The present invention relates to managing Building Information Modeling (BIM) based data.
Building Information Modeling (BIM) is a digital representation of physical and functional characteristics of a facility. A BIM is a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle. In addition to the geometry of a facility, BIM data can also describe further information, such as spatial relationships, light analysis, geographic information, and quantities and properties of building components (e.g., manufacturers' details).
It is known to provide collaborative BIM software tools that enable several users, including ones at geographically remote sites, to work on the same BIM-based project (e.g., building model). An exemplary BIM based project platform is 4BIM, produced by 4Projects. This can allow any project member to review and interact with 3-dimensional building models using a World Wide Web browser. In some instances, it is desirable for one user to manipulate the BIM-based data in a certain way (e.g., modify an image of the facility represented by the data), and for the other users to watch that manipulation substantially in real time, or at least with minimal delay. Conventionally, this type of “screen sharing” involves taking a sequence of snapshots/images of the “master” screen and sending bitmap data representing those to each client over a network, such as the Internet. There are known techniques to reduce the amount of data sent to the devices, such as detecting what has changed since the last image was generated and only sending that portion of the image, but such conventional techniques still ultimately rely on streaming image data at a rate of something like 10 per second minimum (and in many cases 24/25/30 per second). Moreover, it may be desirable for the users to view other information pertaining to building models, such as COBie data corresponding to specific objects within the model. However, 4BIM does not provide such functionality. Therefore, the users may have to access additional programs locally or remotely to facilitate viewing of other related data, such as COBie data, decreasing the data management efficiency of the users. In some cases, a user may have to use multiple computing devices to enable access to a building model as well as COBie data.
Embodiments of the present invention are intended to address at least some of the abovementioned problems. As such in one example, a method for operating a building information modeling (BIM) system is provided. The method includes at a BIM server, in response to receiving a save data command from a client computing device, associatively mapping identification data in each of a building model, a hierarchical structure of building model data, and a Construction Operations Building Information Exchange (COBie) spreadsheet and storing a representation of the associative mapping of the identification data for display in at least one of the BIM server and a client computing device in electronic communication with the server over a network. In one example, the building model includes a 3-dimensional rendering of a structure. Further in one example, the hierarchical structure of building model data is a hierarchical tree structure. Further in one example, the COBie spreadsheet is a spreadsheet conforming to predetermined standards. In this way, the building model, hierarchical structure, and COBie spreadsheet can be associatively linked and saved. As a result, a current BIM session where the user is viewing and manipulating the building model, hierarchical structure, and COBie spreadsheet can be saved on a remote server, enabling quick access of current information in the 3 data structures at a later time by a number of users. As a result, coordination between large amounts of data across different aspects of building construction design can be provided. For instance, an engineer may create data in the building model generating corresponding data in the hierarchical structure and COBie spreadsheet. In turn, the hierarchical structure and COBie spreadsheet data can be viewed and manipulated at later time and/or added to by a construction foreman, for instance.
Additionally, when the building model, hierarchical structure, and COBie spreadsheet are linked in this way the computing efficiency of the server is increased due mapping of the data when compared to computing systems which separately execute, access, and save building data via different programs. Moreover, when the building model, hierarchical structure, and COBie spreadsheet are executed on a remote server the storage capacity and/or processing power of the server can be leveraged to reduce the storage capacity and/or processing power of the client device, if desired. Additionally, when the data in the building model, hierarchical structure, and COBie spreadsheet is linked in this way greater consistency between the data sets is provided.
This Summary is provided to introduce a selection of concepts in a simplified form that are further described below in the Detailed Description. This Summary is not intended to identify key features or essential features of the claimed subject matter, nor is it intended to be used to limit the scope of the claimed subject matter. Furthermore, the claimed subject matter is not limited to implementations that solve any or all disadvantages noted in any part of this disclosure.
Whilst the invention has been described above, it extends to any inventive combination of features set out above or in the following description. Although illustrative embodiments of the invention are described in detail herein with reference to the accompanying drawings, it is to be understood that the invention is not limited to these precise embodiments. As such, many modifications and variations will be apparent to practitioners skilled in the art. Furthermore, it is contemplated that a particular feature described either individually or as part of an embodiment can be combined with other individually described features, or parts of other embodiments, even if the other features and embodiments make no mention of the particular feature. Thus, the invention extends to such specific combinations not already described.
Aspects of this disclosure will now be described by example and with reference to the illustrated embodiments. Components and other elements that may be substantially the same in one or more embodiments are identified coordinately and are described with minimal repetition. It will be noted, however, that elements identified coordinately may also differ to some degree. It will be further noted that the drawings included herein are schematic and generally not drawn to scale. Rather, the various drawing scales, aspect ratios, and numbers of components shown in the figures may be purposely distorted to make certain features or relationships easier to see. Therefore, the figures are not intended to be technically precise, but are drawn to ease understanding.
A system and method for associatively mapping data for display in a building model, a hierarchical structure of building model data, such as a tree structure, and a Construction Operations Building Information Exchange (COBie) spreadsheet. In this way, building data generated via different programs, modules, etc., may be associatively linked to provide coordination of a large amount of data across different aspects of building construction design. For instance, the data may be first uploaded by an architect in a design stage and then subsequently used by maintenance personnel to maintain various building systems, structures, etc. In this way, the efficiency of data management in building design, construction, and maintenance is increased. As a result, users of the system, such as architects, engineers building contractors, maintenance staff, etc., can quickly and efficiently retrieve relevant data during different stages in a building's life-span. As a result, productivity of users of the BIM system at every stage in a building's lifecycle can be increased and the efficiency of data management in the server can also be increased.
At least the master 106 and slave 108 computing devices will normally have, or be associated with, a display device and user interface device (e.g., keyboard, mouse or graphics tablet, etc.) These components will be well known to the person skilled in the art and are not illustrated or described herein in detail. The communications between the various devices may be via any suitable wired or wireless communication structure (e.g., network). The example shows three slave devices, but it will be understood that any reasonable number (e.g., from one upwards) could be included.
The server device 102 executes code on its processor that allows it to process building information modeling (BIM)-based data in various ways, such as creating, displaying and/or editing models (e.g., via routines such as those included in the 4BIM package mentioned above) and also transfer related data to/from the master 106 and slave 108 devices over the network 104. It will be understood that “BIM-based data” can include building-related information according to any version and/or format of BIM. The data may be stored using any suitable data structure or arrangement and in some cases may be compressed and/or encrypted for storage and/or transmission.
In use, the code stored in memory executed via a processor on the server device 102 can perform steps including loading a model represented by BIM-based data and allowing users of the master 106 and the slave 108 devices to create and/or join a session relating to the model as illustrated in
The example implementation detailed herein is based on the server device 102 controlling communication between the other devices (106 and 108). However, it will be understood that in alternative embodiments, at least some of the functions performed by the server device could be performed by one or more of the master/slave devices (e.g., a user could effectively directly use an application running on a master device to exchange data with the slave device(s) without the need for a server).
The BIM system 200 includes a BIM server 202. The BIM server 202 includes a network-based BIM engine 204. The network-based BIM engine 204 may be configured to manage BIM data and enable client computing devices to access the BIM data over a network 206. The network 206 may be the Internet, in one example. However, other suitable networks have been contemplated such as a local area network (LAN), a wide area network (WAN), a virtual private network (VPN), etc. Specifically, the network-based BIM engine 204 may be configured to generate a graphical user interface (GUI) 208 including each of a building model 210, a hierarchical structure of building model data 212, and a construction operation building information exchange (COBie) spreadsheet 214.
The building model 210 may include a 3-dimensional representation of objects in the building model. The objects may include components, systems, and structures in the building. The systems may include heating systems, plumbing systems, cooling systems, and/or electrical systems. Additionally, the structures include one or more of a door, a room, and/or a wall.
Additionally, the hierarchical structure of building model data 212 may be a directory structure such as a tree structure including graphical representations of sections, floors, systems, etc., and sub-directories of the sections, floors, systems such as rooms, components, structures, parts, etc., in one example. In this way, a user may easily view the conceptual arrangement of various features of the building.
Furthermore, the COBie spreadsheet 214 may include at least one or more of an equipment list, a product data sheet, a warranty, a spare parts list, and/or a preventative maintenance schedule in a COBie format. It will be appreciated that the COBie spreadsheet may include non-geometric data associated with various components, structures, etc., in the building model.
Additionally, it will be appreciated that COBie is an internationally recognized data exchange standard. COBie data includes building systems information between design and construction. COBie may be in different formats, such as an Excel format and/or an Excel spreadsheet format. In one example, the COBie data may be limited to a predetermined number of rows, such as a maximum of 65,536 rows. Additionally, the COBie data may also be COBieLite data in an extensible markup language (XML) format. COBie enables data relevant to building systems management to be quickly transferred to owner/operators of the building after the building is designed and constructed. Exemplary COBie data may include floor space, occupancy level, operation costs, maintenance schedule, energy use estimates, etc. It will be appreciated that COBie data may have a plethora of additional uses, such as capturing survey information, documentation of maintenance issues, coordinating maintenance records, etc.
The COBie data can be color coded. Specifically, columns in the COBie data may be color coded in yellow, orange, purple, and green. The yellow color coding indicates a required data such a key, date, building information, etc. The orange color coding indicates reference and/or lookup data, such as a picklist, user, etc. The purple color coding indicates data that is automatically inserted by the system. Additionally, the green color coding indicates data that may be required if specified by the consumer or contract, for example. In this way, the COBie spreadsheet can be color coded according to a predetermined standard.
Additionally, the building model 210, the hierarchical structure of building model data 212, and the COBie spreadsheet 214 may be associatively liked via common identification data, such as a common identification number.
The BIM engine 204 may be configured to validate one or more cells in the COBie spreadsheet 214. Specifically, the BIM engine 204 may be configured to compare COBie data in the COBie spreadsheet 214 stored in a database 216 with predetermined validation requirements. Additionally, in one example the validation may be implemented in real-time. It will be appreciated that versions of the building model 210 and/or hierarchical structure of building model data 212 may also be stored in the database 204.
A master client computing device 218 is also included in the BIM system 200. It will be appreciated that the master client computing device 218 may more generally be a client computing device in electronic communication with the BIM server 202 via the network 206. Additionally, the master client computing device 218 may be configured to access the GUI generated by the BIM engine 204. A network browsing program 220, such as a web-browser, may be used to access the GUI generated by the BIM engine 204, in one example. Additionally, the master client computing device 218 is configured to control the BIM engine 204. For instance, the master client computing device 218 is configured to input, delete, overwrite, etc., data in the building model 210, the hierarchical structure of building model data 212, and/or the COBie spreadsheet 214. In this way, the master client computing device 218 can remotely control the BIM engine 204 via the network connection. As a result, a user may access the BIM engine from a variety of remote locations, if desired.
The master client computing device 218 is also configured to send a save data command to the BIM engine 204. The save data command is configured to request associative mapping between identification data in each of the building model 210, a hierarchical structure of building model data 212, and the COBie spreadsheet 214. Additionally, a representation of the associatively mapped data may be stored in either the BIM server 202 and/or the master client computing device 218. The representation of the associatively mapped data may include viewing coordinates and/or vectors as well as a common identification number. Additionally, the representation of the associatively mapped data may not include graphical building data, in one example. Furthermore, the master client computing device 218 may include a database 219.
A plurality of slave client computing devices 222 are also included in the BIM system 200. Each of the slave client computing devices 222 is configured to passively access the BIM engine 204. Therefore in one example, the slave client computing devices 222 may be inhibited from controlling the BIM engine 204. The slave client computing devices 222 may be configured to view a session with the BIM engine 204 controlled via the master client computing device 218. Specifically, network browsing programs 224 included in each of the slave client computing devices 222 may be configured to facilitate passive access to the BIM engine 204. In this way, a plurality of computing devices may access the BIM engine 204 enabling a meeting with remotely located participants to be implemented, if desired. Specifically, the slave client computing devices 222 may passively view the GUI 208. Additionally, the slave client computing device 222 may include databases 223.
The BIM server 202, master client computing device 218, and the slave client computing devices 222 each include memory 230 holding instructions executable by a processor 232. Therefore, it will be appreciated that the methods and other functionalities described herein with regard to the BIM server and client computing devices may be stored in memory executable by a processor. Moreover, it will be appreciated that the memory and the processor in each of the aforementioned devices may not be equivalent, in one example. Additionally, each of the master client computing device 218 and the slave client computing devices 222 includes a display 250 and an input device 252. The displays 250 are configured to present visual information and the input devices 252 are configured to provide data and control signals to the device in response to user input. Example displays include liquid crystal displays (LCDs), touch displays, OLED displays, etc. Example input devices include keyboards, trackpads, mice, touch interfaces, etc. It will be appreciated that the types of displays and/or input devices may vary between computing devices, in one example.
At step 402 of
After the session identifier has been received, at step 412 the master device 106 requests the model data as currently stored by the server device 102 and at step 414 this request is received by the server device. At step 415, the server device transfers the model data and it is received by the master device at step 416. At step 418, the master device checks whether all the model data has been received/finished loading; if not then the method returns to step 412 to continue transfer of the model data. When the model data has finished loading then the process of the master device creating the session can end at step 419.
If the user of the master device 106 wants to invite one of the slave devices 108 (e.g., device 108A) to join the session so that the user of that slave device can collaborate in relation to the model then at step 420 the master device user selects an appropriate option on the web page/application for sending an invitation to the slave device. At step 422, the invitation is received at the slave device, which is also in communication with the server device 102 web page/application, (e.g., after logging in by providing a username and password). The invitation includes the session identifier and at step 424 the user of the slave device can accept the invitation and a message is sent to the server device (received at step 426) indicating that the slave device is joining the session as a client. This results in the identifier of the model accessed by the master device being retrieved and at step 428 the identifier is sent to the slave device. At step 430 the slave device requests the model data corresponding to the identifier from the server device. The server device then performs steps 414 and 415 as described above, but in relation to the slave device rather than the master device, with the slave device receiving the model data at step 432. At step 434, the slave device checks whether all the model data has been received/finished loading; if not then the method returns to step 430 to continue transfer of the model data. When the model data has finished loading then the process of the slave device joining the session can end at step 436.
At 502 the method includes at a client computing device sending a save tri-dimensional data command to the server, the save data command requesting associative mapping between identification data for display in each of a building model, a hierarchical structure of building model data, and a COBie spreadsheet executed via a BIM engine in the BIM server. It will be appreciated that the save data command may be input by a user of the client computing device via a suitable input device such as a keyboard, touch interface, mouse, etc. Furthermore, the client computing device electronically communicates with the BIM server over a network such as the Internet, a local area network (LAN), a wide area network (WAN), etc. The client computing device may be a master client computing device configured to control a BIM engine executed by the server, in one example. Further in one example, the identification data includes a common identification number. Specifically in such an example, the common identification number is embedded in data structures in each of the COBie spreadsheet, the building model, and the hierarchical structure of building model data.
Further in one example, the hierarchical structure of building model data is a hierarchical tree structure with a root value of sub-trees of children, represented as a set of linked nodes. Further in one example, the building model includes a 3-dimensional rendering of a structure. Still further in one example, The COBie spreadsheet may be color coded according to a predetermined standard.
Next at 504 the method includes receiving the save tri-dimensional data command at the BIM server. At 506 the method includes in response to receiving a save tri-dimensional data command from the client computing device, associatively mapping identification data for display in each of the building model, the hierarchical structure of building model data, and the COBie spreadsheet. In one example, the building model includes viewing perspective data corresponding to a view presented on the client computing device. In this way, a user's viewing angle may be saved.
Further in another example, associatively mapping identification in the building model, the hierarchical structure of building model data, and the COBie spreadsheet includes linking common identification data (e.g., a common identification number) embedded in data structures in each of the building model, the hierarchical structure of building model data, and the COBie spreadsheet. Therefore, it will be appreciated that the identification data may include at least one of a common identification number. In this way, a marker may be used to connect the different data sets. As a result, data in these separate data structures can be quickly linked, increasing processing efficiency when retrieving data in the separate data structures.
At 508 the method includes storing a representation of the associative mapping of the identification data for display in at least one of the BIM server and a client computing device in electronic communication with the server over a network. In one example, the network is the Internet. In another example, the network may be a local area network (LAN).
Next at 510 the method includes sending a request for retrieval of the associatively mapped identification data to the BIM server. At 512 the method includes receiving the request for retrieval of the associatively mapped identification data. The request may include a common identification number included in a saved iteration of the building model, the hierarchical structure of building model data, and the COBie spreadsheet. In this way, associated data sets may be efficiently retrieved.
At 514 the method includes retrieving the associatively mapped identification data in the BIM server. Next at 516 the method may include in response to retrieving the associatively mapped identification data generate a graphical user interface (GUI) simultaneously presenting a view of the building model, the hierarchical structure of building model data, and the COBie spreadsheet based on the associative mapping. In one example, the method may further include sending the GUI to the client computing device for display.
At 518 the method includes sending a command to the BIM server requesting alteration of data in the building model. Next at 520 the method includes receiving the command to alter data in the building model and altering data in the building model in response to receiving the command.
In one example, altering data in one or more of the building model, the hierarchical structure of building model data, and the COBie spreadsheet includes altering the view of the building model. Altering the view of the building model may include adjusting view coordinates and/or a viewing vector via the client computing device. It will be appreciated that the aforementioned adjustment may be implemented through network communication between the BIM server and the client computing device. For instance, the client computing device may access a network-based program provided by the BIM server to provide the aforementioned functionality. Further in some examples, the altered viewing coordinates and/or viewing vector may be sent to other client computing device in electronic communication with the BIM server over the network. Additionally, it will be appreciated that altering data in the building model, hierarchical structure, or the COBie spreadsheet may trigger adjustment of data in the remaining data sets. For instance, an object in the building model may be selected and in response to the selection a directory, sub-directory, etc., associated with the object may be highlighted or otherwise indicated in the hierarchical structure. Furthermore, one or more selected cells associated with the object in the COBie spreadsheet may be highlighted, displayed, etc.
At 522 the method includes alter data in the hierarchical structure of building model data, and the COBie spreadsheet based on the data altered in the building model. The method may also include, at the BIM server, generating an updated GUI based on the data altered in the hierarchical structure of building model data, and the COBie spreadsheet, sending the updated GUI to the client computing device, and displaying the updated GUI at the client computing device. It will be appreciated that the BIM engine may be stored in memory executable by a processor in the BIM server. Additionally, it will be appreciated that steps 504, 506, 508, 512, 514, 516, 520, and/or 522 may be implemented via a BIM engine, in one example.
At 602 the method includes at a master client computing device accessing a network-based BIM engine executed on a BIM server and at 604 the method includes sending a save tri-dimensional data command to the BIM server, the save data command requesting associative mapping between identification data for display in each of a building model, a hierarchical structure of building model data, and a COBie spreadsheet executed via a BIM engine in the BIM server. In one example, the building model is a 3-dimensional rendering of a building and the COBie spreadsheet includes a plurality of cells populated with COBie formatted data.
In one example, the hierarchical structure of building model data may be a hierarchical tree structure with a root value and sub-trees of children, represented as a set of linked nodes, the building model includes a 3-dimensional rendering of a structure, and the COBie spreadsheet is a spreadsheet conforming to predetermined standards. Further in one example, the building model is a 3-dimensional rendering of a structure and the COBie spreadsheet includes a plurality of cells populated with COBie formatted data. Still further in one example, associatively mapping of the identification includes linking a common identification number embedded in data structures each of the building model, the hierarchical structure of building model data, and the COBie spreadsheet.
At 606 the method includes receiving the save tri-dimensional data command at the BIM server. Next at 608 the method includes, at the BIM server, in response to receiving the save tri-dimensional data command, associatively map identification data in each of the building model, the hierarchical structure of building model data, and the COBie spreadsheet executed via a BIM engine in the BIM server. Associatively mapping the identification data may include linking a common identification number embedded in data structures in each of the building model, the hierarchical structure of building model data, and the COBie spreadsheet at 610.
At 612 the method includes, at the BIM server, sending a representation of the associative mapping of the identification data from the BIM engine to the master client and at 614, at the master client computing device, receiving the representation of the associative mapping of the identification data from the BIM engine. At 616 the method includes, at the master client computing device, saving the representation of the associative mapping of the identification data in the master client computing device. Next at 618 the method includes, at the master client computing device, accessing the representation of the associative mapping of the identification data to initiate simultaneous viewing of the building model, the hierarchical structure of building model data, and the COBie spreadsheet through the BIM engine. It will be appreciated that the master client computing device may use a network browsing program to access the representation of the associative mapping. The method may further include in one example, accessing the building model, the hierarchical structure of building model data, and the COBie spreadsheet via a slave computing device and inhibiting the slave computing device from controlling the BIM engine.
Specifically,
The browser window 702 may include tabs 704 and a network address field 706. The network address field 706 enables the browser to access the BIM engine 204, shown in
The COBie spreadsheet 712 includes categories 718 and category fields 720. The category fields may be more generally referred to as cells. The cells may be populated by data entered via a user. The categories 718 may include an object name, a name of the creator of the object, a date of object creation, a floor name, a description of the object, and an associated external system. The category fields 720 include COBie formatted data. Additionally, the COBie spreadsheet may be color coded based on the type of data in the spreadsheet field. As previously discussed, the COBie data may be validated via a BIM engine. It will be appreciated that interaction with one of the building model 708, the hierarchical structure of building model data 710, and the COBie spreadsheet 712 may initiate changes in the other two features. In this way, information across these data sets may be linked. It will be appreciated that each of the aforementioned features are bounded in panels adjacent to one another, in the depicted example. Specified objects such as roofs, floors, stairs, and walls are arranged in a tree structure in the depicted example. Each of the objects may have a specific identification number.
Further in one example, clicking an object (e.g., structural item) in the 3-dimensional building model brings the structural item into view in the hierarchical structure and displays the objects COBie data in the COBie spreadsheet. Likewise, clicking the item on the hierarchical structure with display the item's COBie data on COBie spreadsheet and highlight the item in the 3-dimensionial building model. A COBie export 722 button is also provided in the GUI 700 to enable COBie data to be exported to other computing devices, systems, etc. A search tool 724 is also provided in the GUI 700. Categories 726 such as history, errors, contact, facility, floor, space, zone, type, component, system, assembly, connection, spare, resource, job, impact, document, attribute, coordinate, issue, and/or PickLists are also provided in the GUI. A save button 728 may also be configured to generate a save command that may be sent to the BIM server to initiate storing of various data associated with each of the building model, the hierarchical structure, and the COBie spreadsheet, as previously discussed.
In one example, some objects in the building model 708 are made partially transparent to facilitate viewing of interior objects. Thus, an x-ray option that can be activated allowing a user to view interior structures of the building model through the walls. Further in one example, the GUI 700 may shows an interior view of the building model as witnessed by the 3-dimensional camera that is configured to move around the 3D image in a plurality of ways including an orbiting mode and a helicopter mode.
Additionally, the GUI 700 shows how hovering over an item or clicking an object 730 in the 3D viewer will display certain information 732 related to that item in the 3D viewer. Such information may include but are not limited to: item name, item dimensions, item serial number, color, creation date, and creator name.
It is to be understood that the configurations and/or approaches described herein are exemplary in nature, and that these specific embodiments or examples are not to be considered in a limiting sense, because numerous variations are possible. The specific routines or methods described herein may represent one or more of any number of processing strategies. As such, various acts illustrated may be performed in the sequence illustrated, in other sequences, in parallel, or in some cases omitted. Likewise, the order of the above-described processes may be changed.
The subject matter of the present disclosure includes all novel and non-obvious combinations and sub-combinations of the various processes, systems and configurations, and other features, functions, acts, and/or properties disclosed herein, as well as any and all equivalents thereof.
This application claims priority to U.S. provisional patent application, Ser. No. 61/880,370, entitled “PROCESSING BUILDING INFORMATION MODELING (BIM)-BASED DATA” filed on Sep. 20, 2013, the entire disclosure of which is herein incorporated by reference.
Number | Date | Country | |
---|---|---|---|
61880370 | Sep 2013 | US |