Not Applicable.
During the drilling and completion of oil and gas wells, it may be necessary to engage in ancillary operations, such as monitoring the operability of equipment used during the drilling process or evaluating the production capabilities of formations intersected by the wellbore. For example, after a well or well interval has been drilled, zones of interest are often tested to determine various formation properties such as permeability, fluid type, fluid quality, formation temperature, formation pressure, bubble point, formation pressure gradient, mobility, filtrate viscosity, spherical mobility, coupled compressibility porosity, skin damage (which is an indication of how the mud filtrate has changed the permeability near the wellbore), and anisotropy (which is the ratio of the vertical and horizontal permeabilities). These tests are performed in order to determine whether commercial exploitation of the intersected formations is viable and how to optimize production.
Wireline formation testers (WFT) and drill stem testers (DST) have been commonly used to perform these tests. The basic DST tool consists of a packer or packers, valves, or ports that may be opened and closed from the surface, and two or more pressure-recording devices. The tool is lowered on a work string to the zone to be tested. The packer or packers are set, and drilling fluid is evacuated to isolate the zone from the drilling fluid column. The valves or ports are then opened to allow flow from the formation to the tool for testing while the recorders chart static pressures. A sampling chamber traps formation fluid at the end of the test. WFTs generally employ the same testing techniques but use a wireline to lower the formation tester into the borehole after the drill string has been retrieved from the borehole. The WFT typically uses packers also, although the packers are typically placed closer together, compared to DSTs, for more efficient formation testing. In some cases, packers are not even used. In those instances, the testing tool is brought into contact with the intersected formation and testing is done without zonal isolation.
WFTs may also include a probe assembly for engaging the borehole wall and acquiring formation fluid samples. The probe assembly may include an isolation pad to engage the borehole wall. The isolation pad seals against the formation and around a hollow probe, which places an internal cavity in fluid communication with the formation. This creates a fluid pathway that allows formation fluid to flow between the formation and the formation tester while isolated from the borehole fluid.
In order to acquire a useful sample, the probe must stay isolated from the relative high pressure of the borehole fluid. Therefore, the integrity of the seal that is formed by the isolation pad is critical to the performance of the tool. If the borehole fluid is allowed to leak into the collected formation fluid, a non-representative sample will be obtained and the test will have to be repeated.
Examples of isolation pads and probes used in WFTs can be found in Halliburton's DT, SFTT, SFT4, and RDT tools. Isolation pads that are used with WFTs are typically rubber pads affixed to the end of the extending sample probe. The rubber is normally affixed to a metallic plate that provides support to the rubber as well as a connection to the probe. These rubber pads are often molded to fit within the specific diameter hole in which they will be operating.
With the use of WFTs and DSTs, the drill string with the drill bit must first be retracted from the borehole. Then, a separate work string containing the testing equipment, or, with WFTs, the wireline tool string, must be lowered into the well to conduct secondary operations. Interrupting the drilling process to perform formation testing can add significant amounts of time to a drilling program.
DSTs and WFTs may also cause tool sticking or formation damage. There may also be difficulties of running WFTs in highly deviated and extended reach wells. WFTs also do not have flowbores for the flow of drilling mud, nor are they designed to withstand drilling loads such as torque and weight on bit.
Further, the formation pressure measurement accuracy of drill stem tests and, especially, of wireline formation tests may be affected by mud filtrate invasion and mudcake buildup because significant amounts of time may have passed before a DST or WFT engages the formation after the borehole has been drilled. Mud filtrate invasion occurs when the drilling mud fluids displace formation fluid. Because the mud filtrate ingress into the formation begins at the borehole surface, it is most prevalent there and generally decreases further into the formation. When filtrate invasion occurs, it may become impossible to obtain a representative sample of formation fluid or, at a minimum, the duration of the sampling period must be increased to first remove the drilling fluid and then obtain a representative sample of formation fluid. Mudcake buildup occurs when any solid particles in the drilling fluid are plastered to the side of the wellbore by the circulating drilling mud during drilling. The prevalence of the mudcake at the borehole surface creates a “skin”. Thus there may be a “skin effect” because formation testers can only extend relatively short distances into the formation, thereby distorting the representative sample of formation fluid due to the filtrate. The mudcake also acts as a region of reduced permeability adjacent to the borehole. Thus, once the mudcake forms, the accuracy of reservoir pressure measurements decreases, affecting the calculations for permeability and producibility of the formation.
Another testing apparatus is the formation tester while drilling (FTWD) tool. Typical FTWD formation testing equipment is suitable for integration with a drill string during drilling operations. Various devices or systems are used for isolating a formation from the remainder of the borehole, drawing fluid from the formation, and measuring physical properties of the fluid and the formation. Fluid properties, among other items, may include fluid compressibility, flowline fluid compressibility, density, resistivity, composition, and bubble point. For example, the FTWD may use a probe similar to a WFT that extends to the formation and a small sample chamber to draw in formation fluid through the probe to test the formation pressure. To perform a test, the drill string is stopped from rotating and moving axially and the test procedure, similar to a WFT described above, is performed.
For a more detailed description of the embodiments, reference will now be made to the following accompanying drawings:
Certain terms are used throughout the following description and claims to refer to particular system components. This document does not intend to distinguish between components that differ in name but not function.
In the following discussion and in the claims, the terms “including” and “comprising” are used in an open-ended fashion, and thus should be interpreted to mean “including, but not limited to . . . ”. Also, the terms “couple,” “couples”, and “coupled” used to describe any electrical connections are each intended to mean and refer to either an indirect or a direct electrical connection. Thus, for example, if a first device “couples” or is “coupled” to a second device, that interconnection may be through an electrical conductor directly interconnecting the two devices, or through an indirect electrical connection via other devices, conductors and connections. Further, reference to “up” or “down” are made for purposes of ease of description with “up” meaning towards the surface of the borehole and “down” meaning towards the bottom of the borehole. In addition, in the discussion and claims that follow, it may be sometimes stated that certain components or elements are in fluid communication. By this it is meant that the components are constructed and interrelated such that a fluid could be communicated between them, as via a passageway, tube, or conduit. Also, the designation “MWD” or “LWD” are used to mean all generic measurement while drilling or logging while drilling apparatus and systems.
In the drawings and description that follows, like parts are marked throughout the specification and drawings with the same reference numerals, respectively. The drawing figures are not necessarily to scale. Certain features of the invention may be shown exaggerated in scale or in somewhat schematic form and some details of conventional elements may not be shown in the interest of clarity and conciseness. The present invention is susceptible to embodiments of different forms. Specific embodiments are described in detail and are shown in the drawings, with the understanding that the present disclosure is to be considered an exemplification of the principles of the invention, and is not intended to limit the invention to that illustrated and described herein. It is to be fully recognized that the different teachings of the embodiments discussed below may be employed separately or in any suitable combination to produce desired results. The various characteristics mentioned above, as well as other features and characteristics described in more detail below, will be readily apparent to those skilled in the art upon reading the following detailed description of the embodiments, and by referring to the accompanying drawings.
Referring to
It should also be understood that, even though the MWD formation tester 10 is shown as part of a drill string 5, the embodiments of the invention described below may be conveyed down the borehole 8 via wireline technology, as is partially described above. It should also be understood that the exact physical configuration of the formation tester and the probe assembly is not a requirement of the present invention. The embodiment described below serves to provide an example only. Additional examples of a probe assembly and methods of use are described in U.S. patent application Ser. No. 10/440,593, filed May 19, 2003 and entitled “Method and Apparatus for MWD Formation Testing”; Ser. No. 10/440,835, filed May 19, 2003 and entitled “MWD Formation Tester”; and Ser. No. 10/440/637, filed May 19, 2003 and entitled “Equalizer Valve”; each hereby incorporated herein by reference for all purposes.
The formation tester 10 is best understood with reference to
Referring to
Beneath electronics module 30 in housing section 12a is an adapter insert 34. Adapter 34 connects to sleeve insert 24c at connection 35 and retains a plurality of spacer rings 36 in a central bore 37 that forms a portion of flowbore 14. Lower end 17 of housing section 12a connects to housing section 12b at threaded connection 40. Spacers 38 are disposed between the lower end of adapter 34 and the pin end of housing section 12b. Because threaded connections such as connection 40, at various times, need to be cut and repaired, the length of sections 12a, 12b may vary in length. Employing spacers 36, 38 allow for adjustments to be made in the length of threaded connection 40.
Housing section 12b includes an inner sleeve 44 disposed therethrough. Sleeve 44 extends into housing section 12a above, and into housing section 12c below. The upper end of sleeve 44 abuts spacers 36 disposed in adapter 34 in housing section 12a. An annular area 42 is formed between sleeve 44 and the wall of housing 12b and forms a wire way for electrical conductors that extend above and below housing section 12b, including conductors controlling the operation of formation tester 10 as described below.
Referring now to
As best shown in
Electric motor 64 may be a permanent magnet motor powered by battery packs 20,22 and capacitor banks 32. Motor 64 is interconnected to and drives hydraulic pump 66. Pump 66 provides fluid pressure for actuating formation probe assembly 50. Hydraulic manifold 62 includes various solenoid valves, check valves, filters, pressure relief valves, thermal relief valves, pressure transducer 160b and hydraulic circuitry employed in actuating and controlling formation probe assembly 50 as explained in more detail below.
Referring again to
Beneath piston 70 and extending below inner mandrel 52 is a lower oil chamber or reservoir 78, described more fully below. An upper chamber 72 is formed in the annulus between central portion 71 of mandrel 52 and the wall of housing section 12c, and between spring stop portion 77 and pressure balance piston 70. Spring 76 is retained within chamber 72, which is open through port 74 to annulus 150. As such, drilling fluids may fill chamber 72 in operation. An annular seal 67 is disposed about spring stop portion 77 to prevent drilling fluid from migrating above chamber 72.
Barrier 69 maintains a seal between the drilling fluid in chamber 72 and the hydraulic oil that fills and is contained in oil reservoir 78 beneath piston 70. Lower chamber 78 extends from barrier 69 to seal 65 located at a point generally noted as 83 and just above transducers 160 in
Equalizer valve 60, best shown in
As shown in
Disposed about housing section 12c adjacent to formation probe assembly 50 is stabilizer 154. Stabilizer 154 may have an outer diameter close to that of nominal borehole size. As explained below, formation probe assembly 50 includes a seal pad 140 that is extendable to a position outside of housing 12c to engage the borehole wall 151. As explained, probe assembly 50 and seal pad 140 of formation probe assembly 50 are recessed from the outer diameter of housing section 12c, but they are otherwise exposed to the environment of annulus 150 where they could be impacted by the borehole wall 151 during drilling or during insertion or retrieval of bottom hole assembly 6. Accordingly, being positioned adjacent to formation probe assembly 50, stabilizer 154 provides additional protection to the seal pad 140 during insertion, retrieval, and operation of bottom hole assembly 6. It also provides protection to pad 140 during operation of formation tester 10. In operation, a piston extends seal pad 140 to a position where it engages the borehole wall 151. The force of the pad 140 against the borehole wall 151 would tend to move the formation tester 10 in the borehole, and such movement could cause pad 140 to become damaged. However, as formation tester 10 moves sideways within the borehole as the piston is extended into engagement with the borehole wall 151, stabilizer 154 engages the borehole wall and provides a reactive force to counter the force applied to the piston by the formation. In this manner, further movement of the formation tester 10 is resisted.
Referring to
Referring still to
Referring again to
As best shown in
Stem 92 includes a circular base portion 105 with an outer flange 106. Extending from base 105 is a tubular extension 107 having central passageway 108. The end of extension 107 includes internal threads at 109. Central passageway 108 is in fluid connection with fluid passageway 91 that, in turn, is in fluid communication with longitudinal fluid chamber or passageway 93, best shown in
Adapter sleeve 94 includes inner end 111 that engages flange 106 of stem number 92. Adapter sleeve 94 is secured within aperture 90 by threaded engagement with mandrel 54b at segment 110. The outer end 112 of adapter sleeve 94 extends to be substantially flushed with flat 136 formed in housing member 12c. Circumferentially spaced about the outermost surface of adapter sleeve 94 is a plurality of tool engaging recesses 158. These recesses are employed to thread adapter 94 into and out of engagement with mandrel 54b. Adapter sleeve 94 includes cylindrical inner surface 113 having reduced diameter portions 114,115. A seal 116 is disposed in surface 114. Piston 96 is slidingly retained within adapter sleeve 94 and generally includes base section 118 and an extending portion 119 that includes inner cylindrical surface 120. Piston 96 further includes central bore 121.
The snorkel 98 includes a base portion 125, a snorkel extension 126, and a central passageway 127 extending through base 125 and extension 126.
The probe assembly 50 is assembled such that piston base 118 is permitted to reciprocate along surface 113 of adapter sleeve 94. Similarly, the snorkel base 125 is disposed within piston 96 and the snorkel extension 126 is adapted for reciprocal movement along the piston surface 120. Central passageway 127 of the snorkel 98 is axially aligned with tubular extension 107 of the stem 92 and with the screen 100.
Referring to
The scraper 102 includes a central bore 103, threaded extension 104, and apertures 101 that are in fluid communication with central bore 103. Section 104 threadingly engages internally threaded section 109 of stem extension 107, and is disposed within central bore 132 of screen 100.
Referring now to FIGS. 5 and 7–9, seal pad 140 may be generally donut-shaped having base surface 141, an opposite sealing surface 142 for sealing against the borehole wall, a circumferential edge surface 143 and a central aperture 144. In the embodiment shown, base surface 141 is generally flat and is bonded to a metal skirt 145. Seal pad 140 seals and prevents drilling fluid from entering the probe assembly 50 during formation testing so as to enable pressure transducers 160 to measure the pressure of the formation fluid. Changes in formation fluid pressure over time provide an indication of the permeability of the formation 9. More specifically, seal pad 140 seals against the mudcake 49 that forms on the borehole wall. Typically, the pressure of the formation fluid is less than the pressure of the drilling fluids that are injected into the borehole. A layer of residue from the drilling fluid forms a mudcake 49 on the borehole wall and separates the two pressure areas. Pad 140, when extended, conforms its shape to the borehole wall and, together with the mudcake 49, forms a seal through which formation fluid can be collected.
As best shown in
Pad 140 may be made of an elastomeric material having a high elongation characteristic. At the same time, the material may possess relatively hard and wear resistant characteristics. More particularly, the material may have an elongation % equal to at least 200% and even more than 300%. One such material useful in this application is Hydrogenated Nitrile Butadiene Rubber (HNBR). A material found particularly useful for pad 140 is HNBR compound number 372 supplied by Eutsler Technical Products of Houston, Tex., U.S.A. having a durometer hardness of 85 Shore A and a percent elongation of 370% at room temperature.
One possible profile for pad 140 is shown in
Referring again to
As best shown in
To help with a good pad seal, tool 10 may include, among other things, centralizers for centralizing the formation probe assembly 50 and thereby normalizing pad 140 relative to the borehole wall. For example, the formation tester 10 may include centralizing pistons coupled to a hydraulic fluid circuit configured to extend the pistons in such a way as to protect the probe assembly and pad, and also to provide a good pad seal. A formation tester including such devices is described in U.S. patent application Ser. No. 10/440,593, filed May 19, 2003 and entitled “Method and Apparatus for MWD Formation Testing”, hereby incorporated herein by reference for all purposes.
The hydraulic circuit 200 used to operate probe assembly 50, equalizer valve 60, and drawdown piston 170 is illustrated in
Controller 190 receives a command to initiate formation testing. This command may be received when the drill string is rotating or sliding or otherwise moving; however the drill string must be stationary during a formation test. As shown in
The operation of the formation tester 10 is best understood in reference to
The piston 96 and the snorkel 98 extend from the position shown in
In one method, as seal pad 140 is pressed against the borehole wall, the pressure in circuit 200 rises and when it reaches a predetermined pressure, the valve 192 opens so as to close the equalizer valve 60, thereby isolating the fluid passageway 93 from the annulus. In this manner, the valve 192 ensures that the valve 60 closes only after the seal pad 140 has entered contact with the mudcake 49 that lines the borehole wall 151. In another method, as the seal pad 140 is pressed against the borehole wall 151, the pressure in circuit 200 rises and closes the equalizer valve 60, thereby isolating the fluid passageway 93 from the annulus. In this manner, the valve 60 may close before the seal pad 140 has entered contact with the mudcake 49 that lines the borehole wall 151. The passageway 93, now closed to the annulus 150, is in fluid communication with the cylinder 175 at the upper end of the cylinder 177 in drawdown manifold 89, best shown in
With the solenoid valve 176 still energized, the probe seal accumulator 184 is charged until the system reaches a predetermined pressure, for example 1800 psi, as sensed by the pressure transducer 160b. When that pressure is reached, a delay may occur before the controller 190 energizes the solenoid valve 178 to begin drawdown. This delay, which is controllable, can be used to measure properties of the mudcake 49 that lines the borehole wall 151. Energizing the solenoid valve 178 permits pressurized fluid to enter the portion 172a of the cylinder 172 causing the drawdown piston 170 to retract. When that occurs, the plunger 174 moves within the cylinder 177 such that the volume of the fluid passageway 93 increases by the volume of the area of the plunger 174 times the length of its stroke along the cylinder 177. This movement increases the volume of cylinder 175, thereby increasing the volume of the fluid passageway 93. For example, the volume of the fluid passageway 93 may be increased by 10 cc as a result of the drawdown piston 170 being retracted.
As the drawdown piston 170 is actuated, formation fluid may thus be drawn through the central passageway 127 of the snorkel 98 and through the screen 100. The movement of the drawdown piston 170 within its cylinder 172 lowers the pressure in the closed passageway 93 to a pressure below the formation pressure, such that formation fluid is drawn through the screen 100 and the snorkel 98 into the aperture 101, then through the stem passageway 108 to the passageway 91 that is in fluid communication with the passageway 93 and part of the same closed fluid system. In total, the fluid chambers 93, which include the volume of various interconnected fluid passageways, including passageways in the probe assembly 50, the passageways 85,93 [
Referring momentarily to
Referring again to
With the drawdown piston 170 in its fully retracted position and formation fluid drawn into closed system 93, the pressure will stabilize and enable pressure transducers 160a,c to sense and measure formation fluid pressure. The measured pressure is transmitted to the controller 190 in the electronic section where the information is stored in memory and, alternatively or additionally, is communicated to the master controller in the MWD tool 13 below the formation tester 10 where it can be transmitted to the surface via mud pulse telemetry or by any other conventional telemetry means.
When drawdown is completed, drawdown piston 170 actuates a contact switch 320 mounted in endcap 400 and drawdown piston 170, as shown in
When the contact switch 320 is actuated controller 190 responds by shutting down motor 64 and pump 66 for energy conservation. Check valve 196 traps the hydraulic pressure and maintains drawdown piston 170 in its retracted position. In the event of any leakage of hydraulic fluid that might allow drawdown piston 170 to begin to move toward its original shouldered position, drawdown accumulator 186 will provide the necessary fluid volume to compensate for any such leakage and thereby maintain sufficient force to retain drawdown piston 170 in its retracted position.
During this interval, controller 190 continuously monitors the pressure in fluid passageway 93 via pressure transducers 160a,c until the pressure stabilizes, or after a predetermined time interval.
When the measured pressure stabilizes, or after a predetermined time interval, controller 190 de-energizes solenoid valve 176. De-energizing solenoid valve 176 removes pressure from the close side of equalizer valve 60 and from the extend side of probe piston 96. Spring 58 then returns the equalizer valve 60 to its normally open state and probe retract accumulator 182 will cause piston 96 and snorkel 98 to retract, such that seal pad 140 becomes disengaged with the borehole wall. Thereafter, controller 190 again powers motor 64 to drive pump 66 and again energizes solenoid valve 180. This step ensures that piston 96 and snorkel 98 have fully retracted and that the equalizer valve 60 is opened. Given this arrangement, the formation tool 10 has a redundant probe retract mechanism. Active retract force is provided by the pump 66. A passive retract force is supplied by probe retract accumulator 182 that is capable of retracting the probe even in the event that power is lost. Accumulator 182 may be charged at the surface before being employed downhole to provide pressure to retain the piston and snorkel in housing 12c.
Referring again briefly to
After a predetermined pressure, for example 1800 psi, is sensed by pressure transducer 160b and communicated to controller 190 (indicating that the equalizer valve is open and that the piston and snorkel are fully retracted), controller 190 de-energizes solenoid valve 178 to remove pressure from side 172a of drawdown piston 170. With solenoid valve 180 remaining energized, positive pressure is applied to side 172b of drawdown piston 170 to ensure that drawdown piston 170 is returned to its original position (as shown in
Relief valve 197 protects the hydraulic system 200 from overpressure and pressure transients. Various additional relief valves may be provided. Thermal relief valve 198 protects trapped pressure sections from overpressure. Check valve 199 prevents back flow through the pump 66.
Referring again to
With the assumption that the quartz gauge reading Pq is the more accurate of the two readings, the actual formation test pressures may be calculated by adding or subtracting the appropriate offset error Eoffs1 to the pressures indicated by the strain gauge Psg for the duration of the formation test. In this manner, the accuracy of the quartz transducer and the transient response of the strain gauge may both be used to generate a corrected formation test pressure that, where desired, is used for real-time calculation of formation characteristics.
As the formation test proceeds, it is possible that the strain gauge readings may become more accurate or for the quartz gauge reading to approach actual pressures in the pressure chamber even though that pressure is changing. In either case, it is probable that the difference between the pressures indicated by the strain gauge transducer and the quartz transducer at a given point in time may change over the duration of the formation test. Hence, it may be desirable to consider a second offset error that is determined at the end of the test where steady state conditions have been resumed. Thus, as pressures Phyd2 level off at the end of the formation test, it may be desirable to calculate a second offset error Eoffs2. This second offset error Eoffs2 might then be used to provide an after-the-fact adjustment to the formation test pressures.
The offset values Eoffs1 and Eoffs2 may be used to adjust specific data points in the test. For example, all critical points up to Pfu might be adjusted using errors Eoffs1, whereas all remaining points might be adjusted offset using error Eoffs2. Another solution may be to calculate a weighted average between the two offset values and apply this single weighted average offset to all strain gauge pressure readings taken during the formation test. The amplitude of recorded strain gauge data can also be corrected by multiplying by amplitude correction k, where k=(Pq1−Pq2)/(Psg1−Psg2). Other methods of applying the offset error values to accurately determine actual formation test pressures may also be used accordingly and will be understood by those skilled in the art.
The formation tester 10 may operate in two general modes: pump-on operation and pump-off operation. During pump on operation, mud pumps on the surface pump drilling fluid through the drill string 6 and back up the annulus 150. Using this column of drilling fluid, the tool 10 can transmit data to the surface using mud pulse telemetry during the formation test. The tool 10 may also receive mud pulse telemetry downlink commands from the surface. During a formation test, the drill string 6 and the formation tester 10 are not rotated. However, it may be the case that an immediate movement or rotation of the drill string 6 will be necessary. As a failsafe feature, at any time during the formation test, an abort command can be transmitted from surface to the formation tester 10. In response to this abort command, the formation tester 10 will immediately discontinue the formation test and retract the probe piston to its normal, retracted position for drilling. The drill string 6 can then be moved or rotated without causing damage to the formation tester 10.
During pump-off operation, a similar failsafe feature may also be active. The formation tester 10 and/or MWD tool 13 may be adapted to sense when the mud flow pumps are turned on. Consequently, the act of turning on the pumps and reestablishing flow through the tool may be sensed by pressure transducer 160d or by other pressure sensors in bottom hole assembly 6. This signal will be interpreted by a controller in the MWD tool 13 or other control and communicated to controller 190 that is programmed to automatically trigger an abort command in the formation tester 10. At this point, the formation tester 10 will immediately discontinue the formation test and retract the probe piston 96 to its normal position for drilling. The drill string 6 can then be moved or rotated without causing damage to the formation tester 10.
The uplink and downlink commands are not limited to mud pulse telemetry. By way of example and not by way of limitation, other telemetry systems may include manual methods, including pump cycles, flow/pressure bands, pipe rotation, or combinations thereof. Other possibilities include electromagnetic (EM), acoustic, and wireline telemetry methods. An advantage to using alternative telemetry methods lies in the fact that mud pulse telemetry (both uplink and downlink) requires pump-on operation but other telemetry systems do not. The failsafe abort command may therefore be sent from the surface to the formation tester 10 using an alternative telemetry system regardless of whether the mud flow pumps are on or off.
The down hole receiver for downlink commands or data from the surface may reside within the formation tester 10 or within an MWD tool 13 with which it communicates. Likewise, the down hole transmitter for uplink commands or data from down hole may reside within the formation tester 10 or within an MWD tool 13 with which it communicates. The receivers and transmitters may each be positioned in MWD tool 13 and the receiver signals may be processed, analyzed, and sent to a master controller in the MWD tool 13 before being relayed to local controller 190 in formation testing tool 10.
Commands or data sent from surface to the formation tester 10 can be used for more than transmitting a failsafe abort command. The formation tester 10 can also have many other operating modes that may be selected using a command from the surface. For example, one of a plurality of operating modes may be selected by transmitting a header sequence indicating a change in operating mode followed by a number of pulses that correspond to that operating mode. Other means of selecting an operating mode will certainly be known to those skilled in the art.
In addition to the selection of the operating modes, other information may be transmitted from the surface to the formation tester 10. This information may include critical operational data such as depth or surface drilling mud density. The formation tester 10 may use this information to help refine measurements or calculations made downhole or to select an operating mode. Commands from the surface might also be used to program the formation tester 10 to perform in a mode that is not preprogrammed.
An example of an operating mode of the formation tester 10 is the ability of the formation tester 10 to adapt the pressure test procedure to the bubble point of the formation fluid at different test depths. At discovery, formation fluid can contain some natural gas in solution. The bubble point is the pressure at which the gas comes out of solution in the formation fluid at a given temperature. If any gas comes out of solution during a drawdown test procedure, the test data may not accurately represent the formation pressure.
buildup slope in psi/sec
a=(Σy−bΣx)/n line intercept using n−no points
Where: xi—time
yi—pressure
n—start of drawdown points collected (usually 8–20 data points).
Using the last 10–20 data points a second slope is monitored to look for a change in slope.
end of drawdown and beginning of buildup slope
ao=(Σy−boΣx)/no line intercept using no points
Where: no—set number of points (usually 30 to 120 points).
The beginning slope b is much larger than the ending slope bo and the bubble point is determined by the intersection of the two lines.
If the buildup is allowed to continue another estimate of bubble point can be made from the buildup data. Using this technique, all of the buildup data can be used to determine b and then only a portion of the buildup data is monitored to determine the current slope bo. While monitoring these slopes during the buildup, the ending slope bo becomes much greater than the predominate slope b. The bubble point is then estimated by the intersection of the two lines. The time at which the intersection occurs can also be used to estimate formation permeability.
The linear regression techniques shown are one of several methods that can be used to determine curve inflection points and the subsequent bubble points. Derivative and second derivatives and non linear regression methods may also be used.
The bubble point determined from the buildup is typically higher than that determined from the drawdown (see
In the case where the bubble point and time is determined from the buildup curve, the formation mobility can be estimated by making a few assumptions. The first is that the actual formation flow rate is much lower than the pretest piston rate measured by the formation tester 10. This is because the gas formation in the tool is now regulating the rate. If it is assumed that the flow rate is nearly constant during the time where the pretest starts and where the phase change occurs during the buildup, then the formation spherical mobility can be estimated as follows.
Where: qo=V0/(tbp−tdd
The second assumption is that the formation pressure is near the last build pressure Pstop. If there is insufficient time for the buildup to stabilize, PStop may not yield an optimistic estimate of Ms. If this is the case the hydrostatic mud pressure can be used to obtain a conservative estimate of Ms. This technique of determining the mobility is called the drawdown method and assumes steady state flow. This is one of several that can be used to estimate the mobility. Other methods could include spherical homer and derivative plots.
The operating mode of the formation tester 10 may be adjusted to account for the bubble point of the formation fluid. For example, if the bubble point is breached, the drawdown piston 170 may be moved back to the starting position and the pressure test performed over again.
The first method of modifying the pretest is to lower the flow rate of the fluid into the tool 10. This is accomplished by estimating a flow rate that would keep the drawdown pressure above the bubble point. This can be done from the estimate of the spherical mobility Ms as follows:
After the pressure has been equalized back to nearly hydrostatic the second pretest is performed at the new rate.
Still another method of performing the second drawdown is to set a cutoff pressure. The pretest would stop as soon as this pressure is reached. The cutoff pressure would be higher than the estimated bubble point pressure, usually by several hundred psi. Again the second pretest would be performed after the flowline pressure has been equalized back to nearly hydrostatic mud pressure. This second pretest would start at the same rate as the first but then the pretest piston displacement is stopped when the pressure reaches the cutoff pressure.
Still another method is to both adjust the flow rate and set a cutoff pressure. It may not be possible for the formation tester 10 to reduce its rate to that required to maintain the pressure above the bubble point. The slower rate reduces the change in pressure over time and makes stopping the pretest piston at the prescribe cutoff pressure more accurate.
As another example, if the test is allowed sufficient time to build up as illustrated in
Alternatively, the drawdown of the drawdown piston 170 may be done incrementally until a proper drawdown and buildup are achieved. Using this method, the drawdown piston 170 is drawn down, but not to the full extent under a normal pressure test. The pressure is then monitored in the cylinder 175 using the transducers 160. If the drawdown piston 170 was not drawn down enough to produce a proper buildup, the drawdown piston 170 is drawn down again to create more of a pressure drop within the cylinder 175. The drawdown may be adjusted by drawing the drawdown piston 170 more or at a faster rate, or a combination of magnitude and rate. This method may be performed until a proper drawdown and build up are achieved. Although the bubble point pressure is not measured, parameters for the pressure test may be set based on the incremental drawdown steps to ensure that the bubble point is not reached with further pressure tests.
Other operating modes involve the formation tester 10 determining the bubble point of the formation fluid by performing a pressure test to purposefully bubble point the formation fluid. During the pressure test, the flowline valve 179 may be closed and the drawdown piston 170 drawn down to lower the pressure in the cylinder 175 and create a known volume within the cylinder 175. Once the drawdown piston 170 is retracted, the flowline valve 179 may be opened. With enough pressure drop, the formation fluid will breach its bubble point and any gas in the formation fluid will come out of solution. If the bubble point is not breached, then the test is repeated until enough of an initial pressure drop is created to breach the bubble point. Normally the pretest is moved at it slowest rate while monitoring pressure of the sealed flowline. Then the method of determining the bubble point would be similar to that shown earlier for a pretest drawdown. Basically linear regressions can be used to determine when a slope change occurs. Alternatively the first or second derivative as well as nonlinear regression methods can be used to determine the bubble point. It is also desirable to measure the piston displacement to more accurately monitor the actual rate and volume change. Alternatively the volume change over the total initial trapped volume can be plotted against pressure to improve the bubble point estimate and determine fluid compressibility.
To measure the bubble point pressure from the test, the formation tester 10 may use the position of the drawdown piston 170 as the drawdown piston 170 retracts during the drawdown portion of the pressure test. Knowing the position of the drawdown piston 170, the volume of the cylinder 175 at all positions of drawdown piston 170 may then be calculated. One method to determine position of the drawdown piston 170 is to measure the amount of hydraulic fluid used to drawdown the drawdown piston 170, the time, and the flowrate of the hydraulic fluid pumped by the hydraulic pump 66. Then, knowing the surface area of the face of the drawdown piston 170 facing the flowline side 172a of the cylinder 172, the position of the drawdown piston 1.70 may be calculated. The displacement distance of the drawdown piston 170 is the change in volume of the hydraulic fluid divided by the surface area of the drawdown piston 170 facing the flowline side 172a. The change in volume is calculated by multiplying the amount of time by the flowrate of the hydraulic fluid. Another method of determining position is using a position indicator such as an acoustic sensor, an optical sensor, a linear variable displacement transducer, a potentiometer, a Hall Effect sensor, or any other suitable position indicator or any other suitable method of determining position of the drawdown piston 170.
The pressure at which the formation fluid reaches the bubble point can be calculated during the pressure test manually or by using the controller 190. The controller 190 continuously records elapsed time and the formation fluid pressure during the pre-test. The controller 190 can also calculate the volume of the formation fluid in the cylinder 175 by using the elapsed time, hydraulic pump rate, and the position information of the drawdown piston 170 by the following relationship:
Where Areadd is the area of the drawdown piston 170 on the flow line side 172a and Areahyd is the area of drawdown piston 170 on the hydraulic oil side 172b. The master controller 190 can continuously calculate the compressibility of the fluid in the flow line 93, where compressibility is the ratio of the formation fluid pressure to the formation fluid volume. The bubble point may be the pressure where these calculated ratios change.
An example of compressibility and bubble point determination is illustrated in
Once the bubble point pressure of the formation fluid has been determined, the operating mode of the formation tester 10 may be adjusted so as to stay above the bubble point and keep the gas in solution in the formation fluid during the pressure test.
For example, the formation tester 10 may variably control the drawdown volume created in the cylinder 175 during the pressure test. The most effective method of controlling the drawdown volume is by using the cutoff pressure discussed previously. It is normally desirable to also slow the rate to improve the cutoff pressure methods accuracy.
Alternatively, formation tester 10 may variably control the drawdown rate of the drawdown piston 170 so as to stay above the bubble point pressure. As discussed previously if the formation spherical mobility can be estimated then a rate can be calculated that would keep the drawdown pressure above the bubble point.
Also alternatively, the formation tester 10 may variably control both the drawdown volume and the drawdown rate of the drawdown piston 170 as discussed above.
The formation tester 10 may variably control the drawdown of the drawdown piston 170 to maintain a certain pressure within the cylinder 175 manually or automatically. When done manually, the measured pressure information from the pressure test is recorded and/or sent to the surface where it is monitored and analyzed. Using the calculated bubble point information, commands may be sent to the formation tester 10 to vary the drawdown procedure and avoid the bubble point for the next pressure test as discussed previously. When done automatically, the pressure test information is sent to the controller 190 for analysis of the bubble point. The controller 190 then automatically adjusts the drawdown volume and/or rate of the drawdown piston 170 for the next drawdown procedure to avoid breaching the bubble point as discussed above.
Another mode of operation involves the consistency of the drawdown rate of the drawdown piston 170 during a pressure test. Typically, the formation tester 10 does not change the drawdown rate of the drawdown piston 170 during a pressure test. However, the controller 190 may change the drawdown rate of the drawdown piston 170 during a drawdown by controlling the hydraulic pump 66. Regardless, when being drawn down, the drawdown piston 170 should maintain a substantially constant drawdown rate until the controller 190 adjusts the drawdown rate. Although the positional information of the drawdown piston 170 during drawdown may be taken into account in any pressure test calculations, not maintaining the drawdown rate of the piston 170 constant may affect the accuracy of pressure test measurements and calculations. Maintaining a constant drawdown rate may be difficult to achieve, however, due to the start-up, shut-down, or otherwise inconsistent output of the electric motor 64 and hydraulic pump 66, as well as other system factors.
To maintain the drawdown rate of the drawdown piston 170 substantially constant, the formation tester 10 may send the drawdown piston 170 positional information to the controller 190. The controller 190 uses the positional information to calculate the drawdown rate of the piston 170. Based on the calculations, the controller determines if adjustments need to be made in the hydraulic system 200 during the drawdown of the drawdown piston 170 to maintain a substantially constant drawdown rate.
Another operating mode allows the formation tester 10 to make adjustments during the pressure test relating to the seal formed by seal pad 140 of formation probe assembly 50 against the borehole wall 151 or the mudcake 49. As mentioned above, the operating environment of the borehole 8 can change during the pressure test with either a change in pressure or a deterioration of the borehole wall 151. The electric motor 64, hydraulic pump 66, hydraulic manifold 62, equalizer valve 60, formation probe assembly 50, or any other parts of hydraulic system 200 may also affect the ability to maintain a proper seal against the mudcake 49 or borehole wall 151.
The formation tester 10 makes adjustments by monitoring the integrity of the seal of the pad 140 using the pressure transducers 160a–d. The formation tester 10 uses the transducer data to make adjustments manually using data sent back and forth between the surface and the controller 190 or automatically by sending the monitored information to the controller 190 for analysis. For example, if the monitored pressure approaches the previously measured borehole pressure, then the seal may have been formed improperly. If an improper seal was made, the controller 190 may retract the pad 140 and re-initiate the pressure test. Alternatively, a leak may occur during the pressure test causing the pad 140 to seal improperly. If the seal deteriorates, the formation tester 10 may make adjustments to the hydraulic system 200 to vary the pad force against the mudcake 149 or borehole wall 151. For example, the controller 190 may increase the hydraulic pressure to exert more force by the pad 140 against the mudcake 49 or the borehole wall 151. Additionally, even if the formation tester 10 makes any adjustments automatically, then the tool 10 may send information regarding the adjustments to the surface as well as information regarding the amount of additional time needed to properly run the pressure test.
Alternatively, the formation tester 10 may comprise a sequencing valve, similar to the valve 192 discussed above, that requires a minimum pressure on the pad 140 to create force against the mudcake 49 or the borehole wall 151 before the pressure test may be performed. Although the amount of pressure may not guarantee a good seal, the sequencing valve ensures that a designated minimum pressure be placed on the pad 140 before the pressure test may be performed.
The controller 190 may also be used to vary any one of the pressure test parameters to experiment with and optimize the testing procedures. For example, the buildup, drawdown rate, drawdown volume, pad load, or any other parameter may be varied to observe the changes, if any, to the results of the formation pressure test. The results may then be analyzed by the controller 190 and the testing procedures changed to obtain more precise formation pressure measurements.
While specific embodiments have been illustrated and described, one skilled in the art can make modifications without departing from the spirit or teaching of this invention. The embodiments as described are exemplary only and are not limiting. Many variations and modifications are possible and are within the scope of the invention. Accordingly, the scope of protection is not limited to the embodiments described, but is only limited by the claims that follow, the scope of which shall include all equivalents of the subject matter of the claims.
This application claims the benefit of 35 U.S.C. 119(e) from U.S. Provisional Application Ser. No. 60/573,423, filed May 21, 2004 and entitled “Methods and Apparatus for Controlling a Formation Tester Tool Assembly”, hereby incorporated herein by reference for all purposes.
Number | Name | Date | Kind |
---|---|---|---|
3173485 | Bretzke, Jr. | Mar 1965 | A |
3338307 | Redwine | Aug 1967 | A |
3356137 | Raugust | Dec 1967 | A |
3530933 | Whitten | Sep 1970 | A |
3565169 | Bell | Feb 1971 | A |
3811321 | Urbanosky | May 1974 | A |
3813936 | Urbanosky et al. | Jun 1974 | A |
3858445 | Urbanosky | Jan 1975 | A |
3859850 | Whitten et al. | Jan 1975 | A |
3859851 | Urbanosky | Jan 1975 | A |
3864970 | Bell | Feb 1975 | A |
3924463 | Urbanosky | Dec 1975 | A |
3934468 | Brieger | Jan 1976 | A |
3952588 | Whitten | Apr 1976 | A |
4210018 | Brieger | Jul 1980 | A |
4246782 | Hallmark | Jan 1981 | A |
4248081 | Hallmark | Feb 1981 | A |
4270385 | Hallmark | Jun 1981 | A |
4282750 | Prats et al. | Aug 1981 | A |
4287946 | Brieger | Sep 1981 | A |
4292842 | Hallmark | Oct 1981 | A |
4339948 | Hallmark | Jul 1982 | A |
4375164 | Dodge et al. | Mar 1983 | A |
4416152 | Wilson | Nov 1983 | A |
4434653 | Montgomery | Mar 1984 | A |
4507957 | Montgomery et al. | Apr 1985 | A |
4513612 | Shalek | Apr 1985 | A |
4593560 | Purfurst | Jun 1986 | A |
4671322 | Purfurst | Jun 1987 | A |
4712613 | Nieuwstad | Dec 1987 | A |
4720996 | Marsden et al. | Jan 1988 | A |
4742459 | Lasseter | May 1988 | A |
4745802 | Purfurst | May 1988 | A |
4782695 | Glotin et al. | Nov 1988 | A |
4799157 | Kucuk et al. | Jan 1989 | A |
4833914 | Rasmus | May 1989 | A |
4843878 | Purfurst et al. | Jul 1989 | A |
4845982 | Gilbert | Jul 1989 | A |
4860580 | DuRocher | Aug 1989 | A |
4860581 | Zimmerman et al. | Aug 1989 | A |
4862967 | Harris | Sep 1989 | A |
4879900 | Gilbert | Nov 1989 | A |
4884439 | Baird | Dec 1989 | A |
4890487 | Dussan V. et al. | Jan 1990 | A |
4893505 | Marsden et al. | Jan 1990 | A |
4936139 | Zimmerman et al. | Jun 1990 | A |
4941350 | Schneider | Jul 1990 | A |
4949575 | Rasmus | Aug 1990 | A |
4951749 | Carroll | Aug 1990 | A |
4962665 | Savage et al. | Oct 1990 | A |
4994671 | Safinya et al. | Feb 1991 | A |
5056595 | Desbrandes | Oct 1991 | A |
5095745 | Desbrandes | Mar 1992 | A |
5148705 | Desbrandes | Sep 1992 | A |
5166747 | Schroeder et al. | Nov 1992 | A |
5167149 | Mullins et al. | Dec 1992 | A |
5184508 | Desbrandes | Feb 1993 | A |
5201220 | Mullins et al. | Apr 1993 | A |
5207104 | Enderlin | May 1993 | A |
5230244 | Gilbert | Jul 1993 | A |
5233866 | Desbrandes | Aug 1993 | A |
5247830 | Goode | Sep 1993 | A |
5265015 | Auzerais et al. | Nov 1993 | A |
5269180 | Dave et al. | Dec 1993 | A |
5279153 | Dussan V. et al. | Jan 1994 | A |
5303582 | Miska | Apr 1994 | A |
5303775 | Michaels et al. | Apr 1994 | A |
5329811 | Schultz et al. | Jul 1994 | A |
5335542 | Ramakrishnan et al. | Aug 1994 | A |
5353637 | Plumb et al. | Oct 1994 | A |
5377755 | Michaels et al. | Jan 1995 | A |
5473939 | Leder et al. | Dec 1995 | A |
5517854 | Plumb et al. | May 1996 | A |
5549159 | Shwe et al. | Aug 1996 | A |
5549162 | Moody et al. | Aug 1996 | A |
5587525 | Shwe et al. | Dec 1996 | A |
5602334 | Proett et al. | Feb 1997 | A |
5622223 | Vasquez | Apr 1997 | A |
5635631 | Yesudas et al. | Jun 1997 | A |
5644076 | Proett et al. | Jul 1997 | A |
5663559 | Auzerais et al. | Sep 1997 | A |
5672819 | Chin et al. | Sep 1997 | A |
5703286 | Proett et al. | Dec 1997 | A |
5708204 | Kasap | Jan 1998 | A |
5741962 | Birchak et al. | Apr 1998 | A |
5770798 | Georgi et al. | Jun 1998 | A |
5789669 | Flaum | Aug 1998 | A |
5803186 | Berger et al. | Sep 1998 | A |
5934374 | Hrametz et al. | Aug 1999 | A |
5969241 | Auzerais | Oct 1999 | A |
6026915 | Smith et al. | Feb 2000 | A |
6047239 | Berger et al. | Apr 2000 | A |
6058773 | Zimmerman et al. | May 2000 | A |
6092416 | Halford et al. | Jul 2000 | A |
6111409 | Edwards et al. | Aug 2000 | A |
6128949 | Kleinberg | Oct 2000 | A |
6157893 | Berger et al. | Dec 2000 | A |
6164126 | Ciglenec et al. | Dec 2000 | A |
6178815 | Felling et al. | Jan 2001 | B1 |
6223822 | Jones | May 2001 | B1 |
6230557 | Ciglenec et al. | May 2001 | B1 |
6247542 | Kruspe et al. | Jun 2001 | B1 |
6274865 | Schroer et al. | Aug 2001 | B1 |
6301959 | Hrametz et al. | Oct 2001 | B1 |
6334489 | Shwe et al. | Jan 2002 | B1 |
6343507 | Felling et al. | Feb 2002 | B1 |
6350986 | Mullins et al. | Feb 2002 | B1 |
6388251 | Papanyan | May 2002 | B1 |
6415648 | Peeters | Jul 2002 | B1 |
6427530 | Krueger et al. | Aug 2002 | B1 |
6439307 | Reinhardt | Aug 2002 | B1 |
6446736 | Kruspe et al. | Sep 2002 | B1 |
6474152 | Mullins et al. | Nov 2002 | B1 |
6476384 | Mullins et al. | Nov 2002 | B1 |
6478096 | Jones et al. | Nov 2002 | B1 |
6513606 | Krueger | Feb 2003 | B1 |
6516898 | Krueger | Feb 2003 | B1 |
6568487 | Meister et al. | May 2003 | B2 |
RE38129 | Kleinberg | Jun 2003 | E |
6581455 | Berger et al. | Jun 2003 | B1 |
6585045 | Lee et al. | Jul 2003 | B2 |
6609568 | Krueger et al. | Aug 2003 | B2 |
6637524 | Kruspe et al. | Oct 2003 | B2 |
6640908 | Jones et al. | Nov 2003 | B2 |
6655458 | Kurkjian et al. | Dec 2003 | B2 |
6658930 | Abbas | Dec 2003 | B2 |
6659177 | Bolze et al. | Dec 2003 | B2 |
6668924 | Bolze et al. | Dec 2003 | B2 |
6672386 | Krueger et al. | Jan 2004 | B2 |
6688390 | Bolze et al. | Feb 2004 | B2 |
6719049 | Sherwood et al. | Apr 2004 | B2 |
6729399 | Follini et al. | May 2004 | B2 |
6745835 | Fields | Jun 2004 | B2 |
6748328 | Storm, Jr. et al. | Jun 2004 | B2 |
6758090 | Bostrom et al. | Jul 2004 | B2 |
6763884 | Meister et al. | Jul 2004 | B2 |
6768105 | Mullins et al. | Jul 2004 | B2 |
6769296 | Montalvo et al. | Aug 2004 | B2 |
6786086 | Hashem | Sep 2004 | B2 |
6799117 | Proett et al. | Sep 2004 | B1 |
6825657 | Kleinberg et al. | Nov 2004 | B2 |
6832515 | Follini et al. | Dec 2004 | B2 |
20010035289 | Runia | Nov 2001 | A1 |
20020046835 | Lee et al. | Apr 2002 | A1 |
20020060094 | Meister et al. | May 2002 | A1 |
20020084072 | Bolze et al. | Jul 2002 | A1 |
20020112854 | Krueger et al. | Aug 2002 | A1 |
20020129936 | Cernosek | Sep 2002 | A1 |
20020185313 | Jones et al. | Dec 2002 | A1 |
20020189338 | Kruspe et al. | Dec 2002 | A1 |
20020189339 | Montalvo et al. | Dec 2002 | A1 |
20030042021 | Bolze et al. | Mar 2003 | A1 |
20030062472 | Mullins et al. | Apr 2003 | A1 |
20030066646 | Shammai et al. | Apr 2003 | A1 |
20030146022 | Krueger | Aug 2003 | A1 |
20030167834 | Weintraub et al. | Sep 2003 | A1 |
20030214879 | Proett et al. | Nov 2003 | A1 |
20030226663 | Krueger et al. | Dec 2003 | A1 |
20040007058 | Rylander et al. | Jan 2004 | A1 |
20040011525 | Jones et al. | Jan 2004 | A1 |
20040020649 | Fields | Feb 2004 | A1 |
20040026125 | Meister et al. | Feb 2004 | A1 |
20040035199 | Meister et al. | Feb 2004 | A1 |
20040045706 | Pop et al. | Mar 2004 | A1 |
20040050153 | Krueger et al. | Mar 2004 | A1 |
20040050588 | Follini et al. | Mar 2004 | A1 |
20040099443 | Meister et al. | May 2004 | A1 |
20040173351 | Fox et al. | Sep 2004 | A1 |
20040230378 | Proett et al. | Nov 2004 | A1 |
20040231408 | Shammai | Nov 2004 | A1 |
20040231841 | Niemeyer et al. | Nov 2004 | A1 |
20040231842 | Shammai et al. | Nov 2004 | A1 |
20040260497 | DiFoggio et al. | Dec 2004 | A1 |
20050072565 | Segura et al. | Apr 2005 | A1 |
Number | Date | Country |
---|---|---|
0697501 | Feb 1996 | EP |
0994238 | Apr 2000 | EP |
0978630 | Sep 2002 | EP |
2 304 906 | Mar 1997 | GB |
WO 0133044 | May 2001 | WO |
WO 0133045 | May 2001 | WO |
WO 0198630 | Dec 2001 | WO |
WO 0208570 | Jan 2002 | WO |
Number | Date | Country | |
---|---|---|---|
20050268709 A1 | Dec 2005 | US |
Number | Date | Country | |
---|---|---|---|
60573423 | May 2004 | US |