Claims
- 1. A method of using a neutral event file for manufacturing line analysis, said method comprising the steps of:constructing at least one neutral event file containing a description of interlocked events for a manufacturing line; constructing a manufacturing line analysis model using the at least one neutral event specification file, at least one geometry file, and at least one motion file; executing the manufacturing line analysis model using a manufacturing line verification system to verify the manufacturing line; determining by an operator whether an acceptable manufacturing line exists based on the manufacturing line analysis model; and using the manufacturing line analysis model to build the manufacturing line if determined that an acceptable manufacturing line exists.
- 2. A method as set forth in claim 1 including the step of determining whether a change is required to the manufacturing line if determined that an acceptable manufacturing line does not exist.
- 3. A method as set forth in claim 2 including the step of modifying the manufacturing line analysis model if a change is not required to the manufacturing line.
- 4. A method as set forth in claim 2 including the step of modifying the at least one neutral event file if a change is required to the manufacturing line.
- 5. A method as set forth in claim 1 wherein said step of constructing the at least one neutral event file is based on engineering source applications and data.
- 6. A method as set forth in claim 1 wherein said step of executing the manufacturing line analysis model includes receiving the at least one neutral event file, the at least one geometry file, and the at least one motion file.
- 7. A method as set forth in claim 6 wherein said step of executing includes linking the at least one neutral specification file, the at least one geometry file, and the at least one motion file together to form the manufacturing line analysis model.
- 8. A method as set forth in claim 6 wherein said step of executing further comprises playing the manufacturing line analysis model by the manufacturing line verification system.
- 9. A method as set forth in claim 4 wherein said step of modifying the at least one neutral event file includes modifying engineering source applications and data.
- 10. A method as set forth in claim 3 wherein said step of modifying the manufacturing line analysis model includes modifying the at least one geometry file and the at least one motion file.
- 11. A method as set forth in claim 1 wherein said step of constructing the at least one neutral event file comprises generating a specification format having a name, description, at least one dependency, at least one signal, and at least one action.
- 12. A method as set forth in claim 1 including the step of verifying the manufacturing line model if determined that an acceptable manufacturing line model exists.
- 13. A method as set forth in claim 12 wherein said step of verifying comprises playing the manufacturing line analysis model by the manufacturing line verification system.
- 14. A method of using a neutral event file for manufacturing line analysis, said method comprising the steps of:constructing at least one neutral event file containing a description of interlocked events for a manufacturing line based on engineering source applications and data; receiving the at least one neutral event file, at least one geometry file, and at least one motion file; constructing a manufacturing line analysis model using the at least one neutral event specification file, the at least one geometry file, and the at least one motion file; executing a manufacturing line analysis model using a manufacturing line verification system to verify the manufacturing line; determining by an operator whether an acceptable manufacturing line exists based on the manufacturing line analysis model; and using the manufacturing line analysis model to build the manufacturing line if determined that an acceptable manufacturing line exists.
- 15. A method as set forth in claim 14 including the step of determining whether a change is required to the manufacturing line if determined that an acceptable manufacturing line does not exist.
- 16. A method as set forth in claim 15 including the step of modifying the manufacturing line analysis model if a change is not required to the manufacturing line.
- 17. A method as set forth in claim 15 including the step of modifying the at least one neutral event file if a change is required to the manufacturing line.
- 18. A method as set forth in claim 14 wherein said step of executing further comprises playing the manufacturing line analysis model by the manufacturing line verification system.
- 19. A method as set forth in claim 14 wherein said step of constructing the at least one neutral event file comprises generating a specification format having a name, description, at least one dependency, at least one signal, and at least one action.
- 20. A method of using a neutral event file for manufacturing line analysis, said method comprising the steps of:constructing a neutral event file containing a description of interlocked events for a manufacturing line based on engineering source applications and data; receiving the at least one neutral event file, at least one geometry file, and at least one motion file; constructing a manufacturing line analysis model using the at least one neutral event specification file, the at least one geometry file, and the at least one motion file; executing a manufacturing line analysis model using a manufacturing line verification system to verify the manufacturing line; determining by an operator whether an acceptable manufacturing line exists based on the manufacturing line analysis model; using the manufacturing line analysis model to build the manufacturing line if determined that an acceptable manufacturing line exists; determining whether a change is required to the manufacturing line if determined that an acceptable manufacturing line does not exist; modifying the manufacturing line analysis model if a change is not required to the manufacturing line; and modifying the at least one neutral event file if a change is required to the manufacturing line.
CROSS REFERENCE TO RELATED APPLICATIONS
The present application claims the priority date of co-pending U.S. Provisional Patent Application Serial No. 60/236,965, filed Sep. 29, 2000.
US Referenced Citations (8)
Number |
Name |
Date |
Kind |
4931951 |
Murai et al. |
Jun 1990 |
A |
5050088 |
Buckler et al. |
Sep 1991 |
A |
5963447 |
Kohn et al. |
Oct 1999 |
A |
6167406 |
Hoskins et al. |
Dec 2000 |
A |
6185469 |
Lewis et al. |
Feb 2001 |
B1 |
6223134 |
Rust et al. |
Apr 2001 |
B1 |
6263487 |
Stripf et al. |
Jul 2001 |
B1 |
6292707 |
Hair et al. |
Sep 2001 |
B1 |
Foreign Referenced Citations (1)
Number |
Date |
Country |
508308 |
Apr 1992 |
EP |
Provisional Applications (1)
|
Number |
Date |
Country |
|
60/236965 |
Sep 2000 |
US |