Claims
- 1. A method of using a neutral event file for manufacturing line analysis, said method comprising the steps of:
constructing a neutral event file; executing a manufacturing line analysis model using the neutral event file; determining whether a good manufacturing line exists based on the manufacturing line analysis model; and using the manufacturing line analysis model to build the manufacturing line if a good manufacturing line exists.
- 2. A method as set forth in claim 1 including the step of determining whether a change is required to the manufacturing line if a good manufacturing line does not exist.
- 3. A method as set forth in claim 2 including the step of modifying the manufacturing line analysis model if a change is not required to the manufacturing line.
- 4. A method as set forth in claim 2 including the step of modifying the neutral event file if a change is required to the manufacturing line.
- 5. A method as set forth in claim 1 wherein said step of constructing the neutral event file is based on engineering source applications and data.
- 6. A method as set forth in claim 1 wherein said step of executing the manufacturing line analysis model includes receiving at least one neutral event file, geometry file, and tooling motion file.
- 7. A method as set forth in claim 6 wherein said step of executing includes linking files together to form a manufacturing line model file.
- 8. A method as set forth in claim 6 wherein said step of executing further comprises playing the manufacturing line model by a manufacturing line verification system based on the manufacturing line model file.
- 9. A method as set forth in claim 4 wherein said step of modifying the neutral event file includes modifying engineering source applications and data.
- 10. A method as set forth in claim 3 wherein said step of modifying the manufacturing analysis model includes modifying geometry files and motion files.
- 11. A method as set forth in claim 1 wherein said step of constructing a neutral event file comprises generating a specification format having a name, description, at least one dependency, at least one signal, and at least one action.
- 12. A method as set forth in claim 1 including the step of verifying the manufacturing line model if a good manufacturing line model exists.
- 13. A method as set forth in claim 12 wherein said step of verifying comprises playing the manufacturing line model by a line verification system.
- 14. A method of using a neutral event file for manufacturing line analysis, said method comprising the steps of:
constructing a neutral event file based on engineering source applications and data; receiving at least one neutral event file, geometry file, and tooling motion file; executing a manufacturing line analysis model using the neutral event file, geometry file, and tooling motion file; determining whether a good manufacturing line exists based on the manufacturing line analysis model; and using the manufacturing line analysis model to build the manufacturing line if a good manufacturing line exists.
- 15. A method as set forth in claim 14 including the step of determining whether a change is required to the manufacturing line if a good manufacturing line does not exist.
- 16. A method as set forth in claim 15 including the step of modifying the manufacturing line analysis model if a change is not required to the manufacturing line.
- 17. A method as set forth in claim 15 including the step of modifying the neutral event file if a change is required to the manufacturing line.
- 18. A method as set forth in claim 14 wherein said step of executing further comprises playing the manufacturing line model by a manufacturing line verification system based on the manufacturing line model file.
- 19. A method as set forth in claim 14 wherein said step of constructing a neutral event file comprises generating a specification format having a name, description, at least one dependency, at least one signal, and at least one action.
- 20. A method of using a neutral event file for manufacturing line analysis, said method comprising the steps of:
constructing a neutral event file based on engineering source applications and data; receiving at least one neutral event file, geometry file, and tooling motion file; executing a manufacturing line analysis model using the neutral event file, geometry file, and tooling motion file; determining whether a good manufacturing line exists based on the manufacturing line analysis model; using the manufacturing line analysis model to build the manufacturing line if a good manufacturing line exists; determining whether a change is required to the manufacturing line if a good manufacturing line does not exist; modifying the manufacturing line analysis model if a change is not required to the manufacturing line; and modifying the neutral event file if a change is required to the manufacturing line.
CROSS REFERENCE TO RELATED APPLICATIONS
[0001] The present application claims the priority date of co-pending U.S. Provisional Patent Application Serial No. 60/236,965, filed Sep. 29, 2000.
Provisional Applications (1)
|
Number |
Date |
Country |
|
60236965 |
Sep 2000 |
US |