1. Field of the Invention
This invention relates in general to concrete and steel composite structures, such as used in bridge construction and repair, and more particularly, to the use of modular composite structural members used in new construction and in the repair of old structures utilizing existing girders. The invention further relates to apparatus and methods for connecting longitudinal and transverse joints in such structures and making shear connections at such joints.
2. Description of the Prior Art
Large structures, such as bridges are well known and are obviously time-consuming to build or widen and even more time-consuming to rehabilitate. Typically, a bridge structure will have longitudinally extending girders with a concrete deck surface. The concrete deck surface is usually made composite with the girders by pouring the concrete in place around shear connectors connected to the girders.
To originally form such composite members of the type having an upper concrete surface and a metal or concrete support underneath, a mold typically is utilized. First, the steel or concrete supports, such as girders or beams, are placed beneath the mold assembly disposed around and supported by the supports. Next, concrete is poured into the mold such that the concrete fills the mold and extends over the girders or beams. When the concrete has hardened, the mold pieces are disassembled from around the support such that the concrete rests on the supports. In such instances, these types of structural members are formed in place. This is usually advantageous so the concrete deck surface can better fit into the finished structure. The concrete deck portion is attached to the girders by shear connectors which are molded into the concrete. This technique works satisfactorily in many cases, particularly in original bridge construction where the area of construction is readily accessible and speed of construction is not a concern.
In previous systems where separate prefabricated units are used, the sections are positioned adjacent to one another upon support members for those sections, such as girders or beams, which have been positioned on the piers or abutments. This technique is particularly useful when it is not feasible to form the entire structure in place or when the use of prefabricated members can save construction time on site. It also works well in bridge widening projects where prefabricated members are installed next to the existing structure.
Certain construction restraints, such as those in which a bridge structure is being repaired or otherwise refurbished or rehabilitated, make many prior art methods of construction more expensive and result in associated problems, such as traffic delays. In repair or refurbishing, typically the old concrete deck, or at least a part of it, is removed, and another deck must be put in its place. If the replacement deck must be poured in place, molds must be set up, the concrete poured, and then the concrete allowed time to cure before the bridge structure can be reopened to traffic. In high density traffic areas, this creates considerable traffic tie-up problems, which result in significant lost time and inconvenience to commuters and other travelers.
The use of prefabricated composite units which can be set in place, such as those described above, greatly reduces the repair time involved. That is, the old structure may be removed, and the new structure simply set in place on the piers or abutments and attached to them. Because of the prefabrication, the time necessary to construct molds, pour concrete and allow the concrete to cure can all occur prior to the placement of the composite units. Thus, the “down time” to repair the bridge structure is greatly reduced, which lowers costs and pleases motorists. However, this technique creates longitudinal and transverse joints that need to be properly made so that the upper road surface is smooth and without misaligned upper surfaces. Also, it is important that the longitudinal and transverse joints be filled so that they do not become potential pathways for water and salt-laden water to fall objectionably on other parts of the structure.
The present invention all but eliminates this objectionable leakage without adding construction time to a constrained time window, such as occurs in overnight construction. Because the modular units or modules can be attached quickly, they can carry traffic very soon after they are placed in position. In the present invention, prefabricated composite modules are still positioned adjacent to one another, forming longitudinal and transverse joints therebetween. One of the adjacent modules is pulled and clamped to the other by a precompression technique which holds the adjacent modules together. A shear connection is made between the adjacent units and with the corresponding existing girder over which the longitudinal joint between the modules extends. Leveling bolts are utilized to level adjacent concrete deck portions of the modules so that upper surfaces thereof are level prior to final connections.
The joints may be filled with a sealant applied to the abutting faces of the joints before they are pulled together. Whether used with match-cast, abutting faces or a conventional, hardened, grout-filled joint, precompressing the joint has the advantage of creating an extremely water-tight joint and, at the same time, supplementing the tensile resistance of the joint adhesive with precompressive stresses.
One conventional approach to precompressing bridge structures is to install conduit in the deck portions thereof which is accomplished by positioning the conduit and pouring the moldable material around it. Steel cables are installed in these conduits after the bridge structure is erected and compression applied to the structures in a transverse direction by post-tensioning the steel cables. This process has several problems, one of which is the difficulty of aligning the conduits during the erection of the bridge structure. Further, there is a potential for damaging both the cable and its protective coating when the cable is pulled through misaligned conduit. Additionally, any such damage may result in future deterioration which is not visible and can lead to unexpected and sudden failure. In the present invention, any future deterioration of the precompressive components is readily visible and more easily corrected than with hidden and buried cable. Further, the present invention provides easy disassembly of the structure when future repair and/or rehabilitation is required, thus even further speeding up the rehabilitation time. Finally, due to the cost and extensive time of installation, splices of conventional post-tensioning are usually avoided. Thus, full roadway width installation is required, whereas the present invention allows as little as beam-to-adjacent-beam installation. The latter provides a substantial advantage over full-width installation in that only a portion of the traffic capacity is disabled instead of all of it.
The present invention provides a modular bridge structure which may be used in the construction of new bridges and also used in the repair of existing bridges. The invention utilizes modular composite structural members which may be placed on new or existing girders to provide a fast and efficient construction or repair process. The invention may be used with either steel or concrete girders, and preferably utilizes modules which are cast in an inverted position to produce high longitudinal compression at the centerline of the modules. In this way, by centering, say, a fifty-foot-long piece-at a pier on a continuous girder below the modules, composite action is obtained for a negative moment.
Generally, the present invention may be described as a structural member for use on structural supports, such as piers or abutments. The structural member comprises a plurality of longitudinally extending girders, which may either be new girders for new construction or existing girders in repairing old structures, and a plurality of composite deck modules. Each module comprises a plurality of longitudinal beams extending substantially parallel to the girders, and a deck portion made of a moldable material attached to the beams. Longitudinally extending sides of adjacent deck portions face one another and are positioned above a corresponding one of the girders. The structural member further comprises connecting means for connecting the adjacent deck portions to the girders and thereby forming a shear connection therebetween.
The apparatus may further comprise leveling means for leveling upper surfaces of the deck portion. The leveling means is preferably characterized by a bolt engaged with an insert disposed in the deck portion. The leveling bolt is adapted for engaging the girder whereby the deck portion may be raised above the girder such that a gap is defined therebetween. The deck portion also defines a grouting opening through which grout may be poured to fill the gap. The gap is sealed between the girders and beams to contain grout poured therein.
The connecting means may comprise a plate disposed adjacent to the girder in one of the beams, and fastening means for attaching the plate to the beam and the girder. In one embodiment, the plate is characterized by an angled member having a pair of legs, and the fastening means comprises a fastener interconnecting one of the legs and the tube and another fastener interconnecting the other of the legs and a flange of the girder. In another embodiment, the plate is substantially flat, and the fastening means is characterized by a fastener interconnecting the plate and the tube and another fastener interconnecting the plate and the girder. With the flat plate, a spacer may be disposed between the plate and the flange of the girder. In still another embodiment, the connecting means may comprise a plurality of bolts, such as epoxy-drilled bolts, extending through the flange of the girder into the deck portion thereabove.
The structural member may further comprise precompression means for clamping the sides of the adjacent deck portions together. In a first embodiment, the precompression means comprises a plate attached to the girder, a short transverse tube disposed adjacent to one of the longitudinal tubes and connected to the deck portion, and a fastener interconnecting the plate and the short tube. This plate may be an angled member having a pair of legs wherein the fastener extends through one of the legs. The precompression means may further comprise another angled member having a pair of legs wherein one of the legs on this other angled member is attached to the short tube and the fastener is attached to the other legs on both angled members.
In another embodiment, the precompression means may comprise short transverse tubes adjacent to longitudinal tubes on opposite sides of the corresponding girder and connected to the deck portion, and a fastener disposed through the short tubes, longitudinal tubes and the hole defined in the girder.
In still another embodiment, the girder is concrete and has upper and lower flanges molded therein. In this embodiment, the connecting means comprises a plate disposed adjacent to the girder and one of the beams, and fastening means for attaching the plate to the beam and the girder. The plate may be characterized by an angled member having a pair of legs, and the fastening means may comprise a fastener interconnecting one of the legs and the tube and another fastener interconnecting the other of the legs and the upper flange of the girder. The fastener may be a bolt engaged with an insert disposed in the upper flange of the girder. This insert may be cast in during manufacture of the girder or positioned therein subsequently. Alternatively, the bolt may be an epoxy-drilled bolt.
In the embodiment using a concrete girder, the precompression means may comprise a short transverse tube disposed adjacent to one of the longitudinal tubes and connected to the deck portion, a plate attached to the short tube, and a fastener interconnecting the plate and the girder. The plate may be an angled member having a pair of legs, one of the legs being attached to the short tube, and the fastener means may comprise an all-thread rod engaged with an upper flange of the girder and a nut threadingly engaged with the all-thread rod and further engaged with the other leg of the angled member. The all-thread rod may be threadingly engaged with an insert disposed in the upper flange of the girder. Again, this insert may be cast in or added subsequently. Alternatively, an epoxy-drilled bolt may be used.
The structural member further comprises transverse connecting means for connecting transversely extending sides of facing deck portions of adjacent modules to form a transverse joint therebetween. The transverse connecting means may comprise a plate disposed on one of the adjacent beams of the adjacent modules, another plate disposed on the other of the adjacent beams of adjacent modules, and fastening means for interconnecting the plates. In one embodiment, the plates are angled members, and the fastening means comprises a bolt disposed through facing legs of the angled members.
For the girder nearest the side of the overall structure, the module has a different construction which does not include a joint above the girder. In this portion of the overall structure, the invention may be described as a structural member comprising a longitudinally extending girder, and a composite deck module which comprises a plurality of longitudinal beams extending substantially parallel to one another and to the girder, and a deck portion made of a moldable material attached to the beams such that beams are disposed on opposite sides of the girder. The member may further comprise connecting means for connecting the deck portion to the girder and thereby forming a shear connection therebetween.
For this side connection, the connecting means comprises a plate disposed adjacent to one of the beams and the girder, and another plate disposed adjacent to the other of the beams and the girder, and fastening means for connecting the plates to the girder and the corresponding longitudinal beams. Again, a leveling means, such as a leveling bolt threadingly engaged in an insert in the deck portion and engaging an upper surface of the girder may be used so that the deck portion may be raised above the girder so that a gap is defined therebetween. As previously described, the gap is subsequently filled with high-strength grout.
The present invention may be further described as a method of repairing a bridge structure having a bridge deck supported by a plurality of girders comprising the steps of (a) fabricating a plurality of composite modules, each module comprising a plurality of substantially parallel longitudinal beams and a deck portion made of a moldable material and attached to the beams, (b) removing an old section of the bridge deck from an area above one of the girders while leaving the girder in place, (c) positioning at least one of the modules in the area to replace the old section such that the beams extend longitudinally and substantially parallel to the girder, and (d) clamping facing longitudinal sides of adjacent deck portions of adjacent modules together such that a precompressed joint is formed between the adjacent deck modules. Preferably, step (a) comprises prefabricating the modules in an inverted position, but the invention is not intended to be so limited.
Prior to step (d), the method may comprise the step of placing an adhesive between the facing longitudinal sides of the adjacent deck portions. Step (a) may further comprise forming one of the deck portions with a longitudinally extending groove defined in the side thereof and another deck portion with a tongue thereon adapted for extending into the groove after step (d) such that upper surfaces of the adjacent deck portions are held substantially aligned. Adhesive may be placed in this groove.
In the method, step (a) may comprise fabricating the deck portions with a plurality of leveling bolts disposed therein such that the leveling bolts are adapted for engaging an upper surface of the girder when the deck portions are placed in the area, and thus, the method may further comprise, prior to step (b), using the leveling bolts to level upper surfaces of the deck portions such that all of the deck portions are substantially aligned. Step (a) may comprise casting the threaded inserts in the deck portions during construction of the deck portions.
The step of leveling generally causes a gap to be defined between the adjacent deck portions and the corresponding girder, and step (a) may comprise fabricating the deck portions with a plurality of grouting openings therein and further comprise the step of (e) filling the gap with a high-strength grout through the grouting openings. Prior to step (e), the method may further comprise sealing between the girder and the beams adjacent thereto for substantially sealingly closing the gap and containing the grouting material therein.
The method may additionally comprise the step of attaching adjacent longitudinal beams of adjacent modules along a transverse joint therebetween. The method may further comprise connecting the beams to the girder such that a shear connection is formed therebetween.
Numerous objects and advantages of the invention will become apparent as the following detailed description of the preferred embodiment is read in conjunction with the drawings illustrating such embodiment.
The present invention relates to composite structures, such as bridges and is adapted for use in new construction, refurbishment or repair of old structures, and widening of existing structures. The refurbishment of an existing structure is described, but the technique and apparatus are the same for new construction.
Referring initially to
Original bridge 10 comprises a plurality of longitudinally extending girders 16, which generally have an I-bean configuration. Girders 16 are positioned on structural supports 12 and 14.
Disposed above girder 16 is an existing molded deck portion 18, which is made of a moldable material, such as concrete. Extending upwardly from the top of girder 16 is a plurality of shear connectors 20 of a kind known in the art. Shear connectors 20 are fixedly attached to the top of girders 16 and extend upwardly therefrom in a known manner. Deck portion 18 is formed and placed on girders 16 such that the molded material forming the deck portion is molded around shear connectors 20, thus forming a locking attachment between the deck portion and girders. Once the molded material has hardened, a composite structure is formed.
Using prior techniques, when it is time to repair or refurbish prior art bridge 10, the area of deck portion 18, which is to be replaced, is removed. What is especially difficult to remove is the concrete around and in between shear connectors 20. Inevitably, many of these shear connectors are damaged and have to be replaced.
If a section is removed and is to be replaced by conventional methods, a mold (not shown) must be formed in the area where the old section was and the mold filled with new hardenable material. The material must harden so that a new composite structure is formed. During this process, it will be necessary to reposition new reinforcing material so that it will also be integral with the final structure within the concrete. All of this is a very time-consuming process, and results in a portion of the bridge being repaired or refurbished being out of commission to traffic for a significant period of time including while the concrete cures. In some locations, this simply creates too large a burden on traffic flow to be acceptable. Also, in this process (as mentioned above), some or all of shear connectors 20 in the area to be refurbished may be inadvertently removed or damaged such that subsequent removal is necessary. This requires that new shear connectors 20 be attached which, again, undesirably increases the time the bridge is out of use.
Modular construction may be utilized in repairing or also widening a bridge structure without the necessity of positioning new molds and pouring new concrete in place. When modular units are used, the section of deck portion 18 which is to be replaced, is removed, and replaced with a prefabricated module. Because the module is prefabricated, it can be immediately set in place after removal of the corresponding deck portion. Still referring to
Such modules 24-38 are easily and quickly positioned on girders 16 so that the amount of time that bridge 10 is out of use is greatly reduced from the older, more conventional method of pouring in place. However, because the modules are not originally interconnected, they must be attached to one another and to girders 16.
Referring now also to
Extending upwardly from the top of each longitudinal tube 44 is a plurality of shear connectors 46. Shear connectors 46 are fixedly attached to the tops of tubes 44. Each shear connector 46 has a shank portion 48 with an enlarged head 50 at the outer end thereof, but other kinds of connectors generally known in the art may also be used.
Module 24 further comprises a molded deck portion 52. Deck 52 is made of concrete or similar material and is molded around shear connectors 46 on tubes 44 to form a composite structure after the concrete hardens. Preferably, but not by way of limitation, deck 52 is molded such that it is prestressed in a manner wherein upper surface 50 of the deck is placed in compression at least in the direction of longitudinal tubes 44 when in the operating position shown in the drawings.
One method of forming modules, such as module 24, is that described in U.S. Pat. Nos. 4,493,177, 4,646,493, 4,700,516, 5,144,710, 5,301,483, 5,305,575 and 5,553,439, copies of which are incorporated herein by reference. Those patents show I-beams rather than tubes, but the general construction is the same. Using this method, modules 24-38 are constructed in an inverted position such that longitudinal tubes 44 and the mold for forming deck 52 have downward deflection. The mold is filled with the moldable material, such as concrete, which hardens to form a composite structural member with tubes 44. During placing of the moldable material, the mold is deflected so that tubes 44 are placed in a stressed condition to form a composite, prestressed structural member upon hardening of the moldable material. Once hardening has occurred, the module is inverted. When inverted and supported on girders 16, the center portion of the structure deflects downwardly due to its own weight so that the hardenable material is substantially always in compression in the direction of longitudinal tubes 44. Thus, the resulting modules have been beneficially prestressed since deck 52 thereby resists cracking. Regardless of the actual molding process for forming modules 24-38, these modules are positioned as shown in FIG. 1.
Referring still to
Module 24 is set into place as shown in
After the grout in grout openings 58 and gap 64 has hardened, leveling bolts 60 are removed, and threaded holes 62 are also filled with grout.
A shear connection is made between girders 16 and module 32 by an angled member 70. A horizontal leg of angle 70 is attached to upper flange 56 of girder 16 by a threaded stud 72 welded to flange 56 and a nut 74. A vertical leg of angle 70 is attached to an adjacent longitudinal tube 44 by all-thread rod 76 and nuts 78.
After module 24 has been installed, an adjacent module, such as module 26, can be installed. The installation of module 26 adjacent to module 24 and the connection of these two modules to the corresponding girder 16 therebelow is typical of the other modules forming longitudinal joints 40. Three different embodiments of this connection are shown, but it should be understood that there are many variations of these embodiments, and the invention is not intended to be limited to the specific three illustrated.
The first embodiment is shown in
Referring now in detail to
Each of modules 24 and 26 has a plurality of longitudinally spaced leveling bolts 98 near sides 92 and 94. Also, each of modules 24 and 26 has a plurality of longitudinally spaced grouting openings 100 defined therein.
Module 24 has a longitudinally extending beam or steel member, preferably in the form of a longitudinal tube 102, attached to deck portion 52 by a plurality of shear connectors 104. Similarly, module 26 has a longitudinally extending beam or steel member, preferably in the form of a longitudinal tube 106, attached to deck portion 52 thereof by a plurality of shear connectors 108.
A relatively short, transversely extending tube 110 is positioned adjacent to longitudinal tube 106 and preferably attached thereto, such as by welding. Transverse tube 110 is also connected to deck portion 52 of module 26 by a plurality of shear connectors 112 and has its open end closed with a closure plate 111 attached thereto, such as by welding.
An angled member 134 is attached to upper flange 56 of girder 16 by a threaded, welded stud 136 and a nut 138.
Angled member 134 is also attached to transverse tube 110 by a horizontally disposed all-thread rod 140 and a pair of nuts 142. When everything is positioned as shown in
During assembly, modules 24 and 26 are positioned as shown, and the joint 40 therebetween filled with epoxy adhesive 96 as previously described. Leveling bolts 98 are utilized to make upper surface 114 of module 24 and upper surface 116 of module 26 flush with one another, thus creating a gap 118 between lower surfaces 120 and 122 of modules 24 and 26, respectively, and girder 16. The attachment of tube 102 to girder 16, whether done with module 24 installed by itself or with module 26, is accomplished by another angled member 124 which is attached to tube 102 by a fastening means, such as a bolt 126 and nut 128. Angled member 124 is attached to girder 16 by a threaded, welded stud 130 and a nut 132. Threaded stud 130 is preferably gun-welded to upper flange 56 of girder 16.
Nuts 128 and 132 are tightened, and it will be seen that these tightened connections make a shear connection between girder 16 and tube 102.
Referring now to
In this and other embodiments, it is preferred for new construction to install all of the modules and then level them with the leveling bolts. Then, the described shear connections are made.
Referring now to
Second embodiment bridge 160 comprises modules 162 and 164 which are installed on a girder 166. Girder 166 is illustrated as an old-style, fabricated girder having a vertical web 168 and a pair of upper flanges 170 and 172 which are attached to web 168 by a plurality of rivets 174. This old-style girder construction is shown for illustrative purposes only, and the second embodiment is not intended to be limited to such a girder. The previously described girder 16 could also be used as will be seen by those skilled in the art.
Modules 162 and 164 arc constructed in a manner similar to those previously described. For example, module 162 comprises a deck portion 176 and a longitudinally extending beam or steel member, such as a longitudinal tube 178 connected to the deck portion by a plurality of shear connectors 180. Similarly, module 164 has a deck portion 176 and a longitudinally extending tube 182 connected to deck portion 176 by a plurality of shear connectors 184. A short transversely extending tube 186 is positioned adjacent to tube 182 and preferably attached thereto, such as by welding. Short tube 186 is connected to deck portion 176 of module 164 by a plurality of shear connectors 188.
During construction, modules 162 and 164 are positioned so that a joint 190 therebetween is positioned over the center of girder 166. Leveling bolts 192 are disposed in each module and are used to level upper surfaces 194 and 196 of modules 162 and 164 respectively in the manner previously described for first embodiment 90. This forms a gap 198 between lower surfaces 200 and 202 of deck portions 176 of modules 162 and 164, respectively, and the top of girder 166. Leveling bolts 192 may be disposed in threaded inserts (not shown) as previously described.
Short tube 186 has an angled member 218 fixedly attached thereto, such as by welding. Another angled member 220 is attached to upper flange 172 by a threaded stud 222 gun-welded to upper flange 172 and a nut 224.
A precompression connection is made between girder 166 and module 164 by an all-thread rod 226 and a pair of nuts 228 which are used to interconnect angled members 218 and 220 as seen in the right side of FIG. 6. By tightening one of nuts 228, module 164 is moved toward module 162 closing joint 190 and compressing the epoxy adhesive material that has been applied to the faces of joint 190. Once this precompression is done, a seal, such as a foam backer rod 230, is disposed between longitudinal tube 178 and upper flange 170 and also between longitudinal tube 182 and upper flange 172 to sealingly close gap 198. High-strength grouting material is poured into gap 198 through grouting openings 232 and allowed to harden. Leveling bolts 192 are removed and threaded openings 234 also filled with grout. If module 162 has already been set, only the right half of
A flat plate 204 is used to form a shear connection between longitudinal tube 178 and upper flange 170 as seen in the left side of FIG. 6. Threaded studs 208 are gun-welded to longitudinal tube 178, and nuts 210 are used to connect plate 204 to tube 178. Other threaded studs 212 are attached to upper flange 170, and nuts 214 are used to connect flat plate 204 to upper flange 170. A spacer 216 may be positioned between plate 204 and upper flange 170 as necessary.
Referring now to
A third embodiment is shown in
Module 242 has a longitudinally extending beam or steel member, preferably in the form of a longitudinal tube 260 which is connected to deck portion 252 by a plurality of shear connectors 262. Similarly, module 244 has a longitudinally extending tube 264 attached to deck portion 256 by a plurality of shear connectors 266.
A small transversely disposed tube 268 is positioned adjacent to longitudinal tube 260 and preferably attached thereto, such as by welding. Transverse tube 268 is connected to deck portion 252 by a plurality of shear connectors 270 and has a closure plate attached to the open end as by welding. A similar transverse tube 272 is attached to longitudinal tube 264 of module 144 and to deck portion 256 thereof by a plurality of shear connectors 274.
After modules 242 and 244 are positioned on girder 248, leveling bolts 278 are used to level upper surfaces 280 of module 242 and upper surface 282 of module 244 in a manner previously described for the other embodiments. This will raise lower surfaces 284 and 286 of modules 280 and 282, respectively, such that a gap 288 is defined between the lower surfaces and upper flange 290 of girder 248. Leveling bolts 278 may be disposed in threaded inserts (not shown) as previously described.
After leveling, precompression may be provided by an all-thread rod 276 which extends through transverse tube 268, longitudinal tube 260, through a hole 292 drilled in girder 248, longitudinal tube 264 and transverse tube 272, along with nuts 280 and 282 which engage the all-thread rod. By tightening on either of nuts 280 or 282, modules 242 and 244 are forced toward one another, compressing epoxy adhesive 254 in joint 246 in a manner similar to that previously described.
Gap 288 is sealed by a pair of seals, such as foam backer rods 294, disposed between tube 260 and upper flange 290 and between tube 264 and upper flange 290. High-strength grout is then poured into gap 288 through grouting openings 296.
Referring now to
At shear connections made at longitudinal locations where there was no precompression applied by all-thread rod 276 and nuts 280 and 282, the shear connection will look exactly the same as in FIG. 9.
While third embodiment 240 has the advantage of a more simplified construction in that it does not use flat or angled members to make a shear connection between the girder and the modules, it does have the disadvantage that in some cases, epoxy-drilled bolts are difficult to remove in the event of later repair or replacement of the entire structure. That is, third embodiment 240 may have initially lower materials costs, but it may require more labor to remove epoxy seal bolts 298 than to simply unbolt the components in first embodiment 90 and second embodiment 160, making it easier for repair and replacement later. Each of the embodiments, however, has distinct advantages depending upon the circumstances of the construction.
Referring now to
As previously described, module 26 has a deck portion 52 with a longitudinal tube 102 attached thereto. Similarly, module 34 may be described as having a deck portion 252 with a longitudinally extending tube 302 thereon. Making the transverse connection between modules 26 and 34 is considerably more simple than the longitudinal connections previously described. Joint 42 is preferably a tongue-and-groove joint with a tongue 304 on module 26 extending into a groove 306 defined in module 34. Both faces of joint 42 are coated with an epoxy adhesive 308.
An angled member 310 is attached to tube 102 adjacent to joint 42, and another angled member 310 is attached to tube 302 adjacent to the joint. The pair of angled members 310 are interconnected by a bolt engaged by a nut 314. By tightening this threaded connection, module 34 is moved toward module 26, assuming that module 26 has already been permanently installed on the girders as previously described. This compresses sealant 308 in joint 42 so that a tight, waterproof connection is made.
The previously described embodiments show the structure of the present invention where steel girders are used. However, the modular construction and repair system can also be adapted for bridges utilizing concrete girders, and there are many such bridges in service.
Referring to
Each of modules 324 and 326 has a plurality of longitudinally spaced leveling bolts 330, and each module defines a plurality of longitudinally spaced grouting openings 332 defined therein. Leveling bolts 330 may be disposed in threaded inserts (not shown) as previously described.
Similar to the previously described embodiments, module 324 has a longitudinally extending beam or steel member, preferably in the form of a longitudinal tube 334, attached to deck portion 336 by a plurality of shear connectors 338. Similarly, module 326 has a longitudinally extending beam or steel member, preferably in the form of a longitudinal tube 340, attached to a deck portion 342 by a plurality of shear connectors 344.
An angled member 346 is attached to tube 334 by a fastening means, such as a threaded welded stud 348 and a nut 350. Angled member 346 is connected to upper flange 328 of girder 322 by an all-thread rod 352 threadingly engaged with a threaded insert 354 in upper flange 328. All-thread rod 352 is engaged by a nut 356 to complete the connection. To facilitate connection between angled member 346 and tube 334, the vertical leg of angle 346 has a vertical slot 357 for all-thread rod 352. Threaded insert 354 may be cast in new girders 322 or installed in old girders. Also, all-thread rod 353, threaded insert 354 and nut 356 may be replaced by an epoxy-drilled bolt.
A short, transversely extending tube 358 is positioned adjacent to tube 340 and preferably attached thereto, such as by welding. Short tube 186 is connected to deck portion 342 of module 326 by a plurality of shear connectors 360. Short tube 358 has an angled member 362 fixedly attached thereto, such as by welding, and has its open end closed with a closure plate 359.
A precompression connection is made between girder 322 and module 326 by an all-thread rod 364 and a nut 366 which is used to interconnect angled member 362 and upper flange 328 of girder 322. A threaded insert 368 is engaged by all-thread rod 364. Threaded insert 368 may be cast into a pre-cast girder 322 or subsequently installed in a pre-existing girder. As seen in the right side of
Once this precompression is completed, a seal, such as a foam backer rod 374 is disposed between longitudinal tube 334 and flange 328 of girder 322 and also between longitudinal tube 340 and upper flange 328 to sealingly close a gap 376 defined between deck portions 336 and 342 and girder 332 spaced therebelow. High-strength grouting material is poured into gap 376 through grouting openings 332 and allowed to harden. Leveling bolts 330 are removed and the remaining threaded openings also filled with grout.
Referring now to
Referring now to
Additional modules 404 and 406 may be subsequently positioned on girder 390. Once all of the modules are in their proper locations as shown in
It will be seen, therefore, that the modular bridge connection and repair system of the present invention is well adapted to carry out the ends and advantages mentioned, as well as those inherent therein. While three presently preferred embodiments of the apparatus have been shown for the purposes of this disclosure, numerous changes in the arrangement and construction of parts may be made by those skilled in the art. All such changes are encompassed within the scope and spirit of the appended claims.
This is a continuation of application Ser. No. 09/543,466, filed Apr. 5, 2000, now abandoned.
Number | Name | Date | Kind |
---|---|---|---|
2382761 | Wilks | Aug 1945 | A |
3675385 | Chan | Jul 1972 | A |
4493177 | Grossman | Jan 1985 | A |
4646493 | Grossman | Mar 1987 | A |
4700516 | Grossman | Oct 1987 | A |
4972537 | Slaw, Sr. | Nov 1990 | A |
4991248 | Allen | Feb 1991 | A |
5144710 | Grossman | Sep 1992 | A |
5301483 | Grossman | Apr 1994 | A |
5305575 | Grossman | Apr 1994 | A |
5339475 | Jaeger et al. | Aug 1994 | A |
5457840 | Derechin | Oct 1995 | A |
5553439 | Grossman | Sep 1996 | A |
5820299 | Anderson | Oct 1998 | A |
5978997 | Grossman | Nov 1999 | A |
6050038 | Fey et al. | Apr 2000 | A |
6170105 | Doyle et al. | Jan 2001 | B1 |
6170209 | Dagher et al. | Jan 2001 | B1 |
6453495 | Meggers et al. | Sep 2002 | B1 |
6588160 | Grossman | Jul 2003 | B1 |
Number | Date | Country | |
---|---|---|---|
Parent | 09543466 | Apr 2000 | US |
Child | 10602170 | US |