Model-based planning with multi-capacity resources

Information

  • Patent Grant
  • 9250967
  • Patent Number
    9,250,967
  • Date Filed
    Tuesday, May 29, 2007
    19 years ago
  • Date Issued
    Tuesday, February 2, 2016
    10 years ago
Abstract
Systems and methods are described that facilitate performing model-based planning techniques for allocations of multi-capacity resources in a machine. The machine may be, for instance, a printing platform, such as a xerographic machine. According to various features, the multi-capacity resource may be a sheet buffer, and temporal constraints may be utilized to determine whether an insertion point for a new allocation of the sheet buffer is feasible. Multiple insertion points may be evaluated (e.g., serially or in parallel) to facilitate determining an optimal solution for a print job or the like.
Description
CROSS REFERENCE TO RELATED PATENTS AND APPLICATIONS

The following patents/applications, the disclosures of each being totally incorporated herein by reference are mentioned:


U.S. Pat. No. 6,973,286, issued Dec. 6, 2005, entitled “HIGH RATE PRINT MERGING AND FINISHING SYSTEM FOR PARALLEL PRINTING,” by Barry P. Mandel, et al.;


U.S. application Ser. No. 10/924,458, filed Aug. 23, 2004, entitled “PRINT SEQUENCE SCHEDULING FOR RELIABILITY,” by Robert M. Lofthus, et al.;


U.S. Pat. No. 6,959,165, issued Oct. 25, 2005, entitled “HIGH RATE PRINT MERGING AND FINISHING SYSTEM FOR PARALLEL PRINTING,” by Barry P. Mandel, et al.;


U.S. Publication No. US-2006-0132815-A1, Published Jun. 22, 2006, entitled “PRINTING SYSTEMS,” by Robert M. Lofthus, et al.;


U.S. Publication No. US-2006-0227350-A1, Published Oct. 12, 2006, entitled “SYNCHRONIZATION IN A DISTRIBUTED SYSTEM,” by Lara S. Crawford, et al.;


U.S. Publication No. US-2006-0230403-A1, Published Oct. 12, 2006, entitled “COORDINATION IN A DISTRIBUTED SYSTEM,” by Lara S. Crawford, et al.;


U.S. Publication No. US-2006-0230201-A1, Published Oct. 12, 2006, entitled “COMMUNICATION IN A DISTRIBUTED SYSTEM,” by Markus P. J. Fromherz, et al.;


U.S. Publication No. US-2006-0235547-A1, published Oct. 19, 2006, entitled “ON-THE-FLY STATE SYNCHRONIZATION IN A DISTRIBUTED SYSTEM,” by Haitham A. Hindi;


U.S. application Ser. No. 11/122,420, filed May 5, 2005, entitled “PRINTING SYSTEM AND SCHEDULING METHOD,” by Austin L. Richards;


U.S. application Ser. No. 11/136,959, filed May 25, 2005, entitled “PRINTING SYSTEMS,” by Kristine A. German, et al.;


U.S. application Ser. No. 11/137,634, filed May 25, 2005, entitled “PRINTING SYSTEM,” by Robert M. Lofthus, et al.;


U.S. application Ser. No. 11/137,251, filed May 25, 2005, entitled “SCHEDULING SYSTEM,” by Robert M. Lofthus, et al.;


U.S. application Ser. No. 11/152,275, filed Jun. 14, 2005, entitled “WARM-UP OF MULTIPLE INTEGRATED MARKING ENGINES,” by Bryan J. Roof, et al.;


U.S. application Ser. No. 11/156,778, filed Jun. 20, 2005, entitled “PRINTING PLATFORM,” by Joseph A. Swift;


U.S. application Ser. No. 11/157,598, filed Jun. 21, 2005, entitled “METHOD OF ORDERING JOB QUEUE OF MARKING SYSTEMS,” by Neil A. Frankel;


U.S. application Ser. No. 11/170,845, filed Jun. 30, 2005, entitled “HIGH AVAILABILITY PRINTING SYSTEMS,” by Meera Sampath, et al.;


U.S. application Ser. No. 11/359,065, filed Feb. 22, 2005, entitled “MULTI-MARKING ENGINE PRINTING PLATFORM”, by Martin E. Banton;


U.S. application Ser. No. 11/364,685, filed Feb. 28, 2006, entitled “SYSTEM AND METHOD FOR MANUFACTURING SYSTEM DESIGN AND SHOP SCHEDULING USING NETWORK FLOW MODELING”, by Hindi, et al.;


U.S. application Ser. No. 11/378,046, filed Mar. 17, 2006, entitled “PAGE SCHEDULING FOR PRINTING ARCHITECTURES”, by Charles D. Rizzolo, et al.;


U.S. application Ser. No. 11/378,040, filed Mar. 17, 2006, entitled “FAULT ISOLATION OF VISIBLE DEFECTS WITH MANUAL MODULE SHUTDOWN OPTIONS”, by Kristine A. German, et al.


BACKGROUND

As processing power and memory capacity increase, a need arises for control mechanisms that permit a machine to fully exploit system capabilities. In the case of printers, photocopiers, and the like, conventional control mechanisms are limited in the manner in which they process information, allocate resources, perform jobs or tasks, etc. When designing a control system for a machine, it is desirable to optimize resource allocation and utilization in order to reduce cost and increase throughput. For instance, a resource that is capable of multiple concurrent allocations may be employed to provide improved performance in a machine, such as a printer or photocopier. Traditionally, a single resource could be allocated to a single component or for a single task at a given time. However, in the case of multi-capacity resources (e.g., resources capable of multiple allocations at a given time), control mechanisms to date have failed to provide planning and scheduling mechanisms that optimize resource capacity.


For instance, some attempts at control optimization for multi-function, multi-resource parallel-operation systems have employed manually encoded rules, which to date have not been concluded to be optimal or complete. Other approaches, such as adding component descriptions to responsibilities associated with a planning engine may be functional but may lead to combinatorial challenges in planner performance. However, there exists an unmet need in the art for systems and/or methodologies that facilitate optimizing multi-capacity resource utilization while minimizing computational overhead to improve throughput and reduce costs associated with machine control.


BRIEF DESCRIPTION

In accordance with various aspects described herein, systems and methods are described that facilitate model-based planning of resource allocations using a multi-capacity resource. For example, a method for machine control may comprise evaluating a model of an ordered listing of allocations of a multi-capacity resource, selecting an insertion point for a new allocation into the ordered listing of allocations of the multi-capacity resource, posting one or more temporal constraints that govern an order of execution of allocations, and determining whether execution of the model is feasible after insertion of the new allocation at the selected insertion point. The method may further comprise storing the model for comparison and/or execution if it is feasible, comparing a plurality of models, each with a different selected insertion point for the new allocation, and selecting a model for execution based on a level of feasibility relative to other models. The one or more temporal constraints may comprise a first-in-first-out constraint and/or a serial constraint that ensures that an Nth preceding allocation is complete before the new allocation is started, where N is an integer.


According to another feature described herein, a system that facilitates model-based planning for a multi-capacity resource may comprise a planner that selects an insertion point for a new allocation into an ordering of existing allocations of the multi-capacity resource, a plan generator that specifies at least one temporal constraint on allocations of the multi-capacity resource, and a plan tester that determines whether a new ordering of allocations, which comprises the new allocation at the selected insertion point, is feasible in view of the specified constraints. The multi-capacity resource may be a sheet buffer in a xerographic machine, the ordering of allocations may be an ordering of pages to be passed through the sheet buffer, and the new allocation may be a new page that is inserted into the ordering of pages. Moreover, at least one temporal constraint may comprise a first-in-first-out (FIFO) constraint that ensures that a first page enters the sheet buffer before a second page enters the sheet buffer, and leaves the sheet buffer before the second page leaves the sheet buffer, as well as a capacity-based constraint that ensures that a maximum capacity associated with the sheet buffer is not exceeded. The capacity-based constraint may stipulate that a current page does not enter the sheet buffer until an Nth preceding page has left the sheet buffer, where N is an integer equal to the maximum capacity of the sheet buffer.


Yet another feature relates to a print platform, comprising one or more xerographic components that execute instructions for performing a xerographic process, a planner that selects an insertion point for a new allocation into an existing allocation ordering of a multi-capacity resource, generates an updated allocation ordering, and assigns at least one temporal constraint to govern the allocation ordering, and a plan tester that determines the feasibility of the updated allocation ordering as a function of whether the updated allocation ordering violates those ordering temporal constraints. The temporal constraints governing the allocation ordering may contain at least a first-in-first-out (FIFO) constraint and a capacity constraint that delineates a maximum capacity for the multi-capacity resource.





BRIEF DESCRIPTION OF THE DRAWINGS


FIG. 1 illustrates a system that depicts a plurality of components, such as may be employed in a universal production printer with a color print sheet buffer;



FIG. 2 is an illustration of a set of events that represents a plurality of permutations of potential planning schedules that may be employed to insert a new allocation of a multi-capacity resource into an existing ordering of allocations, in accordance with various aspects;



FIG. 3 is an illustration of a methodology for planning allocation orderings for a multi-capacity resource, in accordance with one or more features described herein;



FIG. 4 illustrates a methodology for evaluating multiple possible orderings of a set of events, such as allocations of a multi-capacity resource, and selecting an optimal allocation ordering, in accordance with one or more features disclosed herein;



FIG. 5 is an illustration of a methodology for utilizing temporal constraints to facilitate model-based planning for multi-capacity resources; and



FIG. 6 is an illustration of a system that facilitates performing model-based planning for multi-capacity resource allocation, in accordance with various aspects.





DETAILED DESCRIPTION

In accordance with various features described herein, a framework is presented that extends current model-based planning algorithms to mitigate a need for separate specialized software to handle a multi-capacity resource while retaining the ability of an online planner to output optimal plans. For example, by adding appropriate temporal points that represent multi-capacity resource allocations, and temporal constraints there between, a planner may determine an optimal manner in which to utilize the multi-capacity resource, given an objective function. Modeling language used by a planner may be analyzed to determine whether the planner permits different tasks to share one or more resources. In this manner, a model-based general-purpose online planner may be used to optimally control multi-capacity resources using temporal constraints.


With reference to FIG. 1, a system 100 is illustrated that depicts a plurality of components, such as may be employed in a universal production printer with a color print sheet buffer. The system 100 comprises a paper source 102, which may comprise one or more sheets of paper, and which is operatively associated with a color engine 104 and an inserter 108. Paper from the paper source 102 may follow one of two paths. For instance, paper may be routed from the paper source 102 to the color print engine 104, and on to a color print buffer 106, before entering the inserter 108. Additionally or alternatively, paper may be routed directly from the paper source 102 to the inserter 108 using the transporter 116 (e.g., bypassing the color engine 104 and the color print buffer 106).


Paper that has been routed directly from the paper source 102 to the inserter 108 may be passed to a black-and-white print engine 110, then through a merger 112 that merges black-and-white and color pages, before proceeding on to a finisher 114 that finishes the document for presentation to a user. Prior to insertion by inserter 108, paper may pass through the transporter 116. Paper that has been routed through the color print engine 104 and into the color print buffer 106 for temporary storage until such time as the color-printed page may be passed through the inserter 108 and the transporter 118 and is merged by merger 112 with other black-and-white pages that are printed by the black-and-white engine 110. It will be appreciated that according to other examples, a page may pass through all components of the system 100 and may have both color portions and black-and-white portions.


In conventional systems, although model-based planning may be employed to explicitly handle resources, typically such resources are in the form of “unit resources,” where tasks can not share resources at the same time, as opposed to multi-capacity resources, which may be shared by multiple tasks or allocations. According to various features described herein, a planning framework may be created to handle multi-capacity resources in which different tasks can share a given resource up to its capacity. This type of multi-capacity resource with unrestricted allocation time can facilitate providing storage and buffer locations for materials in manufacturing domains, and thus may facilitate optimal usage of multi-capacity resources. One application for such model-based planning for multi-capacity resources is planning for tightly-integrated parallel printing (TIPP), where a sheet buffer, such as the color print sheet buffer(s) 106, can be modeled as a multi-capacity resource to enable speeding up printing jobs with mixed color and black-and-white sheets. One example of how it can be done is to print color sheets early using a slower color engine 104 and then quickly feed them out of the temporary storage buffer 106 as needed to merge with sheets printed by a faster B&W engine 110.


For example, when a manufacturing task requires a resource allocation for a multi-capacity resource R with capacity C, the planner may add temporal constraints between the new allocation and the previous allocations on R to guarantee that only up to C allocations can overlap at any given moment in time. That is, C represents a maximum allowable capacity of overlapping allocations of resource R. The planner may also select from all possible ways to add the new resource allocation to find the one leading to an optimal plan given any objective function. For example, if the objective function is to minimize overall end time to complete all tasks, then the planner may try to arrange as many overlapping resources as possible so that the resources are still within capacity while allowing the tasks to finish as soon as possible. The manner in which the planner adds and maintains temporal constraints between different allocations of multi-capacity resources need not rule out any given potential solution and need not change any property of the search algorithm used by the planner, such as completeness or optimality.


Some continuous planning/re-planning systems work in an on-line planning environment and deal with real-time constraints similar to a TIPP environment. However, such systems rely on user-defined local-rules to guide the planning and plan-repair processes, which do not guarantee either completeness or optimality. In contrast, the handling of multi-capacity resources in model-based planning as discussed here is generic, does not depend on local rules, and does not violate the completeness or optimality of the underlying search algorithm used.


Conventional systems and methods do not provide a general-purpose planning system that handles multi-capacity resources directly. Rather, a multi-capacity resource is typically handled by specialized solver or using a scheduler. By way of adding appropriate time points representing multi-capacity resource allocations and temporal constraints between them, the planning algorithms and systems described herein are able to determine an optimal manner in which to use the multi-capacity resources (leading to an optimal solution), given any objective function.



FIG. 2 is an illustration of a set of events 200 that represents a plurality of permutations of potential planning schedules that may be employed to insert a new allocation of a multi-capacity resource into an existing ordering of allocations, in accordance with various aspects. As described herein, planning involves choosing actions to achieve a given goal, and scheduling involves deciding when the chosen actions should take place. Planning and scheduling may be integrated to facilitate making an informed decision regarding an optimal plan. Constraints that are employed to solve scheduling problems may also be utilized as part of a constraint-based planning system. For instance, with regard to multi-capacity resources, some actions may not be performed concurrently due to resource unavailability. For example, a printer may have a print buffer (e.g., a multi-capacity resource) where pages accumulate as they await further action, and the buffer may have a limited capacity. By utilizing a temporal database and network wherein a plurality of constraints and allocation orderings may be stored and evaluated, allocation scheduling/planning models may be evaluated for feasibility to facilitate model-based planning for optimized utilization of the multi-capacity resource.


For simplicity of illustration, the resource allocations (e.g., of a resource, R) are described as having a maximum capacity, C, of 2, although any capacity may be employed in conjunction with the various features set forth herein, as will be appreciated. According to the example, a first allocation (1) is depicted, for which there is only one possible ordering, or model, 202. When a second allocation (2) is added, there are two possible orderings: ordering 204, where allocation (2) is inserted after allocation (1), and ordering 206, where allocation (2) is inserted before allocation (1). Note that the two temporal constraints (solid arrows) do not prevent the two allocations from overlapping each other in time, but rather they enforce that an allocation that starts earlier ends earlier. For example, ordering 204 illustrates that allocation (1) may start at time s1 and end at time e1, while allocation (2) may start at time s2 and end at time e2. The solid arrow from s1 to e1 is slanted slightly to the right (in positive time) to represent the constraint that s2 occurs after s1 in time, and the solid arrow from e1 to e2 indicates that allocation (1) is constrained to end before allocation (2) ends. Thus, allocations (1) and (2) are permitted to overlap in time so long as the constraints are adhered to.


According to another example, ordering 204 may be extended by adding another allocation (3), such that there are three possible permutations of adding allocation (3), which are shown in the scenarios 208, 210, and 212, respectively. The new constraints added in each scenario (dashed arrows) are constraints to ensure that, in any scenario, three consecutive allocations cannot overlap over a single time point. A planner employing such possible permutations to determine an optimal ordering may select the optimal ordering for further extension from among the new orderings.


To further the above example, the multi-capacity resource may be a 2-sheet-capacity sheet buffer, and constraints may be applied to ensure that only two allocations of the resource are permitted to occur at a given time. For instance, the solid arrows of 204 may represent a constraint that ensures that allocation (1) comes before allocation (2). If a third allocation is added, such as is depicted by ordering 208, then constraints may be added to enforce a temporal ordering (straight dashed arrows), as well as capacity (curved and dashed arrow), where the capacity constraint ensures that only two sheets are present in the sheet buffer at a given time. That is, the curved dashed arrow 208, which extends from e1 to s3, represents a constraint that allocation (1) ends before allocation (3) starts. Thus, ordering 208 illustrates that a first sheet (1) enters the buffer at a start time s1 before a second sheet (2) enters the buffer at its respective start time s2, and leaves the sheet buffer at and end time e1 before the second sheet leaves the buffer at e2. Similarly, sheet (3) may not enter the buffer until sheet (2) has entered the buffer, and may not leave the buffer until after sheet (2) has left the buffer. The curved dashed arrow shows that sheet (3) is further constrained not to enter the sheet buffer until after sheet one has left the sheet buffer, in order to enforce the two-sheet maximum allocation of the resource.


Orderings 210 and 212 illustrate other possible insertion points for sheet (3). With regard to ordering 212, the solid curved arrows represent the constraint shown in ordering 206, which may become redundant when sheet (3) is inserted between sheets (2) and (1). From a storage conservation standpoint, such redundant constraints may be deleted from, for instance, a constraint database in order to minimize storage space therein. Additionally or alternatively, a redundant constraint may be left in the constraint database in order to avoid computational overhead associated with a typically expensive deletion action. Furthermore, it will be appreciated that multiple models, such as models 208, 210, and 212, may be evaluated in parallel (e.g., rather than serially) if desired to minimize processing time. It will further be appreciated that any number of models and/or ordering permutations may concurrently be evaluated for optimization purposes, and that the described features are not limited to three models as described with regard to the above example.



FIG. 3 is an illustration of a methodology 300 for planning allocation orderings for a multi-capacity resource, in accordance with one or more features described herein. At 302, an ordering of existing allocations of a multi-capacity resource may be determined and/or evaluated. For instance, the multi-capacity resource may be a sheet buffer having a maximum capacity of N sheets, where N is an integer. At 304, an insertion point for a new allocation (e.g., such as a page) may be selected. Temporal constraints, such as those described above with regard to FIG. 2, may be posted at 306. For instance, a first temporal constraint may be added that requires a first-in-first out ordering for allocations, such that an allocation that begins using the multi-capacity resource prior to another allocation may be constrained to finish using the resource prior to the other allocation's completion of use of the resource. A second constraint may relate to ensuring that a maximum capacity of the multi-capacity resource is not exceeded. It will be appreciated that the foregoing constraints are exemplary in nature and are not intended to limit the number of constraints that may be posted for a given planning session or the manner in which constraints operate to organize allocations of a multi-capacity resource.


At 308, a determination may be made regarding whether insertion of the new allocation at the selected insertion point conflicts with a posted constraint (e.g., causes the constraint to fail). If no post failure is determined to exist, then at 310 the new ordering of allocations (with the new allocation inserted) may be recorded as a feasible ordering of allocations, and the method may revert to 304 for a further iteration of insertion point selection, constraint posting, and ordering evaluation. If it is determined at 308 that one or more posted constraints has failed, then at 312 the new ordering may be recorded as infeasible before the method reverts to 304 for evaluation of another ordering with a different insertion point for the new allocation. In this manner, multiple permutations of allocation orderings may be evaluated to facilitate selection of a desirable ordering of allocations for the multi-capacity resources. Moreover, although the evaluation of different allocation orderings having different insertion points for a new allocation are depicted as occurring serially through an iterative method in FIGS. 3-5, it is to be understood that multiple allocation orderings may be evaluated in parallel to reduce processing time associated with evaluating various ordering permutations of a given allocation set. For example, the three permutations of models 208, 210, and 212 for the addition of allocation (3) in FIG. 2 may be evaluated in parallel to minimize processing time.



FIG. 4 illustrates a methodology 400 for evaluating multiple possible orderings of a set of events, such as allocations of a multi-capacity resource, and selecting an optimal allocation ordering, in accordance with one or more features disclosed herein. At 402, an extant ordering of existing allocations for a multi-capacity resource may be evaluated to facilitate selecting an insertion point for a new allocation into the ordering, which may occur at 404. At 406, one or more temporal constraints may be specified, which govern the timing of the allocations relative to each other. At 408, a determination may be made regarding whether one or more of the specified constraints has failed (e.g., whether the selected insertion point results in a valid ordering. If the determination at 408 indicates that none of the specified constraints has been violated, then at 410 the new ordering may be recorded as a feasible ordering and the method may revert to 404 for evaluation of another ordering having a different insertion point for the new allocation. If one or more specified constraints is determined to be violated by the selected insertion point, then the new ordering may be recorded as infeasible at 412, and the method may revert to 404 for evaluation of another ordering with a difference selected insertion point.


At 414 a comparison may be performed for new orderings that have been recorded as feasible. An optimal ordering may be selected and scheduled for execution at 416. According to an example, two orderings that have been recorded as feasible may be compared to determine which has a better value relative to a predefined metric. For instance, a first feasible ordering may have a shorter execution time given the set of specified constraints, and may therefore be selected over a second feasible ordering. It will be apparent to those of skill that the metric(s) by which a feasible ordering is selected over another feasible ordering is not limited to execution duration, but rather may be any suitable metric for comparing two or more feasible orderings and determining an optimal ordering based on the metric.



FIG. 5 is an illustration of a methodology 500 for utilizing temporal constraints to facilitate model-based planning for multi-capacity resources. According to the figure, at 502, an insertion point may be selected for a new allocation of a multi-capacity resource in an existing ordering of multi-capacity resource allocations. For instance, the ordering of existing allocations may be defined in terms of temporal variables rather than absolute times. Thus, when a new allocation is detected, the selection of an insertion point may be relative to the timing of other allocations, and not necessarily to a specific time. At 504, a first set of temporal constraints may be posted, such as a set of first-in-first-out (FIFO) constraints, which ensure that an allocation that begins before another allocation ends before the other allocation. The FIFO constraints posted at 504 may additionally indicate the insertion point of the new allocation relative to extant allocations in the ordering.


At 506, a second set of temporal constraints may be added to ensure that, at any given time, a maximum capacity associated with the multi-capacity resource is not exceeded. For example, if the multi-capacity resource is a sheet buffer in a printer device, with a maximum capacity of 5 sheets, then the constraint posted at 506 may ensure that the fifth sheet ahead of the current sheet (e.g., the new allocation) has left the sheet buffer before the current sheet enters the buffer. A determination may be made at 508 regarding whether one or more of the constraints has failed (e.g., whether the selected insertion point for the new allocation results in an ordering that is not feasible given the posted constraints). If not, then at 510 the new ordering may be recorded (e.g., stored in a database) as a feasible ordering. If one or more of the posted constraints has failed, then at 512, the new ordering may be recorded as infeasible.



FIG. 6 is an illustration of a system 600 that facilitates performing model-based planning for multi-capacity resource allocation, in accordance with various aspects. The system 600 comprises a planner 602 that evaluates a multi-capacity resource 604 and one or more allocations 6061-606N (collectively referred to as “allocations 606” hereinafter) thereof to identify an existing ordering of allocations 606. It is to be understood that the system 600 may comprise and/or be employed in a variety of environments, such as an electronic imaging environment, as well as a xerographic environment, whereby one or more xerographic components are utilized to perform a xerographic procedure or function. The planner 602 may comprise a plan generator 608, a plan tester 610, and a constraint library 612, and may be associated with a machine, such as a print platform as described above with regard to FIG. 1. According to some aspects, a scheduler (indicated by dotted line 601) may be provided with planning capability such as is described with regard to the planner 602. For instance, the scheduler may be operatively associated with the planner 602 to handle multi-capacity resources, and may utilize a continuous quantity handled by a general-purpose academic planner to approximate multi-capacity resources.


The plan generator 608 may select an insertion point for a new allocation of the multi-capacity resource, as detailed above with regard to the preceding figures, and may access the constraint library 612 to specify one or more constraints to govern the execution of the ordering of allocations with the inserted new allocation. For instance, constraints may comprise temporal constraints (e.g., FIFO, LIFO, etc.), capacity constraints (e.g., maximum of N allocations at a given time, where N is an integer), and the like. The plan tester 612 may evaluate a given ordering of allocations, after insertion of the new allocation, against constraints posted by the plan generator 608, to determine whether a given allocation ordering model is valid. Valid models 616 may be store in a memory 614 for later evaluation and/or implementation by planner 602.


According to an example, non-deterministic pseudo-code for allocating on a FIFO multi-capacity resource may comprise, without being limited to:

    • 1. Given existing ordered list of existing allocations (s1,e1), (s2,e2), . . . (sn,en), select a place to insert the new allocation: point (si,ei).
    • 2. Post temporal constraints si−1→si, ei−1→ei, si→si+1 and ei→ei+1 to enforce the order.
    • 3. Post temporal constraint ej→sj+C for all j such that (i−C)≦j≦(i+C), to ensure that for every allocation, the allocation is finished before the Cth one ahead of it starts. (If any of these allocations doesn't exist, ignore its constraints.)
    • 4. If none of the previous posts failed, record the ordering as a feasible possibility.


The above example describes pseudo-code for adding a resource allocation 606 when a planning task requires a multi-capacity FIFO resource, R, with capacity C, where C represents a maximum allowable number of overlapping (e.g., concurrent) allocations of resource R. Each allocation is represented by a pair of time points (start, end) that are assumed to be previously appropriately constrained relative to each other (e.g., separated by a fixed duration). A planner may evaluate all possible permutations of inserting a new allocation in between two consecutive existing allocations, in addition to trying to add the new allocation as the first or last allocation. It may then add constraints between all allocations within C allocations of the new allocation to ensure that any two allocations with indexes separated by C do not overlap. For instance, if C=5, then a first and a sixth allocation may not overlap. Thus, there need not be more than C allocations of resource R at any given time. It will be noted that the pseudo-code is written in a non-deterministic style such that the “select” operation may result in many possibilities, each of which is explored separately with its own independent set of temporal constraints. A “post” operation may detect that the temporal constraints have become inconsistent, in which case the possibility being explored may be abandoned (e.g., recorded as infeasible). Any remaining feasible orderings may be added to a search queue. The planner may then take into account all other planning constraints and select the best ordering of allocations on R according to the given objective function (e.g. maximize throughput of the manufacturing plant, minimize execution time, etc.). It will be appreciated that the foregoing may be easily modified to support non-FIFO constraints, such as last-in-first-out (LIFO), random access, and other types of capacitated resources.


It will be appreciated that various of the above-disclosed and other features and functions, or alternatives thereof, may be desirably combined into many other different systems or applications. Also that various presently unforeseen or unanticipated alternatives, modifications, variations or improvements therein may be subsequently made by those skilled in the art which are also intended to be encompassed by the following claims.

Claims
  • 1. A method of employing model-based planning of a multi-capacity print sheet buffer for machine control, comprising: evaluating a model of an ordered listing of allocations of a multi-capacity color print sheet buffer, which buffers fully printed color sheets as they await further action, wherein the allocations are permitted to overlap each other in time, wherein the multi-capacity color print sheet buffer outputs buffered color print sheets to be merged with more rapidly printed black and white sheets;selecting an insertion point for a new allocation into the ordered listing of allocations of the multi-capacity color print sheet buffer;posting one or more temporal constraints that govern an order of execution of allocations;determining whether execution of the model is feasible after insertion of the new allocation at the selected insertion point; andstoring the model for comparison and/or execution if it is feasible.
  • 2. The method of claim 1, further comprising comparing a plurality of models, each with a different selected insertion point for the new allocation.
  • 3. The method of claim 2, further comprising evaluating the plurality of models in parallel to minimize processing time.
  • 4. The method of claim 2, further comprising selecting a model for execution based on a level of feasibility relative to other models.
  • 5. The method of claim 4, further comprising executing the selected model.
  • 6. The method of claim 1, further comprising executing the model.
  • 7. The method of claim 1, wherein the one or more temporal constraints comprises a first-in-first-out constraint.
  • 8. The method of claim 1, wherein the one or more temporal constraints comprises a serial constraint that ensures that an Nth allocation is complete before the new allocation is started, where N is an integer.
  • 9. A system that facilitates model-based planning for a multi-capacity print sheet buffer, comprising: a planner that selects an insertion point for a new allocation into an ordering of existing allocations of the multi-capacity color print sheet buffer, which buffers fully printed color sheets as they await further action, wherein the allocations are permitted to overlap each other in time, and wherein the multi-capacity color print sheet buffer outputs buffered color print sheets to be merged with more rapidly printed black and white sheets;a plan generator that specifies at least one temporal constraint on allocations of the multi-capacity color print sheet buffer;a plan tester that determines whether a new ordering of allocations, which comprises the new allocation at the selected insertion point, is feasible in view of the specified constraints; anda memory that stores a model of the new ordering of allocations of the multi-capacity print sheet buffer if the new ordering of allocations does not violate the at least one temporal constraint.
  • 10. The system of claim 9, wherein the multi-capacity color print sheet buffer is employed in a xerographic machine.
  • 11. The system of claim 10, wherein the ordering of allocations is an ordering of pages to be passed through the sheet buffer, and wherein the new allocation is a new page that is inserted into the ordering of pages.
  • 12. The system of claim 11, wherein the at least one temporal constraint comprises a first-in-first-out (FIFO) constraint that ensures that a first page enters the sheet buffer before a second page enters the sheet buffer, and leaves the sheet buffer before the second page leaves the sheet buffer.
  • 13. The system of claim 12, where the at least one temporal constraint further comprises a capacity-based constraint that ensures that a maximum capacity associated with the sheet buffer is not exceeded.
  • 14. The system of claim 13, wherein the capacity-based constraint stipulates that a current page does not enter the sheet buffer until an Nth preceding page has left the sheet buffer, where N is an integer equal to the maximum capacity of the sheet buffer.
  • 15. The system of claim 9, wherein the plan tester determines whether the new ordering of the allocations of the multi-capacity resource violates the at least one temporal constraint.
  • 16. The system of claim 15 wherein the planner abandons the new ordering of allocations if the at least one temporal constraint is violated.
  • 17. The system of claim 9, wherein the planner compares a plurality of stored models and selects an optimal model for execution to maximize throughput.
  • 18. A print platform, comprising: one or more xerographic components that execute instructions for performing a xerographic process;a planner that selects an insertion point for a new allocation into an allocation ordering of a multi-capacity color print sheet buffer that buffers fully printed color sheets as they await further action, generates an updated allocation ordering, and assigns at least one temporal constraint to govern the allocation ordering, wherein allocations in the allocation ordering are permitted to overlap each other in time, and wherein the multi-capacity color print sheet buffer outputs buffered color print sheets to be merged with more rapidly printed black and white sheets; anda plan tester that determines updated allocation ordering feasibility as a function of whether the updated allocation ordering violates the at least one temporal constraint.
US Referenced Citations (116)
Number Name Date Kind
4579446 Fujino et al. Apr 1986 A
4587532 Asano May 1986 A
4836119 Siraco et al. Jun 1989 A
5004222 Dobashi Apr 1991 A
5008713 Ozawa et al. Apr 1991 A
5080340 Hacknauer et al. Jan 1992 A
5095342 Farrell et al. Mar 1992 A
5159395 Farrell et al. Oct 1992 A
5208640 Horie et al. May 1993 A
5272511 Conrad et al. Dec 1993 A
5326093 Sollitt Jul 1994 A
5435544 Mandel Jul 1995 A
5473419 Russel et al. Dec 1995 A
5489969 Soler et al. Feb 1996 A
5504568 Saraswat et al. Apr 1996 A
5525031 Fox Jun 1996 A
5557367 Yang et al. Sep 1996 A
5568246 Keller et al. Oct 1996 A
5570172 Acquaviva Oct 1996 A
5596416 Barry et al. Jan 1997 A
5629762 Mahoney et al. May 1997 A
5710968 Clark et al. Jan 1998 A
5778377 Marlin et al. Jul 1998 A
5884910 Mandel Mar 1999 A
5995721 Rourke et al. Nov 1999 A
6059284 Wolf et al. May 2000 A
6097500 Fromherz Aug 2000 A
6125248 Moser Sep 2000 A
6241242 Munro Jun 2001 B1
6297886 Cornell Oct 2001 B1
6341773 Aprato et al. Jan 2002 B1
6384918 Hubble, III et al. May 2002 B1
6450711 Conrow Sep 2002 B1
6476376 Biegelsen et al. Nov 2002 B1
6476923 Cornell Nov 2002 B1
6493098 Cornell Dec 2002 B1
6537910 Burke et al. Mar 2003 B1
6550762 Stoll Apr 2003 B2
6554276 Jackson et al. Apr 2003 B2
6577925 Fromherz Jun 2003 B1
6607320 Bobrow et al. Aug 2003 B2
6608988 Conrow Aug 2003 B2
6612566 Stoll Sep 2003 B2
6612571 Rider Sep 2003 B2
6621576 Tandon et al. Sep 2003 B2
6633382 Hubble, III et al. Oct 2003 B2
6639669 Hubble, III et al. Oct 2003 B2
6819906 Herrmann et al. Nov 2004 B1
6925283 Mandel et al. Aug 2005 B1
6959165 Mandel et al. Oct 2005 B2
6973286 Mandel et al. Dec 2005 B2
7024152 Lofthus et al. Apr 2006 B2
7123873 deJong et al. Oct 2006 B2
7162172 Grace et al. Jan 2007 B2
7188929 Lofthus et al. Mar 2007 B2
7206532 Lofthus et al. Apr 2007 B2
7206536 Julien Apr 2007 B2
20020078012 Ryan et al. Jun 2002 A1
20020103559 Gartstein Aug 2002 A1
20030077095 Conrow Apr 2003 A1
20040085561 Fromherz May 2004 A1
20040085562 Fromherz May 2004 A1
20040088207 Fromherz May 2004 A1
20040150156 Fromherz et al. Aug 2004 A1
20040150158 Biegelsen et al. Aug 2004 A1
20040153983 McMillan Aug 2004 A1
20040216002 Fromherz et al. Oct 2004 A1
20040225391 Fromherz et al. Nov 2004 A1
20040225394 Fromherz et al. Nov 2004 A1
20040247365 Lofthus et al. Dec 2004 A1
20050278303 Ruml et al. Dec 2005 A1
20060039026 Lofthus et al. Feb 2006 A1
20060066885 Anderson et al. Mar 2006 A1
20060067756 Anderson et al. Mar 2006 A1
20060067757 Anderson et al. Mar 2006 A1
20060114313 Moore Jun 2006 A1
20060114497 Anderson et al. Jun 2006 A1
20060115287 Roof Jun 2006 A1
20060115288 Roof Jun 2006 A1
20060132815 Lofthus et al. Jun 2006 A1
20060176336 Moore et al. Aug 2006 A1
20060197966 Viturro et al. Sep 2006 A1
20060209101 Mizes Sep 2006 A1
20060214359 Clark Sep 2006 A1
20060214364 Clark et al. Sep 2006 A1
20060215240 Mongeon Sep 2006 A1
20060221159 Moore et al. Oct 2006 A1
20060221362 Julien et al. Oct 2006 A1
20060222384 Moore et al. Oct 2006 A1
20060222393 de Jong et al. Oct 2006 A1
20060227350 Crawford et al. Oct 2006 A1
20060230201 Fromherz et al. Oct 2006 A1
20060230403 Crawford et al. Oct 2006 A1
20060233569 Furst et al. Oct 2006 A1
20060235547 Hindi et al. Oct 2006 A1
20060238778 Mongeon et al. Oct 2006 A1
20060244980 Grace Nov 2006 A1
20060250636 Richards Nov 2006 A1
20060268317 Lofthus et al. Nov 2006 A1
20060268318 Lofthus et al. Nov 2006 A1
20060269310 German et al. Nov 2006 A1
20060274334 Mongeon Dec 2006 A1
20060274337 Dalal et al. Dec 2006 A1
20060280517 Roof et al. Dec 2006 A1
20060285159 Frankel Dec 2006 A1
20060285857 Swift Dec 2006 A1
20070002085 Sampath et al. Jan 2007 A1
20070002344 Klassen Jan 2007 A1
20070002403 Klassen Jan 2007 A1
20070024894 Moore et al. Feb 2007 A1
20070031170 deJong et al. Feb 2007 A1
20070041745 Dalal et al. Feb 2007 A1
20070052991 Goodman et al. Mar 2007 A1
20070081064 Spencer et al. Apr 2007 A1
20070081828 Radulski et al. Apr 2007 A1
20070120934 Lang May 2007 A1
Non-Patent Literature Citations (62)
Entry
Wuertz, Jorg, “Oz Scheduler: A Workbench for Scheduling Problems”, Proceedings of the 8th IEEE Int'l Conf. on Tools with Artificial Intelligence; Toulouse, Nov. 16-19, 1996, Los Alamitos, CA: IEEE Computer Soc., Nov. 16, 1996, pp. 149-156.
EP Search Report, Appl. No. 08157087.1-2211 / 1998247, Dated Nov. 24, 2008, Munich, Germany.
Morgan, P.F., “Integration of Black Only and Color Printers”, Xerox Disclosure Journal, vol. 16, No. 6, Nov./Dec. 1991, pp. 381-83.
Desmond Fretz, “Cluster Printing Solution Announced”, Today at Xerox (TAX), No. 1129, Aug. 3, 2001.
U.S. Appl. No. 10/785,211, filed Feb. 24, 2004, Lofthus et al.
U.S. Appl. No. 10/881,619, filed Jun. 30, 2004, Bobrow.
U.S. Appl. No. 10/924,458, filed Aug. 23, 2004, Lofthus et al.
U.S. Appl. No. 10/924,459, filed Aug. 23, 2004, Mandel et al.
U.S. Appl. No. 10/933,556, filed Sep. 3, 2004, Spencer et al.
U.S. Appl. No. 10/953,953, filed Sep. 29, 2004, Radulski et al.
U.S. Appl. No. 10/999,450, filed Nov. 30, 2004, Lofthus et al.
U.S. Appl. No. 11/000,168, filed Nov. 30, 2004, Biegelsen et al.
U.S. Appl. No. 11/109,566, filed Apr. 19, 2005, Mandel et al.
U.S. Appl. No. 11/166,299, filed Jun. 24, 2005, Moore.
U.S. Appl. No. 11/166,460, filed Jun. 24, 2005, Roof et al.
U.S. Appl. No. 11/166,581, filed Jun. 24, 2005, Lang et al.
U.S. Appl. No. 11/215,791, filed Aug. 30, 2005, Hamby et al.
U.S. Appl. No. 11/234,468, filed Sep. 23, 2005, Hamby et al.
U.S. Appl. No. 11/234,553, filed Sep. 23, 2005, Mongeon.
U.S. Appl. No. 11/287,177, filed Nov. 23, 2005, Mandel et al.
U.S. Appl. No. 11/291,583, filed Nov. 30, 2005, Lang.
U.S. Appl. No. 11/291,860, filed Nov. 30, 2005, Willis.
U.S. Appl. No. 11/274,638, filed Nov. 15, 2005, Wu et al.
U.S. Appl. No. 11/287,685, filed Nov. 28, 2005, Carolan.
U.S. Appl. No. 11/317,589, filed Dec. 23, 2005, Biegelsen et al.
U.S. Appl. No. 11/314,774, filed Dec. 21, 2005, Klassen.
U.S. Appl. No. 11/317,167, filed Dec. 23, 2005, Lofthus et al.
U.S. Appl. No. 11/314,828, filed Dec. 21, 2005, Anderson et al.
U.S. Appl. No. 11/292,388, filed Nov. 30, 2005, Mueller.
U.S. Appl. No. 11/292,163, filed Nov. 30, 2005, Mandel et al.
U.S. Appl. No. 11/312,081, filed Dec. 20, 2005, Mandel et al.
U.S. Appl. No. 11/331,627, filed Jan. 13, 2006, Moore.
U.S. Appl. No. 11/341,733, filed Jan. 27, 2006, German.
U.S. Appl. No. 11/359,065, filed Feb. 22, 2005, Banton.
U.S. Appl. No. 11/349,828, filed Feb. 8, 2006, Banton.
U.S. Appl. No. 11/364,685, filed Feb. 28, 2005, Hindi et al.
U.S. Appl. No. 11/363,378, filed Feb. 27, 2006, Anderson et al.
U.S. Appl. No. 11/378,046, filed Mar. 17, 2006, Rizzolo et al.
U.S. Appl. No. 11/378,040, filed Mar. 17, 2006, German.
U.S. Appl. No. 11/403,785, filed Apr. 13, 2006, Banton et al.
U.S. Appl. No. 11/399,100, filed Apr. 6, 2006, Paul.
U.S. Appl. No. 11/417,411, filed May 4, 2006, DeGruchy.
U.S. Appl. No. 11/432,924, filed May 12, 2006, Lieberman et al.
U.S. Appl. No. 11/432,905, filed May 12, 2006, Mongeon et al.
U.S. Appl. No. 11/432,993, filed May 12, 2006, Anderson.
U.S. Appl. No. 11/487,206, filed Jul. 14, 2006, Wu et al.
U.S. Appl. No. 11/485,870, filed Jul. 13, 2006, Moore.
U.S. Appl. No. 11/474,247, filed Jun. 23, 2006, Moore.
U.S. Appl. No. 11/483,747, filed Jul. 6, 2006, Meetze.
U.S. Appl. No. 11/495,017, filed Jul. 28, 2006, Bean.
U.S. Appl. No. 11/501,654, filed Aug. 9, 2006, Mestha et al.
U.S. Appl. No. 11/522,171, filed Sep. 15, 2006, Sampath et al.
U.S. Appl. No. 11/528,770, filed Sep. 27, 2006, Degruchy.
U.S. Appl. No. 11/595,630, filed Nov. 9, 2006, Moore.
U.S. Appl. No. 11/590,432, filed Oct. 31, 2006, Moore.
U.S. Appl. No. 11/636,747, filed Dec. 11, 2006, Mestha et al.
U.S. Appl. No. 11/636,901, filed Dec. 11, 2006, Banton et al.
U.S. Appl. No. 11/639,073, filed Dec. 14, 2006, Biegelsen et al.
U.S. Appl. No. 11/643,119, filed Dec. 21, 2006, Clark et al.
U.S. Appl. No. 11/656,992, filed Jan. 23, 2007, Sampath et al.
U.S. Appl. No. 11/708,298, filed Feb. 20, 2007, Lang.
U.S. Appl. No. 11/714,016, filed Mar. 5, 2007, Furst.
Related Publications (1)
Number Date Country
20080301690 A1 Dec 2008 US