Mining or construction vehicle

Information

  • Patent Grant
  • 11585154
  • Patent Number
    11,585,154
  • Date Filed
    Monday, June 11, 2018
    6 years ago
  • Date Issued
    Tuesday, February 21, 2023
    a year ago
Abstract
A mining or construction vehicle comprising a boom extending in a first direction, which boom, via a first and a second rotation device, is connected to a hydraulic device arranged on a mounting device arranged at a free end of said boom, the first rotation device being arranged to provide a rotation around a first axis that is substantially parallel to the first direction, and a second rotation device being arranged to provide a rotation around a second axis that is arranged at an angle with respect to the first axis. Hydraulic conduits for supply of hydraulic fluid to said hydraulic device on said mounting device are arranged through at least one of the first and second rotation devices.
Description
CROSS-REFERENCE TO RELATED APPLICATIONS

This application is a U.S. National Stage application of PCT/EP2018/065309, filed Jun. 11, 2018 and published on Mar. 14, 2019 as WO/2019/048093, which claims the benefit of Swedish Patent Application No. 1751089-2, filed Sep. 8, 2017, all of which are hereby incorporated by reference in their entireties.


TECHNICAL FIELD

The invention relates to a mining or construction vehicle according to a first and second aspect. Specifically, the invention relates to a mining or construction vehicle comprising a boom that according to a first and aspect is connected to a hydraulic device and to a second aspect is connected to a mining or construction device via a first and a second rotation device arranged at a free end of the boom.


BACKGROUND

In mining or construction industry hydraulic devices, such as a rock drilling machines, are often arranged on a movable arm or the like of a mining or construction vehicle. Such hydraulic devices often include several hydraulic components which need to be furnished with hydraulic fluid, and in some cases flushing medium and pressurised air also need to be furnished to the hydraulic device, such that additional conduits need to be provided along the movable arm.


In WO 2006/096110 A1 a rotation device for a boom of a mining or construction work rig is disclosed. The arrangement of WO 2006/096110 A1 comprises a hydraulic device in the form of a drilling machine. Although not shown in the disclosure of WO 2006/096110 A1, the hydraulic device therein is provided with hydraulic fluid via hoses arranged in flexible reel arrangements allowing the different parts of the rig arm arrangement to rotate and pivot with respect to each other.


Such a system is problematic due to the fact that the hoses are exposed to the harsh environment of a mining or construction work rig risking that a hose may rupture. Conventionally, a major part of the downtime of a mining or construction work rig with a hydraulic device arranged on an arm that extends out from the work rig is due to problems with the provision of hydraulic fluid in one way or another. Further, the many hoses may impede the visibility for the operator controlling the mining or construction work rig.


A related problem is the reach of the mining or construction vehicle. Specifically, a mining or construction device arranged via a first and a second rotation device at a free end of the boom may be obstructed from reach, either by the placement of the hydraulic hoses or by limitations inherent in the arrangement of the rotation devices.


Hence, according to a first aspect, there is a need of an arrangement that improves the conduit arrangement on a mining or construction vehicle. According to a second aspect, there is a need of an arrangement that increases the flexibility and/or the reach of the mining or construction device.


SUMMARY OF THE INVENTION

It is an object of the present invention to provide a mining or construction vehicle with an improved conduit arrangement.


According to a first aspect the invention relates to a mining or construction vehicle comprising a boom extending in a first direction, which boom, via a first and a second rotation device, is connected to a hydraulic device arranged on a mounting device arranged in connection to a free end of said boom, the first rotation device being arranged to provide a rotation around a first axis that is substantially parallel to the first direction, and a second rotation device being arranged to provide a rotation around a second axis that is arranged at an angle with respect to the first axis. At least one hydraulic conduit for supply of hydraulic fluid to said hydraulic device on said mounting device is arranged through at least one of the first and second rotation devices.


In a specific embodiment, the hydraulic conduit is arranged in the inside of the boom, wherein the first rotation device is arranged at a free end of the boom, the first rotation device having a through hole and the hydraulic conduits being arranged through said through hole of the first rotation device.


In a specific embodiment, the second rotation device has a through hole, wherein the hydraulic conduit is arranged through said through hole of the second rotation device.


In a specific embodiment, the hydraulic conduit is arranged via a swivel arrangement arranged between the first and the second rotation devices.


In a specific embodiment, the swivel arrangement comprises a first set of swivels arranged in connection to the first rotation device, and a second set of swivels arranged in connection to the second rotation device.


In a specific embodiment, the swivel arrangement comprises a multi-swivel arranged in connection to the first rotation device, and a second multi-swivel arranged in connection to the second rotation device.


In a specific embodiment, the second axis extend at an angle of between 60° and 120° with respect to the first axis. The swivel arrangement may therefore comprise an angled conduit between the set of swivels/multi-swivels, forming an angle of between 60° and 120°. Preferably, said angle is greater than 80°. Further, said angle is preferably smaller than 110°, or even smaller than 100°.


In a specific embodiment, the boom is an extendable boom comprising at least two telescopic sections, the hydraulic conduit being arranged inside said extendable boom.


In a specific embodiment, the hydraulic cylinder is arranged inside the extendable boom. Further, the hydraulic conduits for supply of hydraulic fluid to the hydraulic device may be arranged inside said hydraulic cylinder.


In a specific embodiment, the hydraulic conduit is arranged through the free end of the second telescopic section of the extendable boom. Preferably, the hydraulic conduit extends substantially in parallel with the extendable boom in the longitudinal direction out from the free end of the second telescopic section of the extendable boom. The conduit for supply to the hydraulic device may be telescopically extendable.


In a specific embodiment, the mining or construction vehicle is a drill rig and the hydraulic device is a hydraulic percussive drilling machine.


With the inventive arrangement, no hydraulic hoses will need to be arranged outside of the boom, wherein problems with such arrangements may be avoided.


According to a second aspect the invention relates to a mining or construction vehicle comprising a boom extending in a first direction, which boom, via a first and a second rotation device, is connected to a mining or construction device arranged on a mounting device arranged in connection to a free end of said boom, the first rotation device being arranged to provide a rotation around a first axis that is substantially parallel to the first direction, and a second rotation device being arranged to provide a rotation around a second axis that is arranged at an angle with respect to the first axis. A pivot point is arranged between said first and second rotation devices to provide an angular movement of said second axis of said second rotation device with respect to said first axis of said first rotation device.


With this arrangement the angle arrangement becomes more compact than prior art arrangements, and therefore the reachability of the mining or construction device of the mining or construction vehicle is increased.


In a specific embodiment a pressure cylinder is arranged to provide the angular movement of said second axis of said second rotation device with respect to said first axis of said first rotation device around said pivot point.


Specifically, a first arm may be arranged to extend backwards with respect to the first direction of the boom from a point at an outer end of said boom so as to rotate with said rotation device, said first arm being connected to a first end of the pressure cylinder, the opposite, second end of the pressure cylinder being connected to a second arm arranged at the second rotation device.


In one specific embodiment the second arm extend along the second axis past at least a part of the second rotation device, and wherein the pressure cylinder is arranged inside said angle, such that an extension of the pressure cylinder will act to increase the angle between the first axis and the second axis and a retraction of the pressure cylinder will act to decrease said angle.


In one specific embodiment a first hinge limb pair extends from the first rotation device and is connected at the pivot point to a second hinge limb pair that extends from the second device, the pivot point comprising two spaced apart hinges, connecting the first and second hinge limb pairs and providing a space between said hinges.


In one specific embodiment the second rotation device comprises a swivel arrangement for supply of hydraulic fluid to said hydraulic device on said mounting device through said swivel arrangement of said second rotation devices, and wherein a valve unit for the distribution of hydraulic fluid to and from the hydraulic device is arranged in direct connection to said swivel arrangement.


As is understood by the skilled person, the mining or construction vehicle of the first and second aspects may be combined in any feasible way. Further though, the mining or construction vehicle of the second aspect is well adapted to external hoses as is conventional in the prior art.


Other embodiments and advantages of the invention will be apparent from the, dependent claims, detailed description and the appended drawings.





BRIEF DESCRIPTION OF DRAWINGS

An exemplary embodiment related to the invention will now be described with reference to the appended drawings, in which;



FIG. 1 is a schematic view of a mining or construction vehicle,



FIG. 2 is a schematic view of a boom,



FIG. 3 is an illustrative view of the geometry of the free end of the boom,



FIG. 4 is an illustrative view of a conduit arrangement at the free end of the boom,



FIG. 5 is a view of hydraulic cylinder with an internal conduit arrangement,



FIG. 6 is a longitudinal cut view of the hydraulic cylinder in FIG. 5,



FIG. 7 is a perspective view of the piston part of a hydraulic cylinder,



FIG. 8 is a schematic view of a boom with an alternative angle unit,



FIG. 9 is a sectional view of the alternative angle unit of FIG. 8, and



FIG. 10 is a perspective view of the alternative angle unit of FIG. 8.





DETAILED DESCRIPTION OF EMBODIMENTS

In FIG. 1 a mining or construction vehicle 10 according to an aspect of the invention is shown. The mining or construction vehicle 10 comprises a boom 12 extending in a longitudinal direction D1, i.e. an axial direction, of the boom 12. A pressure cylinder 38 is arranged to provide an angular movement of the boom 12 with respect to mining or construction vehicle 10. In the shown embodiment the boom 12 is an extendable boom with a first and a second telescopic section 13 and 14, respectively. The invention may however also be used in combination with a non-extendable boom.


The first telescopic section 13 of the shown extendable boom is arranged to be connected to the mining or construction vehicle 10. A mounting device 11 is arranged in connection to a free end 18 of the boom 12 to carry a hydraulic device (not shown). In a specific embodiment, the vehicle is a drill rig and the hydraulic device is a hydraulic rock drilling machine, typically comprising a percussive drill hammer. The mounting device 11 of the shown embodiment is arranged in direct connection to the free end 18 of the boom 12, but the fact that it is arranged in connection to the free end 18 of the boom 12 should be construed as it may be arranged at a distance from the boom 12, e.g. connected via a further boom or the like.


The boom 12 may comprise more than two telescopic sections, wherein additional sections may be telescopically arranged between the first and second telescopic sections 13 and 14. In the shown embodiment, the mounting device 11 arranged to carry the hydraulic device is arranged on a pivot arm at the free end 18 of the boom 12. The mounting device 11 may e.g. be comprised of a mounting plate, a bracket, a holder or a set of mounting holes for attachment of a hydraulic device.


The boom 12 is shown in a longitudinal section in FIG. 2. A hydraulic cylinder 19 is arranged in connection to the boom 12 to govern the extension of said boom 12. In the shown embodiment, the hydraulic cylinder 19 is arranged inside the boom 12. The boom 12 is connected to the hydraulic device arranged on the mounting device 11 via a first and a second rotation device 15 and 16, respectively.


As is illustrated in FIG. 3, the first rotation device 15 is arranged at a free end 18 of the boom 12 to provide a rotation R1 around a first axis A1 that is substantially parallel to the longitudinal direction D1. In the shown embodiment, the first axis A1 coincides with and is parallel to the longitudinal direction D1 of the boom 12. The second rotation device 16 is arranged to provide a rotation R2 around a second axis A2 that is arranged at an angle with respect to the first axis A1. The rotation devices are interconnected by an angle unit 32, which comprises an intermediate part 37 with a first attachment device for attachment to a rotating part of the first rotation device 15, and a second attachment device for attachment to the second rotation device 16. The first and second attachment devices of the intermediate part 37 are arranged at an angle with respect to each other, said angle corresponding to the angle between the first rotation axis A1 and the second rotation axis A2. This angle is preferably about 90° and preferably larger than 60° or more preferably larger than 80°, and preferably smaller than 120°, more preferably smaller than 110°.


The hydraulic device arranged on the mounting device 11 needs pressurised hydraulic fluid to function. The pressurised hydraulic fluid is provided from a pressure source 30 on the mining or construction vehicle 10. In the shown embodiment, the hydraulic conduits 17 for supply of hydraulic fluid to the hydraulic device are arranged through the boom 12. Specifically, the hydraulic conduits 17 are arranged inside the hydraulic cylinder 19. Further, additional conduits, such as conduits for providing flushing medium and pressurised air to the hydraulic device are provided. In a preferred embodiment such additional conduits are also arranged inside the boom 12.


In a not shown embodiment the hydraulic cylinder 19 may be arranged outside of the boom 12. The hydraulic conduits 17 may however still be arranged inside the boom 12. Further, both the hydraulic cylinder 19 and the hydraulic conduits 17 may be arranged inside the boom 12, side by side, i.e. with the hydraulic conduits inside the boom 12 but outside the hydraulic cylinder 19.


In the embodiment shown in FIG. 4, the hydraulic conduits 17, which are arranged for supply of hydraulic fluid to the hydraulic device arranged on the mounting device 11, extend through both the first and second rotation devices 15 and 16.


In another not shown embodiments the hydraulic conduits 17 are arranged through only one of the rotation devices, either the first or second rotation device 15 or 16. In such a case, the hydraulic conduits 17 are arranged past the other rotation device on the outside of it.


In the shown embodiment, the hydraulic conduits 17 are arranged through the free end 18 of the boom 12, i.e. through the free end of the second telescopic section 14. The hydraulic conduits 17 extend substantially in parallel with the boom 12 in the longitudinal direction D1 out from the free end 18 of the boom 12. Specifically, the hydraulic conduits 17 are arranged to extend through an end part of the hydraulic cylinder 19 and further out through the free end 18 of the boom 12. In the shown embodiment, the conduits 17 for supply to the hydraulic device are telescopically extendable, which will be more closely described below.


The first rotation device 15 is arranged at a free end 18 of the boom 12, wherein the first rotation device 15 has a through hole and wherein the hydraulic conduits 17 are arranged through said through hole of the first rotation device 15. Further, in the shown embodiment, the second rotation device 16 also comprises a through hole, wherein the hydraulic conduits 17 are arranged through said through hole of the second rotation device 16. In a specific embodiment the rotation devices are hydraulically driven worm gear motors with an external drive allowing the hydraulic conduits 17 to pass through the centre of the first or second rotation device, or both. A skilled person will know that are other ways of providing a motor with a central through hole allowing conduits to pass centrally, an example being a hydraulic motor with a centrally located swivel arrangement. The rotation devices may also be hydraulic radial piston engines. Further, electric rotation devices may be used to provide the rotation.


In order to allow the conduits to rotate with the rotation of the rotation devices a swivel arrangement 20 is arranged. In the shown embodiment, each conduit is swiveled twice, on both sides of an angle of about 90°. A first set of swivels 23 are arranged to allow the conduits extending through the first rotation device to rotate around an axis that is substantially parallel to the first axis or rotation A1 of the first rotation device 15. A second set of swivels 24 are arranged to allow the conduits 17 to rotate around an axis that is substantially parallel to the second axis of rotation A2 of the second rotation device 16. Each swivel may e.g. be a rotatable hose coupling. Instead of sets of individual swivels the swivel arrangement may comprise one or two multi-swivels providing a swivel connection for a plurality of hydraulic conduits.


Further, as illustrated in the alternative embodiment of FIGS. 9 and 10, such multi-swivels 23 and 24 may be a part of a rotation device 15 or 16, and provided centrally inside said rotation device 15 and 16, respectively. In such a multi-swivel the conduits may be connected axially to the multi-swivel of the first rotation device 15 from the inside of the boom 12. The swiveled conduits may extend either axially or radially out from the free end of the boom. A similar arrangement may be arranged at the second rotation device 16, with conduits arriving either radially or axially with respect to the second axis of rotation A2 from the first rotation device. The swiveled fluid conduits preferably extend axially out from the second rotation device 16 towards the hydraulic device arranged on the mounting device 11. If the conduits are arranged radially from the first rotation device 15, they will extend axially out from the second rotation device 16, whereas they may extend either radially or axially to the hydraulic device if the conduits enter axially from the first rotation device 15.


Between the sets of swivels 23 and 24 or multi-swivels, hydraulic connectors 27, e.g. individual connectors, are provided, which hydraulic connectors in conjunction with the set of swivels 23 and 24 form an angle that correspond to the angle between the first and second axis of rotation A1 and A2, respectively. In the shown embodiment, this angle is about 90°. The angle is preferably larger than 60° or more preferably larger than 80°, and smaller than 120°, more preferably smaller than 110° or even 100°. In one specific embodiment only one set of swivels, or one multi-swivel is arranged for any which one of the rotation devices, wherein the conduits are arranged to flex along with the rotation of the other rotation device.


A valve unit 25 is arranged at the mounting device 11, or in connection to the second rotation device 16. The valve unit 25 is arranged to provide the different functions of the hydraulic device with a hydraulic pressure. The valve unit 25 allows the number of conduits that need to be arranged to the hydraulic device to be minimised. At least one of the hydraulic conduits 17 is a pressure line from a pressure source arranged on the mining or construction vehicle. In addition to the at least one pressure line a return line leading to tank needs to be arranged. In a specific not shown embodiment, these are the only two hydraulic conduits that are arranged along, and preferably inside, the boom 12.


A diverter valve 26, separate from the valve unit 25, may be arranged to provide the rotation motors 15 and 16 with pressurised hydraulic fluid.


In a specific embodiment, the hydraulic device is a rock drilling machine. A rock drilling machine normally needs three hydraulic pressurised inputs, a first input for the percussion of the drill string, a second input for the rotation of the drill string and a third input for the forward feed of the drilling machine in the drilling direction. In one embodiment, these three inputs may be provided from one combined hydraulic supply conduit. However, in many applications it may be advantageous to provide these different functions with separate supply lines, because the pressure and flow may vary greatly between different functions such that they may influence each other.



FIG. 5 shows a partly cut view of an exemplary embodiment of hydraulic conduits 17A-D arranged inside a hydraulic cylinder 19 that is arranged to govern the extension of the boom 12. In this embodiment, the hydraulic conduits 17 are comprised of four different conduits, a first conduit 17A to a percussive unit of the drilling machine, a second conduit 17B to a rotation motor of the drilling machine, a third conduit 17C to a feed device for feeding the drilling machine back and forth, and a fourth conduit 17D for a return flow to tank.


These are exemplary uses for the different conduits and it is obvious to a person skilled in the art that more conduits may be arranged, or less, and that other applications in need of a hydraulic supply may be used. Also shown in FIG. 5 are the hydraulic connections 34 and 35 providing the hydraulic cylinder 19 with hydraulic fluid, and a conduit 33 to the rod side of the hydraulic cylinder 19.



FIG. 6 is a cut view along the longitudinal direction D1 of the hydraulic cylinder 19. From this view it is apparent that that each hydraulic conduit 17A-D is telescopic, comprising two tubular sections each, whereof a smaller tubular section is arranged to slide within a relatively larger tubular section. The individual hydraulic conduits may also comprise three or more telescopic sections. Specifically, the embodiment with three telescopic sections may be made neutral with respect to pressure and volume, such that a conduit may expand lengthwise without affecting its interior volume or the pressure inside it. As is apparent from FIG. 6 the hydraulic conduits 17 extend through the piston end part 36, substantially parallel with the longitudinal direction D1 of the boom 12.


In FIG. 7 it is shown how the hydraulic conduits 17 extend through the piston end part 36 from where they will continue through the free end of the boom 12.


A sensor 21 is arranged to monitor the extension of the boom 12 in the longitudinal direction D1. The sensor 21 may be arranged on anyone of the moving parts, i.e. on the boom 12 or on the hydraulic cylinder 19. A control unit 22 is arranged to control operation of the hydraulic device and to monitor other operations of the mining or construction vehicle 10, see FIG. 1. The control unit 22 is inter alia arranged to monitor commands issued by an operator, such as commands relating to the extension of the boom 12 in the longitudinal direction D1. The control unit 22 may physically be arranged anywhere, e.g. on the mining or construction vehicle 10, on the boom 12, or at a distant location in communication with a communication unit at the mining or construction vehicle 10.


The control unit 22 is also arranged to compare the commanded extension of the boom 12 with the actual extension as monitored by the sensor 21. Such a comparison may be made as a method of detecting a leak in anyone of the hydraulic conduits arranged inside the hydraulic cylinder 19. If the actual extension as monitored by the sensor 21 is greater than the commanded extension of the boom 12 this may be due to a leak in one of the pressurised hydraulic conduits 17A-C. Namely, the leaking pressurised hydraulic fluid from the pressurised hydraulic conduits 17A-C will leak into the hydraulic cylinder, mixing with the hydraulic fluid of the hydraulic cylinder and causing the piston of the hydraulic cylinder to extend so as to extend the boom 12. Alternatively, if a low-pressure conduit, such as the return conduit 17D, is broken fluid may leak from the hydraulic cylinder and into said return conduit 17D such that an undesired retraction of the boom may be noted.


If such undesired extension or retraction is noted, i.e. if the monitored extension does not correspond to the commanded extension, an alert signal may be issued, or under certain conditions the system may be shut down and/or the operation interrupted. The operation may be resumed only after the problem has been identified and attended to. The distinction between issuing a warning signal and system shut down may be decided by the magnitude of the discrepancy, such that when a discrepancy exceeding a first threshold is noted a warning signal is issued, and when a discrepancy exceeding a second threshold, which is greater than the first threshold, is noted the system is shut down and/or the operation interrupted. In a specific embodiment, the control unit 22 may be arranged to govern a compensation of the discrepancy, e.g. by providing excess hydraulic fluid to a hydraulic cylinder from which hydraulic fluid is lost into a low-pressure conduit, or to allow hydraulic fluid to escape from a hydraulic cylinder into which hydraulic fluid leak from a high-pressure conduit. Such compensation is hence governed by means of the control unit to make sure that a small leak is compensated for. If it becomes apparent that such compensation is not successful or does not meet a desired level of accuracy, e.g. if a discrepancy exceeding a specific threshold is noted, the operation may be aborted.


The arrangement of detecting leaks inside a hydraulic cylinder may be used irrespective of where the hydraulic cylinder is arranged. It is however specifically useful in applications where a hydraulic device is arranged on a boom such that hydraulic conduits will need to be arranged along or inside the boom.


The control unit 22 may also be arranged to control the operation of the hydraulic device in dependence of the extension of the boom 12. Typically, a hydraulic device includes a hydraulic motor that works in a specific frequency. In the example where the hydraulic device is a drilling machine it comprises a percussion hammer producing strong hydraulic pulses by means of which a drill string is intermittently pushed further into the material being drilled to form a bore hole into/through the same. These pulses are produced with a specific frequency, which is adaptable as one of several drilling parameters in order to optimize a drilling operation. Conventionally, the frequency may e.g. be adapted as a function of the properties of the material in which the drilling is performed.


A problem that needs to be considered with extendable hydraulic conduits 17 is the vibration of the hydraulic device, which may cause resonance problems in the hydraulic conduits. Resonance may lead to detrimental vibrations causing instability, fatigue and, as a worst case, total break-down of the system. Each conduit may be regarded as a trombone pipe with a specific resonance frequency, which is a direct function of the length of said hydraulic conduit. If this resonance frequency coincides with a frequency of a vibrating or oscillating hydraulic device, such as a rotating drilling machine or a percussion hammer, the conduit may start to self-oscillate, thereby risking serious negative consequences. Especially, the frequency of a percussive hammer of a hydraulic percussion rock drill needs to be considered. The percussions of the percussive creates pulsations that may propagate backwards through the hydraulic medium in the first conduit 17A to a percussive unit of the drilling machine. During a continuous drilling operation, these pulsations will have a frequency corresponding to the frequency of the percussive hammer.


Therefore, the control unit 22 may be arranged to operate a hydraulic device such as a percussive drilling machine so as to avoid operating frequencies that has been identified to be prone to produce resonances and/or self-oscillation. Hence, drilling frequencies that may be prone to produce resonances are identified for specific extensions of the boom 12. Subsequently, during a drilling operation, the control unit 22 is arranged to compare a current extension of the boom 12 with a current drilling frequency of the drilling machine. If it is noted that a commanded drilling frequency may be prone to produce a resonance at the current extension of the boom 12, the control unit will issue a warning or a command to avoid said commanded drilling frequency. The drilling machine may then be set to operate at a different drilling frequency that has not been identified as prone to produce a resonance at the current extension of the boom 12, or the extension of the boom 12 may be altered.


However, often during a drilling operation, it is desired not to move the mining or construction vehicle 10 or to adjust its position or settings, e.g. by changing the extension of the boom 12. However, in most operation the frequency range that will be used for a specific operation will be known before start of the operation. Therefore, the set-up of the drilling or construction vehicle preferably set up so as to avoid an extension of the boom corresponding to a length of a hydraulic conduit that may risk to interfere with the drilling frequency range to be used. Namely, often it is possible to locate a hydraulic device arranged in connection to an extendable boom, and specifically, a drilling end of a drilling machine at one specific location by adapting other parameters than the extension of the extendable boom, such as e.g. the position of the drilling or construction vehicle, the angles of the extendable boom with respect to both the vehicle and/or the feed beam.


Therefore, in order to avoid resonance in a hydraulic conduit during an ongoing drilling operation, it is possible to adjust the drilling frequency, but for most applications it desirable to adapt the position of the vehicle, e.g. drill rig, beforehand so as to make sure that the desired drilling frequencies may be used without causing problems.


In a specific embodiment, an attenuator may be arranged to attenuate the vibration of the hydraulic conduits. The fact that the hydraulic conduits 17 are arranged inside the hydraulic cylinder 19, embedded in a hydraulic fluid, will dampen their possibilities to oscillate and hence also restrict the self-oscillation of the hydraulic conduits 17. This is particularly useful for the conduit 17A to the percussive unit of the drilling machine, and in one embodiment only the conduit 17A to the percussive unit of the drilling machine is embedded inside the hydraulic cylinder 19. Nevertheless, it may still be of importance to dampen the possibility of self-oscillation of the hydraulic conduits 17 by avoiding specific drilling frequencies in combination with specific extensions of the boom 12.


A hydraulic feed system 31 comprising a supply tank and a pump may be arranged in connection to the hydraulic cylinder 19 to compensate a fluid volume in at least one of the hydraulic conduits 17 for supply to a drilling machine. When the boom 12 is extended, the volume inside the hydraulic conduits 17 is increased. The control unit 22 may be part of the hydraulic feed system and is arranged to control a compensation by supplying a hydraulic flow to the hydraulic conduit corresponding to the increased volume of said hydraulic conduit. Correspondingly, when the boom 12 is compacted, the control unit 22 may be configured to control a compensation by allowing a hydraulic flow corresponding to the decreased volume of said hydraulic conduit to escape from the hydraulic conduit. In order to avoid cavitation and a negative pressure in the hydraulic conduits a consumer may be connected to the return line to make sure that too much hydraulic fluid is not drawn from the conduits.


In FIGS. 8-10 an alternative angle unit 32 is shown. This angle unit 32 is arranged on a boom 12 extending in a first direction D1. The boom 12 is connected to a mining or construction device arranged on a mounting device 11, via a first and a second rotation device 15, and 16, arranged in connection to the free end of said boom 12. The mining or construction device is preferably a device for producing holes in a rock or the like, e.g. a rock drilling device. In a specific embodiment it is a hydraulic rock drilling machine.


Preferably the mining or construction device is a drill rig including a rock drilling machine arranged on a mounting device 11.


Preferably the boom 12 is extendable, comprising a first telescopic section 13 and second telescopic section 14.


The first rotation device 15 is arranged to provide a rotation around a first axis A1 that is substantially parallel to the first direction D1, and the second rotation device 16 is arranged to provide a rotation around a second axis A2 that is arranged at an angle with respect to the first axis A1. In an alternative embodiment, the first rotation device 15 is arranged inside the boom, specifically an extendable boom. In such an arrangement the second telescopic section 14 is cylindrical and arranged with splines inside the first telescopic section 13. The first rotation device may be arranged inside the first telescopic section 13 to be translated along with the inner end of the second telescopic section 14. Such an arrangement is described in detail in EP 0 434 652 and may be implemented on the inventive mining or construction vehicle.


The angle unit of this embodiment is different with respect to the embodiment shown in FIGS. 1-4. Namely, in contrast to the embodiment shown in FIGS. 1-4 a pivot point 40 is arranged between said first and second rotation devices 15 and 16 to provide an angular movement of said second axis A2 of said second rotation device 16 with respect to said first axis A1 of said first rotation device 15. Conventionally, such a pivot point 40, if at all present, is arranged outside of both the rotation devices 15 and 16. The angular movement may be used to alter the tilt angle of a feed beam, not show, including a drilling machine arranged on the mounting device 11 into suitable drilling angles. Except from this difference the arrangements of the different embodiments of the angle unit 32 may be combined in any possible way.


As noted above, the angle unit 32 of the embodiment shown in FIGS. 8-10 comprises a pivot point 40 arranged between said first and second rotation devices 15, 16 and a pressure cylinder 39 arranged to provide the angular movement of the second axis A2 of the second rotation device 16 with respect to the first axis A1 of said first rotation device 15 around said pivot point 40. In the shown embodiment, the first rotation device 15 is arranged at the outer end of second telescopic section 14 of an extendable boom 12. Thereby, space is limited for the arrangement of the angle unit 32.


In view of the limited space between the first and second rotation devices 15, 16 a first arm 41 extends backwards with respect to the direction D1 of the boom 12, so as to prolong the working length of the pressure cylinder 39 and make it possible to have a shorter angle unit 32 between the rotational units 15, 16. Specifically, the first arm 41 is arranged to extend backwards with respect to the first direction D1 of the boom 12 from a point at an outer end of said boom 12 so as to rotate with said rotation device 15, said first arm 41 being connected at a first end of the pressure cylinder 39. The opposite, second end of the pressure cylinder 39 is connected to a second arm 42 arranged at the second rotation device 16. The arms 41 and 42 may be a narrow arm structure as shown in FIGS. 8-10 or a structure partly or fully enclosing the rotational devices 15, 16.


The angle unit 32 shown in FIG. 8-10 comprises a first part 32a connected to the first rotation device 15 and a second part 32b connected to the second rotation device 16 wherein the first and second parts of the angle unit 32 are connected to each other in the pivot point 40. The first arm 41, which extends backwards with respect to the direction D1 of the boom 12 and rotates with the rotation device 15, extends past the connection between the first part and the first rotation device 15. The second arm 42 is connected to the second part and extends along the second axis A2 past the connection between the second part and the second rotation device 16. The arms 41 and 42 may be made integral, welded or bolted to the first and second parts of the angular unit 32. An alternative design, not shown, would be to make the first and/or second parts of the angle unit 32 longer to include the connection points for the pressure cylinder 39. However this will increase the length along the axis A1 and/or A2 and size of the angle unit in a non-desired way. The angle unit 32 is preferably bolted to the first and second rotational device 15, 16 for easy connection and disconnection.


In the shown embodiment second arm 42 extends past at least a part of the second rotation device 16 along the second axis A2. The main object of the second arm 42 in this embodiment is not to increase the pivot length with respect to the pivot point 40, but to allow a compact and reliable arrangement. Therefore, the second arm 42 extend along the second axis A2 past at least a part of the second rotation device 16, thereby allowing the pressure cylinder 39 to be arranged inside the angle between the first and second axis A1 and A2. Thereby, an extension of the pressure cylinder 39 will act to increase the angle between the first axis A1 and the second axis A2 and a retraction of the pressure cylinder 39 will act to decrease said angle.


In an alternative, not shown embodiment, one or two pressure cylinders may be arranged at the outer end of the angle arrangement, i.e. on the outside of the angle, such that a extension of the pressure cylinder 39 will act to decrease the angle between the first axis A1 and the second axis A2 whereas a retraction of the pressure cylinder 39 will act to increase said angle. In this alternative the second arm 42 will extend in the opposite way, along the second axis A2, away from the second rotation device 16. In this way, the outer end of the second arm will become visible below the boom 12.


In the shown embodiment the first part 32a of the angle unit comprises a first hinge limb pair 43 that extends from the first rotation device 15 and is connected at the pivot point 40 to a second hinge limb pair 44 of the second part 32b of the angle unit. As is visible in FIG. 10, the hydraulic connectors 27 are arranged to pass between the first hinge limb pair 43, inside the pivot point 40 and between the second hinge limb pair 44. Hence, in this embodiment, the pivot point is comprised of two spaced apart hinges, connecting the first and second hinge limb pairs 43 and 44 to each other and providing a space in between allowing e.g. the hydraulic conduits 27 to pass inside said spaced apart hinges.


In the embodiment shown in FIGS. 9 and 10 the first rotation device 15 comprises a first swivel arrangement 23 and the second rotation device 16 comprises a second swivel arrangement 24 for supply of hydraulic fluid to the hydraulic device on the mounting device 11. Hydraulic connectors 27, typically in the form of flexible conduits, are arranged to connect the first swivel arrangement 23 to the second swivel arrangement 24.


Also, in the shown embodiment, a valve unit 25 for the distribution of hydraulic fluid to and from the hydraulic device is arranged in direct connection to the second swivel arrangement 24. They may even be arranged as one integral unit. The close connection between the valve unit 25 and the second swivel arrangement 24 is advantageous as it saves place and it is made possible in that the pivot point is arranged between the first and second rotation devices 15 and 16. Namely, with such an arrangement, the hydraulic conduits downstream of the second rotation device 16 need only be compensated for the translational movement of the hydraulic device along the feed beam 11, which is predictable and easily compensated for. The hydraulic connectors 27 arranged between the swivels 23 and 24 are configured to cope with the angular movement of the angle unit 32. In a similar way, the hydraulic conduits 17 through the piston end part 36 may be directly connected to the first swivel arrangement 23.


In the shown embodiment the hydraulic fluid to and from the hydraulic device is arranged through the first and second swivels 23 and 24 arranged in connection to the first and second rotation devices 15 and 16, respectively. The swivels 23 and 24 may be fully or partly located in opening through the rotation devices 15 and 16. In an alternative, not shown embodiment, the hydraulic conduits may be arranged in a more conventional manner outside of the boom 12 and/or the angle unit 32. The use of a pivot point arranged between the first and second rotation devices 15 and 16 is hence not dependent of that the hydraulic conduits are internally drawn. For an arrangement where the hydraulic conduits are drawn around the angle unit 32 other types of motors, which do not include a hole through their centres, may be utilised.


Above, the invention has been described with reference to specific embodiments. The invention is however not limited to these embodiments. It is obvious to a person skilled in the art that other embodiments are possible within the scope of the following claims. The terms “comprising” and “comprised of” is used in this application in a non-exclusive meaning, such that all comprised parts may be completed with additional parts.

Claims
  • 1. A boom extending in a first direction, via a first and a second rotation device, the boom is configured to connect to a hydraulic device arranged on a mounting device arranged in connection to a free end of said boom, the first rotation device being arranged to provide a rotation around a first axis that is substantially parallel to the first direction, and the second rotation device being arranged to provide a rotation around a second axis that is arranged at an angle with respect to the first axis, wherein that at least one hydraulic conduit for supply of hydraulic fluid to said hydraulic device on said mounting device is arranged through the first and second rotation devices, wherein the at least one hydraulic conduit is arranged inside the boom, and wherein the first rotation device is arranged at the free end of the boom, the first rotation device having a through hole and the at least one hydraulic conduit being arranged through said through hole of the first rotation device.
  • 2. The boom according to claim 1, wherein the second rotation device has a through hole and wherein the at least one hydraulic conduit is arranged through said through hole of the second rotation device.
  • 3. The boom according to claim 2, wherein the at least one hydraulic conduit is coupled to a swivel arrangement arranged between the first and the second rotation devices.
  • 4. The boom according to claim 3, wherein the swivel arrangement comprises a first set of swivels arranged in connection to the first rotation device, and a second set of swivels arranged in connection to the second rotation device.
  • 5. The boom according to claim 3, wherein the swivel arrangement comprises a multi-swivel arranged in connection to the first rotation device, and a second multi-swivel arranged in connection to the second rotation device.
  • 6. The boom according to claim 3, wherein the second axis extends at an angle of between 60° and 120° with respect to the first axis.
  • 7. The boom according to claim 1, wherein the boom is an extendable boom comprising at least two telescopic sections.
  • 8. The boom according to claim 7, further comprising a hydraulic cylinder arranged inside the extendable boom.
  • 9. The boom according to claim 8, wherein the at least one hydraulic conduit for supply of hydraulic fluid to the hydraulic device is arranged inside said hydraulic cylinder.
  • 10. The boom according to claim 7, wherein the at least one hydraulic conduit is arranged through a free end of a second telescopic section of the extendable boom.
  • 11. The boom according to claim 10, wherein the at least one hydraulic conduit extends substantially in parallel with the extendable boom in a longitudinal direction out from the free end of the second telescopic section of the extendable boom.
  • 12. The boom according to claim 7, wherein the at least one hydraulic conduit for supply of hydraulic fluid to the hydraulic device supply of hydraulic fluid to the hydraulic device is telescopically extendable.
  • 13. The boom according to claim 1, wherein the hydraulic device is a hydraulic percussive drilling machine.
  • 14. The according to claim 1, wherein a pivot point is arranged between said first and second rotation devices to provide an angular movement of said second axis of said second rotation device with respect to said first axis of said first rotation device.
  • 15. A boom extending in a first direction, via a first and a second rotation device, the boom is configured to connect to a mining or construction device arranged on a mounting device arranged in connection to a free end of said boom, the first rotation device being arranged to provide a rotation around a first axis that is substantially parallel to the first direction, and the second rotation device being arranged to provide a rotation around a second axis that is arranged at an angle with respect to the first axis, wherein an angle unit with a pivot point is arranged between said first and second rotation devices to enable an angular movement of said second axis of said second rotation device with respect to said first axis of said first rotation device; wherein the angle unit comprises a first part and a second part, the first and second parts of the angle unit being connected to each other in the pivot point;wherein the first rotation device is connected to the first part of the angle unit and to the free end of said boom, the second rotation device is connected to the second part of the angle unit and to the mounting device;wherein the first and second parts of the angle unit enclose at least partly the first and second rotation devices respectively;wherein a pressure cylinder is arranged to provide the angular movement of said second axis of said second rotation device with respect to said first axis of said first rotation device around said pivot point; andwherein a first end of the pressure cylinder is connected to the first part of the angle unit and an opposite second end of the pressure cylinder is connected to the second part of the angle unit.
  • 16. The boom according to claim 15, wherein a first arm comprised in the first part of the angle unit is arranged to extend backwards with respect to the first direction of the boom from a point at an outer end of said boom so as to rotate with said first rotation device, said first arm being connected to the first end of the pressure cylinder, the opposite, second end of the pressure cylinder being connected to a second arm comprised in the second part of the angle unit and arranged to connect to the second rotation device.
  • 17. The boom according to claim 16, wherein the second arm extends along the second axis towards or past at least a part the second rotation device, and wherein the pressure cylinder is arranged inside said angle, such that an extension of the pressure cylinder will act to increase the angle between the first axis and the second axis and a retraction of the pressure cylinder will act to decrease said angle.
  • 18. The boom according to claim 15, wherein the second rotation device comprises a swivel arrangement configured to supply hydraulic fluid to said mining or construction device on said mounting device through said swivel arrangement of said second rotation device, and wherein a valve unit for the distribution of hydraulic fluid to and from the hydraulic device is arranged in direct connection to said swivel arrangement.
  • 19. The according to claim 15, wherein a first hinge limb pair extends from the first rotation device and is connected at the pivot point to a second hinge limb pair that extends from the second rotation device, the pivot point comprising two spaced apart hinges, connecting the first and second hinge limb pairs and providing a space between said hinges.
Priority Claims (1)
Number Date Country Kind
1751089-2 Sep 2017 SE national
PCT Information
Filing Document Filing Date Country Kind
PCT/EP2018/065309 6/11/2018 WO
Publishing Document Publishing Date Country Kind
WO2019/048093 3/14/2019 WO A
US Referenced Citations (38)
Number Name Date Kind
1851940 Williams Mar 1932 A
2813692 Bremer et al. Nov 1957 A
3020012 Moracco et al. Feb 1962 A
3187916 O'Leary Jun 1965 A
3207044 Hall Sep 1965 A
3315821 Grove Apr 1967 A
3460691 Erhard Aug 1969 A
3623501 Reimbold Nov 1971 A
3664527 Short May 1972 A
3696712 Sung Oct 1972 A
3782484 Martin Jan 1974 A
3800664 Phillips Apr 1974 A
3874518 Swoboda, Jr. et al. Apr 1975 A
3920084 Russell, Jr. Nov 1975 A
3980142 Grigoriev et al. Sep 1976 A
4023836 Applehans May 1977 A
4199299 Petitto, Sr. et al. Apr 1980 A
4214780 Grace Jul 1980 A
4290491 Mayer Sep 1981 A
4382619 Grisebach May 1983 A
4410049 Molin Oct 1983 A
4459898 Harjar et al. Jul 1984 A
4534584 Weirich et al. Aug 1985 A
4536017 Weirich et al. Aug 1985 A
4544185 Weirich et al. Oct 1985 A
5458375 Anspach, Jr. et al. Oct 1995 A
5558118 Mooring Sep 1996 A
5896935 Esko et al. Apr 1999 A
6364142 Kaspar Apr 2002 B1
6435235 Hicks Aug 2002 B1
7644782 Coogan et al. Jan 2010 B1
8267194 Saf Sep 2012 B2
20020056573 Akerlund May 2002 A1
20050258295 Wireman Nov 2005 A1
20080093525 Sat Apr 2008 A1
20100300567 Svensson Dec 2010 A1
20140367529 Choi et al. Dec 2014 A1
20150016934 Cooper Jan 2015 A1
Foreign Referenced Citations (54)
Number Date Country
2019201281 Nov 2019 AU
201071851 Jun 2008 CN
104695871 Jun 2015 CN
205370442 Jul 2016 CN
207526423 Jun 2018 CN
4222007 Jan 1994 DE
4318872 Dec 1994 DE
102011115634 Sep 2012 DE
0066755 Dec 1982 EP
0140873 May 1985 EP
0434652 Jun 1991 EP
0835971 Apr 1998 EP
1707529 Oct 2006 EP
2154412 Feb 2010 EP
1448471 Jan 2011 EP
3564476 Nov 2019 EP
3679224 Jul 2020 EP
84642 Sep 1991 FI
1408620 Aug 1965 FR
2328836 May 1977 FR
908133 Oct 1962 GB
1234981 Jun 1971 GB
1262666 Feb 1972 GB
1469661 Apr 1977 GB
2000333 Jan 1979 GB
2028693 Mar 1980 GB
2074686 Nov 1981 GB
H0310206 Mar 1991 JP
H082876 Jan 1996 JP
H1052390 Feb 1998 JP
2004156299 Jun 2004 JP
2005201323 Jul 2005 JP
2006256828 Sep 2006 JP
20000030293 Jun 2000 KR
20090059361 Jun 2009 KR
102094601 Mar 2020 KR
2491403 Aug 2013 RU
303115 Aug 1968 SE
390528 Dec 1976 SE
500903 Sep 1994 SE
528389 Oct 2006 SE
535073 Apr 2012 SE
535386 Jul 2012 SE
536794 Aug 2014 SE
9010588 Sep 1990 WO
02097316 Dec 2002 WO
2006056849 Jun 2006 WO
2006096110 Sep 2006 WO
2009124957 Oct 2009 WO
2009138556 Nov 2009 WO
2010110759 Sep 2010 WO
2010122212 Oct 2010 WO
2014011100 Jan 2014 WO
2019048094 Mar 2019 WO
Non-Patent Literature Citations (7)
Entry
Extended European Search Report in corresponding European Application No. 20197347.6 dated Feb. 17, 2021 (9 pages).
International Search Report and Written Opinion in corresponding International Application No. PCT/EP2018/065309 dated Nov. 15, 2018 (17 pages).
Australian Examination Report No. 1 for corresponding Australian Application No. 2020250307 dated Nov. 30, 2021 (3 pages).
European Examination Report in corresponding European Application No. 20197347.6 dated Feb. 22, 2022 (7 pages).
Russian Search Report in corresponding Russian Application No. 2020113008 dated Oct. 6, 2021 (2 pages).
Examination Report dated Jun. 15, 2022 for Australian Patent Application No. 2020250307, 4 pages.
Office Action dated Jun. 20, 2022 for European Patent Application No. 20197347.6, 5 pages.
Related Publications (1)
Number Date Country
20210025237 A1 Jan 2021 US