Milling machine, in particular surface miner, and method for mining milled material of an open cast surface

Abstract
In a method for milling an opencast mining surface or for milling off layers of an asphalt or concrete traffic surface with a milling machine removing the ground surface, by milling the ground surface along a predetermined milling track having a predetermined length, by transporting the milled material via a conveying device to at least one container of a truck that travels along next to the milling machine, said truck having a predetermined maximum loading volume per load, and by replacing a fully loaded truck with an unloaded truck when the maximum loading volume of a truck load has been reached, it is provided for the following features to be achieved: calculation of the maximum total loading volume resulting over the length of the current milling track as a function of the current effective working width and a milling depth that has been optimized in relation to a predetermined, preferably maximum milling power, calculation of the number of truck loads required for the maximum total loading volume of a milling track, determination of an effective total loading volume of the current milling track, which results from the volume of the nearest whole number of loads, and adjustment of the adjustable total milling volume of the milling machine over the length of the milling track to match the effective total loading volume that results in a whole number of loads.
Description

The invention relates to a method in accordance with claims 1 and 6 respectively, as well as to a milling machine in accordance with claims 18 and 23 respectively.


In mining, earthwork and rock operations, the mining of solid earth materials in the form of milled material offers a great advantage over drilling and blasting as it can be performed with much greater economic efficiency.


The milling machine, generally called a surface miner, is able to crush the mined material to such a small size that it can be processed without any or requiring only minor subsequent treatment. The material removed by a milling drum is loaded, via loading conveyors, onto a truck that travels along next to the milling machine. In the process, the milled material is cut, crushed and finally loaded.


A known method provides that the ground surface of an opencast mining surface is milled along a predetermined milling track having a predetermined length. In the process, the milling operation is optimized, in terms of milling depth and milling speed, in accordance with the machine's power and the type of material to be milled.


The milled material is transported via a conveying device to at least one container of a truck that travels along next to the milling machine, said truck having a predetermined maximum loading volume per load. Once the truck is fully loaded, it is replaced with an unloaded truck.


At the end of the milling track, the milling machine turns so that an adjoining milling track can be removed. It is of disadvantage in this process that the truck may not be fully loaded at the end of the milling track so that the vehicle either needs to transport the milled material away being only partially loaded, or else needs to wait for the turning manoeuvre to be completed, in which case the working process will have to be interrupted once again during the next truck change until changing of the trucks has been completed. In order to minimize the breaks in operation, it is also known to use truck and trailer combinations that are provided with one or several trailers. With such truck and trailer combinations, there is the problem all the more, however, of the truck and trailer combination not being fully loaded at the end of the milling track. As such a truck is not able to perform a turning manoeuvre, there is the problem all the more in this arrangement of it not being possible to fully load the truck and trailer combination.


A further problem lies in loading the container of a truck evenly in order to be able to make maximum use of the container volume.


It is therefore the object of the present invention to specify a method for milling an opencast mining surface that can be performed with greater economic efficiency.


The above mentioned object is achieved by the features of claims 1, 6, 18 and 23.


To this end, the following is provided in accordance with the method according to the present invention:

    • calculation of the maximum total loading volume resulting over the length of the current milling track as a function of the current effective working width and a milling depth that has been optimized in relation to a predetermined, preferably maximum milling power,
    • calculation of the number of truck loads required for the maximum total loading volume of a milling track,
    • determination of an effective total loading volume of the current milling track, which results from the volume of the nearest whole number of loads, and
    • adjustment of the adjustable total milling volume of the milling machine over the length of the milling track to match the effective total loading volume that results in a whole number of loads.


The invention enables the milling operation to be optimized in such a manner that, at the end of a current milling track, the container of a truck is, or containers of a truck are, also completely filled so that journeys of the trucks or truck and trailer combinations with containers not fully loaded are avoided, thus also minimizing the number of breaks in operation for the purpose of changing the trucks.


At the same time, the advance speed may be increased, for example, when working at a reduced milling depth so that the time required for milling off a milling track can be reduced.


It is preferably provided that the adjustable total milling volume of the milling machine in a milling track is adjusted to match a total loading volume which results from the volume of the nearest lower whole number of loads.


In this case, adjustment of the total milling volume to match the specified effective total loading volume is preferably effected by altering the milling depth. The reason for this is that, by reducing the milling depth, the total milling volume within a milling track can be reduced in such a fashion that it corresponds to the specified effective total loading volume that enables a whole number of loads to be achieved in a milling track.


An alternative possibility consists in adjusting the total milling volume to match the specified effective total loading volume by altering the effective working width by selecting a different overlap of adjoining milling tracks.


In this case, the milling depth optimized for the milling process is maintained, and the reduction of the total milling volume for adjustment to the total loading volume is adjusted by partly travelling over the previous milling track.


It is provided in this arrangement that the advance speed of the milling machine is adjusted to match the effective total milling volume in such a fashion that a preselected milling power, preferably maximum milling power, is maintained or achieved.


In order to improve the effectiveness of the milling process and the even loading of the container, it may also be provided that the travel speed of the truck is controlled, as a function of the advance speed of the milling machine, in such a fashion that the loading space of the at least one container is loaded evenly and fully over the length up to the maximum loading volume.


This is preferably effected by regulating the loading process by means of controlling the travel speed of the truck as a function of the advance speed of the milling machine and of the measured loading condition of a container.


The travel speed or the current position of the truck may alternatively be controlled as a function of the advance speed of the milling machine, or of the distance traveled by the milling machine in the current milling track, or of the current discharge position of the transport device.


It may further be provided that the travel speed or the current position of the truck is controlled in such a fashion that the discharge position of the conveying device above the at least one container moves from a front or rear end position inside the container to an end position that is opposite in longitudinal direction.


The travel speed of the truck is preferably controlled in such a fashion that the travel speed of the truck is higher than or equal to the advance speed of the milling machine.


It may alternatively be provided that the travel speed of the truck is controlled in such a fashion that the travel speed shows a constant positive difference to the advance speed of the milling machine.


It may alternatively be provided that the travel speed of the truck is controlled in such a fashion that the travel speed of the truck is altered in a discontinuous fashion.


At the beginning of the loading process, it may be provided that controlling the travel speed of the truck at a higher travel speed than the advance speed of the milling machine begins only after a sufficiently high initial fill has been discharged at the front or rear end position.


The method can be applied to advantage in particular when truck and trailer combinations with several trailers connected to one another in an articulated fashion are used.


In order to enable a continuous loading process, it is particularly advantageous in this arrangement if containers on several trailers connected to one another in an articulated fashion are used in which the upper end edges of the opposite end walls of adjacent containers overlap.


Containers may be used in this arrangement, the opposite end walls of which are provided with a mutually adapted curvature about an axis orthogonal to the ground surface in such a fashion that the opposite end walls have a smallest possible mutual distance but enable a mutual turning movement of the trailers both laterally and in a ramp transition area nonetheless.


Containers may also be used, the front end wall side of which is curved in a convex manner and is provided, preferably at the front end edge, with a projecting collar that covers a driver's cabin of the truck and/or the rear upper concavely curved end edge of the end wall of a container travelling ahead.





In the following, one embodiment of the invention is explained in greater detail with reference to the drawings.


The following is shown:



FIG. 1 a graphic representation of a so-called opencast pit of an opencast mining surface,



FIG. 2 loading of a container of a truck via a transport conveyor of the milling machine,



FIG. 3 a side view of a surface miner,



FIG. 4 a top view of a surface miner,



FIG. 5 a complete cross-section of a pit in the working direction of the milling machine,



FIG. 6 a complete cross-section of a pit transverse to the working direction,



FIG. 7 definition of the actual cutting depth,



FIG. 8 material heaps with realistic and idealized loading, and



FIG. 9 a basic structure of a truck control unit.






FIG. 1 shows an opencast pit of an opencast mining surface, wherein the reference symbol 4 shows the ground surface to be processed, the area 6 shows a ramp which leads to an elevated turning area 8 in the respective periphery of the opencast pit. The surface miner 3 can turn in said turning area 8 after a milling track has been removed in order to process an adjoining milling track in the opposite direction.


An opencast pit has a size of, for example, approx. 100 m in width and approx. 500 m in length.


As can be seen from FIG. 2, the milled material removed by the surface miner 3, such as ore or coal, is loaded via a transport conveyor 2 onto a truck 1 that may also be provided with one or several containers 10. A container is located on the truck 1, said container having a loading volume of, for instance, 100 t. Truck and trailer combinations with a total number of three containers of 100 t each mounted on trailers are frequently used, so that the total loading capacity of such a truck load amounts to approx. 300 t. When a truck with a 100-t container is used, changing of the trucks needs to be performed approx. 16 to 17 times over the length of a milling track of approx. 500 m. This means that a short break in operation during changing of the trucks is required after every 30 m already, as the transport conveyor needs to be stopped and, due to the high milling power of the milling machine, the milling process thus also needs to be interrupted briefly during changing of the vehicles.



FIG. 3 shows a surface miner 3 that is provided with a control unit 12 for controlling the removal process during the mining of milled material of an opencast mining surface or during the milling off of layers of an asphalt or concrete traffic surface, and for controlling the transporting away of the removed milled material for loading onto a truck.


The ground surface is removed along a predetermined milling track having a predetermined length.


The milled material is conveyed via a conveying device, for instance, a transport conveyor 2, to at least one container of a truck 1 that travels along next to the milling machine, said truck 1 having a predetermined maximum loading volume per load.


A fully loaded truck is replaced with an unloaded truck when the maximum loading volume of a truck load has been reached.


The control unit 12 of the milling machine 3 calculates

    • the maximum total loading volume resulting over the length of the current milling track as a function of the current effective working width and a milling depth that has been optimized in relation to a predetermined, preferably maximum milling power,
    • the number of truck loads required for the maximum total loading volume of a milling track, and determines
    • an effective total loading volume of the current milling track, which results from the nearest whole number of loads.


The control unit 12 then adjusts the adjustable total milling volume of the milling machine over the length of the milling track to match the effective total loading volume that results in a whole number of loads.


For the purpose of setting and adjusting the total milling volume, the control unit 12 can calculate the effective total loading volume which results from the nearest lower whole number of loads.


For the purpose of adjusting the adjustable total milling volume to match the specified effective total loading volume, the control unit 12 can alter, preferably reduce, the milling depth.


For the purpose of adjusting the adjustable total milling volume to match the specified effective total loading volume, the control unit 12 can alternatively alter the effective working width by selecting a different overlap of adjoining milling tracks.


The control unit 12 can set the advance speed of the milling machine to a preselected milling power, preferably maximum milling power.


In addition, the control unit 12 can control the travel speed of the truck as a function of the advance speed of the milling machine in such a fashion that the loading space of the at least one container is loaded evenly and fully over the length up to the maximum loading volume.


The control unit 12 can regulate the loading process of at least one container by controlling the travel speed of the truck as a function of the advance speed of the milling machine and of the measured loading condition of the container.


The control unit 12 can control the travel speed or the current position of the truck as a function of the advance speed of the milling machine, or of the distance traveled by the milling machine in the current milling track, or of the current discharge position of the transport device in relation to the truck.


In this arrangement, the control unit 12 can control the travel speed or the current position of the truck in such a fashion that the discharge position of the conveying device above the at least one container moves from a front or rear end position inside the container to an end position that is opposite in longitudinal direction.


Preferably, the control unit can control the travel speed of the truck in such a fashion that the travel speed of the truck is higher than or equal to the advance speed of the milling machine.


The control unit 12 can increase the travel speed of the truck only after a sufficiently high initial fill has been reached at the front or rear end position.


The containers may be arranged on several trailers connected to one another in an articulated fashion, in which case the adjacent upper end edges of the opposite end walls overlap.


The adjacent end walls of the containers on the several trailers connected to one another in an articulated fashion may be provided with a mutually adapted curvature about an axis orthogonal to the ground surface in such a fashion that the end walls have a smallest possible mutual distance but enable a lateral turning movement of the trailers nonetheless.


The containers may be curved in a convex manner at the front end wall side and be provided, preferably at the front end edge, with a projecting collar that covers a driver's cabin of the truck and/or the rear upper concavely curved end edge of the end wall of a container travelling ahead.


A dimensioning and control concept for automated opencast mining is described in the following. The procedure comprises the following steps:

    • calculation/dimensioning of the cutting depth for each layer (as a function of a “vertical” opencast mining process, assuming that the pit dimensions are known) to achieve optimal truck loading for each layer,
    • application of a control concept for the opencast mining/loading process to achieve optimal truck loading at minimized control and communication efforts.


The fundamental advantage of the following control concept lies in the fact that a continuous loading process between truck and opencast milling machine, where both machines travel at a constant speed, is especially easy to realize with regard to the control concept and requires almost no communication between the milling machine and the truck (except at the beginning and at the end of the loading process).


The principle of the present invention consists in controlling the truck speed and direction as a function of the actual position and speed of the milling machine (or of the position and speed of the conveyor belt of the milling machine respectively), the cutting depth and cutting width of the milling machine and other process parameters known in advance, such as the maximum payload of the truck, the equivalent loading length of the truck and the density of the milled material.


Calculation of the optimal cutting depth as a function of the vertically progressing layer mining process:


GENERAL DEFINITIONS AND RELATIONS

Known process parameters and variables:


lmin e,max in [m]: maximum total horizontal distance to be mined without the milling machine turning back (including the ramp and the flat part; see FIG. 5)


αramp in [m]: mining ramp angle; see FIG. 5

ρmat in [t/m3]: density of the mined material


Mpay in [t]: payload of the truck


L in [−]: loosening factor, relation between the density of the cut material and the density of the loaded material


FT,max in [m]: maximum cutting depth


FB in [m]: cutting width


FT,act in [m]: actual cutting depth


Unknown process variables to be determined (in the sequence of clarification):


lmin e,act in [m]: actual total horizontal distance to be mined without the milling mm e, act machine turning back (including the ramp and the flat part; see FIG. 5)


lramp,act in [m]: actual horizontal distance to be mined while the milling machine is on the ramp; see FIG. 7

lflat,act in [m]: actual horizontal distance to be mined while the milling machine is on the flat part of the pit cross-section; see FIG. 7

Qramp,act in [m3]: material volume to be loaded on the ramp


Qflat,act in [m3]: material volume to be loaded on the flat part of the mining track


Qtotal,act in [m3]: total material volume to be loaded in a single track


Mtotal,act in [t]: total weight to be loaded in a single track


ntrucks in [−]: number of trucks required for the total load of a single track.



FIG. 1 shows a top view of the sample of a pit, and FIGS. 5 and 6 show the relevant cross-sections. A complete pit cross-section in the working direction of the milling machine is depicted in FIG. 5. In FIG. 5, 16 depicts the maximum pit length, 18 depicts the maximum mining length, 21 depicts the maximum mining depth, and 20 depicts the mining ramp, said mining ramp having a slope of, for instance, 1:10˜5.71°. The complete pit cross-section transverse to the working direction is depicted in FIG. 6. In FIG. 6, 22 depicts the maximum mining depth, and 24 depicts the mining ramp, said mining ramp having a slope of, for instance, 1:0.25˜76°. Let it be assumed that the total pit dimensions as well as the cross-section are known prior to the start of the mining process. Determination of the dimensions is typically performed prior to the start of the mining process by means of an extensive analysis of drilling samples.


Calculation Procedure:





    • Start at the top of the pit by adjusting lmin e, act to the beginning of the track length and by adjusting the cutting depth to the maximum cutting depth

    • Calculate the number of trucks required by means of the cited procedure

    • Reduce the number of trucks required to the next smaller whole number

    • Recalculate the cutting depth and the actual horizontal distance on the flat part lflat,act

    • Set lflat,act as the starting value for lmin e, act to calculate the next cutting depth





The material volume that needs to be loaded on a ramp can be calculated from







Q

ramp
,
act


=


1
2

·

l

ramp
,
act


·

F

T
,
act


·

F
B

·

L
.






In a similar fashion, the material volume that needs to be loaded on the flat part can be derived from






Q
flat,act
=l
flat,act
·F
T,act
·F
B
·L.


The total material that needs to be loaded for the entire track is simply






Q
total,act
=Q
flat,act+2·Qramp,act.


Substituting the material volume of the ramp and the flat part results in








Q

total
,
act


=



l

flat
,
act


·

F

T
,
act


·

F
B

·
L

+

2
·

1
2

·

l

ramp
,
act


·

F

T
,
act


·

F
B

·
L



,




which can be further simplified to







Q

total
,
act


=




(


l

flat
,
act


+

l

ramp
,
act



)




l

mine
,
act



·

F

T
,
act


·

F
B

·
L





The total weight to be loaded is






M
total,act
=Q
total,act·ρmat


The number of truck loads required for the total load is






n
trucks
=M
total,act
/M
pay.


A recalculation of the required cutting depth can now be performed quite easily by solving the aforementioned equations for the cutting depth, which results in







F

T
,
act


=



Q

total
,
act




F
B

·
L
·

l

mine
,
act




.





The current total horizontal distance of the flat part can be determined by initially calculating the distance of the ramp







l

ramp
,
act


=



F

T
,
act



tan


(

α
ramp

)



.





The remaining distance of the flat part lflat,act can then be calculated from (FIG. 7)






l
flat,act
=l
min e,act−2·lramp,act.


The total horizontal distance lmin e,act for calculation of the next layer equals the last calculated distance of the flat part





lmin e,act=lflat,act,


with the exception of the first calculation, where said length needs to be set to the maximum initial horizontal distance lmin e,max.



FIG. 8 shows material heaps 26 with realistic and idealized loading 28, 30, with 32 depicting the loading length.


Control law for the truck speed:


General definitions and relations:


Known process parameters and variables:


FT in [m]: cutting depth


FB in [m]: cutting width


vSM in [m/min]: advance speed of the milling machine


Mpay in [t]: payload of the truck


L in [−]: loosening factor, relation between the density of the cut material and the density of the loaded material


ρmat in [t/m3]: density of the mined material


llc in [m]: equivalent loading length of the truck


Unknown process variables to be determined (in the sequence of clarification):


tlc in [min]: truck loading time


Qlc in [m3]: material volume for one loading cycle


{dot over (q)} in [m3/min]: material flow rate from the milling machine


Atray,cr in [m2]: loadable cross-sectional area of the truck tray


vTruck in [m/min]: truck speed in forward direction


Where: [min]: minutes [m]: metres [m3/min]: cubic metres per minute


The truck-loading cross-sectional area as a function of the surface milling machine speed, the cutting depth, the cutting width and the truck speed can be calculated by using the following simple assumptions and relations:

    • The material can be loaded onto the truck without any angle of repose (see FIG. 8 for illustration).
    • The truck 1 and the milling machine 3 travel at a constant speed.
    • The truck 1 starts loading at the front end of the truck tray and travels faster than the milling machine.
    • There is no storage of material in the milling machine 3.
    • A constant loosening of the cut material takes place, i.e. the material delivered by the conveying device equals the cut material, multiplied by the loosening factor.


The material delivered by the milling machine 3 during a specific loading time tlc can be calculated from






Q
lc
=F
T
·F
B
·v
SM
·L·t
lc
={dot over (q)}·t
lc.


The resulting cross-sectional loading area of the truck tray can be calculated from






A
tray,cr
=Q
lc
/l
lc


where llc represents an equivalent loading length assuming that the load deposited on the truck resembles a cuboid.


By substituting the material volume and the loading length one obtains











A

tray
,
cr


=


F
T

·

F
B

·
L
·


v
SM



v
Truck

-

v
SM





,




(
1
)







which means that for a given cutting depth, a given cutting width and a given loosening factor the cross-sectional loading area is a function of the milling machine speed and the difference of milling machine speed and truck speed. This relation can be verified quite easily. Assuming that the truck is stationary (Vtruck=0), it results from the aforementioned relation that






A
tray,cr
=F
T
·F
B
·L,


which means that the material cross-section to be cut by the milling machine, multiplied by the loosening factor, needs to be stored in the truck 1.


To be able to obtain a particular cross-sectional loading area of the truck tray, equation (1) produces a control law for adjusting the truck speed and/or the milling machine speed for a given cutting depth and cutting width. In practice, the loading area is subject to a limitation that is due to the maximum payload of the truck tray. With a given maximum payload of the truck tray, the maximum material volume that can be loaded during one loading cycle is defined by






Q
lc,max
=M
paymat.


The maximum material volume can then be translated into a maximum cross-sectional loading area






A
tray,cr,max
=Q
lc,max
/l
lc  (2).


Inserting (2) into (1) and solving (1) for the truck speed produces a feedforward control law for the truck speed:







v
Truck

=



v
SM



(

1
+



F
T

·

F
B

·
L
·

ρ
mat

·

l
lc



M
Pay



)


.





The basic structure of a truck control unit is depicted in FIG. 9. The truck position and speed feedforward control unit 34 includes a feedforward control rule for the truck speed and for mapping the conveyor position onto the truck position. The truck position and speed feedforward control unit 34 includes measuring values 36, such as absolute conveyor positions and speeds, actual cutting depth and actual milling machine speed. Additional parameters 38 exist, such as the maximum payload of the truck, the loosening factor, the material density, the equivalent loading length of the truck tray, or the cutting width. 40 depicts the commanded speeds and positions (direction and amplitude), 42 depicts the truck control device, 44 depicts the control commands, speed commands, 46 depicts the truck, 48 depicts the absolute truck position, and 50 depicts the ATS/GPS.

Claims
  • 1. Method for milling a ground surface with a milling machine removing the ground surface, by milling the ground surface along a milling track having a length,by transporting the milled material via a conveying device to at least one container of a truck that travels along next to the milling machine, said truck having a maximum loading volume per load, andby replacing a fully loaded truck with an unloaded truck when the maximum loading volume of a truck load has been reached,
  • 2. Method in accordance with claim 1, wherein step (d) is further characterized in that the total milling volume of the milling machine in the milling track is adjusted to equal a whole number of truck loads equal to a nearest whole number lower than the number of truck loads calculated in step (b).
  • 3. Method in accordance with claim 1, wherein step (d) is characterized by adjusting the total milling volume by altering the milling depth.
  • 4. Method in accordance with claim 1, wherein step (d) is characterized by adjusting the total milling volume by altering the effective working width by selecting a different overlap of adjoining milling tracks.
  • 5. Method in accordance with claim 1, characterized in that an advance speed of the milling machine is adjusted such that a preselected milling power is maintained.
  • 6. Method for milling a ground surface with a milling machine removing the ground surface, by milling the ground surface along a milling track having a length,by transporting the milled material via a conveying device to at least one container of a truck that travels along next to the milling machine, said truck having a maximum loading volume per load, andby replacing a fully loaded truck with an unloaded truck when the maximum loading volume of a load has been reached,
  • 7. Method in accordance with claim 6, wherein the controlling step is further characterized by controlling the travel speed of the truck also as a function of a measured loading condition of the at least one container.
  • 8. Method in accordance with claim 6, wherein the controlling step is further characterized by controlling the travel speed of the truck also as a function of a distance traveled by the milling machine in the milling track, or of a current discharge position of the transport device.
  • 9. Method in accordance with claim 6, wherein the controlling step is further characterized by controlling the travel speed of the truck such that a discharge position of the conveying device above the at least one container moves from a front or rear end position inside the container to an end position that is opposite in longitudinal direction.
  • 10. Method in accordance with claim 6, wherein the controlling step is further characterized by controlling the travel speed of the truck such that the travel speed of the truck is higher than or equal to the advance speed of the milling machine.
  • 11. Method in accordance with claim 6, wherein the controlling step is further characterized by controlling the travel speed of the truck such that the travel speed of the truck maintains a constant positive difference to the advance speed of the milling machine.
  • 12. Method in accordance with claim 6, wherein the controlling step is further characterized by controlling the travel speed of the truck such that the travel speed of the truck is altered in a discontinuous fashion.
  • 13. Method in accordance with claim 6, wherein the controlling step is further characterized in that control of the travel speed of the truck at a higher travel speed than the advance speed of the milling machine begins only after a sufficiently high initial fill has been discharged at a front or rear end position of the at least one container.
  • 14. Method in accordance with claim 1, characterized by the use of trucks with containers on several trailers connected to one another in an articulated fashion.
  • 15. Method in accordance with claim 14, where upper end edges of opposite end walls of adjacent containers overlap.
  • 16. Method in accordance with claim 14, wherein the opposite end walls of the containers are provided with a mutually adapted curvature about an axis orthogonal to the ground surface such that the opposite end walls have a smallest possible mutual distance and enable a turning movement of the trailers.
  • 17. Method in accordance with claim 14, wherein a front end wall side of each container is curved in a convex manner and is provided, with a projecting collar that covers a driver's cabin of the truck and/or a rear upper concavely curved end edge of the end wall of a container travelling ahead.
  • 18. Milling machine, with a control unit for controlling a removal process during the milling of milled material of a ground surface, and for controlling the transporting away of the removed milled material for loading onto a truck, where the milling machine removes the ground surface along a milling track having a length,conveys the milled material via a conveying device to at least one container of a truck that travels along next to the milling machine, said truck having a maximum loading volume per load, and wherea fully loaded truck is replaced with an unloaded truck when the maximum loading volume of a truck load has been reached,
  • 19. Milling machine in accordance with claim 18, characterized in that the control unit is operable to determine the effective total loading volume which results from the whole number of truck loads equal to a nearest number lower than the required number.
  • 20. Milling machine in accordance with claim 18, characterized in that, for the purpose of adjusting the adjustable total milling volume, the control unit is operable to alter the milling depth.
  • 21. Milling machine in accordance with claim 18, characterized in that, for the purpose of adjusting the adjustable total milling volume, the control unit is operable to alter the effective working width by selecting a different overlap of adjoining milling tracks.
  • 22. Milling machine in accordance claim 18, characterized in that the control unit is operable to adjust the advance speed of the milling machine to a maximum milling power.
  • 23. Milling machine, with a control unit for controlling a removal process during the milling of milled material of a ground surface, and for controlling the transporting away of the removed milled material for loading onto a truck, where the milling machine removes the ground surface along a milling track having a length,conveys the milled material via a conveying device to at least one container of a truck that travels along next to the milling machine, said truck having a maximum loading volume per load, and wherea fully loaded truck is replaced with an unloaded truck when the maximum loading volume of a truck load has been reached,
  • 24. Milling machine in accordance with claim 23, characterized in that the control unit is operable to control the travel speed of the truck also as a function of a measured loading condition of the container.
  • 25. Milling machine in accordance with claim, characterized in that the control unit is operable to control the travel speed of the truck also as a function of a distance traveled by the milling machine in the milling track, or of a current discharge position of the transport device in relation to the truck.
  • 26. Milling machine in accordance with the claim 23, characterized in that the control unit is operable to control the travel speed of the truck such that an discharge position of the conveying device above the at least one container moves from a front or rear end position inside the container to an end position that is opposite in longitudinal direction.
  • 27. Milling machine in accordance with claim 23, characterized in that the control unit is operable to control the travel speed of the truck such that the travel speed of the truck is higher than or equal to the advance speed of the milling machine.
  • 28. Milling machine in accordance with claim 23, characterized in that the control unit is operable to control the travel speed of the truck such that the travel speed of the truck maintains a constant positive difference to the advance speed of the milling machine.
  • 29. Milling machine in accordance with claim 23, characterized in that the control unit is operable to alter the travel speed of the truck in a discontinuous fashion.
  • 30. Milling machine in accordance with claim 23, characterized in that the control unit is operable to increase the travel speed of the truck only after a sufficiently high initial fill has been reached at a front or rear end position of the at least one container.
  • 31. Milling machine in accordance with claim 18, characterized in that the at least one container comprises several containers arranged on several trailers connected to one another in an articulated fashion, where adjacent upper end edges of opposite end walls of adjacent containers overlap.
  • 32. Milling machine in accordance with claim 18, characterized in that the at least one container comprises a plurality of containers connected to one another in an articulated fashion and adjacent end walls of adjacent containers are provided with a mutually adapted curvature about an axis orthogonal to the ground surface such that the end walls have a smallest possible mutual distance but enable a lateral turning movement of the containers.
  • 33. Milling machine in accordance with claim 18, characterized in that the at least one container comprises a plurality of containers connected to one another in an articulated fashion and the containers are curved in a convex manner at a front end wall side and are provided with a projecting collar that covers a driver's cabin of the truck and/or a rear upper concavely curved end edge of the end wall of a container travelling ahead.
Priority Claims (1)
Number Date Country Kind
10 2008 008 260.0 Feb 2008 DE national
PCT Information
Filing Document Filing Date Country Kind 371c Date
PCT/EP2009/051383 2/6/2009 WO 00 11/18/2010