Information
-
Patent Grant
-
6194275
-
Patent Number
6,194,275
-
Date Filed
Monday, March 13, 200024 years ago
-
Date Issued
Tuesday, February 27, 200123 years ago
-
Inventors
-
Original Assignees
-
Examiners
Agents
- Saile; George O.
- Ackerman; Stephen B.
- Pike; Rosemary L. S.
-
CPC
-
US Classifications
Field of Search
US
- 438 130
- 438 275
- 438 276
- 438 277
- 438 278
- 438 290
- 438 598
- 438 923
-
International Classifications
-
Abstract
Sewage water containing phosphate is passed through an anaerobic treatment chamber containing reductive-iron-dissolution (RID) material, such as ferric oxyhydroxide solids. The RID material releases ferrous ions into solution, which combine with the phosphate to produce ferrous-phosphate minerals, such as vivianite, which precipitate in the anaerobic chamber. Also, iron and phosphate remaining in the water can precipitate as ferric-phosphate minerals such as strengite, when the water is later aerated.
Description
BACKGROUND TO THE INVENTION
In many ponds, lakes, and other bodies of water, the nutrient balance is such that phosphorus is the nutrient that limits the growth of algae. An increase in the amount of phosphorus in the water can cause an excess of algae. This can deplete the oxygen and the other nutrients in the water, to the detriment of fish and other life forms. It is therefore important to prevent excess phosphorus from entering the body of water.
Often, excess phosphorus comes from sewage. Sometimes, the excess phosphorus is in the effluent from small-scale domestic septic tank systems, and in some cases the factor that limits how many dwellings can be located in an area near a lake is the fact that any further dwellings will cause an unacceptable increase in the amount of phosphorus entering the lake.
The traditional way of limiting phosphorus has been to limit the number of dwellings. Conventional sewage treatment, especially of the kind carried out in a traditional domestic septic tank, has not been aimed at removing, and does not remove, the phosphorus to any substantive degree.
The invention is aimed at treating sewage water, to attenuate the phosphorus content thereof. Another aim is to provide a phosphorus treatment system which operates on the water as the water is passing through the septic-tank or other sewage treatment system, whereby the costs attributable solely to the phosphorus treatment system are minimised. Another aim is to provide a treatment system which requires nothing, or very little, by way of on-going attention and maintenance, over long periods of use.
GENERAL FEATURES OF THE INVENTION
The invention lies in placing a body of RID material in the water to be treated, and keeping the water, and the RID material, under anaerobic conditions. Preferably, the anaerobic conditions are so strict that the Eh voltage of the water becomes very, low, or negative.
For the purposes of this specification, RID material means Reductive Iron Dissolution material. That is to say, RID material is material that contains ferric iron, and the ferric iron therein is capable of undergoing a change in oxidation state, i.e is capable of being reduced, to ferrous iron, under conditions of anaerobicity, i.e conditions of low or negative Eh voltage.
As to pH, generally sewage water tends to of neutral, or near-neutral, pH, under which conditions the newly-created ferrous ions are much more soluble than the ferric ions, and readily pass into solution in the water.
The phosphorus-attenuation systems as described herein make use of the fact that iron in the ferric oxidation state Fe
3+
is very insoluble at neutral pH values, but in its ferrous oxidation state Fe
2+
is much more soluble. The invention recognises that in anaerobic (low Eh) waters, ferric iron is unstable and can be solubilized by reduction to Fe
2+
. The dissolved Fe content in anaerobic waters can thus rise to tens of milligrams Fe per liter of water (and considerably more than that in some cases).
The presence of large amounts of dissolved iron in the water leads to phosphate precipitation by two mechanisms. First, in the anaerobic environments, when phosphate is present, increased iron levels lead to the formation of ferrous-phosphate minerals, such as vivianite Fe
3
(PO
4
)
2
.8H
2
O which is insoluble enough to precipitate. Second, when the effluent is subsequently oxidised, any still-remaining dissolved ferrous ions tend to start to oxidise back to ferric ions, but because of the still-dissolved phosphate, the ferric ions now tend to form ferric-phosphate compounds, such as strengite FePO
4
.2H
2
O which again is insoluble enough to precipitate.
Thus, the dissolved ferrous iron provides two mechanisms for drawing the phosphate ions out of solution, and causing them to precipitate
In fact, a third mechanism can be present also. Oxidation of the ferrous ions back to ferric will result in precipitation of some ferric hydroxide or oxyhyroxide, besides the strengite and other ferric-phosphate minerals. Ferric oxyhydroxide serves as an excellent medium for adsorbing phosphate ions out of solution.
When all three mechanisms are present, the phosphate is removed (a) by precipitation in the anaerobic area as vivianite, (b) by precipitation in the aerobic area as strengite, and (c) by adsorption. All three mechanisms, however, require first that insoluble ferric iron be converted to soluble ferrous iron, which requires a low Eb; and it is recognised that raw sewage, held under anaerobic conditions, provides an excellent medium for promoting the reductive dissolution of ferric iron.
The RID material should be rich in ferric iron. Ferric hydroxide Fe(OH)
3
or oxy-hydroxide FeOOH compounds are suitable. (Ferric oxide, e.g hematite Fe
2
O
3
would be unsuitable, because its mineral structure makes hematite less susceptible to reductive dissolution.
The RID material that is to be placed in the anaerobic conditions, i.e the material that contains the ferric iron, need only, contain a little iron, as an overall percentage. The minimum effective iron content, for the purposes of the invention, may be regarded as being about 1 milli-gram of iron per gram of aggregate material (i.e 0.1%/wt). The iron content referred to here is the content of ferric iron that can be reduced to ferrous iron (which is sometimes called the “acid-extractable” iron). The preferred ferric iron content in the RID material is in the region of 0.3%/wt to 5%/wt.
As to its physical or mechanical character, the RID material should be physically capable of releasing its ferrous ions into the water. The RID material should be porous, and permeable to the passage of a flow of water through the material. The RID material may include a matrix of sand, which is chemically inert, which supplies the grain size for maintaining permeability. The RID material preferably may be supplied as sand-sized grains, the grains being coated with powder-sized particles of the ferric substances.
Ferric hydroxides and oxyhydroxides are available quite readily in many places, in the soil-B horizon; that is to say, in the mineral-enhanced area underneath the top-soil. Suitable ferric hydroxide compounds have the characteristic red-orange-brown colour associated with a high ferric content.
If the ferric content of the locally-available material is inadequate, extra ferric can be provided in the form of e.g Fe(OH)
3
(ferri-hydrite) or FeOOH (geothite). These minerals are readily available in powder form (they are used for making pigmentations), and can be used with bulk filler such as local sand.
Providing RID material with a ferric content of more than about 5%/wt would not be suitable, because the ferric hydroxide and oxyhydroxide materials minerals are generally of a fine-grained nature, and the greater percentage would, or might, diminish permeability too much.
The degree to which the phosphorus contamination in the water is attenuated depends on the amount of iron that is solubilized. In a typical real case, the residence time needed for an effective amount of ferrous ions to enter the water may be regarded as being in the order of a day or two; that is to say, about the same residence time as the water in a well-engineered small system spends in the anaerobic septic tank.
Typically, a system that handles a through-flow of 1000 liters/day of sewage has a septic tank volume of about 3500 liters. In a case where the presence of phosphorus is troublesome enough to warrant being addressed by the system as described herein, the concentration of phosphorus in the water might be, for example, 10 mg-P per liter of the water. Such a system would need to be supplied with fresh ferrous iron entering solution at the rate of about 5 grams Fe per day. Given that the body of RID material contains, for example, about 2%/wt of ferric iron, a mass of RID material of about 1800 kilograms (which would be about 1 cubic meter of material) can be expected to go on releasing ferrous iron into solution at that sort of rate for many months, and possible for many years.
It is recognised that providing such an amount of RID material can be done economically, and that amount of material can be readily accommodated in a sewage treatment system without resorting to great expense, over and above what is needed in any event for the main task of the conventional system, i.e the remediation of the ammonium and organic constituents in the water.
It is recognised that it is economical to keep this quantity of ferric iron on hand, and available for the slow release of ferrous ions, at the required rate such that the amount of Fe taken into each charge of water that goes through the system can be expected to contain in the range of 1-20 mg-Fe per liter of water.
Once the ferrous ions have entered the water, the water should still be kept under strict anaerobic conditions. The reaction of the ferrous ions with the phosphate ions takes, again, about a day or so, in order for a majority of the phosphate to precipitate out as vivianite and the other ferrous-phosphate precipitants.
It may be noted that building up the required concentration of ferrous ions in the water does not take place immediately, but takes several hours, during which time the water must remain in contact with the RID material, and anaerobic. Also, the time taken for the required degree of precipitation of vivianite to take place, likewise is several hours (during which time, again, the conditions must remain strictly anaerobic). It is recognised that because the two processes are sequentially separated in time, they can be physically separated. This is advantageous, because it means the designer can arrange for the precipitation of the vivianite to take place after the water has left the RID material. Therefore, the designer can arrange that the main bulk of the precipitated vivianite accumulates outside the RID material. Thus the RID material can remain unclogged over long periods. (This aspect may be contrasted with systems in which the phosphate is removed out of solution by adsorption; of course in that case the adsorbed solid phosphate cannot avoid clogging the permeability of the treatment material.)
Because the dissolution reaction consumes iron from the RID material, replenishment of the material will be required periodically. The designer should preferably design for easy replenishment of the RID material, and it is sensible also to provide for removal of the vivianite at the same time. Of course, the prudent designer will seek to make the intervals of replenishment of the RID material coincide with the normal periodic maintenance of the septic tank.
Although the treatment configurations discussed here pertain to sewage treatment in septic systems, the system can also be used in conjunction with conventional wastewater treatment plants and with other wastewaters containing phosphorus.
THE INVENTION IN RELATION TO THE PRIOR ART
Iron has been used for phosphate treatment in conventional sewage treatment processes. The iron is added as iron salts, e.g ferrous chloride, or ferric chloride, which are much more soluble than the ferric oxyhydroxide compounds present in the RID material. These salts are effective in causing the precipitation of phosphate; but because they dissolve quickly, the salts must be added continually to the wastewater stream, manually or by mechanical means, so that continual maintenance is required. Systems that require such constant attention can be viable in municipal sewage systems, but are contra-indicated for domestic systems, where any departure from the minimum amount of attention needed by the traditional septic tank system would not find favour.
Because RID material solubilizes iron more slowly and only under anaerobic conditions, a large mass of RID material can be provided, and this large mass can be left to release ferrous ions into the water slowly, and over long periods of time, without attention or maintenance. These characteristics are attractive for smaller treatment systems.
Porous media material with ferric oxyhydroxide compounds have been suggested previously for treatment of phosphate from sewage, but by a distinctly different process, i.e absorption. Patent publications U.S. Pat. No. 4,184,947 (Demisch, Jan. 22, 1980) and CA-2,190,033 (Blowes, May 11, 1997) show examples of sorption processes. At normal pH ranges, ferric oxide minerals have surfaces that are positively charged, and are thus capable of adsorbing anions such as phosphate. Such sorption reactions do not involve an increase in dissolved iron concentrations. The RID treatment process is distinct in that it requires that the RID material be placed in the water under such anaerobic conditions, and for such residence time, that ferric iron reduces to ferrous iron, whereby the concentration of iron dissolved in the water substantially increases. The increase in iron in the water is caused not by the dissolution of soluble iron salts, as was done in sewage works, but by providing anaerobic (i.e low Eh) conditions in which ferric iron solids can undergo a change in oxidation state, from Fe
3+
to Fe
2+
.
In conventional sewage treatment, phosphorus levels have been controlled by addition of soluble metal salts (ferrous chloride, ferric chloride, alum, lime) which promote the precipitation of insoluble (that is to say, sparingly soluble) metal-phosphate mineral phases. Treatment requires continual addition of reagents however, so that the maintenance requirements generally make such treatment methods impractical for use with smaller domestic sewage treatment systems such as septic systems.
Previously suggested phosphate treatment methods for use with small septic systems have focussed on adsorption, using porous media material with enhanced capacity to absorb phosphate. At normal pH ranges, many metal hydroxide minerals such as ferrihydrite Fe(OH)
3
have a positive surface charge and thus have a strong capacity to absorb anions such as phosphate PO
4
3−
.
DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS
By way of further explanation of die invention, exemplary embodiments of the invention will now be described with reference to the accompanying drawings, in which:
FIG. 1
is a cross-sectional view of a water treatment system for carrying out treatment that embodies the invention;
FIG. 2
is a corresponding view of another system;
FIG. 3
is a corresponding view of another system;
FIG. 4
is a corresponding view of another system;
FIG. 5
is a corresponding view of another system;
FIG. 6
is a corresponding view of another system;
FIG. 7
is a corresponding view of another system;
FIG. 8
is a graph showing attenuation of phosphate from the water;
FIG. 9
is a graph showing presence of iron in the water.
The systems shown in the accompanying drawings and described below are examples which embody the invention. It should be noted that the scope of the invention is defined by the accompanying claims, and not necessarily by specific features of exemplary embodiments.
FIG. 1
shows raw sewage (from e.g a domestic house) being fed to a primary tank
20
. The primary tank may be regarded as equivalent to a conventional septic tank. As in a septic tank, the water in the primary tank is maintained under anaerobic conditions. In the primary tank, the usual digestion of organic materials in the sewage takes place, and inert solids in the water settle to the floor of the tank. Also, if organic phosphate is present in the sewage, much of that is transformed, as usual, into inorganic phosphate in the primary tank. (It is the inorganic phosphate which is attenuated by the remediation treatments as described herein.)
Sludge
23
collects on the floor of the primary tank
20
. The partially treated water from the primary tank leaves via pipe
25
. The water now enters a secondary treatment chamber
27
. The water in the secondary treatment chamber also is maintained under strict anaerobic conditions. In this secondary treatment chamber is provided a body
29
of RID material, which rests on a support screen
30
. The body
29
of RID material is permeable, and the water passes through the body. The water emerges from the secondary treatment chamber
27
via pipe
32
. From there, the water passes to a tile-bed or soakaway
34
. Here, the water is exposed to the air, and the usual oxidation reactions commence.
In the anaerobic conditions inside the secondary treatment chamber
27
, low redox-voltage (i.e low Eh-voltage) conditions prevail. The ferric RID material
29
becomes unstable, and the ferrous (reduced) form becomes the stable state. Ferrous ions have a much greater solubility, and the ferrous ions pass into solution.
The dissolved ferrous ions react with the dissolved phosphate ions in the water, under the maintained-anaerobic conditions, to form ferrous-phosphate mineral substances, such as vivianite Fe
3
(PO
4
)
2
.8H
2
O which is insoluble, and which precipitates. The solid vivianite collects as a sludge
36
in the anaerobic secondary treatment chamber
27
.
Generally, upon leaving the chamber
27
, there will still be some ferrous ions in solution in the water, and there will still be some phosphate ions in solution in the water, when the water is passed through pipe
32
to the aerobic treatment zone
34
stage. Now, the Eh-voltage goes up, and the ferrous ions tend to oxidise, i.e to revert to the ferric state. The ferric state being much less soluble, as mentioned, precipitation occurs. The substance that precipitates, however, need not be the ferric hydroxide and oxyhydroxide (from whence the iron came) but rather, the presence of the phosphate ions leads to the formation of combined ferric-phosphate minerals, such as strengite FePO
4
.2H
2
O Strengite also is insoluble, and precipitates. Thus, more of the phosphate is taken out of the water as the ferric ions come out of solution.
Some ferric oxyhydroxide, and other ferric substances, do precipitate, however, in the aerobic treatment zone
34
. And in fact, these precipitates can act to remove even more phosphate; this is because the newly-formed ferric oxyhydroxide is an excellent adsorbing medium, and is effective to sorb even more of the phosphate out of the water.
Tests have shown that the following level of performance is possible, and expected, in a well-engineered system. Of the total inorganic phosphorus burden (i.e the phosphate-P burden) in the water entering the anaerobic secondary treatment chamber
27
, 70-80% of the phosphate-P can be expected to be removed in the secondary treatment chamber, by precipitation as vivianite and the other ferrous-phosphate minerals. And a total of around 90-98% of the phosphate-P burden can be expected to have been removed from the water leaving the aerobic treatment zone, following the further precipitation of strengite and the other ferric-phosphate minerals, and as a result of sorption of the phosphate onto the newvly-precipitated ferric oxyhydroxide.
As far as the physical characteristics of the system shown in
FIG. 1
are concerned, the primary tank
20
and secondary chamber
27
can be formed by providing a single tank structure
38
, and placing a baffle
40
to separate the tank
20
from the chamber
27
. The sludge
23
that collects on the floor of the primary tank is normal septic-tank sludge, which has to be removed every two or three years, in a well-designed system. At the same time as that traditional septic-system maintenance work is being done, the RID material
29
can be replaced, and the vivianite sludge
36
can be removed. That is to say, the replenishment of the RID material, and the removal of the phosphorus-laden precipitates, can be timed more or less to coincide with normal maintenance of the septic system.
The amount of accumulation of strengite and other ferric minerals in the aerobic treatment zone is likely to be so small as to be not worth removing, during the life of the system. (It may be noted that it would be very difficult to extract any precipitated material from a soakaway.)
The RID treatment system, engineered in this way, is simple and inexpensive, and the maintenance work required is ver, much in line with the services already provided by pump-out contractors and septage hauliers, both as to the nature of the work and as to timing.
FIG. 2
shows a slightly more elaborate set-up. Here, water from the anaerobic primary tank
40
is drawn upwards through the first portion
43
a
of the anaerobic secondary treatment chamber
43
, in which is located the permeable body
45
of RID material. The water then passes into the second portion
43
b
of the treatment chamber, which is maintained anaerobic also. The water entering the second portion
43
b
contains a maximum of dissolved ferrous ions, having just passed through the body
45
, and there is ample opportunity for the reaction of the ferrous ions with the phosphate ions to take place, and to be maximised, in the second portion
43
b
of the treatment chamber. The vivianite sediment collects on the bottom of the second portion
43
b
, and it can be removed from there just as can the sludge from the bottom of the primary tank
40
.
Of course, the main purpose of a septic system is to process the ammonium in the sewage, and that function should not be compromised by the phosphate remediation. The designer of the phosphate remediation should note that it would be disadvantageous if the permeable body of RID material had to cope with such solids as may be present in the sewage, and so the designer should take care to place the body of RID material in a place where the water entering the body is substantially clear of solids. But that is not too difficult to engineer, as shown, and it may be noted that the iron-phosphate reactions can then proceed simultaneously, i.e in the same chambers, with the ammonium and other anaerobic sewage-processing reactions, so that the total volume of the anaerobic components of the system are hardly any greater than in a conventional septic system. Similarly, the capacity of the aerobic components need hardly be increased. It is the common practice to over-specify a septic system (mainly because of the large expense if the capacity had to be increased later), and the extra capacity needed by the phosphate system can normally be accommodated within that margin.
FIG. 3
shows an RID phosphorus-treatment system that is installed as a separate unit between a traditional septic tank
50
and a traditional tile-bed soakaway
52
, both of which are left untouched. The anaerobic treatment chamber
54
(of concrete, plastic, or metal) contains a body
56
of RID material. The water from the septic tank
50
enters the chamber
54
, still under anaerobic conditions. The vivianite precipitates into the body
56
, and the designer should see to it that the body will remain permeable and unclogged for a suitable number of months.
FIG. 4
shows another version of a separate phosphorus-treatment unit that fits between a traditional septic tank and tile-bed soakaway. Here, the unit
60
houses the anaerobic treatment chamber
63
, containing the body of RID material, as well as an aerobic cell
65
. Oxidation of the ferrous ions to ferric, and the precipitation of ferric-phosphates such as strengite, are processes that take place, or get started, in the aerobic cell
65
. It is an advantage if the tile bed soakaway (which comes later) is not subjected to the strengite precipitation, i.e if at least some of the strengite (and the ferric hydroxides) can be removed before the water reaches the tile bed.
The main function of the aerobic tile bed is to convert the (dissolved) ammonium into (dissolved) nitrate, and if some conversion of ammonium to nitrate takes place in the aerobic cell
65
, so much the better. But it is advantageous for the main function of the tile bed soakaway if the soakawvay is not troubled by the solids that have precipitated in the cell
65
.
In the case of a pre-existing septic tank system, in which it is desired to achieve some phosphorus attenuation, with a minimum of expenses, the system shown in
FIG. 5
might be considered.
In
FIG. 5
, the RID material is in the form of briquettes
70
, which are suspended in the pre-existing septic tank
72
. Now, the water does not flow through the RID material, in the sense as previously described, but rather the ferrous ions, upon entering solution, diffuse from the briquettes out into the water in the septic tank. This arrangement can therefore be expected to be inferior to the systems where the water flows actually through the permeable body of RID material. Also, sewage solids are present in the septic tank
72
, which can affect the RID material.
FIG. 6
shows another version. In the previous designs, it was convenient to maintain continuity between the anaerobic water in the phosphorus treatment zone with the anaerobic water in the septic tank, but such continuity is not essential. In fact, the water can be allowed to become aerated after passing from the septic tank, and the water can still be rendered suitable for phosphorus treatment using the processes described herein, by making the water once more anaerobic. In
FIG. 6
, the anaerobic treatment chamber is located underneath the aerobic tile bed.
In many cases, it will be convenient to provide the anaerobic treatment chamber below the water table, because that is where it is easier to maintain anaerobic conditions.
FIG. 6
shows, however, that an anaerobic chamber
80
can be provided above the water table
83
. A liner
85
of plastic or other impervious material defines the bottom of the chamber. The body
86
of RID material is placed on top of the liner, and the infiltration pipes
87
and gravel body
89
of the soakaway are placed on top of that, i.e above the RID material.
The RID material must remain anaerobic, and this can be achieved by ensuring the RID material cannot dry out. The grain size of the RID material can be selected such that the material remains tension-saturated for long periods of time, and the liner
85
creates a basin in which the water under treatment is retained. In
FIG. 6
, the precipitated vivianite collects in the RID material, which is not preferred, but this system might be applicable in some cases.
FIG. 7
shows another treatment system. As mentioned, preferably the water entering the RID media should not previously have been aerated, because aeration increases the residence time needed to bring the water down to near-zero or negative Eh-voltage. Preferably, therefore, the system is so arranged that the water being presented to the RID media is already in a thoroughly anaerobic condition. However, the attenuation of phosphorus using the RID treatment system can still be employed, even if the water to be treated has been previously aerated. But then, the required anaerobic conditions of the RID media must be engineered.
Pre-aeration of the water can be present as a result of, for example, mechanical aeration, or the use of unsaturated sand filters, peat systems, biofilters, or the like. To effect the RID process, the designer should provide a secondary anaerobic chamber
90
, in which reducing-Eh conditions are re-established, in line following an aerobic treatment station
92
. This can be done by adding a carbon source
94
or other electron donor source in the secondary chamber
90
. Suitable electron-donor sources can include sawdust, compost, pyrite, or the like. The environment in the secondary chamber
90
should be such as to establish thoroughly anaerobic conditions in the chamber, i.e such that the Eh-voltage of the water can go negative, or almost so.
Thus, an organic carbon material such as sawdust or compost is useful for establishing conditions in which the Eh voltage will fall. The provision of organic carbon also has another benefit.
One result of aerobic pre-treatment is that ammonium in the water can already be oxidised (at least partially) to nitrate. It is known that passing nitrate-laden water through organic carbon material under anaerobic conditions can lead to denitrification of the dissolved nitrate. It is recognised that the carbon material
94
can be mixed with the RID media material, in the one anaerobic chamber. Now, the system has the advantage of potentially enabling the simultaneous treatment of the nitrate (by denitrification), and of the phosphate.
FIG. 8
is a graph showing the on-going remediation of phosphorus in laboratory tests. Phosphate-P is present in the incoming sewage at a burden varying between 5 and 20 milligrams-P per liter of water. Precipitation in the anaerobic chamber reduces the P by a first, large, proportion, and then the subsequent aerobic precipitation brings the P down to 2 mg/L or less.
FIG. 9
is a graph showing the amount of ferrous iron that is put into solution by the RID process. As shown, the ferrous content can be expected to be in the 1 or 2 mg/L range.
It is recognised that passing sewage water over RID material, under anaerobic conditions, can be expected to put ferrous ions into solution in domestic sewage water at the rate of 1 or 2 milligrams per liter, or more, and to continue doing so, without replenishment, and indeed without additional input or attention of any kind, over periods that can be measured in months or even years.
At that rate, dissolved phosphorus (in phosphate form) can be attenuated from a problematic 10 mg/L down to the much lower 2 mg/L, or less, as the sewage water passes through the kind of treatment phases it has to undergo in any event.
Replenishing the supply of RID material every two years or so is much more acceptable than tipping in a bag of soluble treatment salts every few days. The precipitated vivianite etc minerals might eventually clog up the treatment system, if left, but the system can be arranged so these minerals are collected in a place where they can be easily removed, and they can be carried away periodically—at the same time as the sludge from the septic tank, for example. Thus, as far as the user is concerned, although the RID phosphorus-attenuation system is not quite in the fit-it-and-forget-it category, the needs of a properly-engineered RID system are no more demanding than the needs of the properly-engineered conventional septic system into which it is incorporated.
When trouble occurs in conventional septic systems, it is usually because the sy stem has been overloaded, perhaps with solids, or with ammonium, and of course, if an RID system has indeed been inadequately engineered, there will be similar problems with the RID system.
It is recognised, in the invention, that, given the amount of RID material that can conveniently and economically be provided for treating sewage water, and given the levels of phosphorus likely to be encountered in sewage water, the RID system can in fact provide an effective degree of attenuation of the phosphorus over long periods. If replenishmnent were needed every few days, the system would be of little practical use. If huge quantities of the RID material were needed for the treatment to be effective, or if the RID material was expensive to provide in the quantities needed, that would be no use either. The recognition is that the RID system can provide effective treatment performance, at an acceptably economical cost, both as to initial installation, and as to on-going maintenance.
As mentioned, a mineral is suitable to be considered as an RID material, in the invention, insofar as ferric material in the mineral reduces, under conditions of low Eh voltage (i.e less than +200 mV) and neutral pH, to a ferrous salt, and the ferrous salt is soluble under those Eh and pH conditions. It should also be noted that, when considering whether a mineral would be suitable, the rate at which the redox conversion takes place is important. In respect of some minerals, the redox conversion from ferric to ferrous., under the kind of Eh and pH conditions obtaining generally in septic tank effluent, would be very slow, the time scale of the changes being measured perhaps in thousands of years. For example, minerals such as hematite have such a very slow reduction rate, as to be of little use for generating soluble ferrous salts. Ferrous iron arising from minerals such as magnetite is not soluble under the reducing conditions, so they are not of much use either.
Preferably, the RID material is material in respect of which, under the reducing conditions, the ferrous iron enters solution at a rate of no less than 0.1 mg of Fe per day, per kg of the mineral. That is to say, if the production of ferrous material from the redox conversion is so slow that ferrous material enters solution at a rate of less than 0.1 mg /day per kg, the effect is so slight as to be not worthwhile. With some minerals, rates at which ferrous ions are produced, and enter solution, can be as high as 10 mg of Fe per day per kg, but it is noted that adequate remediation of phosphorus can be achieved with minerals that produce ferrous ions at lower rates than that. Indeed, too fast a rate would be less advantageous—the rate should be slow enough that the mineral will still be supplying ferrous ions after a period that is measured, preferably, in years, or at least in months. Redox reactions are slow enough, generally, that minerals that might be considered as RID material would be unlikely to produce too rapid a reductive conversion of ferric material.
In the systems as described herein, it does not matter if the ferrous ions are quick to dissolve; indeed it would not matter if the ferrous ions were to enter solution as soon as they were produced. The advantageous long-term performance of the mineral arises because the ferrous material is produced at a slow steady rate, not because the ferrous material in necessarily slow to dissolve.
It is recognised that a commercially worthwhile rate of production of soluble ferrous ions can be achieved by the use of certain ferric minerals, under the reducing conditions encountered in septic tank effluent. For the remediation of phosphorus to be long-term, and effective, the production of soluble ferrous ions should not be so fast that the material is quickly used up (but of course, the rate of production should be substantial enough that the quantity of soluble material produced is worthwhile).
It is recognised that a suitable rate of production of soluble ferrous ions can be engineered in the manner as described herein. It is recognised that in trying to treat phosphorus simply by providing soluble ferrous salts, the designer will always face the great difficulty of slowing down the rate at which the ferrous material enters solution, such that there would still be some ferrous ions entering solution after a period of months or years. It is recognised that the highly-suitable rate that arises in the systems as described arises basically automatically, without the need for attention on the part of the owner of the system.
The Eh or redox voltage of the water in which the reactions take place should be less than about +200 mV. This figure does not represent a sudden cut-off point, above which no result is obtainable. The +200 mV limit identifies a commercially worthwhile rate; +300 mV would be the level above which reduction of ferric to ferrous generally would hardly be detectable. The more reducing the conditions, the greater the rate of production of ferrous ions. Reducing conditions of less than about −200 mV are unlikely to be encountered (or achieved) in septic tank effluent, and in any event such a low voltage might lead to too rapid a rate of reduction, whereby the mineral would be used up too quickly,.
Claims
- 1. Procedure for attenuating dissolved phosphorus from water passing through a septic tank, wherein:the septic tank is configured with an inlet conduit and an outlet conduit, and the procedure includes conveying the water therebetween; the water flowing through the outlet conduit has, dissolved in it, an ammonium content; the water flowing through the inlet conduit is contaminated by having, dissolved in it, a phosphorus content; the septic tank is so arranged and operated, as to its configuration and as to the manner and rate at which the water passes therethrough, that water in the septic tank is under such strictly anaerobic reducing conditions that the Eh voltage of the water is less than 0.3 volts; the procedure includes providing, in the septic tank, a body of treatment material; the treatment material in the body includes solid grains of Reductive Iron Dissolution material, being RID-material, being material that consists of either ferric hydroxide or ferric oxy-hydroxide or both; the conditions in the septic tank, as to the pH and the Eh of the water, are such that the ferric hydroxide or oxyhydroxide dissolves at a slow rate, and thereby releases ferrous ions into solution in the water, and the ferrous ions react with the phosphorus dissolved in the water, to produce solid ferrous-phosphate minerals, which precipitate; the procedure includes so configuring the body of treatment material in the septic tank, that the water, in flowing towards the outlet conduit, has sufficient residence time that a major proportion of the dissolved phosphorus precipitates out as solid ferrous-phosphate minerals; providing means for collecting the solid precipitate; and conveying the water, having now given up the major proportion of its dissolved phosphorus, out of the outlet conduit of the septic tank.
- 2. Procedure of claim 1, wherein the conditions under which the RID material and the water are provided and maintained are such as to promote a substantially neutral pH.
- 3. Procedure of claim 1, including providing the RID material in a second compartment of the septic tank, and holding the water therein in contact with the RID material only long enough for the water to acquire dissolved ferrous ions, but not long enough for the ferrous ions to react with phosphate ions, and precipitate in significant quantity;passing the water to a third compartment of the septic tank, and holding the water therein for a long enough residence time for the ferrous ions to react with phosphate ions, and precipitate; the structure of the compartments being such that precipitates arising in the third compartment are deposited substantially elsewhere than on the RID material in the second compartment.
- 4. Procedure of claim 3, wherein a first one of the compartments of the septic tank serves to collect sludge and sediment from the water, whereby the water passing through the body of RID material in the second compartment is substantially clear of entrained solids.
- 5. Procedure of claim 1, wherein the water conveyed out of the septic tank still contains dissolved phosphorus, and still contains a quantity of dissolved ferrous ions;passing that water into an aerobic treatment zone; maintaining the water in the treatment zone under such aerobic conditions, and for such residence time, that the ferrous ions oxidise to a ferric state, and the ferric ions react with the phosphorus dissolved in the water, to produce solid ferric-phosphate minerals, which precipitate; and conveying the treated water, having given up at least some more of its phosphorus, out of the aerobic treatment zone.
- 6. Procedure of claim 1, wherein the RID material is provided in such quantities in the system that, in relation to the flow of water through the system, the ferrous ions enter into solution at a concentration of at least 1 mg-Fe per liter of water.
- 7. Procedure of claim 1, wherein the strictly anaerobic conditions are such that the Eh voltage of the water is about +200 mV.
- 8. Procedure of claim 7, wherein the RID material is a mineral in respect of which, under the said conditions, the iron enters solution at a rate of no less than 0.1 mg of Fe per day, per kg of the mineral.
- 9. Procedure of claim 1, including the step of so configuring the septic tank that the Eh and pH conditions thereof are uniform during the flow of water therethrough.
- 10. Procedure of claim 1, wherein the procedure includes:providing the body of treatment material such that the body is permeable to the flow of water therethrough; and so configuring the body of treatment material, in the septic tank, that the water, in flowing towards the outlet conduit, passes through the permeable body of treatment material.
- 11. Procedure of claim 1, wherein the procedure includes:so disposing the body of RID-material in relation to the flow of water through the septic tank that the ferrous phosphate minerals substantially do not precipitate within the body of RID-material, but substantially do precipitate at a location downstream from the body of RID material; and so arranging the said location that the precipitates that collect therein are accessible for removal and disposal.
- 12. Procedure of claim 11, wherein the procedure includes:arranging the septic tank with separate compartments; putting the RID-material in an intermediate or second one of the compartments, between a first one of the compartments and a third one of the compartments; the first compartment is where septic tank solids and sludge collect; the third compartment contains the location where the ferrous phosphate minerals precipitate.
- 13. Procedure of claim 12, wherein the procedure includes:locating the third compartment underneath the second compartment, being separated therefrom by a screen; arranging the septic tank such that the flow of water goes downwards through the RID-material in the second compartment.
- 14. Procedure of claim 12, wherein the procedure includes:locating the third compartment alongside the second compartment, being separated therefrom by a baffle; arranging the septic tank such that the flow of water goes upwards through the RID material in the second compartment, then over the baffle, and then downwards through the third compartment.
- 15. Procedure of claim 12, wherein the procedure includes locating the second and third compartments together in a container that is physically separate from the first compartment, and conveying water from the first compartment to the separate container in a conduit.
- 16. Procedure for attenuating both nitrate and phosphorus from water, including:providing a treatment chamber, and maintaining the treatment chamber under strictly anaerobic conditions; providing a body of a solid nitrate-reducing material, and placing same in the water in the treatment chamber; the nitrate-reducing-material is material which, under the said conditions in the treatment chamber, serves as an electron donor source, whereby nitrate in the water undergoes a reduction reaction, providing a body of solid Reductive-Iron-Dissolution material, or RID-material, being material that consists of either ferric hydroxide or ferric oxy-hydroxide or both, and placing same in the water in the treatment chamber; the RID-material is material that, when immersed in water having an Eh-voltage of less than 0.3 volts, releases ferrous ions into solution in the water, and the ferrous ions react with phosphorus dissolved in the water, to produce solid ferrous-phosphate minerals, which precipitate; conducting the nitrate-and-phosphorus-contaminated water into and through the treatment-chamber, and through the bodies of nitrate-reducing material and RID-material therein; maintaining the Eh voltage of the water in the treatment chamber below 0.3 volts during its passage through the bodies of nitrate-reducing material and RID-material; and conveying the water, having given up at least some of its phosphorus and at least some of its nitrate, out of the treatment chamber.
- 17. Procedure of claim 16, wherein:the body of a solid nitrate-reducing-material is permeable to the passage of water therethrough; the body of RID-material is permeable to the passage of water therethrough; the procedure includes passing the water that enters the treatment chamber through both bodies.
- 18. Procedure of claim 16, wherein:the solid nitrate-reducing-material and the RID-material are physically mixed together, the a mixture forming a single combined body of material; the combined body is permeable to the passage of water therethrough; the procedure includes passing the water in the treatment chamber through the combined body.
- 19. Procedure of claim 16, wherein the nitrate-reducing-material is organic carbon.
- 20. Procedure of claim 19, wherein the conditions in the septic tank are such as to drive the Eh-voltage down to about 0.2 volts.
US Referenced Citations (6)