Methods and apparatus for long term monitoring of a hydrocarbon reservoir

Information

  • Patent Grant
  • 6230800
  • Patent Number
    6,230,800
  • Date Filed
    Friday, July 23, 1999
    25 years ago
  • Date Issued
    Tuesday, May 15, 2001
    23 years ago
Abstract
The methods and apparatus of the invention include installing sensors in one or more of the many hole sections which are abandoned before the holes are sealed with cement. According to the invention, a sensor array is attached to the cement delivery device which is used to seal a hole which would otherwise be abandoned. The preferred apparatus for cement delivery is a “coiled tubing”. Preferably, the sensor array is passed through the center of the tubing so that it is protected from damage or snagging while being delivered to its deployment position. The coiled tubing may be withdrawn or left in place after the cement is delivered into the hole. When the cement cures, the sensor array is centered in the cement plug which seals the reservoir. According to the invention, the sensor array may be placed in any well which is to be abandoned. Such wells include exploration wells, appraisal wells, delineation wells, collapsed wells, oil wells which develop high levels of gas or water production, and gas wells which develop high levels of water production. In addition, the sensor array may be deployed in an unused portion of a production or injection well. For example, the sensor array may be located in a logging pocket. Similarly, the sensor array may be located in the pilot hole of a horizontal well.
Description




BACKGROUND OF THE INVENTION




1. Field of the Invention




The invention relates to the management of hydrocarbon production. More particularly, the invention relates to methods and apparatus for the long term monitoring of reservoir fluids by locating instruments in wells.




2. State of the Art




In an oil field, numerous holes are drilled into the formation before and after oil production begins. Some holes are discovery, appraisal, and delineation wells to determine the location and boundaries of a petroleum reservoir. Other holes will become injection and production wells. Many of the hole sections which are not used for production (e.g., all except the injection and production wells) are usually sealed with cement. The injection and production wells are, in most parts of the world, each completed by installing a casing in the hole and surrounding the casing with cement. The casing is usually made from metal pipe sections having a diameter close to that of the well hole. The sections are lowered into the well hole and cement is poured into the annulus between the casing and the formation. The casings are then perforated at predetermined depths where it is believed that an oil reservoir is located.




Water may be naturally present in the reservoir acting on the oil to urge it out through the well bore. Often, water (or steam) is injected into the reservoir from an injection bore located near the production bore. As oil is extracted from the well, the water moves through the porous media of the formation closer to the production well. As a result, the oil-water interface changes shape. If the location of the oil-water interface is not monitored during production, it is possible that the well will produce a mixture of oil and water. In some cases, it is possible for the well to produce more water than oil. Similarly, it may be desirable to monitor the oil-gas interface should one exist.




Well logs are a primary source of information used to map the distribution of fluids in hydrocarbon reservoirs. The logs are made from various sensor measurements such as resistivity, pressure, temperature, sonic velocity, etc. It is a common practice in a producing well to interrupt production and re-enter the well with wireline logging tools in order to ascertain changes in the reservoir which occur as a result of production. This practice is undesirable because it interrupts production and it is expensive. In addition, logging tools used inside a production casing can only measure satisfactorily water saturation and can not measure satisfactorily changes in formation pressure, a measure which is very useful in determining the efficiency with which fluids are being extracted from the formation. Furthermore, in a completed sub-sea well, re-entry into the well with logging tools may be either impossible or prohibitively expensive.




U.S. Pat. No. 4,475,591 discloses a method for obtaining pressure measurements in a producing well by permanently mounting pressure sensors in the cement filling between the formation and the casing. Placement of these sensors is often difficult. When the sensors are located in the cement surrounding the casing, there is a danger that the sensors or the cables to the sensors will be damaged during installation. Damage can also occur during casing perforation or side tracking.




U.S. Pat. No. 5,214,384 discloses a method for electronic self-potential logging in a cased observation well which is located between a steam injector well and a production well. A metallic casing complicates the method and the placement of electrodes in a casing or between a casing and the formation is also difficult as mentioned above. Furthermore, this method requires the drilling of an additional well which will not produce any hydrocarbons.




Co-owned U.S. Pat. No. 5,467,823 discloses a method for long term monitoring of a reservoir by locating a pressure gauge in an observation well which traverses the reservoir. The upper portion of the observation well is cased and the remainder is left open. A measuring device is suspended from a cable and lowered into the observation well to the depth of the reservoir. The measuring device includes a pressure gauge mounted in a casing-like tube section and an explosive perforation device. Cement is injected into the observation well to a depth corresponding to the reservoir. After the cement cures, the explosive device is ignited to perforate the cement and put the reservoir in fluid communication with the pressure gauge. While this method has advantages over the previously described methods, the cable is still in danger of damage as the well is being injected with cement, and the sensor package can be damaged during the perforation explosion.




SUMMARY OF THE INVENTION




It is therefore an object of the invention to provide methods and apparatus for long term monitoring of a hydrocarbon reservoir.




It is also an object of the invention to provide methods and apparatus for measuring formation characteristics of a producing reservoir without interrupting production.




It is another object of the invention to provide methods and apparatus for measuring changes in formation characteristics without interrupting production.




It is still another object of the invention to provide methods and apparatus for directly measuring changes in formation pressure.




It is also an object of the invention to provide methods and apparatus for measuring changes in water saturation in a formation without interrupting production.




It is another object of the invention to provide methods and apparatus for measuring changes in formation characteristics without drilling a special observation well.




It is still another object of the invention to provide methods and apparatus for permanently installing sensors in a well.




It is also an object of the invention to provide methods and apparatus for permanently installing sensors in a well with minimal risk of damage to the sensors or to cables coupled to the sensors.




In accord with these objects which will be discussed in detail below, the methods and apparatus of the present invention include installing sensors in one or more of the many holes which are sealed with cement. According to the invention, a sensor array is attached to the cement delivery device which is used to seal a hole section which would otherwise be abandoned. The preferred apparatus for cement delivery is a “coiled tubing”. Preferably, the sensor array is passed through the center of the tubing so that it is protected from damage or snagging while being delivered to its deployment position. However, the sensor array may be strapped to the outside of the tubing. The coiled tubing may be withdrawn or left in place after the cement is delivered into the hole. When the cement cures, the sensor array is preferably fixedly centered in the cement plug which seals the reservoir. The sensors in the array may include electrical sensors, pressure gauges, geophones, or other sensors.




According to the invention, the sensor array may be placed in any well which is to be abandoned. Such wells include exploration wells, appraisal wells, delineation wells, collapsed wells, oil wells which develop high levels of gas or water production, and gas wells which develop high levels of water production. In addition, the sensor array may be deployed in an unused portion of a production or injection well. For example, the sensor array may be located in a logging pocket (an extension of a well beyond its required depth which permits logging tools to log the entire depth of the formation). Similarly, the sensor array may be located in the pilot hole from which a horizontal well is drilled.




The invention has many advantages. In cases where the sensor array is deployed in an uncased well, resistivity measurements are not affected by the large steel mass of a casing. In all cases, utilizing the methods of the invention permits the use of a light weight cable since the weight of the array is supported by the cement delivery device. No separate logging run and no additional equipment is needed since the cement delivery device is used to seal the well and deploy the sensor array in a single run. Better zonal isolation of adjacent pressure gauges is achieved because the array is centrally located in the cement plug rather than located in an annulus between the formation and the casing.




Additional objects and advantages of the invention will become apparent to those skilled in the art upon reference to the detailed description taken in conjunction with the provided figures.











BRIEF DESCRIPTION OF THE DRAWINGS





FIG. 1

is a schematic diagram of an oil field having five wells, each well illustrating a sensor deployment according to a different embodiment of the invention;





FIG. 2

is a schematic diagram of a cement delivery device with a sensor array releasably coupled thereto prior to delivery of cement;





FIG. 3

is a schematic diagram of the sensor array of

FIG. 2

after cement delivery and decoupling of the cement delivery device;





FIG. 4

is a schematic diagram of a “coiled tubing” cement delivery device with a sensor array disposed therein prior to delivery of cement;





FIG. 5

is a schematic diagram of the sensor array of

FIG. 4

at the start of cement delivery;





FIG. 6A

is a schematic diagram of the sensor array of

FIGS. 4 and 5

at the completion of cement delivery according to one method of the invention where the delivery tube is removed from the borehole; and





FIG. 6B

is a schematic diagram of the sensor array and delivery tube of

FIGS. 4 and 5

at the completion of cement delivery according to another method of the invention where the delivery tube remains partially embedded in cement.











DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS




Referring now to

FIG. 1

, a typical oil field includes a sealing formation


10


, an oil reservoir


12


, and a bearing formation


14


. During the course of oil field development, several wells are drilled in the field. These may include a discovery well


16


, appraisal wells


18


and


20


, a development well


22


, and a pilot well


24


for a horizontal well


26


. Prior to production, the discovery well


16


, and the appraisal wells


18


and


20


will be sealed with cement


17


,


19


,


21


to prevent oil from escaping the reservoir


12


during subsequent production. After the installation of a casing


28


, a logging pocket portion


22


′ of the development well


22


will be sealed with cement


23


to prevent water


14


from entering the oil reservoir


12


. Before installation of production tubing


30


, the pilot well


24


will be sealed with cement


25


.




According to one embodiment of the invention, a sensor array


32


, coupled to a cable


34


is deployed in the discovery well


16


prior to filling the well with cement


17


. After the cement


17


cures, the sensor array


32


is centrally located in the well


16


and encased in the cement


17


.




According to another embodiment, a sensor array


36


coupled to a cable


38


is deployed in the appraisal well


18


before it is sealed with cement


19


. Similarly, a sensor array


40


coupled to a cable


42


is deployed in the appraisal well


20


before it is sealed with cement


21


. In both of these cases, the sensor arrays are centered in the bore of the well and encased in cement. The cables coupled to the sensor arrays are not necessarily completely encased in cement as it is only necessary to pour enough cement to seal around the oil reservoir


12


.




According to still another embodiment, a sensor array


42


coupled to a cable


44


is deployed in the logging pocket


22


′ of the development well


22


prior to the installation of the casing


46


, cement


23


, and casing perforations


48


. In this embodiment, the sensor array


42


is centered in the logging pocket


22


′, but the cable


44


is located in the annulus surrounding the casing


46


.




According to yet another embodiment, a sensor array


50


coupled to a cable


52


is deployed in the bottom of the pilot well


24


below the horizontal well


26


prior to the installation of the production tubing


30


and the cement


25


. In this embodiment, the sensor array


50


is centered in the bottom of the pilot well


24


below the horizontal well


26


, but the cable


52


is located in the annulus surrounding the production tubing


30


.




As mentioned above, any or all of these embodiments may be deployed in an oil field. The common feature of each embodiment is that each sensor array is placed in a well (or well portion) which is to be abandoned. The sensors in any array may include electrical sensors, pressure gauges, geophones, or other sensors. Any array may contain a variety of sensors.




According to the preferred embodiment of the invention the arrays are delivered to their deployment sites using the same devices which will be used to deliver cement to seal the wells or well portions. Thus, a light weight cable can be used for the sensors since the weight of the array is supported by the cement delivery device. In addition, no separate logging run and no additional equipment is needed since the cement delivery device is used to seal the well and deploy the sensor array in a single run.




Turning now to

FIGS. 2 and 3

, according to one method of the invention, a sensor array


100


, coupled to a cable


102


, is attached by a releasable device


104


, e.g. a pump-out plug, to the end of a cement delivery tube


106


. The tube


106


is run-in to a well bore


108


until the sensor array


100


is at the desired location for deployment. Cement


110


is pumped through the tube


106


and out of the end of the tube causing the device


104


to uncouple from the end of the tube. According to this embodiment, the tube


106


is withdrawn from the borehole


108


in advance of the rising cement


110


.




Two presently preferred methods of the invention are illustrated in

FIGS. 4

,


5


,


6


A, and


6


B. As shown in

FIGS. 4 and 5

, a sensor array


200


, coupled to a cable


202


, is disposed within “coiled tubing”


206


and connected to the end of the tubing by a releasable device


204


. The tube


206


is run-in to a well bore


208


until the sensor array


200


is at the desired location for deployment. Cement


210


is pumped through the tube


206


and out of the end of the tube causing the device


204


to uncouple from the end of the tube. According to a first preferred embodiment illustrated in

FIG. 6A

, the tube


206


is completely withdrawn from the borehole


208


in advance of the rising cement


210


. According to a second preferred embodiment illustrated in

FIG. 6B

, the tube


206


is partially drawn up the borehole


208


to expose the sensor array


200


but not fully in advance of the rising cement


210


. The tube


206


is left in the borehole


208


with a portion of the tube


206


embedded in the cement


210


. The embodiment illustrated in

FIG. 6B

is preferably utilized when the coiled tubing is nearing the end of its useful life. Normally coiled tubing is used several times and then abandoned due to the risk of failure from metal fatigue. According to this embodiment, the otherwise wasted tubing is put to use as a protective conduit surrounding the cable


202


in a location where it will not affect the functioning of the sensors. If, on the other hand, the tubing


206


is still valuable for use in sealing other wells, the method illustrated in

FIG. 6A

is preferably utilized.




There have been described and illustrated herein several embodiments of methods and apparatus for long term monitoring of a hydrocarbon reservoir. While particular embodiments of the invention have been described, it is not intended that the invention be limited thereto, as it is intended that the invention be as broad in scope as the art will allow and that the specification be read likewise. It will therefore be appreciated by those skilled in the art that yet other modifications could be made to the provided invention without deviating from its spirit and scope as so claimed.



Claims
  • 1. A method for long term monitoring of a hydrocarbon reservoir, comprising:a) selecting a well bore which is destined to be sealed with cement; b) delivering a sensor array coupled to a cable through the well bore to a selected location; c) filling the well bore with cement so that the sensor array is embedded in cement and the well bore is sealed; and d) using the sensor array to monitor reservoir conditions during the course of hydrocarbon production, wherein said step of delivering includes releasably attaching the sensor array to a cement delivery device and running-in the cement delivery device to the selected location.
  • 2. A method according to claim 1, wherein:the well bore to be sealed is selected from the group consisting of exploration wells, appraisal wells, delineation wells, collapsed wells, oil wells which have developed high levels of gas or water production, and gas wells which have developed high levels of water production.
  • 3. A method according to claim 1, wherein:said step of filling includes pumping cement through the cement delivery device and releasing the sensor array from the delivery device.
  • 4. A method according to claim 1, wherein:said step or releasably attaching includes disposing the sensor array inside the delivery device.
  • 5. A method according to claim 4, wherein:said step of filling includes pumping cement through the cement delivery device and releasing the sensor array from the delivery device.
  • 6. A method according to claim 5, further comprising:e) raising the delivery device while filling so that the delivery device is completely removed from the well bore when filling is completed.
  • 7. A method according to claim 5, further comprising:e) raising the delivery device while filling so that the sensor array is exposed from the delivery device but a portion of the delivery device remains embedded in the cement.
  • 8. A method according to claim 1, wherein:said step of delivering includes running the cable outside the tubing of a production well.
  • 9. A method according to claim 1, wherein:said step of delivering includes running the cable outside the casing of a cased well.
  • 10. A system for long term monitoring of a hydrocarbon reservoir, comprising:a) a sensor array; b) a cable coupled to said sensor array; c) deployment means for deploying said sensor array at a location in a well bore which is destined to be sealed with cement; and d) cement delivery means for delivering cement to said location so that said sensor array is embedded in cement and the well bore is sealed, wherein said deployment means includes coupling means for releasably coupling said sensor array to said cement delivery means.
  • 11. A system according to claim 10, wherein:said coupling means includes means for releasably retaining said sensor array within said cement delivery means.
  • 12. A system according to claim 10, wherein:said sensor array includes a resistivity sensor.
  • 13. A system according to claim 10, wherein:said sensor array includes a pressure sensor.
  • 14. A system according to claim 10, wherein:said sensor array includes a temperature sensor.
  • 15. A system according to claim 11, wherein:said means for releasably retaining said sensor array within said cement delivery means includes a pump-out plug.
US Referenced Citations (22)
Number Name Date Kind
4475491 Griinwald et al. Oct 1984
4775009 Wittrisch et al. Oct 1988
4986350 Czernichow Jan 1991
5206840 Cobbs et al. Apr 1993
5214384 Sprunt et al. May 1993
5233304 Hubans Aug 1993
5243562 Laurent et al. Sep 1993
5265680 Withers et al. Nov 1993
5303773 Czernichow et al. Apr 1994
5355952 Meynier Oct 1994
5363094 Staron et al. Nov 1994
5467823 Babour et al. Nov 1995
5481502 Cretin et al. Jan 1996
5503225 Withers Apr 1996
5505259 Wittrisch et al. Apr 1996
5524709 Withers Jun 1996
5597042 Tubel et al. Jan 1997
5642051 Babour et al. Jun 1997
5662165 Tubel et al. Sep 1997
5724311 Laurent et al. Mar 1998
5767680 Torres-Verdin et al. Jun 1998
5892733 Havig Apr 1999
Foreign Referenced Citations (4)
Number Date Country
2 276 723 Oct 1994 GB
WO 9737103 Oct 1997 WO
WO 981241 Mar 1998 WO
WO 9815850 Apr 1998 WO
Non-Patent Literature Citations (1)
Entry
Cooke Jr., C.E. et al. “Field Measurements of Annular Pressure and Temperature During Primary Cementing”. Journal of Petroleum Technology, US, AIME, Dallas, Tx. (Aug. 1, 1983) pp. 1429-1438.