Abstract
A method of operating a communication system such that the communication system comprises at least a macrocell base station and a femtocell base station that is within the coverage area of the macrocell base station. The communication system is configured to provide an indication of the noise rise or interference at the macrocell base station to the femtocell base station and the femtocell base station, in response thereto, adjusts a maximum permitted transmission power based on the indication.
Description
FIELD OF THE INVENTION

The invention relates to communication networks that include femtocell base stations, and in particular to methods and devices for reducing a noise rise or interference caused by transmissions from mobile devices to a femtocell base station.


BACKGROUND TO THE INVENTION

Femtocell base stations in a Long Term Evolution (LTE) communication network (otherwise known as Home evolved Node Bs—HeNBs—or Enterprise evolved Node Bs—EeNBs) are small, low-power, indoor cellular base stations for residential or business use. They provide better network coverage and capacity than that available in such environments from the overlying macrocellular LTE network. In addition, femtocell base stations use a broadband connection to receive data from and send data back to the operator's network (known as “backhaul”).


As femtocell base stations make use of the same air interface as macrocell base stations in the macrocellular network, and as they are located within the coverage area of one or more macrocell base stations in the macrocellular network, it is necessary to ensure that uplink transmissions from mobile devices (otherwise known as User Equipments—UEs) to the femtocell base station do not interfere substantially with uplink transmissions from other mobile devices to the macrocell base stations.


It has been suggested that this interference can be mitigated by placing a cap on the power that a mobile device can use to transmit to the femtocell base station. This cap is determined from an estimated path loss to the neighboring macrocell base station with the strongest signal, such that, when the mobile device is transmitting to the femtocell base station at the capped power level, the increase in noise experienced at the macrocell base station is limited to a specified amount (measured in decibels, dB).


There is a problem with this approach in that the maximum permitted transmission power level only considers the noise increase caused by an individual mobile device. In order to maintain the noise rise at the macrocell base station to the specified fixed amount, the cap needs to be a function of the number of mobile devices that are transmitting to femtocell base stations (i.e. an increasing number of mobile devices transmitting to femtocell base stations should lead to a lower maximum permitted transmission power).


Hence, there is a need for an alternative approach to reducing the interference caused by mobile devices transmitting to femtocell base stations.


SUMMARY OF THE INVENTION

Therefore, according to a first aspect of the invention, there is provided a method of operating a communication system, the communication system comprising at least a macrocell base station and a femtocell base station that is within the coverage area of the macrocell base station, the method comprising providing an indication of the noise rise or interference at the macrocell base station to the femtocell base station; and the femtocell base station adjusting a maximum permitted transmission power for mobile devices transmitting to the femtocell base station based on the indication.


In some embodiments, the femtocell base station determines a target noise rise or interference level at the macrocell base station from the indication of the noise rise or interference.


In some embodiments, the step of adjusting can comprise adapting the maximum permitted transmission power based on the target noise rise or interference level.


In some embodiments, the step of adjusting can comprise reducing the maximum permitted transmission power in the event that the received notification indicates that the noise rise or interference at the macrocell base station is relatively high, or increasing the maximum permitted transmission power in the event that the received notification indicates that the noise rise or interference at the macrocell base station is relatively low.


In the above embodiment, reducing or increasing the maximum permitted transmission power can comprise reducing or increasing the maximum permitted transmission power to a respective predetermined value. Alternatively, reducing or increasing the maximum permitted transmission power can comprise reducing or increasing the maximum permitted transmission power by a predetermined amount.


In preferred embodiments, the step of providing comprises providing the indication of the noise rise or interference using signaling on an X2 interface.


Preferably, the indication of the noise rise or interference comprises an “UL Interference Overload” indicator.


In some embodiments, the step of providing comprises providing the indication of the noise rise or interference from the macrocell base station.


In other embodiments, the step of providing comprises providing the indication of the noise rise or interference from an X2 proxy or femto gateway having a communication interface with the femtocell base station and the macrocell base station.


Preferably, the method further comprises, after providing an indication that the noise rise or interference at the macrocell base station is relatively high, the steps of determining whether the noise rise or interference at the macrocell base station has improved; in the event that the noise rise or interference at the macrocell base station has not improved, providing a second indication to the femtocell base station; and the femtocell base station increasing the maximum permitted transmission power for mobile devices transmitting thereto based on the second indication.


In further embodiments, the communication system further comprises at least one other macrocell base station neighboring the macrocell base station, the method further comprising, after providing an indication that the noise rise or interference at the macrocell base station is relatively high, the steps of determining whether the noise rise or interference at the macrocell base station has improved; in the event that the noise rise or interference at the macrocell base station has not improved, providing an indication of the noise rise or interference at the macrocell base station to said at least one other macrocell base station; and said at least one other macrocell base station adjusting a maximum permitted transmission power for mobile devices transmitting thereto based on the indication.


According to a second aspect of the invention, there is provided a method of operating a femtocell base station that is within the coverage area of a macrocell base station, the method comprising receiving an indication of the noise rise or interference at the macrocell base station; and adjusting a maximum permitted transmission power that issued by mobile devices transmitting to the femtocell base station based on the received indication.


In some embodiments, the femtocell base station determines a target noise rise or interference level at the macrocell base station from the indication of the noise rise or interference.


In some embodiments, the step of adapting comprises adapting the maximum permitted transmission power based on the target noise rise or interference level.


In some embodiments, the step of adapting can comprise reducing the maximum permitted transmission power in the event that the received notification indicates that the noise rise or interference at the macrocell base station is relatively high, or increasing the maximum permitted transmission power in the event that the received notification indicates that the noise rise or interference at the macrocell base station is relatively low.


In the above embodiment, reducing or increasing the maximum permitted transmission power comprises reducing or increasing the maximum permitted transmission power to a respective predetermined value. Alternatively, reducing or increasing the maximum permitted transmission power can comprise reducing or increasing the maximum permitted transmission power by a predetermined amount.


In preferred embodiments, the step of receiving comprises receiving the indication of the noise rise or interference using signaling on an X2 interface.


Preferably, the indication of the noise rise or interference comprises an “UL Interference Overload” indicator.


In some embodiments, the step of receiving comprises receiving the indication of the noise rise or interference from the macrocell base station.


In other embodiments, the step of receiving comprises receiving the indication of the noise rise or interference from an X2 proxy or femto gateway having a communication interface with the femtocell base station and the macrocell base station.


According to a third aspect of the invention, there is provided a femtocell base station configured to perform the method described above.


According to a fourth aspect of the invention, there is provided a method of operating a network node, the network node having a communication interface with a femtocell base station, the femtocell base station being located in the coverage area of a macrocell base station, the method comprising providing an indication of the noise rise or interference at a macrocell base station to the femtocell base station, such that the femtocell base station sets a maximum permitted transmission power for mobile devices transmitting to the femtocell base station based on the received indication.


In preferred embodiments, the step of providing comprises providing the indication of the noise rise or interference using signaling on an X2 interface.


Preferably, the indication of the noise rise or interference comprises an “UL Interference Overload” indicator.


Preferably, the method further comprises, after providing an indication that the noise rise or interference at the macrocell base station is relatively high, the steps of determining whether the noise rise or interference at the macrocell base station has improved; and in the event that the noise rise or interference at the macrocell base station has not improved, providing a second indication to the femtocell base station, such that the femtocell base station increases the maximum permitted transmission power for mobile devices transmitting thereto based on the second indication.


In further embodiments, after providing an indication that the noise or interference at the macrocell base station is relatively high, the method further comprises the steps of determining whether the interference at the macrocell base station has improved; and in the event that the noise rise or interference at the macrocell base station has not improved, providing an indication of the interference at the macrocell base station to at least one other macrocell base station neighboring the macrocell base station, such that the at least one other macrocell base station sets a maximum permitted transmission power for mobile devices transmitting thereto based on the indication.


In a preferred embodiment, the network node is the macrocell base station.


In an alternative embodiment, the network node has a communications interface with the macrocell base station and the femtocell base station.


In these embodiments, the network node is an X2 proxy or a femto gateway.


According to a fifth aspect of the invention, there is provided a network node configured to perform the method described above.





BRIEF DESCRIPTION OF THE DRAWINGS

The invention will now be described in detail, by way of example only, with reference to the following drawings, in which:



FIG. 1 shows an exemplary communication network;



FIG. 2 is a flow chart illustrating a method in accordance with the invention;



FIG. 3 is an illustration of an X2 interface between a macrocell base station and a femtocell base station;



FIG. 4 is a flow chart illustrating an alternative method in accordance with the invention;



FIG. 5 is an illustration of an X2 proxy or femto gateway between a macrocell base station and a femtocell base station;



FIG. 6 is a graph illustrating the change in throughput against femtocell density in a macrocell sector;



FIG. 7 is a graph illustrating the change in throughput against femtocell density for a user equipment at the edge of the macrocell;



FIG. 8 is a graph illustrating the change in throughput against femtocell density in a femtocell sector; and



FIG. 9 is a graph illustrating the change in throughput against femtocell density for a user equipment at the edge of the femtocell.





DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

Although the invention will be described below with reference to an LTE communication network and femtocell base stations or HeNBs, it will be appreciated that the invention is applicable to other types of third or subsequent generation network in which femtocell base stations (whether for home or business use), or their equivalents in those networks, can be deployed. Moreover, although in the embodiments below the femtocell base stations and macrocell base stations use the same air interface (LTE), it will be appreciated that the invention can be used in a situation in which the macrocell and femtocell base stations use different air interfaces (for example the macrocell base stations could use WCDMA while the femtocell base stations use LTE).



FIG. 1 shows part of an exemplary communication network 2 in which the invention can be implemented. The communication network 2 includes a plurality of macrocell base stations 4 (only one of which is shown in FIG. 1) that each define a respective coverage area—indicated by macrocell 6. In an LTE communication network, the macrocell base stations 4 are referred to as evolved Node Bs (eNBs).


One or more femtocell base stations 8 (Home eNBs—HeNBs) can be located within the coverage area 6 of the macrocell base station 4 (although only one femtocell base station 8 is shown in FIG. 1), with each femtocell base station 8 defining a respective coverage area—indicated by femtocell 10).


It will be appreciated that FIG. 1 has not been drawn to scale, and that, in most real-world implementations, the coverage area 10 of the femtocell base station 8 will be significantly smaller than the coverage area 6 of the macrocell base station 4.


A number of mobile devices (UEs) 12 are also located in the communication network 2 within the coverage area 6 of the macrocell base station 4.


Four mobile devices 12a, 12b, 12c and 12d are each associated with the macrocell base station 4, meaning that they transmit and/or receive control signaling and/or data using the macrocell base station 4. It will be noted that although the mobile device 12d is also within the coverage area 10 of the femtocell base station 8, it is associated with the macrocell base station 4 (this could be due to the signal strength of the macrocell base station 4 being significantly better for mobile device 12d than the signal strength of the femtocell base station 8 or the femtocell base station 8 could be restricted to specific subscribers that don't include mobile device 12d, etc.). Mobile devices 12a, 12b, 12c and 12d are referred to collectively herein as “macro-UEs”, as they are the mobile devices/user equipments (UEs) associated with the macrocell base station 4.


Two further mobile devices, 12e and 12f, are located within the coverage area 10 of the femtocell base station 8 and are associated with the femtocell base station 8, meaning that they transmit and/or receive control signaling and/or data using the femtocell base station 8. Mobile devices 12e and 12f are referred to collectively herein as “femto-UEs”, as they are the mobile devices/user equipments (UEs) associated with the femtocell base station 8.


As described above, unless properly controlled, the uplink transmissions from the femto-UEs (i.e. the transmissions from mobile devices 12e and 12f to the femtocell base station 8) cause undesirable levels of interference at the macrocell base station 4, which will impair the quality of the uplink transmissions from the macro-UEs (i.e. the transmissions from mobile devices 12a, 12b, 12c and 12d to the macrocell base station 4).


In accordance with the invention, the femtocell base station 8 sets the maximum permitted transmission power for the femto-UEs based on a measurement of the noise or interference at the macrocell base station 4. This method is illustrated in FIG. 2.


It will be appreciated that instead of measuring a noise rise, it is possible to measure an interference level, or a noise and interference level, or any other similar parameter.


In particular, in step 101, a noise rise is measured at the macrocell base station 4. In one embodiment, the thermal noise level can be measured according to the “Thermal noise power” measurement defined in 3GPP TS 36.214 and the interference plus noise power level can be measured according to the “Received Interference Power” measurement defined in 3GPP TS 36.214. The noise rise can then be determined as the ratio of these two measurements.


In step 103, an indication of the measured noise rise or a permissible noise rise at the macrocell base station 4 is provided to the femtocell base station 8.


In step 105, the femtocell base station 8 sets the maximum permitted transmission power for all of the femto-UEs associated therewith based on the indication of the measured noise rise or permissible noise rise.


In a particular embodiment, the femtocell base station 8 can reduce the maximum permitted transmission power if the received notification indicates that the noise rise or interference at the macrocell base station 4 is above a first threshold value, and increase the maximum permitted transmission power if the received notification indicates that the noise rise or interference at the macrocell base station 8 is below a second threshold value. The second threshold value can be equal to the first threshold value. However, the second threshold value can be less than the first threshold value, which means that the femtocell base station 8 can maintain the maximum permitted transmission power at its current value when the received notification indicates that the noise rise or interference at the macrocell base station 4 is between the first and second threshold values.


In particular embodiments, the femtocell base station 8 sets appropriate values within the P-Max, UplinkPowerControlCommon and/or UplinkPowerControlDedicated Information Elements (as defined in 3GPP TS 36.331).


In one embodiment, the indication can be provided to the femtocell base station 8 using an interface known as X2, which is an interface used to interconnect macrocell base stations, and potentially (in future releases of the LTE specifications) macrocell base stations and femtocell base stations. The X2 interface is illustrated in FIG. 3. The X2 interface allows macrocell base stations and femtocell base stations to initiate and complete actions, such as handovers, without having to use higher network authorities to co-ordinate the action.


In particular, the X2 interface can be used to provide a femtocell base station 8 with an indication of the loading and usage of the macrocell base station 4, which is not available by other means. It is this indication that can be used by the femtocell base station 8 to set the maximum permitted transmission power for the femto-UEs.


The indication can comprise the X2 “UL Interference Overload” indicator, which indicates the interference overload at the macrocell base station 4 in terms of a “high”, “medium” or “low” value for each physical resource block (PRB).


The femtocell base station 8 can be configured to interpret a “high” value for the “UL Interference Overload” indicator to mean that the noise rise at the macrocell base station 4 caused by the femto-UEs should be lower than when the value of the indicator is “low”. The femtocell base station 8 can adjust the maximum permitted transmission power for the femto-UEs accordingly. In particular, the femtocell base station 8 can set the maximum permitted transmission power to a lower value if the noise rise at the macrocell base station 4 should be a low value, and vice versa.


In one embodiment, the femtocell base station 8 can interpret the value of the “UL Interference Overload” indication in an absolute manner, for example by associating a specific value of the noise rise at the macrocell base station 4 with the different values of the indicator. The femtocell base station 8 can set the maximum permitted transmission power for the femto-UEs to meet the specified noise requirements.


An exemplary noise rise at the macrocell base station 4 when the “UL Interference Overload” indicator is “high” can be 0.1 dB, while an exemplary noise rise at the macrocell base station 4 when the indicator is “low” can be 1.0 dB. The noise rise when the indicator is “medium” can be an intermediate value, say, 0.5 dB.


Using the X2 interface in this way has the advantage that all femtocell base stations 8 within the coverage area of the macrocell base station 4 will be synchronized, in terms of the target noise rise at the macrocell base station 4. This is because there is an X2 interface between the macrocell base station 4 and each of the femtocell base stations 8 within its coverage area 6, and each femtocell base station 8 will receive the same “UL Interference Overload” indicator value.


In an alternative embodiment, the femtocell base station 8 can interpret the value of the “UL Interference Overload” indicator in a relative manner, for example by increasing, reducing or maintaining the level of noise rise caused by the femto-UEs at the macrocell base station 4 according to the value of the indicator. For example, if the “UL Interference Overload” indicator is “high”, then it is assumed that the noise rise at the macrocell base station 4 caused by the femto-UEs should be reduced by, say, 0.1 dB. Similarly, if the “UL Interference Overload” indicator is “low”, then it is assumed that the noise rise at the macrocell base station 4 caused by the femto-UEs can be increased by, say, 0.1 dB. The femtocell base station 8 can maintain the current noise rise at the macrocell base station 4 on receipt of a “medium” value of the indicator.


In this embodiment, however, it may be necessary to periodically synchronize the femtocell base stations 8 to make sure that they are all using the same value of the noise rise at the macrocell base station 4. This synchronization can be performed using signaling over the X2 interface.


In an alternative embodiment of the invention, instead of using the “UL Interference Overload” indicator in the X2 interface, the indication can be provided using a different message in the X2 interface that allows a more granular adjustment of the permitted noise rise at the macrocell base station 4 caused by the femto-UEs. For example, this message can be defined to be able to indicate a plurality of specific values for the permitted noise rise at the macrocell base station 4. Moreover, the value of this message could be set individually for each of the femtocell base stations 8 within the coverage area 6 of the macrocell base station 4, allowing even greater control over the noise rise at the macrocell base station 4 caused by different groups of femto-UEs.


Although the method described above can control noise rise at the macrocell base station 4 caused by femto-UEs, it may be that some or all of the noise rise at the macrocell base station 4 is actually being caused by transmissions from mobile devices that are associated with other neighboring macrocell base stations (which are not shown in FIG. 1).


Therefore, it may be undesirable (and unnecessary) to restrict the maximum permitted transmission power of the femto-UEs if the noise rise is being caused by the macroUEs associated with another macrocell base station, while at the same time it is undesirable to restrict the maximum permitted transmission power of those macro-UEs if the noise rise is being caused by the femto-UEs otherwise the coverage areas of those other macrocell base stations may be reduced.


The flow chart in FIG. 4 illustrates a method of operating the communication system to overcome this problem. In this method, the operation of the femto-UEs (in terms of their maximum permitted transmission power) is adapted independently of the operation of the macro-UEs (in terms of their maximum permitted transmission power).


In step 121, the noise rise at the macrocell base station 4 is measured. This step is performed in the same way as step 101 in FIG. 2 described above.


In step 123, it is determined whether the measured noise rise is acceptable. This can be determined by comparing the measured noise rise to a threshold noise value. If the noise rise is acceptable, the method returns to step 121.


If the noise rise is unacceptable, the method moves to step 125 in which an indication of the noise rise is provided to the femtocell base station(s) 8 within the coverage area 6 of the macrocell base station 4. This indication can be provided to the femtocell base station(s) 8 using any of the embodiments described above with reference to FIGS. 2 and 3.


At step 127, the femtocell base station(s) 8 adjust the maximum permitted transmission power for their associated femto-UEs based on the received indication. Again, this adjustment can be performed in accordance with any of the embodiments described above with reference to FIGS. 2 and 3.


At step 129, it is determined whether the adjustment to the maximum permitted transmission power for the femto-UEs has resulted in a measurable or significant improvement (i.e. a reduction) in the noise rise at the macrocell base station 4.


If this adjustment has resulted in a measurable improvement in the noise rise, the method returns to step 121 and repeats.


If this adjustment has not resulted in a measurable improvement to the noise rise, then it is likely that the noise rise at the macrocell base station 4 is not caused by the femtoUEs, so the method moves to step 131 in which the changes to the maximum permitted transmission power for the femto-UEs are undone or reversed. This reversal can be achieved by providing an appropriate indication to the femtocell base station(s) 8, which causes the femtocell base station(s) 8 to set the maximum permitted transmission power to the value in place before step 127 was carried out.


In the next step, step 133, an indication of the noise rise at the macrocell base station 4 is provided to other macrocell base stations neighboring the macrocell base station 4. As with the embodiments of the invention described above, this indication can be provided to the other macrocell base stations using signaling on the X2 interface, and the macrocell base stations can be configured to use the indication to adjust a maximum permitted transmission power for the macro-UEs associated therewith.


In the above embodiments of the invention, signaling over the X2 interface between the femtocell base station 8 and macrocell base station 4 is used to provide the indication of the noise rise at the macrocell base station 4. However, in alternative embodiments of the invention, an X2 proxy or femtocell gateway could be provided between the femtocell base station 8 and the macrocell base station 4. This is illustrated in FIG. 5.


The X2 proxy or femto gateway 14 reduces the number of X2 interfaces the macrocell base station 4 needs to maintain with the femtocell base stations 8 within its coverage area 6. Instead of an X2 interface with each of the femtocell base stations 8, the macrocell base station 4 will have a single X2 interface with the X2 proxy/femto gateway 14 (as well as X2 interfaces with neighboring macrocell base stations) and the X2 proxy/femto gateway will have respective X2 interfaces to each of the femtocell base stations 8. Alternatively, an interface other than X2 could be used as the interface between the X2 proxy/femto gateway and the femtocell base stations 8.


The X2 proxy or femto gateway 14 will receive the load information originating from the macrocell base station 4, adjust the indication (if necessary) and send an appropriate indication to the femtocell base stations 8. The X2 proxy or femto gateway 14 can receive the “UL Interference Overload” indicator from the macrocell base station 4 as described above and can provide the same or a different indicator to the femtocell base stations 8.


In a communication system that implements the method illustrated in FIG. 4, the X2 proxy or femto gateway 14 can avoid the need for the macrocell base station 4 to be modified in any way from conventional designs, since each of steps 121-125, 129 and 131 can be performed by the X2 proxy or femto gateway 14. In particular, the X2 proxy or femto gateway 14 can determine if the changes to the femto-UEs maximum permitted transmission power has any impact on the noise rise measured at the macrocell base station 4 and adjust the signaling to the femtocell base stations 8 accordingly.


The procedures described with reference to FIGS. 2 and 4 can be performed per physical resource block (PRB), as the current specifications for LTE (in particular 3GPP TS 36.214) indicate that interference measurements by a macrocell base station 4 and X2 signaling is performed per resource block. In this case, the maximum transmission power that a femto-UE is allowed to use is set as a function of the set of PRBs assigned to that femto-UE (noting that the femto-UE transmission power is constant across the PRBs assigned to it).


Furthermore, the macrocell base station 4 and femtocell base stations 8 may use non-identical but overlapping sets of PRBs. Therefore, when setting the maximum permitted transmission power for the femto-UEs, the femtocell base station 8 will consider indications received for those macrocell PRBs which overlap the set of PRBs used by the femtocell.


Furthermore, each procedure can be performed separately for each frequency carrier in use in the communication network 2.


Although each of the embodiments above has been described through the use of the X2 interface, it will be appreciated that it is possible to use signaling over alternative control interfaces (whether an X2 proxy or femto gateway is present in the communication system 2 or not).


For example, in an alternative embodiment, instead of using X2 interfaces, the maximum permitted transmission power for the femto UEs could be controlled on a slower basis via Operations and Maintenance (O&M) interfaces between the femtocell base stations 8 and an operations center that is located in the core network (not shown in FIG. 1). The control can be provided by the operations center on the basis of interference reports received from the macrocell base station 4 (which are sent to the operations center via interfaces between the macrocell base station 4 and the operations center). In this case, the geographic locations of femtocell base stations 8 and macrocell base stations 4 may be known and therefore the control at the operations center could also set the maximum permitted transmission power for the femto-UEs as a function of the density of femtocell base stations 8 within the coverage area 6 of a macrocell base station 4.



FIGS. 6 to 9 illustrate the performance benefits of the invention described above.


It can be seen that for a fixed scheme, with the target noise rise at the macrocell base station set to 1 dB, there is a significant degradation in the performance of the macrocell as the density of active femtocell base stations per macrocell increases for both the average UE (FIG. 6) and UEs at the cell edge (FIG. 7). For example, for cell edge (5 percentile) UEs, the throughput is reduced from about 275 kb/s to 50 kb/s, as the number of femtocell base stations increase.


However, with a noise rise set to 0.1 dB, the performance degradation is much less significant for the macrocell, but it does result in a restriction in throughput in the femtocells when the density of femtocells is low (FIG. 9 for example shows that the throughput for cell edge—5 percentile—UEs is reduced from 7 Mb/s to 1 Mb/s).


Therefore, these graphs indicate that the adaptation of the maximum permitted transmission power is desirable and will provide performance benefits over the conventional fixed maximum permitted transmission power scheme.


Furthermore, the graphs indicate that making the adaptation of the maximum permitted transmission power more granular (i.e. having more than two permissible noise rises of 0.1 dB and 1.0 dB) will also be advantageous. For example, a value of 0.5 dB for the noise rise for medium densities of femtocells should provide better performance for the femtocells than with a noise rise of 0.1 dB, while still providing adequate protection for macro-UEs.


While the invention has been illustrated and described in detail in the drawings and foregoing description, such illustration and description are to be considered illustrative or exemplary and not restrictive; the invention is not limited to the disclosed embodiments.


Variations to the disclosed embodiments can be understood and effected by those skilled in the art in practicing the claimed invention, from a study of the drawings, the disclosure, and the appended claims. In the claims, the word “comprising” does not exclude other elements or steps, and the indefinite article “a” or “an” does not exclude a plurality. A single processor or other unit may fulfill the functions of several items recited in the claims. The mere fact that certain measures are recited in mutually different dependent claims does not indicate that a combination of these measures cannot be used to advantage. A computer program may be stored/distributed on a suitable medium, such as an optical storage medium or a solid-state medium supplied together with or as part of other hardware, but may also be distributed in other forms, such as via the Internet or other wired or wireless telecommunication systems. Any reference signs in the claims should not be construed as limiting the scope.

Claims
  • 1. A method of operating a communication system, the communication system comprising at least a macrocell base station and a femto cell base station that is within the coverage area of the macrocell base station, the method comprising: providing an indication of a noise rise or interference measured at the macrocell base station to the femtocell base station by providing the indication of the noise rise or interference from an X2 proxy or femto gateway having a communication interface with the femtocell base station and the macrocell base station; andthe femtocell base station adjusting a maximum permitted transmission power for mobile devices transmitting to the femtocell base station based on the indication.
  • 2. The method as claimed in claim 1, wherein the femtocell cell base station determines a target noise rise or interference level at the macrocell base station from the indication of the noise rise or interference.
  • 3. The method as claimed in claim 2, wherein the adjusting step comprises adapting the maximum permitted transmission power based on the target noise rise or interference level.
  • 4. The method as claimed in claim 1, wherein the adjusting step includes reducing the maximum permitted transmission power in the event that the received notification indicates that the noise rise or interference at the macrocell base station is relatively high, or increasing the maximum permitted transmission power in the event that the received notification indicates that the noise rise or interference at the macrocell base station is relatively low.
  • 5. The method as claimed in claim 4, wherein the reducing or increasing the maximum permitted transmission power comprises reducing or increasing the maximum permitted transmission power to a respective predetermined value.
  • 6. The method as claimed in claim 4, wherein the reducing or increasing the maximum permitted transmission power comprises reducing or increasing the maximum permitted transmission power by a predetermined amount.
  • 7. The method as claimed in claim 1, wherein the providing step includes providing the indication of the noise rise or interference using signaling on an X2 interface.
  • 8. A method of operating a communication system, the communication system comprising at least a macrocell base station and a femtocell base station that is within the coverage area of the macrocell base station, the method comprising: providing an indication of a noise rise or interference at the macrocell base station to the femtocell base station; andadjusting a maximum permitted transmission power at the femtocell base station for mobile devices transmitting to the femtocell base station based on the indication, for at least one other macrocell base station neighboring the macrocell base station, after providing an indication that the noise rise or interference at the macrocell base station is relatively high, the adjusting step comprising: determining whether the noise rise or interference at the macrocell base station has improved;in the event that the noise rise or interference at the macrocell base station has not improved, providing an indication of the noise rise or interference at the macrocell base station to said at least one other macrocell base station; andadjusting a maximum permitted transmission power at the at least one other macrocell base station for mobile devices transmitting thereto based on the indication.
  • 9. The method as claimed in claim 8, wherein the femtocell base station determines a target noise rise or interference level at the macrocell base station from the indication of the noise rise or interference.
  • 10. The method as claimed in claim 9, wherein the adjusting step comprises adapting the maximum permitted transmission power based on the target noise rise or interference level.
  • 11. The method as claimed in claim 8, wherein the adjusting step includes reducing the maximum permitted transmission power in the event that the received notification indicates that the noise rise or interference at the macrocell base station is relatively high, or increasing the maximum permitted transmission power in the event that the received notification indicates that the noise rise or interference at the macrocell base station is relatively low.
  • 12. The method as claimed in claim 8, wherein providing includes providing the indication of the noise rise or interference using signaling on an X2 interface.
  • 13. A femtocell base station having a communication interface, the femtocell base station being located in a coverage area of a macrocell base station, the femtocell base station comprising a communication interface configured to: receive an indication of a noise rise or interference from a macrocell base station, the indication setting a maximum permitted uplink transmission power for mobile devices transmitting in an uplink to the femtocell base station based on the received indication;reduce, in the femtocell base station, the maximum permitted uplink transmission power for mobile devices transmitting in an uplink to the femtocell base station;receive a second indication at the femtocell base station from the macrocell base station, the second indication indicating whether the noise rise or interference at the macrocell base station has improved after the reducing, in the femtocell base station, the maximum permitted uplink transmission power; andin the event that the noise rise or interference at the macrocell base station has not improved, increase, in the femtocell base station, the maximum permitted uplink transmission power for mobile devices transmitting in an uplink to the femtocell base station based on the second indication.
  • 14. The femtocell base station as claimed in claim 13, further comprising an X2 interface configured to provide the indication of the noise rise or interference using signaling on an X2 interface.
  • 15. The femtocell base station as claimed in claim 14, wherein the indication of the noise rise or interference comprises an “UL Interference Overload” indicator.
  • 16. The femtocell base station as claimed in claim 13, further configured to, after providing the second indication to the femtocell base station, receive an indication of the interference at the macrocell base station to at least one other macrocell base station neighboring the macrocell base station, such that the at least one other macrocell base station provides, to the femtocell base station, a maximum permitted uplink transmission power for mobile devices transmitting to the femtocell base station based on the indication.
  • 17. The femtocell base station having a communication interface as claimed in claim 13, further comprising an X2 proxy or a femto gateway.
  • 18. A communication system comprising at least a macrocell base station and a femtocell base station that is within the coverage area of the macrocell base station, the communication system configured to: provide an indication of a noise rise or interference at the macrocell base station to the femtocell base station; andadjust a maximum permitted transmission power at the femtocell base station for mobile devices transmitting to the femtocell base station based on the indication;after providing an indication that the noise rise or interference at the macrocell base station is relatively high, at least one other macrocell base station neighbouring the macrocell base station configured to: determine whether the noise rise or interference at the macrocell base station has improved;in the event that the noise rise or interference at the macrocell base station has not improved, provide an indication of the noise rise or interference at the macrocell base station to said at least one other macrocell base station; andadjust a maximum permitted transmission power to the at least one other macrocell base station for mobile devices transmitting thereto based on the indication.
  • 19. The communication system as claimed in claim 18, wherein the femtocell base station is configured to determine a target noise rise or interference level at the macrocell base station from the indication of the noise rise or interference.
  • 20. The communication system as claimed in claim 19, wherein the step of adjusting a maximum permitted transmission power comprises adapting the maximum permitted transmission power based on the target noise rise or interference level.
  • 21. The communication system as claimed in claim 18, wherein the step of adjusting a maximum permitted transmission power comprises reducing the maximum permitted transmission power in the event that the received notification indicates that the noise rise or interference at the macrocell base station is relatively high, or increasing the maximum permitted transmission power in the event that the received notification indicates that the noise rise or interference at the macrocell base station is relatively low.
  • 22. The communication system as claimed in claim 18, further comprising an X2 interface configured to provide the indication of the noise rise or interference.
Priority Claims (1)
Number Date Country Kind
0907787.6 May 2009 GB national
PRIORITY CLAIM

This application is a continuation of and claims priority to U.S. patent application Ser. No. 12/773,970 filed on May 5, 2010, now issued as U.S. Pat. No. 8,423,072 on Apr. 16, 2013, which claims priority to and the benefit of Great Britain Application No. 0907787.6 filed on May 7, 2009.

US Referenced Citations (186)
Number Name Date Kind
4380046 Frosch et al. Apr 1983 A
4574345 Konesky Mar 1986 A
4589066 Lam et al. May 1986 A
4601031 Walker et al. Jul 1986 A
4603404 Yamauchi et al. Jul 1986 A
4622632 Tanimoto et al. Nov 1986 A
4698746 Goldstein Oct 1987 A
4720780 Dolecek Jan 1988 A
4736291 Jennings et al. Apr 1988 A
4814970 Barbagelata et al. Mar 1989 A
4825359 Ohkami et al. Apr 1989 A
4858233 Dyson et al. Aug 1989 A
4890279 Lubarsky Dec 1989 A
4914653 Bishop et al. Apr 1990 A
4937741 Harper et al. Jun 1990 A
4943912 Aoyama et al. Jul 1990 A
4967326 May Oct 1990 A
4974146 Works et al. Nov 1990 A
4974190 Curtis Nov 1990 A
4992933 Taylor Feb 1991 A
5036453 Renner et al. Jul 1991 A
5038386 Li Aug 1991 A
5065308 Evans Nov 1991 A
5109329 Strelioff Apr 1992 A
5152000 Hillis Sep 1992 A
5193175 Cutts et al. Mar 1993 A
5233615 Goetz Aug 1993 A
5239641 Horst Aug 1993 A
5241491 Carlstedt Aug 1993 A
5247694 Dahl Sep 1993 A
5253308 Johnson Oct 1993 A
5265207 Zak et al. Nov 1993 A
5280584 Caesar et al. Jan 1994 A
5384697 Pascucci Jan 1995 A
5386495 Wong et al. Jan 1995 A
5408676 Mori Apr 1995 A
5410723 Schmidt et al. Apr 1995 A
5410727 Jaffe et al. Apr 1995 A
5473731 Seligson Dec 1995 A
5555548 Iwai et al. Sep 1996 A
5557751 Banman et al. Sep 1996 A
5570045 Erdal et al. Oct 1996 A
5600784 Bissett et al. Feb 1997 A
5692139 Slavenburg Nov 1997 A
5719445 McClure Feb 1998 A
5734921 Dapp et al. Mar 1998 A
5752067 Wilkinson et al. May 1998 A
5761514 Aizikowits et al. Jun 1998 A
5790879 Wu Aug 1998 A
5795797 Chester et al. Aug 1998 A
5796937 Kizuka Aug 1998 A
5802561 Fava et al. Sep 1998 A
5805839 Singahl Sep 1998 A
5826033 Hayashi et al. Oct 1998 A
5826049 Ogata et al. Oct 1998 A
5826054 Jacobs et al. Oct 1998 A
5845060 Vrba et al. Dec 1998 A
5860008 Bradley Jan 1999 A
5861761 Kean Jan 1999 A
5864706 Kurokawa et al. Jan 1999 A
5923615 Leach et al. Jul 1999 A
5926640 Mason et al. Jul 1999 A
5946484 Brandes Aug 1999 A
5951664 Lambrecht et al. Sep 1999 A
5959995 Wicki et al. Sep 1999 A
5963609 Huang Oct 1999 A
6023757 Nishimoto et al. Feb 2000 A
6044451 Slavenburg Mar 2000 A
6052752 Kwon Apr 2000 A
6055285 Alston Apr 2000 A
6069490 Ochotta et al. May 2000 A
6101599 Wright et al. Aug 2000 A
6122677 Porterfield Sep 2000 A
6167502 Pechanek et al. Dec 2000 A
6173386 Key et al. Jan 2001 B1
6175665 Sawada Jan 2001 B1
6199093 Yokoya Mar 2001 B1
6317820 Shiell et al. Nov 2001 B1
6345046 Tanaka Feb 2002 B1
6360259 Bradley Mar 2002 B1
6381293 Lee et al. Apr 2002 B1
6381461 Besson et al. Apr 2002 B1
6393026 Irwin May 2002 B1
6408402 Norman Jun 2002 B1
6424870 Maeda et al. Jul 2002 B1
6448910 Lu Sep 2002 B1
6499096 Suzuki Dec 2002 B1
6499097 Tremblay et al. Dec 2002 B2
6567417 Kalkunte et al. May 2003 B2
6615339 Ito et al. Sep 2003 B1
6631439 Saulsbury et al. Oct 2003 B2
6681341 Fredenburg et al. Jan 2004 B1
6775766 Revilla et al. Aug 2004 B2
6795422 Ohsuge Sep 2004 B2
6829296 Troulis et al. Dec 2004 B1
6892293 Sachs et al. May 2005 B2
6928500 Ramanujan et al. Aug 2005 B1
6952181 Karr et al. Oct 2005 B2
6961782 Denneau et al. Nov 2005 B1
6996157 Ohsuge Feb 2006 B2
7103008 Greenblat et al. Sep 2006 B2
7161978 Lu et al. Jan 2007 B2
7237055 Rupp Jun 2007 B1
7302552 Guffens et al. Nov 2007 B2
7340017 Banerjee Mar 2008 B1
7342414 DeHon Mar 2008 B2
7383422 Kageyama et al. Jun 2008 B2
7428721 Rohe et al. Sep 2008 B2
7549081 Robbins et al. Jun 2009 B2
7672836 Lee et al. Mar 2010 B2
7712067 Fung et al. May 2010 B1
7801029 Wrenn et al. Sep 2010 B2
7804719 Chirania et al. Sep 2010 B1
8032142 Carter et al. Oct 2011 B2
20020045433 Vihiriala Apr 2002 A1
20020069345 Mohamed et al. Jun 2002 A1
20020174318 Stuttard et al. Nov 2002 A1
20020198606 Satou Dec 2002 A1
20030154358 Seong Aug 2003 A1
20030235241 Tamura Dec 2003 A1
20040078548 Claydon et al. Apr 2004 A1
20040083409 Rozenblit et al. Apr 2004 A1
20040139466 Sharma et al. Jul 2004 A1
20040150422 Wong et al. Aug 2004 A1
20040198386 Dupray Oct 2004 A1
20050083840 Wilson Apr 2005 A1
20050114565 Gonzalez et al. May 2005 A1
20050124344 Laroia et al. Jun 2005 A1
20050163248 Berangi et al. Jul 2005 A1
20050250502 Laroia et al. Nov 2005 A1
20050282500 Wang et al. Dec 2005 A1
20060087323 Furse et al. Apr 2006 A1
20060089154 Laroia et al. Apr 2006 A1
20060251046 Fujiwara Nov 2006 A1
20060268962 Cairns et al. Nov 2006 A1
20070036251 Jelonnek et al. Feb 2007 A1
20070127556 Sato Jun 2007 A1
20070173255 Tebbit et al. Jul 2007 A1
20070183427 Nylander et al. Aug 2007 A1
20070220522 Coene et al. Sep 2007 A1
20070220586 Salazar Sep 2007 A1
20070248191 Pettersson Oct 2007 A1
20070254620 Lindqvist et al. Nov 2007 A1
20070263544 Yamanaka et al. Nov 2007 A1
20070270151 Claussen et al. Nov 2007 A1
20080146154 Claussen et al. Jun 2008 A1
20080151832 Iwasaki Jun 2008 A1
20090003263 Foster et al. Jan 2009 A1
20090042593 Yavuz et al. Feb 2009 A1
20090046665 Robson et al. Feb 2009 A1
20090080550 Kushioka Mar 2009 A1
20090092122 Czaja et al. Apr 2009 A1
20090097452 Gogic Apr 2009 A1
20090098871 Gogic Apr 2009 A1
20090111503 Pedersen et al. Apr 2009 A1
20090150420 Towner Jun 2009 A1
20090163216 Hoang et al. Jun 2009 A1
20090168907 Mohanty et al. Jul 2009 A1
20090196253 Semper Aug 2009 A1
20090215390 Ku et al. Aug 2009 A1
20090252200 Dohler et al. Oct 2009 A1
20090264077 Damnjanovic Oct 2009 A1
20090286545 Yavuz et al. Nov 2009 A1
20090296635 Hui et al. Dec 2009 A1
20100035556 Cai et al. Feb 2010 A1
20100046455 Wentink et al. Feb 2010 A1
20100054237 Han et al. Mar 2010 A1
20100087148 Srinivasan et al. Apr 2010 A1
20100105345 Thampi et al. Apr 2010 A1
20100111070 Hsu May 2010 A1
20100157906 Yang et al. Jun 2010 A1
20100195525 Eerolainen Aug 2010 A1
20100215032 Jalloul et al. Aug 2010 A1
20100216403 Harrang Aug 2010 A1
20100216485 Hoole Aug 2010 A1
20100222068 Gaal et al. Sep 2010 A1
20100234061 Khandekar et al. Sep 2010 A1
20100248646 Yamazaki et al. Sep 2010 A1
20100273481 Meshkati et al. Oct 2010 A1
20100279689 Tinnakornsrisuphap et al. Nov 2010 A1
20100329132 Ragothaman et al. Dec 2010 A1
20110002426 Muirhead Jan 2011 A1
20110122834 Walker et al. May 2011 A1
20110130143 Mori et al. Jun 2011 A1
20110170494 Kim et al. Jul 2011 A1
20120258746 Tokgoz et al. Oct 2012 A1
Foreign Referenced Citations (51)
Number Date Country
101754351 Jun 2010 CN
101873688 Oct 2010 CN
0 180 212 May 1986 EP
492174 Jul 1992 EP
0 877 533 Nov 1998 EP
0 973 099 Jan 2000 EP
0 977 355 Feb 2000 EP
1054523 Nov 2000 EP
1 134 908 Sep 2001 EP
1418776 May 2004 EP
1 946 506 Jul 2008 EP
1876854 Sep 2008 EP
2 071 738 Jun 2009 EP
2 326 118 May 2011 EP
2 304 495 Mar 1997 GB
2 370 380 Jun 2002 GB
2398651 Aug 2004 GB
2 414 896 Dec 2005 GB
2391083 Mar 2006 GB
2 447 439 Sep 2008 GB
2463074 Mar 2010 GB
61123968 Jun 1986 JP
A-8-297652 Nov 1996 JP
11272645 Oct 1999 JP
2001-034471 Feb 2001 JP
2004-525439 Aug 2004 JP
2006-500673 Jan 2006 JP
9004235 Apr 1990 WO
9111770 Aug 1991 WO
9726593 Jul 1997 WO
9850854 Nov 1998 WO
0102960 Jan 2001 WO
0250624 Jun 2002 WO
0250700 Jun 2002 WO
03001697 Jan 2003 WO
2004029796 Apr 2004 WO
2004034251 Apr 2004 WO
2004102989 Nov 2004 WO
2005048491 May 2005 WO
2006059172 Jun 2006 WO
2007021139 Feb 2007 WO
2007054127 May 2007 WO
2007056733 May 2007 WO
2007126351 Nov 2007 WO
2008030934 Mar 2008 WO
2008090154 Jul 2008 WO
2008099340 Aug 2008 WO
2008155732 Dec 2008 WO
2009054205 Apr 2009 WO
2010072127 Jul 2010 WO
2010126155 Nov 2010 WO
Non-Patent Literature Citations (39)
Entry
Panesar, G. et al., “Deterministic Parallel Processing”, Proceedings of the 1st Microgrid Workshop, Jul. 2005.
Towner, D. et al., “Debugging and Verification of Parallel Systems—the picoChip way”, 2004.
picoChip, “PC7203 Development Platform Preliminary Product Brief”, Jul. 2007.
Ennals, R. et al., “Task Partitioning for Multi-core Network Processors”, 2005.
Rabideau, Daniel J., et al., “Simulated Annealing for Mapping DSP Algorithms on to Multiprocessors,” Signals, Systems and Computers, 1993 Conference Record of the Twenty-Seventh Asilomar Conference, Nov. 1-3, 1993, IEEE, pp. 668-672.
Nanda, Ashwini K., et al., “Mapping Applications onto a Cache Coherent Multiprocessor,” Conference on High Performance Networking and Computing, Proceedings of the 1992 ACM/IEEE Conference on Supercomputing, 1992, IEEE, pp. 368-377.
Lin, Lian-Yu, et al., Communication-driven Task Binding for Multiprocessor with Latency Insensitive Network-on-Chip, Design Automation Conference, 2005 Proceedings of th ASP-DAC, Jan. 18/21, 2005, IEEE, pp. 39-44.
Holger Claussen, Bell Laboratories, Alcatel-Lucent; “Performance of Macro and Co-Channel Femtocells in a Hierarchical Cell Structure”; The 18th Annual IEEE Internation Symposium on Personal, Indoor and Mobile Radio Communications (PIMRC'07); Sep. 1, 2007; pp. 1-5, XP031168593, ISBN: 978-1-4244-1143-6; Swindon, United Kingdom.
Shiroshita, T., et al.: “Reliable data distribution middleware for large-scale massive data replication” Parallel and Distributed Information Systems, 1993, Fourth International Conference on Miami Beach, FL, USA Dec. 18-20, 1996, Los Alamitos, CA, USA IEEE Comput. Soc, US, Dec. 18, 1996, pp. 196-205m XP010213188 ISBN: 0-8186-7475-X.
Levine B. N. et al.: “A comparison of known classes of reliable multicast protocols” Netowrk Protocols, 1996 International Conference on Columbus, OH, USA Oct. 29-Nov. 1, 1996, Los Alamitos, CA, USA IEEE Comput. Soc. US Oct. 29, 1996, pp. 112-121, XP010204425 ISBN: 0-8186-7453-9.
Ishijima, et al., A Semi-Synchronous Circuit Design Method by Clock Tree Modification IEEE Trans. Fundamentals, vol. E85-A, No. 12 Dec. 2002.
Greenstreet, et al., Implementing a STARI Chip, IEEE 1995.
Hierarchical multiprocessor organizations; J. Archer Harris; David R. Smith; International Symposium on computer Architecture; Proceedings of the 4th annual symposium on Computer architecture pp. 41-48 Year of Publication 1977.
“Hierarchical Interconnection Networks for Multicomputer systems” Sivarama P. Dandamudi, et al. IEEE Transactions on Computers archive vol. 39, Issue 6 (Jun. 1990) pp. 786-797 Year of Publication: 1990.
A Cluster Structure as an Interconnection Network for Large Multimicrocomputer Systems Wu, S.B. Liu, M.T. This paper appears in: Transactions on Computers Publication Date: Apr. 1981 vol. C-30, Issue: 4 On pp. 254-264.
Performance Analysis of Multilevel Bus Networks for Hierarchichal Multiprocessors S.M. Mahmud IEEE Transactions on Computers archive vol. 43, Issue 7 (Jul. 1994) pp. 789-805 Year of Publication: 1994.
Performance Analysis of a Generalized Class of M-Level Hierarchical Multiprocessor Systems I.O. Mahgoub A.K. Elmagarmid Mar. 1992 (vol. 3, No. 2) pp. 129-138.
Kober, Rudolf, “The Multiprocessor System SMS 201—Combining 128 Microprocessors to a Powerful Computer,” Sep. 1977, Compcon '77, pp. 225-230.
Knight, Thomas and Wu, Henry, “A Method for Skew-free Distribution of Digital Signals using Matched Variable Delay Lines,” VLSI Circuits, 1993. Digest of Technicial Papers. 1993 Symposium on, May 1993, pp. 19-21.
Popli, S.P., et al., “A Reconfigurable VLSI Array for Reliability and Yield Enhancement,” Proceedings of the International Conference on Systolic Arrays, 1988, pp. 631-642.
John, L.K., et al., “A Dynamically Reconfigurable Interconnect for Array Processors,” IEE Transactions on Very Large Scale Integration (lvsi) Systems, vol. 6, No. 1, Mar. 1998, pp. 150-157.
Schmidt, U., et al., “Datawave: A Single-Chip Multiprocessor for Video Applications,” IEEE Micro, vol. 11, No. 3, Jun. 1991, pp. 22-25, 88-94.
Chean, M., et al., “A Taxonomy of Reconfiguration Techniques for Fault-Tolerant Processor Arrays,” Computer, IEEE Computer Society, vol. 23, No. 1, Jan. 1990, pp. 55-69.
Kamiura, N., et al., “A Repairable and Diagnosable Cellular Array on Multiple-Valued Logic,” Proceedings of the 23rd International Symposium on Multiple-Valued Logic, 1993, pp. 92-97.
LaForge, l., “Extremally Fault Tolerant Arrays,” Proceedings: International Conference on Wafer Scale Integration, 1989, pp. 365-378.
Reiner Hartenstein, et al., On Reconfigurable Co-Processing Units, Proceedings of Reconfigurable Architectures Workshop (RAW98), Mar. 30, 1998.
Schmidt, U., et al., “Data-Driven Array Processor for Video Signal Processing”, IEEE—1990 (USA).
Muhammad Ali Mazidi, “The80x86 IBM PC and Compatible Computers”, 2003, Prentice Hall, 4th edition, pp. 513-515.
Shigei, N., et al., “On Efficient Spare Arrangements and an Algorithm with Relocating Spares for Reconfiguring Processor Arrays,” IEICE Transactions on Fundamentals of Electronics, communications and Computer Sciences, vol. E80-A, No. 6, Jun. 1997, pp. 988-995.
“Interference Management in Femto Cell Deployment”, Mingxi Fan, Mehmet Yavuz, Sanjiv Nanda, Yeliz Tokgoz, Farhad Meshkati, Raul Dangui, Qualcomm Incorporated, Qualcomm 3GPP2 Femto Workshop Boston, MA, Oct. 15, 2007.
“Details on specification aspects for UL ICIC”, Qualcomm Europe, May 5-May 9, 2008, 2 pages.
3GPP TS 36.331 v9.2.0 3rd Generation Partnership Project: Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Acces (E-UTRA); Radio Resource Control (RRC) Protocol specification (Release 9) Mar. 2010, pp. 1-248.
Alcatel-Lucent, et al., “Congested H(e)NB Hybrid Access Mode cell”, 2009, 3GPP Draft; R3-091053-Congested H(e)NB, 3RD Generation Partnership Project (3GPP), Apr. 29, 2009, 4 pages.
Motorola, “Text proposal for TR 36.9xx: Reducing HeNB interference by dynamically changing HeNB access mode”, 2009, 3GPP Draft: R4-094688, Apr. 29, 2009, 2 pages.
MIPS, MIPS32 Architecture for Programmers, 2001, MIPS Technologies, vol. 2, pp. 1-253.
Pechanek, et al. ManArray Processor Interconnection Network: An Introduction, Euro-Par'99, LNCS 1685, pp. 761-765, 1999.
Waddington, T., Decompilation of “hello world” on Pentium and SPARC, 4 pages, [retrieved on Aug. 3, 2012]. Retrieved from the Internet<URL: http://web.archive.org/web/20050311141936/http://boomerang.sourceforge.net/helloworld.html>.
Balakrishnan, et al., CodeSurfer/x86—A Platform for Analyzing x86 Executables, Springer-Verlag Berlin Heidelber, 2005, [retrieved on Dec. 30, 2011], retrieved from the internet<URL:http://www.springerlink.com/content/uneu2a95u9nvb20v/>.
Miecznikowski, J., et al., “Decompiling Java Using Stage Encapsulation”, Proceedings of the Eighth Working Conference on Reverse Engineering, Oct. 2-5, 2001.
Related Publications (1)
Number Date Country
20130231154 A1 Sep 2013 US
Continuations (1)
Number Date Country
Parent 12773970 May 2010 US
Child 13864185 US