The field of use includes the draw-down or de-inventory of underground storage containment locations, such as salt domes, bedded salt, depleted reservoirs, or other designated locations below the surface in the midstream sector. Typical underground storage may contain a mixture of fluids including hydrocarbon fluids, in a liquid or gas form, and brine. The hydrocarbon fluids themselves may include a mix of Liquefied Petroleum Gas, abbreviated as LPG, Highly Volatile Liquid, abbreviated as HVL, Highly Reactive Volatile Organic Compounds, abbreviated as HRVOC, Methane Gas, abbreviated as NG or PG, hydrogen, carbon dioxide, abbreviated as CO2, and various grades of oil or hydrocarbons abbreviated as HC.
The brine may be considered as a displacement media with a significantly heavier specific gravity than the hydrocarbon fluid. The brine may usually be a mixture of salt and water. The brine may also include other inert displacement media, as well as any intermediate phases between liquid and gas. Due to the difference in densities between the stored hydrocarbon fluids and water, there is separation between the two phases, with the lighter density hydrocarbon fluid layer being on top of the heavier density brine layer.
Underground storage may be in need of drawn down for various reasons, including routine maintenance for issues like inspections, valve replacement, corrosion or damage repair to the pipe or casing. Other needs may also include inspections such as pressure testing or cutting out stuck inline inspection tools, idling of underground storage facilities when not in use for long periods or abandonment at the end of its service life.
A typical existing method used to perform an underground storage draw-down or de-inventory operation is to use a flare stack designed to burn the evacuated fluids. During this process, the flare typically initially receives 100 percent of the hydrocarbon fluid being stored until the bulk of the hydrocarbon fluid has been removed. At this point the underground storage cavern will be mostly full of brine with just residuals of hydrocarbon fluid remaining entrained in the brine.
When using this existing method, all the hydrocarbon fluid in the underground storage cavern is treated as waste and consumed by the flare. Therefore, all value of the hydrocarbon fluid inside the underground storage cavern will be lost and the combustion of the entire volume of hydrocarbon fluid within the underground storage cavern may increase the amount of released emission in the atmosphere.
For a more detailed description of the embodiments of the disclosure, reference will now be made to the accompanying drawings.
It is to be understood that the following disclosure describes several exemplary embodiments for implementing different features, structures, or functions of the invention. Exemplary embodiments of components, arrangements, and configurations are described below to simplify the disclosure; however, these exemplary embodiments are provided merely as examples and are not intended to limit the scope of the invention.
Even if advantages and other features will become apparent from the following schematics, description and proposed claims, the proposed list of advantages may be limiting.
The proposed invention process may use a combination of some elements of the two methods described in the existing art section, while adding specific usage, features and control method.
One advantage of the proposed invention would be to capture as much hydrocarbon fluid as practical from the drawdown underground storage cavern, while completing the draw down in the same or less time frame as a typical flaring operation would take. The proposed invention may therefore result in nearly 100 percent of hydrocarbon fluid recovery from the drawdown underground storage cavern, Overall, the proposed invention may improve both the financial and environmental aspects of the drawdown operation.
The following item numbers refer to the
As depicted in
The underground storage 24 may typically be located below the ground level or surface level 54. Aboveground, a wellhead 21 with various valves and connections may link the underground storage 24 with the equipment located next to the ground level 54. The underground storage 24 may include a flow connection 53 which links the wellhead 21 with storage containment volume 52. The storage containment volume 52 may have the shape of a natural or artificial underground cavern, a fracked or boosted reservoir, a depleted reservoir, a salt dome, or other underground volumes which can be used to store various fluid mixtures 9 in gas or liquid form. The flow connection 53 may have the shape of a tubing or a casing, as represented in
The storage containment volume 52 would be the section to de-inventory or draw down. Typically, as the fluid mixture 9 is pumped and stored from surface, the fluid mixture 9 may be over-pressured compared to the surface pressure, plus the hydrostatic pressure from the fluid column depth. The over-pressure of the fluid mixture 9 allows to proceed with fluid recovery as decided and planned. The wellhead 21 may include a Christmas Tree, as represented in
A drawdown section 8 may be linked to one of the connections of the wellhead 21. The drawdown section may allow flowing the fluid mixture 9 from the underground storage 24 towards further equipment located above surface level 54. From the drawdown section 8, a flowline 11 may link a drawdown section connection 5 to the separation vessel 1. The drawdown section connection 5 may be a tie-in point on the pipeline of the drawdown section 8 allowing flowing the fluids 9 inside the flow line 11.
The separation vessel 1, also designated as knock-out tank, or gas buster, or slug catcher, or trap tank, may have the shape of a barrel or tank, either in a vertical position or horizontal position. The separation vessel 1 would typically include a feed-in connection, with flow line 11. The typical function of the separation vessel 1 would be to separate the brine phase 15 from the hydrocarbon fluid phase 14 within the vessel. A brine to hydrocarbon fluid level within the separator vessel would be symbolized as level 13. Different types of separation vessel 1 could be used, such as mechanical, gravity or centrifugal. The usage, shape and types of separation vessel 1 could depend on the fluid mixture 9, on the proportion of fluid versus gas to be separated, the type of fluid or gas such as the expansion ratio between liquid and gas, the quantities of mixture being separated, the time and capacity of operation, the environment parameters such as pressure and temperature.
The separation vessel 1 may have two output connections, a vessel top connection 2 and a vessel bottom connection 3. The vessel top connection 2 allows to flow the hydrocarbon fluid phase 14 from the upper section of the separation vessel 1. The vessel bottom connection 3 allows to flow the brine phase 15 from the upper section of the separation vessel 1. After flowing through the vessel top connection 2, the hydrocarbon fluid phase 14 may flow through a hydrocarbon fluid flow line 16 towards a pump suction inlet connection 30. After flowing through the vessel bottom connection 3, the brine phase 15 may flow through a brine flow line 17 towards the pump suction inlet connection 30. Depending on the opening/closing position of the vessel top connection 2 versus the position of the vessel bottom connection 3 as well as of the pump suction inlet connection 30, the pump 10 may flow either fluid of the fluid mixture 9 out of the separation vessel 1. The pump 10 may therefore flow either the hydrocarbon fluid phase 14 or the brine phase 15, out of the separation vessel 1. A possibility for specific operations may be that both fluid phases 14 and 15 are pumped simultaneously through the pump 10.
The pump 10 may transport out the hydrocarbon fluid phase 14 towards a hydrocarbon fluid output flowline 31. Typically, with the vessel top connection 2 open, and the pump suction inlet connection 30 directed to take fluid flow from the hydrocarbon fluid flowline 16, the pump 10 may flow out most of the fluid towards the hydrocarbon fluid output flowline 31. While the hydrocarbon fluid phase 14 is flowing through the flow lines 16 and 31, the vessel bottom connection 3 may be closed and no brine phase 15 may be flown simultaneously. As represented on
Alternatively, the pump 10 may transport out the brine phase 15 towards a brine output flowline 32. Typically, with the vessel bottom connection 3 open, and the pump suction inlet connection 30 directed to take fluid flow from the brine flowline 17, the pump 10 may flow out most of the fluid towards the brine output flowline 32. While the brine phase 15 is flowing through the flow lines 17 and 32, the vessel top connection 2 may be closed and no hydrocarbon fluid phase 14 may be flown simultaneously.
The pump 10 may be operated manually, remotely, or automated. The pump 10 may function through pneumatic, pressure, electrical, mechanical, or other hydraulic means. The type of the pump 10 may include a piston pump, a screw pump, a diaphragm pump, a centrifugal pump, a gear pump, a lobe pump, a metering pump, a progressive cavity pump, a plunger pump or multi-phase pump or compressor. The pump 10 would typically displace in a range from 0 to 250 thousand scf/hour, as standard cubic feet of gas per hour [0 to 7,000 cubic meters per hour] or 1 to 3 barrels per minute of liquid [0.16 to 0.5 cubic meter per minute].
The brine output flowline 32 may connect to an adjoining brine section connection valve 27. The adjoining brine section connection valve 27 may be a multi-port valve or a combination of multiple valves, allowing connecting or isolating multiple fluid flowing output. As represented in
The hydrocarbon fluid output flowline 31 may connect to an adjoining hydrocarbon fluid section connection valve 6. The adjoining hydrocarbon fluid section connection valve 6 may be a multi-port valve or a combination of multiple valves, allowing connecting or isolating multiple fluid flowing output. As represented on
The hydrocarbon fluid return flowline 36 may itself be linked with a hydrocarbon fluid collection volume 33. The hydrocarbon fluid collection volume 33 may have the shape of a reservoir or a tank, as well as a pipeline connecting to an external network of hydrocarbon fluid collection volumes. The hydrocarbon fluid collection volume 33 may be movable, replaceable and may include some pumping, venting or flaring capacity. The hydrocarbon fluid collection volume 33 may be used to inject or re-circulate hydrocarbon fluid 14, using the adjacent hydrocarbon fluid return line 4 and the drawdown section 8, towards the wellhead 21.
Both the brine output flow line 32 and the hydrocarbon fluid output flowline 31 may include a check valve 18. The check valve 18 may have the shape of a ball check valve or anti-return flow valve. The check valve 18 may only allow passing the fluid towards one downstream direction and therefore may avoid any return of either hydrocarbon fluid phase 14 or brine fluid phase 15 back to the pump 10.
An injection of flush media may be added to the application process and is symbolized in
The operating sequence represented in
Additional pumps may be incorporated in series or in parallel, while keeping a similar flow schematic as described in
As a first step 101, with starting the sequence method, the fluid mixture 9, stored within the underground storage location 24, will be flown towards the separation vessel 1, positioned at or above the ground surface 54. The fluid mixture 9 may include the hydrocarbon fluid phase 14 and the brine phase 15. The fluid mixture 9 is over pressurized within the storage containment volume 52 of the underground storage location 24, compared to the surface pressure. Typically, the pressure within the storage containment volume 52 may be between 500 psi and 10,000 psi [3.4 MPa and 68.9 MPa] depending on the type of storage, the depth of the storage containment volume 52 compared to the ground surface 54, the geometry of the storage containment volume 52, the fluid mixture 9 type and ratio, the natural or artificial pressure acting on the fluid mixture 9 contained within storage containment volume 52. Above ground surface 54, the pressure of the fluid mixture 9 may be between 30 psi and 5,000 psi [0.2 MPa to 34.5 MPa], allowing a positive displacement of the fluid mixture 9 from the underground storage location 24 towards the separation vessel 1. A decrease of fluid pressure between the underground storage location 24 and the separation vessel 1 may typically be caused by friction losses, gravity difference and the flowthrough areas of the various flowlines and valves.
As also mentioned in step 101, the separation vessel 1 may provide the separation of the fluid mixture 9 between the hydrocarbon fluid phase 14 and the brine phase 15. Due to the fluid density difference, the hydrocarbon fluid phase 14 will be located on the upper section of the separation vessel 1, and the brine phase 15 will be located on the lower section of the separation vessel 1, as depicted in
As also mentioned in step 101, the hydrocarbon to brine ratio may be above 0.9 when starting flowing the fluid mixture 9 stored within the underground storage location 24 towards the separation vessel 1. At the start of flowing operation of the fluid mixture 9, while having an overpressure of the fluid mixture 9 within the separation vessel 1 at surface, of at least 30 psi [0.2 MPa], mostly the hydrocarbon fluid phase 14 may flow first, due to its lighter fluid density compared to the brine fluid 15.
In step 102, having the starting condition of the step 101, the hydrocarbon fluid phase 14 may be flown out of the separation vessel 1, using the vessel top connection 2. The displacement of the hydrocarbon fluid phase 14 may be induced by the pump 10, having the suction inlet connection 30 open to allow the displacement of the hydrocarbon fluid phase 14 through the hydrocarbon fluid flowline 16. The discharge of the pump 10 may be directed towards the hydrocarbon fluid output flowline 31 which may be linked to the adjacent hydrocarbon fluid return line 4 and a hydrocarbon fluid return flowline 36, through the adjoining hydrocarbon fluid section connection valve 6. Further, the hydrocarbon fluid phase 14 may be saved and separated within the hydrocarbon fluid phase collection volume 33. Through this step 102, the hydrocarbon fluid phase 14 may be valued and reused for future occasion, while being separated from the brine phase 15.
Also mentioned in step 102, the flow-out of the hydrocarbon fluid phase 14, from the separation vessel through the pump 10, may modify the starting hydrocarbon to brine ratio by decreasing it. The hydrocarbon to brine ratio may decrease with time as the fluid mixture entering and flowing through the separation vessel 1 will be a mix of both phases 14 and 15. Therefore, while flowing out nearly exclusively the hydrocarbon fluid phase 14 through the pump 10, the flow entry of the separation vessel 1 will include both phases 14 and 15, though the flowline 11. Furthermore, the hydrocarbon to brine ratio within the storage containment volume 52 may also evolve with time, as the least dense phase represented by the hydrocarbon fluid phase 14 may tend to decrease with time allowing a higher proportion of brine phase 15 to replace the hydrocarbon fluid phase 14.
Step 103 may be a continuation of step 102, whereby the hydrocarbon to brine ratio within the separation vessel will decrease with time to reach a value between 0.1 and 0.4. This means that the volume of the brine phase 15 represents between 60% and 90% of the whole volume of the separation vessel 1. When a predetermined hydrocarbon to brine ratio has been reached within the separation vessel, typically between 0.1 and 0.4, the operation continues by closing the valve of the drawdown section connection 5. Closing drawdown section connection 5 allows stopping the flow of fluid mixture 9 through the flowline 11.
Step 104 may be a continuation of step 103, by keeping the flow out of the hydrocarbon fluid phase 14 from the top connection 2 of the separation vessel 1 through the pump 10, until the pressure within the separation vessel 1 has decreased to reach a predetermined limit. The pressure limit may be set between 0 psi and 10 psi [0 MPa and 0.07 MPa]. Practically, it would mean that when reaching this pressure limit, the pressure is no more sufficient to displace the hydrocarbon fluid phase 14 from the top connection 2 of the separation vessel 1.
Step 105 may be a continuation of step 104, by stopping the flow-out of the hydrocarbon fluid phase 14 from the vessel top connection 2 towards the pump 10, when the pressure of the fluid mixture 9 within the separation vessel 1 has decreased to reach the pressure limit set between 0 psi and 10 psi [0 MPa and 0.07 MPa]. Practically, stopping the flow-out of the hydrocarbon fluid phase 14 from the vessel top connection 2 may occur by closing the vessel top connection 2 of the separation vessel 1. Furthermore, step 105 may include the start of flowing the brine phase 15 from the separation vessel bottom connection 3 towards the pump 10. The pump suction inlet connection 30 may be adjusted to switch the pump suction from the hydrocarbon fluid phase 14 through the flow line 16 towards the brine phase 15 through the flow line 17. In addition, to allow the discharge of the brine phase 15 through the brine output flowline 32, instead of the discharge of the hydrocarbon fluid phase 14 through the hydrocarbon fluid output flowline 31, the adjoining brine section connection valve 27 may be open while the adjoining hydrocarbon fluid section connection valve 6 may be closed. Therefore, the separation vessel 1 may be emptied from the remaining brine phase 15, which was left at the end of step 103 or 104.
Step 106 may be a back loop to repeat in sequence the steps 102, 103, 104 and 105 multiple times.
At any time during the sequence steps 102, 103, 104 and 105, the adjacent brine return line 23 or the brine injection line 22 may be used to inject an additional brine phase 15 through the well head 21. The brine injection may be used to equalize pressures at different steps of the sequence methods, for example between the flow line 11 and the discharge of the pump 10. The brine injection may also be used to repressurized some section of the flowlines, typically directed towards the separation vessel 1, when the pressure inside the separation vessel 1 has reached the lower pressure limit set between 0 psi and 10 psi [0 MPa and 0.07 MPa]. The brine injection may also be used to add a brine phase 15 inside the storage containment volume 52 of the underground storage 24, and therefore push further the hydrocarbon fluid phase 14, possibly left within the fluid mixture 9. One goal may be to recover most of the hydrocarbon fluid phase 14 as possible.
At the end of the sequence described in
Step 111 may be a mirror of step 101 of
In step 112, having the starting condition of the step 111, the hydrocarbon fluid phase 14 may be flown out of the separation vessel 1, using the vessel top connection 2. The displacement of the hydrocarbon fluid phase 14 may be induced by the pump 10a, having the suction inlet connection 30a open to allow the displacement of the hydrocarbon fluid phase 14 through the hydrocarbon fluid flowline 16. The discharge of the pump 10a may be connected with the hydrocarbon fluid output flowline 31 which may be linked to the adjacent hydrocarbon fluid return line 4 and a hydrocarbon fluid return flowline 36, through the adjoining hydrocarbon fluid section connection valve 6. Further, the hydrocarbon fluid phase 14 may be saved and separated within the hydrocarbon fluid phase collection volume 33. Through this step 112, the hydrocarbon fluid phase 14 may be valued and reused for future occasions, while being separated from the brine phase 15.
Also mentioned in step 112, the flow-out of the hydrocarbon fluid phase 14, from the separation vessel through the pump 10, may modify the starting hydrocarbon to brine ratio by decreasing it. The hydrocarbon to brine ratio may decrease with time as the fluid mixture entering and flowing through the separation vessel 1 will be a mix of both phases 14 and 15. Therefore, while flowing out nearly exclusively the hydrocarbon fluid phase 14 through the pump 10a, the flow entry of the separation vessel 1 will include both phases 14 and 15, though the flowline 11. Furthermore, the hydrocarbon to brine ratio within the storage containment volume 52 may also evolve with time, as the least dense phase represented by the hydrocarbon fluid phase 14 may tend to decrease with time allowing a higher proportion of brine phase 15 to replace the hydrocarbon fluid phase 14.
Step 113 may be a continuation of step 112, whereby the hydrocarbon to brine ratio within the separation vessel will decrease with time to reach a value between 0.1 and 0.4. This means that the volume of the brine phase 15 represents between 60% and 90% of the whole volume of the separation vessel 1. When a predetermined hydrocarbon to brine ratio has been reached within the separation vessel, typically between 0.1 and 0.4, the operation continues by closing the valve of the drawdown section connection 5. Closing drawdown section connection 5 allows stopping the flow of fluid mixture 9 through the flowline 11.
Step 114 may be a continuation of step 113, by keeping the flow out of the hydrocarbon fluid phase 14 from the top connection 2 of the separation vessel 1 through the pump 10a, until the pressure within the separation vessel 1 has decreased to reach a predetermined limit. The pressure limit may be set between 0 psi and 10 psi [0 MPa and 0.07 MPa]. Practically, it would mean that when reaching this pressure limit, the pressure is no more sufficient to displace the hydrocarbon fluid phase 14 from the top connection 2 of the separation vessel 1.
Step 115 may be a continuation of step 114, by stopping the flow-out of the hydrocarbon fluid phase 14 from the vessel top connection 2 towards the pump 10a, when the pressure of the fluid mixture 9 within the separation vessel 1 has decreased to reach the pressure limit set between 0 psi and 10 psi [0 MPa and 0.07 MPa]. Practically, stopping the flow-out of the hydrocarbon fluid phase 14 from the vessel top connection 2 may occur by closing the vessel top connection 2 of the separation vessel 1. Furthermore, step 115 may include the start of flowing the brine phase 15 from the separation vessel bottom connection 3 towards the pump 10b. The pump suction inlet connection 30b may be allow the brine phase 15 flowing through the flow line 17. In addition, the adjoining brine section connection valve 27 may be open, while the adjoining hydrocarbon fluid section connection valve 6 may be closed. Therefore, the separation vessel 1 may be emptied from the remaining brine phase 15, which was left at the end of step 113 or 114.
Step 116 may be a back loop to repeat in sequence the steps 112, 113, 114 and 115 multiple times.
At any time during the sequence steps 112, 113, 114 and 115, the adjacent brine return line 23 or the brine injection line 22 may be used to inject an additional brine phase 15 through the well head 21. The brine injection may be used to equalize pressures at different steps of the sequence methods, for example between the flow line 11 and the discharge of the pumps 10a and 10b. The brine injection may also be used to repressurized some section of the flowlines, typically directed towards the separation vessel 1, when the pressure inside the separation vessel 1 has reached the lower pressure limit set between 0 psi and 10 psi [0 MPa and 0.07 MPa]. The brine injection may also be used to add a brine phase 15 inside the storage containment volume 52 of the underground storage 24, and therefore push further the hydrocarbon fluid phase 14, possibly left within the fluid mixture 9. One goal may be to recover most of the hydrocarbon fluid phase 14 as possible.
At the end of the sequence described in
As depicted in
The level indicator 60, as depicted in
Parameters 70 represent the variables which may be significant for the flow section 11, between the underground storage 24 and the separation vessel 1. Parameters 70 may be described as following:
QA would represent the flowrate of the fluid mixture 9 including the brine phase 15 and the hydrocarbon fluid phase 14, further present within the separation vessel 1.
PA would represent the pressure fluid mixture 9 within the flow section 11.
RA would represent the hydrocarbon to brine ratio within the fluid mixture 9 flowing inside the flow section 11. A RA of 1 would mean a full hydrocarbon fluid phase, and a RA of 0 would mean a full brine phase.
Parameters 71 represent the variables which may be significant within the separation vessel 1. Parameters 31 may be described as the following:
PB would represent the pressure fluid mixture 9 within the separation vessel 1. Standard PB pressure would typically be close to the pressure PA.
RB would represent the hydrocarbon to brine ratio within the separation vessel 1. A RB of 1 would mean a full hydrocarbon fluid phase, and a RB of 0 would mean a full brine phase. The ratio RB would relate directly to the level 13 within the separation vessel 1. The ratio RB could be derived from the level indicator 50 or the level controller, as described in
Parameters 72 represent the variables which may be significant for the hydrocarbon fluid flowline 16, between the top connection 2 of the separation vessel 1 and the pump 10a. Parameters 32 may be described as the following:
QC would represent the flowrate of the hydrocarbon fluid phase flowing inside the hydrocarbon fluid flowline 16.
PC would represent the pressure of the hydrocarbon fluid phase within hydrocarbon fluid flowline 16.
Parameters 73 represent the variables which may be significant for the brine flowline 17, between the bottom connection 3 of the separation vessel 1 and the pump 10b. Parameters 33 may be described as the following:
QC would represent the flowrate of the brine phase flowing inside the brine flowline 17.
PC would represent the pressure of the brine phase within brine flowline 17.
A primary goal of the regulation method, represented as a regulation loop 80 in
RBactual 81 would represent an input or actual measured ratio or level inside the separation vessel 1. RBcommand 82 would represent a target ratio or level considered as a command. RBcommand could include a wished ratio, typically between 0.1 to 0.4, as well as a RBmin, representing the minimum ratio for an optimum operation, and a RBmax, representing the maximum ratio for an optimum operation. A typical RBmin value may be between 0.05 and 0.15. A typical RBmax value may be between 0.3 and 0.5. The consequence of the RB regulation may be to maintain PA above a predetermined limit. As described in the sequences of
The regulation loop may include RBactual 81 as input. A first output action 85 may be the adjustment of the speed or flow output of the pump 10a, which may directly influence QC. A second output action 86 may be the adjustment of the speed or flow output of the pump 10b which may directly influence QD.
The regulation loop 80 may be controlled by a control system 84 performing at a predetermined frequency, either manual or automatic, typically between once every 1 second to once every 10 hours.
The control system 84 may also control the opening/closing position of the valve connections, which may have an influence on the various pressures and flowrates within the flow system, namely PA, QA, PB, QC, PC, QD, PD. The valves which may be part of the regulation system includes the drawdown section connection 5, the adjoining hydrocarbon fluid section connection valve 6, the vessel top connection 2, the vessel bottom connection 3, the pump suction inlet connections 30a and 30b, and the adjoining brine section connection valve 27.
Other regimes may also be part of the regulation loop 80, with additional output and specific actions. Other regimes may include a start regime or an end regime. Example of a start regime, which may be performed as part of the process, may include the removal of contaminates such as air, nitrogen within the separation vessel 1. Other start regimes may include the purge of the flowlines 8, 11, 4, 23.