This nonprovisional application is a U.S. National Stage Filing under 35 U.S.C. § 371 of International Patent Application Serial No. PCT/SE2012/051223, filed Nov. 9, 2012, and entitled “Methods and Arrangements for Resource Allocation.”
The disclosure generally relates to timing the scheduling of resources in a frequency division duplex system, and in particular to a user equipment, a network node and methods therein for timing scheduling of resources.
The Universal Mobile Telecommunication System (UMTS) is one of the 3G mobile communication technologies designed to succeed GSM. 3GPP Long Term Evolution (LTE) is a project within the 3rd Generation Partnership Project (3GPP) to improve the UMTS standard to cope with future requirements in terms of improved services such as higher data rates, improved efficiency, lowered costs etc. The Universal Terrestrial Radio Access Network (UTRAN) is the radio access network of a UMTS system and Evolved UTRAN (E-UTRAN) is the radio access network of an LTE system. The complete cellular system that comprises an LTE system (and thus E-UTRAN) is denoted Evolved Packet System (EPS).
In order to support high data rates, LTE allows for a system bandwidth of up to 20 MHz. LTE is also able to operate in different frequency bands and can operate in at least FDD (Frequency Division Duplex) and TDD (Time Division Duplex). The modulation technique or the transmission method used in LTE is known as OFDM (Orthogonal Frequency Division Multiplexing). For the next generation mobile communications system e.g. IMT-advanced (International Mobile Telecommunications) and/or LTE-Advanced, which is an evolution of LTE, support for bandwidths of up to 100 MHz is being discussed. In both LTE and LTE-Advanced, radio base stations are known as eNodeBs.
The main difference between FDD and TDD is in how the single channel to provide paths for both uploading and downloading is divided. In FDD this is done by dividing the frequency band allotted into two discrete smaller channels. In TDD the entire channel is used alternating between uploading and downloading.
Because of how FDD operates, it is classified as a full-duplex system. This means that both the upload and download are always available. TDD is half-duplex as either upload or download can use the channel but not at the same time.
In cellular networks with a tight frequency reuse pattern and, especially, during high load scenarios, the need may arise to mitigate the interference using so-called Inter-Cell Interference Coordination (ICIC) techniques for downlink and/or uplink transmissions.
One such technique, specified for LTE as from 3GPP Release 10, is the concept of Almost Blank Subframes (ABS). When using ABS, certain subframes are “blanked”, i.e. nothing but reference signals is transmitted in such a blanked subframe. Hence, no information on downlink control channels, i.e. Physical Downlink Control Channel (PDCCH), Physical HARQ Indicator Channel (PHICH), and Physical Control Format Indicator Channel (PCFICH), or on the downlink data channel, i.e. the Physical Downlink Shared Channel (PDSCH), is transmitted during the blanked downlink subframes.
Furthermore, work is ongoing in 3GPP TR 36.888, “Study on provision of low-cost Machine-Type Communications (MTC) User Equipments (UEs) based on LTE”, on defining reduced complexity mobile devices. One such device proposal is half-duplex FDD operation devices for LTE (in contrast to the full-duplex requirement on LTE FDD UEs of being the baseline today). MTC devices are to be understood as being a subset of the more general term user equipments.
Uplink transmissions on the Physical Uplink Shared Channel (PUSCH) from the UE to the network, is scheduled by transmitting so-called uplink grants on the PDCCH from the network to the UE. In an LTE FDD system, an uplink grant sent during subframe N schedules an uplink PUSCH transmission during a subframe four subframes later N+4. An example of the timing of scheduling of resources in an LTE FDD system is illustrated in
Now, assume that subframe N is either blanked by ABS or is a non-downlink half-duplex subframe, and thus that no uplink grant can be transmitted on the PDCCH during this subframe. As a consequence, no uplink PUSCH transmission may take place in subframe N+4. Hence, the larger fraction of downlink subframes being blanked by means of ABS, the larger fraction of the uplink will be impossible to use for dynamic scheduling. An illustration of the timing of scheduling of resources in an LTE FDD system using ABS is given in
In an LTE system where half-duplex FDD operation is used, the same problem exists as no more than half of the subframes can be used for neither the UL nor the DL. Thus, the possibility to adapt to traffic situations that is either uplink or downlink heavy is limited due to the fact that each scheduled subframe needs a subframe on the downlink and each PDSCH transmission needs an uplink subframe for feedback. An illustration of the timing of scheduling of resources in an LTE FDD system where half-duplex FDD operation is used is given in
It is therefore an object to address some of the problems outlined above, by providing an improved solution for timing the scheduling of resources in a FDD system. This object and others are achieved by the methods, the user equipment and the network node according to the independent claims, and by the embodiments according to the dependent claims.
In accordance with a first aspect of embodiments a method in a user equipment for timing the scheduling of resources in a frequency division duplex system is provided. The user equipment communicates with a network node comprised in the frequency division duplex communication system. Furthermore, the method comprises receiving an indication from the network node to apply a time division duplex configuration to a timing of scheduling of resources. Thereupon the time division duplex configuration is applied to the timing of scheduling of resources.
In accordance with a second aspect of embodiments a method in a network node for timing the scheduling of resources in a frequency division duplex system is provided. The network node communicates with a user equipment. The method comprises determining whether the user equipment is prohibited to receive an uplink grant in at least one subframe. Furthermore, if the user equipment is prohibited to receive an uplink grant in at least one subframe, the method further comprises sending an indication to the user equipment to apply a time division duplex configuration to a timing of scheduling of resources.
In accordance with a third aspect of embodiments a user equipment configured to enable timing the scheduling of resources in a frequency division duplex system is provided. The user equipment is configured to communicate with a network node comprised in the frequency division duplex communication system. The user equipment comprises a receiver adapted to receive an indication from the network node to apply a time division duplex configuration to a timing of scheduling of resources. The user equipment further comprises a processing unit adapted to apply the time division duplex configuration to the timing of scheduling of resources.
In accordance with a fourth aspect of embodiments a network node configured to enable timing the scheduling of resources in a frequency division duplex system is provided. The network node is configured to communicate with a user equipment. The network node comprises a processing unit adapted to determine whether the user equipment is prohibited to receive an uplink grant in at least one subframe. Furthermore, if the user equipment is prohibited to receive an uplink grant in at least one subframe, the network node further comprises a transmitter adapted to send an indication to the user equipment to apply a time division duplex configuration to a timing of scheduling of resources.
Another advantage of embodiments of the invention is that they provide the possibility to improve the experienced bit rate of the UE.
Yet another advantage of embodiments of the invention is that they provide the possibility to improve the battery consumption of the UE.
Other objects, advantages and features of embodiments will be explained in the following detailed description when considered in conjunction with the accompanying drawings and claims.
In the following, different aspects will be described in more detail with references to certain embodiments and to accompanying drawings. For purposes of explanation and not limitation, specific details are set forth, such as particular scenarios and techniques, in order to provide a thorough understanding of the different embodiments. However, other embodiments that depart from these specific details may also exist.
Moreover, those skilled in the art will appreciate that the functions and means explained herein below may be implemented using software functioning in conjunction with a programmed microprocessor or general purpose computer, and/or using an application specific integrated circuit (ASIC). It will also be appreciated that while the embodiments are primarily described in the form of a method and device, they may also be embodied in a computer program product as well as in a system comprising a computer processor and a memory coupled to the processor, wherein the memory is encoded with one or more programs that may perform the functions disclosed herein.
The following embodiments are described in a non-limiting general context in relation to an example sequence for allocation of resources in a FDD system such as an LTE FDD system, wherein the radio resource management is performed in a distributed way between the radio base stations. The network node may be a radio resource management node, such as a network management node used to control the utilization of the radio resources available within the radio communication system or a radio base station such as an eNodeB. In an LTE FDD system a transmitter and a receiver operate at different carrier frequencies. Therefore network nodes and user equipments (UEs) must be able to send and receive Radio Frequency (RF) signals at the same time. This mode of operation is referred to as duplex mode. Uplink and downlink sub-bands are separated by the frequency offset. In an LTE TDD system time-division multiplexing is applied to separate uplink and downlink signals. It emulates full-duplex communication over a half-duplex communication link. LTE FDD systems require less time synchronization among nodes than LTE TDD systems, and are more efficient in scenarios of symmetric traffic. However, in certain scenarios an UE operating in a FDD system may be prohibited to receive uplink grant in some of the subframes. For example, as mentioned above in connection with
In one embodiment the determining 400 whether the UE is prohibited to receive an uplink grant in at least one subframe is based on if the user equipment is configured with an ABS procedure and/or with a half-duplex operation. By applying the timing of the TDD configuration to the FDD system the downlink subframe blanking by means of ABS and/or half-duplex operation is alleviated.
In an exemplary embodiment, the timing of scheduling of resources is applied to transmitting uplink data according to a timing of a transmission delay for uplink data of the TDD configuration in the UE. By applying the TDD configuration to the timing of transmission delay for uplink data it will be possible for the network node to let the PDCCH transmission during subframe N schedule uplink transmissions on the
PUSCH not only for subframe N+4, but also for subsequent subframes e.g. N+5 and N+6.
When the traffic is asymmetric, e.g. when a vast majority of the traffic is either uplink or downlink transmissions, it is even more beneficial to apply the TDD configuration to the timing of resources in an LTE FDD system. In a further exemplary embodiment the network node may, in addition to determining whether the UE is prohibited to receive an uplink grant in at least one downlink subframe, determine if the traffic is asymmetric.
In order to determine if the majority of the traffic is in uplink, an uplink threshold value may be set. Furthermore, if the UE is prohibited to receive an uplink grant in at least one downlink subframe and is determined by the network node to transmit more in uplink during a time period than the uplink threshold value, the network node sends the indication to the UE to apply the TDD configuration to the timing of scheduling of resources. As an alternative, the network node may determine if the UE transmits more in downlink during a time period than a certain downlink threshold value. In an exemplary embodiment the uplink and downlink threshold values may be predetermined in the network. The network node may continuously measure the traffic of the UE and adaptively determine to indicate to the UE to apply timing of the TDD configuration.
For LTE FDD operation, HARQ feedback is sent 4 ms after a transmission, a potential retransmission then, at least for uplink, occur 4 ms after the HARQ feedback. The TDD configuration of the HARQ timings is different dependent on the selected uplink-downlink configuration. In an exemplary embodiment, the TDD configuration is further applied to a timing of the HARQ protocol in the LTE FDD system. An advantage of this feature is that time bundling of HARQ feedback can be achieved without defining new HARQ schemes. The network node sends a further indication to the user equipment to apply the TDD configuration to the timing of HARQ protocol. The UE receives the indication and applies the TDD configuration to the timing of HARQ protocol. In one embodiment the UE applies the TDD configuration by transmitting uplink feedback in a subframe according to the timing of the HARQ protocol of the TDD configuration. By configuring a UE with the TDD configuration different UEs in the cell may have different HARQ timing. This would result in a collision risk on both control channels and the uplink data channel in case of retransmission. However, this can be avoided by taking the different round trip times in to account in the scheduler of the network node.
In some embodiments the HARQ feedback mapping for PUCCH will be conducted according to the configured TDD configuration. In other embodiments, a semi-statically configured resource or one of a set of semi-statically configured resources is used on PUCCH. For Physical Hybrid ARQ Indictor Channel (PHICH) signaling some embodiments include additional PHICH resources for subframes not contacting enough PHICH resources. In other embodiments no PHICH is used and a new uplink grant is sent for each HARQ retransmission.
The indications sent from the network node to the UE may be sent over higher layer signaling such as Radio Resource Control (RRC) signaling, in a RRC Reconfiguration Request message or by other means. The TDD configuration may in an embodiment be preconfigured in the user equipment. However, the TDD configuration, or updates of the configuration, may in another embodiment be sent from the network node to the UE by RRC signaling or Media Access Control (MAC) signaling.
The TDD configuration may comprise a TDD uplink/downlink configuration and may also contain a special subframe configuration, an additional Radio Network Temporary Identity (RNTI) connected to the TDD configuration and/or a timing offset for the configuration.
In an exemplary embodiment, the UE may assume that the format used for downlink control information (DCI) follows the format associated with the applied TDD configuration. In another embodiment, the UE may assume the DCI on the common search space follows the FDD configuration while the DCI on the UE specific search space follows the TDD configuration. The DCI format may also be different dependent on the RNTI with which the DCI is scrambled. In other embodiments new DCI formats may be introduced for UEs configured with a TDD configuration in an FDD system.
In an exemplary embodiment, the UE will follow the FDD configuration if it is scheduled on the common search space and the TDD configuration if it is scheduled on the UE specific search space.
A UE which has applied the TDD configuration may in some embodiments disregard grants if the UE is a half-duplex UE and the uplink grant corresponds to a subframe wherein the UE is configured to listen to paging or if the UE needs to read broadcasted system information in that subframe.
In some embodiments of the invention the TDD configuration may also contain a Downlink Pilot Time Slot (DwPTS) configuration applied during the downlink to uplink switching and/or include Uplink Pilot Time Slot (UpPTS) to accommodate switching. In other embodiments the UE may assume that all symbols are used for downlink also in the switching subframes. Different DwPTS/UpPTS configurations may be configured to different users dependent on the estimated radio channel for the UE and/or if the UE is a half duplex UE and the UEs switching capability between UL/DL operations. However, in FDD systems DwPTS/UpPTS subframes could be utilized to lower the requirements of the implementation in the UEs. Hence, the advantage of utilizing DwPTS/UpPTS subframes is that it provides the possibility to lower the cost of UE implementations, however at the cost of losing uplink/downlink resources.
A network node 650 and a UE 600 for a wireless communication system are schematically illustrated in the block diagram in
In one embodiment the receiver 601 included in the UE 600 is further adapted to receive a further indication from the network node to apply the time division duplex configuration to a timing of a hybrid automatic repeat request (HARQ) protocol; and the processing unit is adapted to apply the time division duplex configuration to the timing of the HARQ protocol.
In one embodiment the processing unit 602 included in the UE 600 is further processing unit is adapted to apply the time division duplex configuration by transmitting uplink feedback in a subframe according to the timing of the HARQ protocol of the time division duplex configuration.
In one embodiment the receiver 601 is further adapted to receive the time division duplex configuration from the network node 650.
In one embodiment the processing unit 653 included in the network node 650 is further adapted to determine whether the UE 600 is prohibited to receive an uplink grant in at least one subframe based on if the UE is configured with an ABS procedure.
In one embodiment the processing unit 653 included in the network node 650 is further adapted to determine whether the UE 600 is prohibited to receive an uplink grant in at least one subframe is based on if the UE is configured with a half-duplex operation.
In one embodiment the network node 650 comprises a predetermined uplink threshold value and the processing unit 653 is further adapted to determine whether the UE 600 transmits more in uplink during a time period than the predetermined uplink threshold value.
In one embodiment the network node 650 comprises a predetermined downlink threshold value and the processing unit 653 is further adapted to determine whether the UE 600 transmits more in downlink during a time period than the predetermined downlink threshold value.
In one embodiment the transmitter 651 included in the network node 650 is further adapted to send a further indication to the UE 600 to apply the time division duplex configuration to a timing of a HARQ protocol.
In one embodiment the transmitter 651 included in the network node 650 is further adapted to send the time division duplex configuration to the UE 600.
The units described above with reference to
Hence in the embodiments described, the code means in the computer program 612 of the UE 600 comprises a module 612a for receiving an indication from the network node to apply a TDD configuration to a timing of scheduling of resources. Moreover, the computer program 612 also comprises a module 612b for applying the time division duplex configuration to the timing of scheduling of resources. In one embodiment the computer program 612 also comprises a module 612c for receiving a further indication from the network node to apply the time division duplex configuration to a timing of a HARQ protocol and a module 612d for applying the time division duplex configuration to the timing of the HARQ protocol. In one embodiment the computer program 612 also includes a module 612e for receiving the time division duplex configuration from the network node.
The code means may be implemented as computer program code structured in computer program modules. The modules 612a-e essentially perform the steps of the flow described in connection with
The network node 650 illustrated in
Hence in the embodiments described, the code means in the computer program 662 of the network node 650 comprises a module 662a for determining whether the UE is prohibited to receive an uplink grant in at least one subframe. The computer program 662 also includes a module 662b for sending an indication to the UE to apply a time division duplex configuration to a timing of scheduling of resources if the UE is prohibited to receive an uplink grant in at least one subframe.
In one embodiment the computer program 662 also includes a module 662c for determining whether the UE transmits more in uplink during a time period than a predetermined uplink threshold value. In one embodiment the computer program 662 also includes a module 662d for determining whether the UE transmits more in downlink during a time period than the predetermined downlink threshold value. In one embodiment the computer program 662 additionally comprises a module 662e for sending a further indication to the UE to apply the time division duplex configuration to a timing of a HARQ protocol. In one embodiment the computer program 662 also includes a module 662f for sending the time division duplex configuration to the UE.
The code means may be implemented as computer program code structured in computer program modules. The modules 662a-f essentially perform the steps of the flow described in connection with
Although the code means in the embodiments disclosed above in conjunction with
The above mentioned and described embodiments are only given as examples and should not be limiting. Other solutions, uses, objectives, and functions within the scope of the accompanying patent claims may be possible.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/SE2012/051223 | 11/9/2012 | WO |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2014/074036 | 5/15/2014 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
20090213766 | Chindapol et al. | Aug 2009 | A1 |
20090274109 | Zhang | Nov 2009 | A1 |
20110039568 | Zhang | Feb 2011 | A1 |
20110310830 | Wu | Dec 2011 | A1 |
20120182908 | Pan | Jul 2012 | A1 |
20120236736 | Frank | Sep 2012 | A1 |
20130016656 | Satou | Jan 2013 | A1 |
20130040598 | Kashiwase | Feb 2013 | A1 |
20130114484 | Suzuki | May 2013 | A1 |
20130114573 | Suzuki | May 2013 | A1 |
20130128782 | Boixadera | May 2013 | A1 |
20130242824 | Lee | Sep 2013 | A1 |
20130250772 | Yin | Sep 2013 | A1 |
20130281076 | Damnjanovic | Oct 2013 | A1 |
20130315159 | Xia | Nov 2013 | A1 |
20140016526 | Ratasuk | Jan 2014 | A1 |
20140198744 | Wang | Jul 2014 | A1 |
20140328326 | Gunnarsson | Nov 2014 | A1 |
20150016310 | Yi | Jan 2015 | A1 |
20170280339 | Jeong | Sep 2017 | A1 |
Number | Date | Country |
---|---|---|
1787690 | Jun 2006 | CN |
101594205 | Dec 2009 | CN |
102474886 | May 2012 | CN |
1 670 277 | Dec 2005 | EP |
2 865 124 | Jun 2013 | EP |
2 853 045 | Apr 2015 | EP |
WO-2005032172 | Apr 2005 | WO |
2008 107856 | Sep 2008 | WO |
Entry |
---|
Interference Management in LTE-Advanced Heterogeneous Networks Using Almost Blank Subframes Author Hisham El Shaer (Year: 2006). |
PCT International Search Report for International application No. PCT/SE2012/051223, dated Aug. 9, 2013. |
R1-105940; 3GPP TSG RAN WG1 Meeting #63; Jacksonville, Florida; Title: ABS Signaling consideration for LTE-A-TDD, Nov. 15-19, 2010. |
PCT Written Opinion of the International Searching Authority for International application No. PCT/SE2012/0501223, dated Aug. 9, 2013. |
EPO Communication Pursuant to Article 94(3) EPC for Application No. 12 788 320.5-1854—dated May 11, 2017. |
First Office Action issued by the Chinese Patent Office for Application No. 201280076989.3—dated Jan. 8, 2018. |
English translation of second Office Action in application No. 201280076989.3 dated Oct. 8, 2018 3 pages. All references cited therein have been previously made of record. |
Number | Date | Country | |
---|---|---|---|
20150305057 A1 | Oct 2015 | US |