The present invention relates to a method, in a radio base station and a radio base station for controlling transmit power in a wireless communications system.
The Universal Mobile Telecommunication System (UMTS) is one of the 3G mobile communication technologies designed to succeed GSM. 3GPP Long Term Evolution (LTE) is a project within the 3rd Generation Partnership Project (3GPP) to improve . . . the UMTS standard to cope with future requirements in terms of improved services such as higher data rates, improved efficiency, lowered costs etc. The Universal Terrestrial Radio Access Network (UTRAN) is the radio access network of a UMTS system and Evolved UTRAN (E-UTRAN) is the radio access network of an LTE system. The complete cellular system that comprises an LTE system (and thus E-UTRAN) is denoted Evolved Packet System (EPS), A radio access network typically comprises user equipments (UE) wirelessly connected to base stations (BS), commonly referred to as NodeB in UTRAN and eNodeB in E-UTRAN. Each BS serves one or more areas each referred to as cells.
One of the hot topics for future developments of cellular systems is heterogeneous networks. Heterogeneous networks are networks with a mixed deployment of cells of widely different sizes, such as macro cells, micro cells, pico cells, and femto cells. The cells may either cover overlapping areas, e.g., when the area covered by a pico cell is also covered by a macro cell, or they may complement each other's coverage. Smaller cells, such as pico cells, will typically be overlapping with other cells. They will be used, e.g., to provide increased capacity at locations with dense user populations and high traffic volumes, so called hotspots, or to provide improved coverage, e.g., in terms of better channel quality at certain indoor locations.
Deploying small base stations to enhance capacity or coverage seems to be an appealing way for operators to overcome the cumbersome of finding and leasing new macro sites. The main characteristics of these small base stations are that they are smaller in size compared to a typical macro site, easily installed, e.g. they can be attached to lamp posts, walls, etc., and their transmit power is often lower compared to the transmit power of a macro site.
One issue with the deployment of these small base stations is at what extent they can offload macro sites or how large areas they can cover. Simulations with various channel models have shown that this coverage area is typical small to medium compared to the coverage area of a typical macro site. Additionally, the benefits of cell-area splitting gains are usually marginal and deployment of the small base stations does not pay off. One way to increase the coverage area of a small base station is to apply a cell selection offset (CSO) to the cell selection algorithm and thus steer more users to the small base station. This is illustrated in
One potential problem with applying a CSO to the cell selection algorithm is that users in the cell range extended (CRE) area 160, so called CRE users, might be interfered heavily from the macro site in the downlink. This results in a very low downlink Signal-to-Interference Ratio (SIR). This in turn may lead to that users in the CRE area will experience problems in demodulating control and/or data signals, leading to lower performance. One way to mitigate this is to apply muting restrictions in the macro layer. Using so called Almost Blank Subframes (ABS), macro cells are muted, in a static or dynamic way, in order to reduce interference to pica users in the CRE area.
By doing that, protection of both data and control channels of CRE users takes place.
There are mainly two problems with the ABS solution. Firstly, by muting the macro base station precious macro capacity is sacrificed in order to favor transmissions of the small base stations. Secondly, muting the macro base station only helps CRE users when the interference from the macro is what limits their performance. If a low signal strength from the own small base station in comparison with thermal noise is the limiting factor, it does not help to reduce macro interference. Furthermore, in the case of dynamic ABS coordinated scheduling between the macro site and the small base station is required in order for the macro site to be able to mute its transmission at the same time as the small base station schedules its CRE users.
Simulation results have shown that the loss of useful signal power for the CRE users is more important than the interference originating from the nearby macro site. In addition to that, simulations have shown that while increasing the CSO and steering more users to the small base station layer, macro interference becomes less and less important due to the fact that macro utilization drops.
It is therefore an object to address some of the problems outlined above, and to provide a solution for controlling the transmit power of a radio base station. This object and others are achieved by the method and the base station according to the independent claims, and by the embodiments according to the dependent claims.
In accordance with a first aspect of embodiments a method in a radio base station of a wireless communications system for controlling transmit power is provided. The radio base station has a maximum allowed average output power. The method comprises determining a first transmit power of at least a first type of subframe which is higher than the maximum allowed average output power, and a second transmit power of at least a second type of subframe which is lower than the maximum allowed average output power. Further, the method comprises determining an average transmit power by which the radio base station transmitted an amount of subframes during a preceding time period. Moreover, the method includes determining a maximum allowed power for a subsequent subframe based on the determined average transmit power and the maximum allowed average output power. Finally, the method includes determining at least one type of subframe to be allowed for the subsequent subframe based on the determined maximum allowed power for the subsequent subframe and at least the first and second transmit power.
In accordance with a second aspect of embodiments a radio base station for a wireless communications system is provided. The radio base station is configured to control transmit power. The radio base station has a maximum allowed average output power. The radio base station comprises a processing unit configured to determine a first transmit power of at least a first type of subframe which is higher than the maximum allowed average output power, and a second transmit power of at least a second type of subframe which is lower than the maximum allowed average output power. The processing unit is further configured to determine an average transmit power by which the radio base station transmitted an amount of subframes during a preceding time period and configured to determine a maximum allowed power for a subsequent subframe based on the determined average transmit power and the maximum allowed average output power. Furthermore, the processing unit is configured to determine at least one type of subframe to be allowed for the subsequent subframe based on the determined maximum allowed power for the subsequent subframe and at least the first and second transmit power.
An advantage of embodiments is that the service coverage area of the radio base station is extended.
Another advantage of embodiments is that transmission to UEs with low Signal-to-Noise Ratio (SNR) is supported by the radio base station.
Yet another advantage of embodiments is that the radio base station is configured to avoid exceeding the average transmission power constraint while utilizing available extra transmit power.
Yet a further advantage of embodiments it that no additional signaling or measurements are required in the wireless communications system. Thus, it is a proprietary solution.
Yet a further advantage of embodiments is that the solution is independent of the other radio base stations in the wireless communications system. Hence, there is no need for modifying the transmissions of another radio base station.
Other objects, advantages and features of embodiments will be explained in the following detailed description when considered in conjunction with the accompanying drawings and claims.
a-6b are block diagrams illustrating the RBS according to embodiments.
In the following, different aspects will be described in more detail with references to certain embodiments and to accompanying drawings. For purposes of explanation and not limitation, specific details are set forth, such as particular scenarios and techniques, in order to provide a thorough understanding of the different embodiments. However, other embodiments that depart from these specific details may also exist.
Moreover, those skilled in the art will appreciate that the functions and means explained herein below may be implemented using software functioning in conjunction with a programmed microprocessor or general purpose computer, and/or using an application specific integrated circuit (ASIC). It will also be appreciated that while the embodiments are primarily described in the form of a method and device, they may also be embodied in a computer program product as well as in a system comprising a computer processor and a memory coupled to the processor, wherein the memory is encoded with one or more programs that may perform the functions disclosed herein.
Embodiments are described herein by way of reference to particular example scenarios. Particular aspects are described in a non-limiting general context in relation to a wireless communications system involving a radio base station which is a high power node 210 such as a macro site covering a macro cell 220 and a radio base station 230 which is a low power node (LPN) such as a pico radio base station (RBS) covering a pico cell 240 as illustrated in
The RBS 230 is capable of serving several user equipments when located in the pico cell 240. In
The low downlink SIR may lead to that the UEs in the CRE area will experience problems in demodulating control and/or data signals, leading to lower performance. By increasing the transmit power of the LPN 230, e.g., to always utilizing the available maximum power of the base station, and hence to enhance the useful signal and Signal-to-Noise Ratio (SNR) of the UEs would protect both data and control channels of the UEs in the CRE area. However, it will not be efficient from an energy perspective. Moreover, it will require bigger cooling devices and higher back up battery requirements for the base station. For the above reasons and in order to keep the size of the low power nodes small, restrictions on the transmit power is applied. These restrictions can be formulated in many different ways such as an absolute maximum output power value or a maximum allowed average output power.
In embodiments of the invention an increased transmit power of the radio base station during certain periods of time is used, while maintaining a sufficiently low output power averaged over a longer time. A certain type of subframe, herein after called enhanced power subframe (ePSF), is transmitted with an increased transmit power. In the ePSF a UE in the CRE area may be scheduled, for example UE2 in
Another advantage is that there is no need to coordinate scheduling between the macro site and the LPN, since the scheduling decision and power control decision are taken at the same place i.e. in the LPN.
Embodiments provide an alternative solution to ABS that target enhancing performance of low SNR pica users which are located to CRE areas while satisfying the imposed transmit power restrictions.
For example, UE1 and UE3 in
In another embodiment, several types of subframes can be employed offering better granularity for setting transmit power levels and better utilization of the available resources. If more than two types of subframes each associated with a certain transmit power are allowed then extra signaling to the UE is needed in the case when Common Reference Signal (CRS) assisted signal demodulation is deployed. In case user specific Reference Signal (RS) such as Demodulation RS (DMRS) is used then there is no need for additional signaling.
An exemplary embodiment is illustrated in
UEs reporting higher RSRP values than or equal to the RSRP threshold value are scheduled in nPSFs with relatively low power Ptx,Low, and UEs reporting lower RSRP than the RSRP threshold value are scheduled in ePSFs which are transmitted with a relatively high power Ptx,High. The RSRP threshold value may be predetermined in the RBS or calculated in the RBS. A fraction of UEs (fHigh) will be scheduled in ePSFs and the rest (f) will be scheduled in nPSFs. Hence:
f
High
+f
Low=1 (1)
Each fraction of UEs will be scheduled with a certain probability (ProbHigh or ProbLow) based on the utilization of the corresponding UEs, so that the sum is equal to cell utilization (U). Hence:
ProbHigh+ProbLow=U (2)
If we assume a linear relation between the fraction of UEs in each set and the probability of each set to be scheduled, we get:
ProbHigh=U·fHigh and ProbLow=U·fLow (3)
Based on the above assumptions and equations 1-3, the RBS can calculate the two transmit power levels used in each type of subframe, i.e. Ptx,Low and Ptx,High. To do this it first calculates the average transmit power as a function of the high and low power levels.
Where
P
tx,High=2·Ptx,Low (5)
This ensures that the difference of the two levels is a factor of two, or 3 dB. It should be pointed out that the criterion may be set in different ways. Another criterion may be to determine an SNR target value, for example to set SNR to 10 dB, for the CRE users. From the SNR target value, the pathgain and the noise power, the required transmit power of the ePSF, i.e. Ptx,High, can be calculated. Further, the transmit power of the nPSF, i.e. RtxLow, can be calculated with Equation (4).
Based on the above set of configurations, a Radio Resource Management (RRM) function of the RBS applies constraints on which UE may be scheduled in which type of subframe. Based on the maximum allowed average output power of the RBS
where the amount of subframes N are equal to the size of the time window,
Hence on time instant t, a transmit power Ptx(t) should be:
In case of a predefined set of transmit power levels the RRM function allows for the subsequent subframe to be of the type of subframe which associated transmit power level satisfy the following equation:
P(t)=Ptx,u≦Pmax(t) (8)
In one embodiment the RBS further schedules a UE or a set of UEs in the allowed type of subframe based on a required transmit power associated with the UE or the set of UEs. As mentioned above, UEs reporting higher RSRP values than or equal to the RSRP threshold value are scheduled in nPSFs with relatively low power Ptx,Low, and UEs reporting lower RSRP than the RSRP threshold value are scheduled in ePSFs which are transmitted with a relatively high power Ptx,High.
In embodiments wherein dynamic transmit power levels are supported, the RRM function selects an arbitrary UE and serves it with a power of at most
P(t)=Pmax(t) (9)
The above analysis can be generalized for more than two transmit power levels. In case the power levels are continuous and not discrete, e.g. when DMRS is used, then equation 4 becomes:
E[P
tx
]=∫P
tx(RSRP)·f(RSRP)dRSRP (10)
where Ptx and f are two continuous functions of RSRP.
Furthermore, the method comprises determining 520 an average transmit power by which the radio base station has transmitted an amount of subframes during a preceding time period. In one embodiment this may be calculated according to Equation (6). The method also includes determining 530 a maximum allowed power for a subsequent subframe based on the determined average transmit power and the maximum allowed average output power. In one embodiment, the maximum allowed power for the subsequent subframe is calculated according to Equation (7) mentioned above, i.e. as the power that would result in that the average transmit power after transmission of the subsequent subframe equals the maximum allowed average output power.
The maximum allowed power for the subsequent subframe to be transmitted is determined in order not to exceed the maximum allowed average output power. Based on the determined maximum allowed power for the subsequent subframe and at least the fast transmit power and the second transmit power, at least one type of subframe to be allowed for the subsequent subframe is determined 540.
Furthermore, the second type of subframe is allowed when the maximum allowed power for the subsequent subframe is determined to be higher than or equal to the second transmit power. The first type of subframe is allowed when the maximum allowed power for the subsequent subframe is higher than or equal to the first transmit power. However, when the determined maximum allowed power for the subsequent subframe is lower than both the first transmit power and second transmit power none of the first or second type of subframe is allowed. Hence, the RBS must be silent in the subsequent subframe in order not to exceed the maximum allowed average output power.
It should be pointed out that the order of the different steps in the method described above could be performed in other orders than what is illustrated in
In an exemplary embodiment, the RBS further schedules a UE either in the first type of subframe or in the second type of subframe based on a required transmit power associated with the UE. In one embodiment, the required transmit power may be based on a RSRP value which is reported by each UE being served by the RBS. The low RSRP value indicates whether the LIE is located far away from the RBS and therefore also requires a type of subframe transmitted with a higher transmit power. That is, the UE reports a RSRP value to the RBS and if the value is high, e.g. higher than or equal to a determined RSRP threshold value, the UE is scheduled in the second type of subframe, e.g. a nPSF, which is transmitted with a relatively low power, and if the value is low, e.g. lower than the RSRP threshold value, the UE is scheduled in the first type of subframe, e.g. an ePSF, which is transmitted with a relatively high power.
In one embodiment the RSRP threshold value is a static value. Alternatively, the threshold value is a dynamic value calculated by the RBS.
In another exemplary embodiment, the required transmit power associated with the UE is based on whether the user equipment is assigned a CSO value. The assignment of a CSO value indicates whether the UE is located in a CRE area and therefore requires a type of subframe transmitted with a higher transmit power. The RBS determines whether the LIE is assigned a CSO value, schedules the UE in the first type subframe, e.g. an ePSF, if the user equipment is assigned a CSO value and in the second type of subframe, e.g. nPSF, if the UE is not assigned a CSO value.
In an exemplary embodiment, the RBS has an output power constraint at 200 mW which defines the maximum allowed average output power of the RBS i.e.
2*Ptx,low*0.6+Ptx,low*0.4≦0.2/0.25=0.8
This yields that the first transmit power Ptx,high=1 W and the second transmit power Ptx,low=0.5 W.
Further, assume that N=100, and that during the last 99 subframes, the ePSF with the high power has been used Nhigh=10 times and the nPSF with the low power Nlow=15 times. The RBS determines a maximum allowed power for a subsequent subframe Ptx(t) based on an average transmit power by which the RBS has transmitted the amount of subframes during a preceding period and the maximum allowed average output power. Thus, according to Equation (7),
P
tx(t)≦100*0.2−(10*1+15*0.5)=2.5 W
The RBS must thus use a transmit power lower than 2.5 W when transmitting the subsequent subframe in order not to exceed the power limit. The RBS determines which type of subframe to be allowed for the subsequent subframe, i.e. if nPSF and/or ePSF are allowed. In this example, both the first and the second type of subframe are allowed the maximum allowed power for the subsequent subframe is higher than the both the first and the second transmit power.
Furthermore, at a later instance, assume that Nhigh=10 and Nlow=20. Then the maximum allowed power for a subsequent subframe is
P
tx(t)≦100*0.2−(10*1+20*0.5)=0 W
The RBS determines that no type of subframe is allowed because the maximum allowed power for the subsequent subframe is lower than both the ePSF and the nPSF. Thus, the RBS must be silent in the subsequent subframe in order not to exceed the maximum allowed average output power of the RBS.
A RBS 230 for a wireless communications system is schematically illustrated in the block diagram in
Furthermore, the processing unit 600 is configured to determining at least one type of subframe to be allowed for the subsequent subframe based on the determined maximum allowed power for the subsequent subframe and at least the first and second transmit power. The RBS 230 also comprises a transceiver unit 601 for communicating with the UEs.
In a further embodiment the processing unit 600 is configured to scheduling a UE in the first type of subframe or in the second type of subframe based on as a required transmits power associated with the UE in accordance with the method described above.
The units described above with reference to
b schematically illustrates an embodiment of the RBS 230, which is an alternative way of disclosing the embodiment illustrated in
Hence in the embodiments described, the code means in the computer program 612 of the RBS 230 comprises a module 612a for determining transmit power of the first and second type of subframes. The computer program 612 also comprises a module 612b for determining an average transmit power by which the radio base station has transmitted an amount of subframes during a preceding time period. The computer program 612 further includes a module 612c for determining a maximum allowed power for a subsequent subframe based on the determined average transmit power and the maximum allowed average output power. In addition the computer program 612 further includes a module 612d for determining at least one type of subframe to be allowed for the subsequent subframe based on the determined maximum allowed power for the subsequent subframe and the first and second transmit power. In one embodiment the computer program 612 further includes a module 612e for determining a RSRP or CSO value of a UE and a module 612f for scheduling the UE in either the first type of subframe or the second type of subframe dependent on the value. The code means may thus be implemented as computer program code structured in computer program modules. The modules 612a4 essentially perform the steps of the flow described in connection with
Although the code means in the embodiments disclosed above in conjunction with
The above mentioned and described embodiments are only given as examples and should not be limiting. Other solutions, uses, objectives, and functions within the scope of the accompanying patent claims may be possible.
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/SE2012/050482 | 5/7/2012 | WO | 00 | 11/3/2014 |