Presently the market has a limited number of marginally effective or economical ways to address the problem of delaminating unintentionally voided masonry piers and/or walls usually associated with separation between leaves (leafs or layers) of masonry. A restorer has the choice of dismantling and reconstructing the affected masonry at great expense and occasional danger, or using an array of existing, externally applied products and systems to try to knit the masonry back together but never fully restoring its structural integrity. Some of the prior options which attempt to but do not meet current needs or accomplish all of the functions of tying and cementing voided masonry back together are as follow:
a) Injection Grouting Systems into Voids: These systems require numerous drill holes to inject grout (to attempt to “glue” the masonry together) and sometimes separate drill holes to install anchors, if needed for additional tying of the masonry. Such systems can only partially rely on the adhesiveness of the grout to hold the masonry together, and must therefore rely on the presence of ties, and have little or no mechanism for scoping and cleaning the voids that must be filled, thereby establishing a proper, cementing bond. Thus, these systems can lead to major problems in the stabilization of masonry and require numerous drill holes which can increase the potential danger of the repair operation. Some grout injection systems do not rely on ties, however, these employ high strength resin or cement based grout formulations that are not physically compatible with the parent masonry. Also, these systems cannot be used at below 32 degrees F. temperature as the grout will not cure properly and could freeze.
b) Epoxy-Based (Adhesive) Anchor Systems: These systems involve the insertion of tubular screens into holes that are drilled through the voided masonry, partial filling of the screens with epoxy, and then insertion of metal rods. These provide limited reliability and are not effective in spanning over large voids as not enough containment pressure is developed within the screen to uniformly cover all contact surfaces before the adhesive oozes out of the screen. Also, these systems do not attempt to actually fill the voids (in order to cement the leaves back together), and therefore have very limited shear capacity across wider voids. These systems are not generally suitable for cold temperature installations where the curing of the adhesive is slowed or halted.
c) Mechanical Wedge (Mechanical) Anchor Based Systems: These systems transfer no shear loads and make not attempt to fill the voids between leaves of masonry, rather, they simply keep the voids from widening or narrowing.
d) Dry-Set Helical (Mechanical) Anchor Systems: These systems make no attempt to fill the voids and must be vibrated and driven into place, potentially damaging and loosening delicate masonry wall systems during use.
e) Grouted Sock (Adhesion)Anchor Systems: These systems have only a moderate amount of shear capacity and contain the grout so that it does not flow into the voids. These systems will also not work in temperatures of below 32 degrees F. as the grout will not cure.
The present system and method of anchoring and cementing adjacent and often separated leaves (layered structures) of masonry and has the capability of being used for anchoring, cleaning and flushing of old mortar, and injecting grout into internal masonry voids, thereby tying and re-cementing or cementing the masonry mass back together. Various embodiments of anchor systems are provided for performing the various methods, more particularly, some of the embodiments describe port anchors which are used to clean and flush the old mortar and then grout fill the void between. adjacent masonry leaves while other embodiments are used to grout fill the void. The disclosed methods apply these various anchor systems to tie adjacent masonry leaves together as well as clean, flush and fill the void between the leaves. These embodiments negate the need for expensive and sometimes dangerous reconstruction of the masonry while providing a much better and safer result than the other old building masonry restoration systems that are currently used. Other advantages of the embodiments are that supplemental, temporary bracing can be directly attached to the outer ends of the anchors to resist grouting pressures that would tend to separate the leaves, and heating wands can be temporarily inserted into the open shanks of the anchors so that they can be installed under temperatures that are lower than 40 degrees.
More specifically, the anchor system is used to repair a masonry structure with a pair of leaves having a void between the leaves. The anchor system is made up of a hollow tube extending in the longitudinal direction, the hollow tube having at least one opening therein between the interior of the hollow tube and the void, an adhesion anchor adjacent one end of the hollow tube, the adhesion anchor being made of a flexible material configured to have a hollow interior for receiving a flowable substance therein, an anchor adjacent another end of the hollow tube, a feeder tube associated with the adhesion anchor for feeding the flowable substance into the hollow interior of the adhesion anchor in order to expand said adhesion anchor; and an opening associated with an end of the hollow tube for permitting a flowable substance to flow into the hollow tube and out of the at least one opening in the hollow tube into the void between adjacent leaves of the structure. Wherein the fiowable substance for the interior of the adhesion anchor may be a hardening adhesive substance.
In a further embodiment, the hollow tube is replaced with at least one rod which extends in the longitudinal direction, an adhesion anchor adjacent one end of the at least one rod, the adhesion anchor being made of a flexible material configured to have a hollow interior for receiving a flowable substance therein, an anchor adjacent another end of the at least one rod, a feeder tube associated with the adhesion anchor for feeding a flowable substance into the hollow interior of the adhesion anchor in order to expand the adhesion anchor, and an open space adjacent the at least one rod and within the void for permitting a flowable substance to flow adjacent the at least one rod into the void between adjacent leaves of the masonry structure.
Further, the method of repairing a masonry structure having first and second leaves having a void therebetween includes the steps of: providing at least one hole through the first leaf and continuing through at least a portion of the second leaf; inserting an anchor system into the at least one hole in the first leaf and into the hole in the second leaf such that a portion of the anchoring system is located within the void between leaves; expanding a portion of the anchor system within the opening in the second leaf to secure the anchor system in place; securing another portion of the anchor system within the opening in the first leaf; providing pressurized water or air through an opening within the anchor system located within the void of the masonry structure in order to clean out old grout or cement located within the void between leaves; and providing a flowable substance through the opening within the anchor system located in the void between the first and second leaf in order to permit the flowable substance to flow into the void. between leaves to secure the leaves of the masonry structure together and wherein the flowable substance may be a non-shrinkable hardening substance.
For a better understanding of the present invention, together with other and further objects thereof, reference is made to the accompanying drawings and detailed description, and the scope of the invention will be set forth in the appended claims.
The various embodiments of this invention provide for a variety of grouted port anchor systems, that is, anchor systems utilizing an opening therethrough as shown in
Further, for clarity of understanding of this invention, like numerals will be used throughout the specification to represent substantially the same elements or components. Further components that function substantially in the same way may be interchangeable between embodiments and therefore may not necessarily have reference numerals associated therewith in all figures.
As is shown in
Jet-cleaning of the void is accomplished by, preferably, but not limited to, the use of high pressure, low volume water jet. Flushing of the void is accomplished by, preferably, but not limited to, the use of low pressure high volume water spray. In both cases, compressed air may be combined therewith. Pre-dampening of the void may be accomplished by maintaining residual dampness after cleaning, fine misting with water, or injection of steam.
More specifically,
Referring to
Port anchor systems 10 and 50 are used with large stay-in-place plates against the front leaf of a structure were there is no need to architecturally conceal the front leaf connections. Port anchor systems 90 and 110 are used with smaller stay-in-place plates in combination with adhesion anchors at the front leaf where there is insufficient leaf thickness or strength for all of the required load to be resisted by the adhesion anchors alone.
Port anchor systems 10, 50, 90 and 110 may also secure temporary plates that are used to clamp temporary bracing against the front leaf where the front leaf is not strong enough to span between anchors to resist the fluid pressures of the void filling grout without the additional bracing, which can be removed after the grout has become sufficiently stiff that the fluid pressures have dissipated.
Referring back to
A series of diffuser holes 24 may he located in the hollow tube 12 and are used for providing pressurized water of the like through the hollow interior of rod 12 to flush and clean old mortar or debris from voids located between separated leaves of masonry as shown in
Reference is now made to
A series of diffuser holes 44 may be located in the hollow tube 32. Each end of the port anchor system 30 is capped by washer type members 45 and 46 secured preferably to hollow tube 32 by, but not limited to, welding. There is also and intermediate washer 47 at the inner end of adhesion anchor 34, which encircles hollow tube 12. Port anchor system 30 may be used for flushing and grout filling the voids.
Reference is now made to
The face washer 56 at one end of rods 52 may be made of, but not limited to, stainless steel. At the other end of rods 52 a washer type member 66 is secured by, preferably, but not limited to, welding to hollow tube 12. Port anchor system 50 with the open shank space between rods 52 may be used for cleaning, flushing and grout filling the voids, as well as securing temporary bracing or surface plating via the threaded rods or bolts 58.
Reference is now made to
Each end of the anchor system 70 is capped by face and end washer members 84 and 86, respectively, secured preferably by, but not limited to, welding to opposite ends of hollow tubes 71 and 73. There is also an intermediate washer, 85, fastened to the opposite end of hollow tube 71 from face washer 84. Anchor system 70 may be used for cleaning, flushing and grout filling the voids.
Reference is now made to
Each end of the anchor system 90 adjacent adhesion anchors 94 and 96 is capped by face and end washer type members 106 and 108, respectively, secured preferably by, but not limited to, welding to ends of rod 92. Face washer 106 has holes therein which may be tapped for insertion therein of removable threaded rods or bolts 109. A port hole located substantially in the center for injecting the void filling grout. There is also an intermediate washer, 107, which surrounds hollow tube 92 at the end of adhesion anchor 94. Anchor 90 may be used for flushing and grout filling voids, as well as securing temporary bracing or surface plating via the threaded rods 109.
The anchor system 110 shown in
Throughout the embodiments the port hole 19 is located in the center of the face washer or face plate, however, it should be realized the port hole 19 may be located slightly off center for specific installations. As shown in
The embodiment of
It should be noted that all of the port anchors or anchor systems are also used to secure the leaves or adjacent masonry wall structures in place during the cleaning, flushing and filling procedures.
Further expanding on the system and method of this invention, the components of the various embodiments of the anchor systems are preferably made of stainless steel, but are not limited thereto, such as the use of plastic for the feeder tubes or pipes. Grout, if used for filling the adhesion anchors is preferably a cement type, high strength non-shrink grout. Grout for void filling is of a type which has chemical and functional compatibility with the existing masonry construction and is formulated to best suit existing conditions. Although the specific type of materials may vary accordingly based on the type of masonry and within the concept of this invention, constituent materials may include but are not limited to the following:
Pozzolanic or Natural Hydraulic Lime—which has many of the breathability and strength compatibility properties of the regular Lime with which many of the historic structures that must be repaired were built, but cures much more rapidly and contains less free lime in a cured state and therefore has less chance of bleeding.
Portland or Natural Cement—which improves strength, rate of cure and freeze-thaw resistance.
Non corrosive additives which improve workability and limit curing shrinkage.
Fine sand, which reduces shrinkage, material cost and embodied energy.
Water—which is the common mixing medium of all formulations.
Any other mortar or grout materials allowed under ASTM C1713, which is the Standard Specification for Mortars for the Repair of Historic Masonry, and pertains to the void filling grout formulations used in this invention and which behave like mortar in their cured state.
For an understanding of the mode of operation, the invention utilizes a number of different embodiments of the various embodiments of anchor systems described above which are used not only for anchoring or securing adjacent (leaves) of masonry together but also spanning the voids 210 (see
In order to repair existing leaves of masonry as shown in
Referring to
a. The embodiment shown in
b. The embodiment shown in
c. The embodiment shown in
d. The embodiment shown in
e. The embodiment shown in
f. The embodiment shown in
More specifically, all of the port anchor systems use adhesion anchors at their inner ends and at their outer ends use an adhesion anchor (port anchor systems 30 and 70), a mechanical bearing connection (port anchor systems 10 and 50), or both in combination (port anchor systems 90 and 110) in order to hold the separated wall leaves together in a fixed position. Half of the port anchor systems (port anchor systems 50, 70 and 110) have open shanks that allow for cleaning, flushing and grouting of voids and half of the port anchor systems (port anchor systems 10, 30 and 90) have perforated pipe shanks that only allow for flushing and grouting of voids.
Adhesion anchors are always used at the far ends of the port anchor systems, which are concealed within the far ends of holes that are drilled just short of the opposite face of the far wall leaf, and are effective in transferring both horizontal tension and compression loads. Adhesion anchors or hearing plate(threaded rod or bolted) type connections are used at the near leaves, for reasons described above. While adhesion anchors can transfer both horizontal tension and compression forces, bearing connections can only transfer tension forces. In sock type adhesion anchor applications, shown, after the socks have been filled with grout to secure the anchors in place with holes, the feed pipes or tubes can be cut or removed by pulling them from the releasable or breakaway fittings, as in the embodiments of
Following drilling of all holes 200 and installation of at least half of the port anchors systems into the drilled holes, the void 210 can be cleaned of old mortar and debris by high pressure jetting and then low pressure flushing water into the void through remaining open holes and open shank port anchors (30, 70 and 110), with old mortar and debris being removed through the remaining open holes. As shown in
More specifically, cleaning is performed by a repeated and incremental combination of water jetting and vacuuming or draining out of old mortar and debris from between the masonry leaves. A row of open holes should remain at or near the bottom of the void to facilitate removal of the old mortar and debris along with the infused water that trickles down from above. Jetting and flushing shall be performed as part of this method using the following steps individually or in combination:
b. High volume, low pressure water for flushing out voids and spoil.
Installation of the remaining port anchor systems then take place though the remaining core holes, and may employ open shank port anchor systems (30, 70 or 110) or perforated pipe shank port anchor systems (10, 50 or 90).
Next the pre-dampening and new void filling grouting takes place, starting at the bottom and working upward through masonry structure as grout advances upward through the void. Grouting takes place in any or all of the following ways:
Grout shall be tbrmulated from any material that meets the requirements of ASTM C1713, but modified as needed within the limits of C1713 to work as a grout. It shall contain ashrinkage compensator and as well as other non corrosive additives, and shall be chemically and physically compatible with the existing construction, non-bleeding, and of a consistency that lends itself to the installation.
Patching of holes are then done on the exterior surfaces of the masonry to conceal the core holes made during the initial phase of the process.
i. At stone construction this shall be done by fitting biscuits trimmed from the drilling cores into the holes and adhering them with color and fleck matching repair mortar.
ii. At brick construction this shall involve installing full-face trimmed slabs cut from individual bricks (termed “soaps”) over the installation holes and setting them with a mortar that matches the existing in-situ mortar.
Surface cleaning of the masonry surfaces take place following completion of the removal of old grout and installation of new grout. In addition, rear adhesion anchors should not extend into the void more than approximately one inch or a total of one quarter the void's width.
In summary, after the holes are drilled in various locations in the pair of leaves so as to install an anchor system in each of the holes in the pair of leaves as shown schematically in
After the leaves are secured by the plates or jigs the old grout, cement or debris is cleaned out by water pressure or water pressure and pressurized air. Excess old grout may be removed through holes drilled at the bottom y either vacuuming or being flushed by water. Thereafter the void or space between the leaves is pre-dampened by water mist or steam and the void is then filled with the appropriate grout or cement, securing the leaves together. The jig or face plates can then be removed along with the threaded rods, and the holes are patched showing virtually no visible sign that the anchorage system of this invention has been used to secure the leaves or walls in place.
Although the invention has been described with respect to the various embodiments of this invention and the methods of use thereof the present system provides positive transverse-to-face tension and compression strength as well as in-plane shear strength by tying and cementing the separated voids together, causes little or no vibration or grout-pressure damage during installation, it should be realized this invention is also capable of a wide variety of further and other embodiments within the spirit and scope of the appended claims.
For example,
This application is a divisional of co-pending U.S. patent application Ser. No. 13/523,542, filed Jun. 14, 2012,entitled SYSTEM OF TYING, CLEANING AND RE-CEMENTING MASONRY USING PORT ANCHORS, which in turn claims priority to and benefit of U.S. Provisional Application Ser. No. 61/496,744, filed Jun. 14, 2011, and which is incorporated by reference herein in its entirety for all purposes.
Number | Name | Date | Kind |
---|---|---|---|
1924724 | Olney | Aug 1933 | A |
2629446 | Freling | Feb 1953 | A |
3395625 | Blanchette | Aug 1968 | A |
4044512 | Fischer et al. | Aug 1977 | A |
4096672 | Fischer et al. | Jun 1978 | A |
4355933 | Fischer | Oct 1982 | A |
4487528 | Skogberg | Dec 1984 | A |
4631889 | Adam | Dec 1986 | A |
4741141 | Harke | May 1988 | A |
4772166 | Shamah | Sep 1988 | A |
4773794 | Harke | Sep 1988 | A |
4790114 | Falco | Dec 1988 | A |
4836729 | Bisping | Jun 1989 | A |
4883396 | Shamah | Nov 1989 | A |
4893974 | Fischer | Jan 1990 | A |
4930284 | Falco | Jun 1990 | A |
4968185 | Leibhard | Nov 1990 | A |
5003749 | Harke | Apr 1991 | A |
5104266 | Daryoush | Apr 1992 | A |
5129135 | Yoshino | Jul 1992 | A |
5134828 | Baur | Aug 1992 | A |
5216857 | Harke | Jun 1993 | A |
5243805 | Fricker | Sep 1993 | A |
5344256 | Hedrick | Sep 1994 | A |
5415507 | Janusz | May 1995 | A |
5636486 | Hall | Jun 1997 | A |
5644889 | Getz | Jul 1997 | A |
6189281 | Sobek | Feb 2001 | B1 |
6213859 | Yekutiely | Apr 2001 | B1 |
6402427 | James | Jun 2002 | B1 |
6499268 | James | Dec 2002 | B2 |
6513300 | James | Feb 2003 | B1 |
6543977 | Sander et al. | Apr 2003 | B2 |
6681545 | James | Jan 2004 | B1 |
6705804 | Dierker | Mar 2004 | B2 |
6837018 | Hagel | Jan 2005 | B1 |
7404274 | Hayes | Jul 2008 | B2 |
7568320 | Paterson | Aug 2009 | B2 |
7594366 | Viezens | Sep 2009 | B2 |
8209934 | Pettingale | Jul 2012 | B2 |
20020194718 | Yekutiely | Dec 2002 | A1 |
20040105734 | Yekutiely | Jun 2004 | A1 |
20080075553 | Gonzalez Carquijero | Mar 2008 | A1 |
20080110640 | Bernthaler | May 2008 | A1 |
20080148664 | Hayes | Jun 2008 | A1 |
20090158678 | Ginter | Jun 2009 | A1 |
20120291394 | Tooman | Nov 2012 | A1 |
Number | Date | Country |
---|---|---|
2048545 | Oct 2004 | CA |
2245121 | Aug 2006 | CA |
588407 | Nov 1933 | DE |
4112128 | Oct 1992 | DE |
Entry |
---|
International Search Report dated Jan. 25, 2013 for PCT/US12/42484. |
Written Opinion dated Jan. 25, 2013 for PCT/US12/42484. |
Number | Date | Country | |
---|---|---|---|
20150007526 A1 | Jan 2015 | US |
Number | Date | Country | |
---|---|---|---|
61496744 | Jun 2011 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 13523542 | Jun 2012 | US |
Child | 14491495 | US |