraulic jetting hose, thus providing for the maximum hydraulic horsepower at the jetting nozzle.
While it will be apparent that the inventions herein described are well calculated to achieve the benefits and advantages set forth above, it will be appreciated that the inventions are susceptible to modification, variation and change without departing from the spirit thereof. While it is realized that certain embodiments of the invention have been disclosed herein, it is perceived that further modifications will occur to those skilled in the art, and such obvious modifications are intended to be within the scope and spirit of the present invention.
Number | Date | Country | |
---|---|---|---|
61308060 | Feb 2010 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 13198802 | Aug 2011 | US |
Child | 14612538 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 13033587 | Feb 2011 | US |
Child | 13198802 | US |