R.C. Smith, L.A. Hayes and J. F. Wilkin, "The Lateral Tie-Back System: The Ability to Drill and Case Multiple Laterals", IADC/SPE 27436, Feb. 15-18, 1994, pp. 55-64. |
B. Prevedel, "New Techniques, in Horizontal and Drainhole Drilling Optimization: Lehrte 41 Lateral Drilling Project", SPE 15694, Mar. 7-10, 1987, pp. 75-84. |
Ray H. Holifield and Bill Rehm, "Recompletion by Horizontal Drilling Pays Off", World Oil, Mar. 1989, pp. 42,43 and p. 50. |
United States Department of Energy, "Heavy Oil Recovery Process", Oct. 15, 1990, pp. A1-4, B1, C1-C27 with Figs. 19a, 19b,20,21,22,23,24,25,26,27,28,29,30,31, and Fig. 10. |
M. Gondouin and J.M. Fox III, "The Challenge of West Sak Heavy Oil: Analysis of an Innovative Approach, SPE 22077, May 29-31, 1991, pp. 215-223, and pp. 226-228. |
Ray Holifield & Associates, "Pearsall and Giddings Austin Chalk Horizontal/Directional Drilling Program", Jun. 1, 1991, 2 p. Table of Contents and pp. 1-11 with 13 p. attachments. |
Michael Gondouin, "Heavy Oil Recovery Process", Oct. 31, 1991, pp. 1-26 with Tables and Appendixes 1, 2, 2.1, 3, and Appendix 4, with Figs. 10, 19a, 19b, 20,21, 22, 23, 24, and 25, and Appendix 5 with Figs. 26, 27 and 28. |
Axel Christensen, "Recent Achievements in Drilling and Completion of Multiple Lateral Drainholes in Chalk Reservoirs", pp. 1-12. |
Karl Hesse, "Multilateral Drilling--A Case History", pp. 1-7 with Attachments 1-7. |
Paul Hardman, "Multi-Lateral Drilling Past, Present and Future", pp. 26-30. |
Paul Hardman, "Multi-Lateral Drilling: Past, Present and Future", Nov. 9-11, 1993, pp. 1-7 with FIGS. 1-8. |
D.H. Stormont, "Increasing Draining of Oil Into Well by Drain-Hole Drilling", The Oil and Gas Journal, Aug. 17, 1953, pp. 105-106, 108 and p. 145. |
H. John Eastman, "Lateral Drain Hole Drilling", The Petroleum Engineer, Nov. 1954, pp. B-57, B-58, B-61, B-62, B-64, B-67, B-68, B-70, and B-73. |
H. John Eastman, "Lateral Drain Hole Drilling", The Petroleum Engineer, Dec. 1954, pp. B-44 and B-47. |
H. John Eastman, "Lateral Drain Hole Drilling", The Petroleum Engineer, Mar. 1955, 7 pp. |
W.D. Moore III, "ARCO Drills Horizontal Drainhole for Better Reservoir Placement", Oil and Gas Journal, Sep. 15, 1980, pp. 139-142 and pp. 147-148. |
Maurer Engineering Inc., "Evaluation of Branch and Horizontal Boreholes for In Situ Leach Mining", Jul. 1980, pp. 1-149. |
W. Dickinson and R.W. Dickinson, "Horizontal Radial Drilling System", SPE 13949, Mar. 27-29, 1985, pp. 887-890 with FIGS. 1-3. |
R.S. Parsons and R.W. Fincher, "Short-Radius Lateral Drilling: A Completion Alternative", SPE 15943, Nov. 12-14, 1986, pp. 239-245 with Tables 1-4 and FIGS. 1-12. |
Roger W. Fincher, "Short-Radius Lateral Drilling: A Completion Alternative", Petroleum Engineer International, Feb. 1987, pp. 29-30, 32, 34 and 35. |
Jeff Littleton, "Standard Oil Applies Extended-Reach Drilling to Prudhoe Bay", Petroleum Engineer International, Apr. 1986, pp. 43, 44 and 46. |