The invention relates generally to modular building systems, and more particularly to a modular building system for constructing multi-story buildings using prefabricated, precast concrete modular units that are disassembleable and repurposable.
Modular units are commonly used for constructing residential and industrial structures because they can be partially assembled/constructed remote from the building site and transported via train, truck, or ship to the building site for assembly into a complete structure, such as an office building, for example. However, once the modular units are assembled into complete structures, the modular units cannot later be disassembled and reused in another structure or disassembled into repurposable or recyclable components. Further, in existing buildings constructed from modular units, the shear walls are not modular and instead must be constructed on site. Such non-modular shear walls are constructed by placing rods, beams, or a wire grid and pouring concrete on site, and thus cannot be disassembled and reused. Conventional modular units are typically in the form of a “box” that includes a floor and ceiling and external walls. Forming a structure from such units necessarily results in redundant floor, ceiling, and wall elements between units, which is inefficient.
Consequently, many otherwise sound modular units are wasted because they cannot be disassembled without being damaged or destroyed. Moreover, conventional modular units require some type of additional frame to support the modular units once they are stacked on top of, and next to, one another. Additionally, during assembly of the completed modular units into the final structure, wet trades must be employed at the construction site to couple the individual modular units together. Such connected modular units cannot be disassembled for reuse.
Currently, when modular units are assembled together at a construction site, a crane must lift and move the modular unit to an assembly position and hold the modular unit in position so that the modular unit can be connected to another modular unit. Scaffolds are typically constructed or moved around the modular unit to enable workmen to access the connection points of the modular units. For example, the connection point for a column is at the top of the column when the column is standing vertically. The process of moving/assembling various scaffolds around the construction site is time consuming, costly, and dangerous.
In one aspect, the present invention provides a modular building system for constructing a multi-story building. The system includes prefabricated modular units, each modular unit including a horizontal slab for forming a floor/ceiling of the building and a joist portion extending horizontally along a first edge of the slab. The joist portion extends below the slab and has a portion that extends horizontally beyond the first edge of the slab to form a receiving lip. Columns are positioned on top of the slab along the first edge. Connectors are installed in cavities formed in the modular unit.
At least one floor of the multi-story building is formed by arranging the modular units so that the slab of a first modular unit is positioned on the receiving lip of a second modular unit. At least one additional floor of the multi-story building is formed by arranging the modular units so that the joist portion of an upper modular unit is positioned on the columns of a lower modular unit.
Embodiments of the present invention may include one or more of the following features.
The modular units may be formed of cast concrete. The columns may be cast as part of the modular unit or may be cast separately from the modular unit and attached to the modular unit. One of the columns may include a connector arrangement including a cavity that passes completely through the column for receiving a connecting element, the connecting element being movable within the cavity.
The joist portion may be cast as part of the modular unit or may be cast separately from the modular unit and attached to the modular unit.
The connectors of the modular unit may include a connecting element fixed within the cavity of the connector. The connecting elements may be arranged such that the connecting elements of the connectors of adjacent modular units can be joined with a coupler. The connecting element may be a threaded rod. The coupler may be configured to allow connected ends of the coupler to move with respect to one another.
The modular units may include prefabricated walls connected to the columns of the modular unit. The wall may have a connector arrangement including a cavity that passes completely through the wall for receiving a connecting element, the connecting element being movable within the cavity. The walls may be arranged to form a utilities section between two parallel walls at an end of the modular unit.
In other embodiments, the present invention may include a hoist frame having a first end configured to attach to the columns of the modular unit, supports configured to hold a second, opposite end of the hoist frame in position above the slab, and ties attached to the hoist frame and configured to attach to the slab of the modular unit. Connectors may be positioned at pick points of the hoist frame, the connectors being configured to secure crane cables for lifting the modular unit. The hoist frame may include an accessway arranged between the tops of the columns.
Other objects and features of the present invention will become apparent from the following detailed description considered in conjunction with the accompanying drawings. It is to be understood, however, that the drawings are designed solely for purposes of illustration and not as a definition of the limits of the invention, for which reference should be made to the appended claims. It should be further understood that the drawings are not necessarily drawn to scale and that, unless otherwise indicated, they are merely intended to conceptually illustrate the structures and procedures described herein.
In the drawings, like reference characters refer to the same parts throughout the different views. Also, the drawings are not necessarily to scale, emphasis instead generally being placed upon illustrating the principles of the invention.
The present invention involves a precast concrete modular building system for constructing buildings. The individual modular units are preformed and prefabricated at a factory and shipped via truck, train, or ship to a construction site. The individual modular units are stacked next to, and on top of, one another and coupled together to form a final structure, such as a multi-story office building, or apartment building. The individual modular units are self-supporting and include load-bearing members so that the structure can be completed without additional steel or a concrete frame. Further, the modular units are coupled together using various means that allow them to be easily separated/disassembled at a later time for the purpose of being reused in another structure or for the components of the modular units to be recycled. Consequently, no wet trades (i.e., cement) are used in the assembly of the final structure. The system is adaptable to a variety of multi-tier building types including residential, hotel, motel, dormitory, office, school, and hospital buildings.
Referring to
According to one aspect of the invention, each modular unit 100 includes at least two load-bearing self-supporting columns 102 and 104, and a slab/joist section 106. Each slab/joist section 106 includes a receiving lip 108 for coupling to an adjacent slab/joist section.
In one embodiment, the columns 102 and 104 and the slab/joist 106 are precast as one piece. In another embodiment, the columns 102 and 104 are connected to the slab/joist 106 using the connection arrangements discussed below. Likewise, the joist 106 may be cast separately and attached to the slab.
Referring to
To assemble the modular units 100 into a building, once the modular units 100 arrive at the construction site, a crane lifts and moves a modular unit 100a to an installation location, for example. The units may be arranged to form a ground floor of a building if mounted on foundation elements (see
Referring to
The modular unit 100 is the basic building element for any building. Depending on the type of building to be constructed, the modular unit 100 can be further pre-configured at the factory for a particular building type. For example, the modular unit 100 can be further pre-configured for commercial buildings, such as an office buildings, schools, etc., as shown in
Referring to
The joist/bottom column 804 includes a steel receptacle 816 embedded therein. A threaded steel bar 814 is disposed in the steel receptacle 816 and surrounded by grout 822. The threaded steel bar 814 extends out of the steel receptacle 816 so that it can be inserted into the steel receptacle 806 to mate with the threaded coupler 810.
The connection between a column 804 and joist/bottom column 804 is a compression connection, because the weight of the column 804 itself acts to keep the elements connected. Therefore, it is sufficient that the threaded bars on both ends of the connection are fixedly embedded in a cavity of the structures to be connected.
In certain embodiments, a connection arrangement may involve a tension connection, such as, for example, a horizontal connection between two modular units 100 or a connection between a shear wall 500 and a modular unit 100 (discussed below). In such cases, the threaded rod may extend further into the connected structures or may extend through the entire structure, so that a tension force can be sustained by the threaded bar without allowing it to be pulled out of the structure in which it is embedded.
In embodiments in which the threaded bar extends through the entire structure, then non-cementitious material, such as sand, may be used in the cavity surrounding the threaded bar, since the bar will be secured at the opposite end of the structure and axial movement of the threaded bar within the structure is desirable in order to distribute the tension forces. In other words, the use of sand to surround the threaded bar in the cavity will allow tension forces to be borne by the entire length of the threaded rod, because the threaded rod will not be fixed to the walls of the cavity, as in the case of using grout to fill the cavity.
In embodiments in which the threaded bar does not extend through the entire structure, a mechanical anchor, as well as grout or other cementitious material, may be used in a tension connection to secure an internal end of the threaded bar inside a structure to be connected.
To assemble the structure, the column 802 is lowered over, and aligned with, the joist/bottom column 804 so that the threaded steel bar 814 that extends out of the steel receptacle 816 can be inserted into the receptacle 806. The threaded coupler 810 is turned so that it retracts to a position such that it does not extend beyond the end of the steel bar 808. The column 802 is lowered onto the joist/bottom column 804 and the end of the steel bar 814 meets the end steel bar 708.
A tool is then inserted into the access port 812 to turn the threaded coupler 810 and engage the steel bar 814, thereby coupling the steel bars 808 and 814. In one embodiment, the coupler 810 is hex coupler and is turned by a wrench. In another embodiment, the coupler includes holes disposed along its circumference. The holes are adapted to receive a hex square or ⅜″ round bar to turn the coupler from the access port.
The result is a rigid structure that includes the upper column 802 and the joist/bottom column 804 held in place by the coupled threaded steel rods 808 and 814. This process is repeated to construct a frame for a modular unit. The access port 812 is covered/sealed with a fireproof plug when not being used.
To disassemble the structure, a tool is inserted into the access port 812 to turn the threaded coupler 810 and decouple the threaded steel rods 808 and 814. Thereafter, the upper column 802 and the joist/bottom column 804 can be separated and reused.
In another embodiment, as shown in
As noted above, the upper column 802 may be attached to the joist/bottom column 804 using the connection devices and methods discussed above or the upper column 802 may be precast as part of the modular unit 100.
The connection devices and methods discussed above also may be used to connect the top of the upper column 802 to the joist/bottom column 804 of a second modular unit 100 positioned above the first modular unit 100, i.e., a modular unit that forms the next higher floor in the building. Moreover, these connection devices and methods also may be used to connect shear walls 500 to the modular units 100, as noted above. Thus, these connection devices and methods may be used to form individual modular units 100 as well as to interconnect the modular units 100 to form the building structure.
In this embodiment, the threaded bar 808 extends through the entire shear wall 500. A threaded connector 810 is attached to the threaded rod 814 extending from the joist/bottom column 804. The wall 500 is moved into position over the connection point and may be maintained in position by temporary spacer blocks 815 to allow safe access to the connection point. The threaded rod 808 of the wall 500, as noted above, extends through the entire wall and is axially movable so that a tension connection can be formed without applying tension forces to the wall itself. Once the threaded rod 808 is positioned in the opposite end of the connector 810, then a tool, such as a “T-bar” or cross-bar tool 813, may be used to tighten the threaded rod 808 in the connector 810. The threaded bar 808 may include a slot 809, or similar structure, at the end to engage with a corresponding structure in the cross-bar tool 813. An access port 812 (see
The cavity surrounding the threaded bar 814 of the joist/bottom column 804 may be filled with grout or other cementitious material to secure the threaded bar 814 in place. The cavity surrounding the threaded bar 808 of the wall 500 may be filled with a non-cementitious material, such as sand (e.g., 60 grit sand). This connection arrangement may also be used for compression connections. For example, a column may be connected to the slab using a threaded rod installed in a cavity that passes through the entire column. In such a case, the cavity may be filled partially or completely with grout after the threaded rod is tightened using the cross-bar tool.
Referring to
Utility elements, such as lighting (and alarm system) connections 750 and fire suppression/sprinkler connections 755 may be stored between the dropped ceiling 702 and the slab/joist member 106a of the modular unit 100a, and are accessible via an access panel in the dropped ceiling (not shown). Utility elements such as HVAC 760, electrical 765, communication 767, and plumbing connections 769 may be stored between the raised floor 704 and the slab/joist member 106b of the modular unit 100b, and are accessible via an access panel 803 in the raised floor (see
Referring to
Further, all the utilities discussed above, which are stored in the above the dropped ceiling or below the raised floor are extended through the access panels and stored in a constructed utility closet.
Referring to
Each modular unit 900 further includes a utilities section 910 that includes all the apparatus and connections for electric, HVAC, water/plumbing, and any communication connections, such as telephone, LAN, broadband, fiber, and/or cable.
Referring to
Electrical wiring is run in a conduit that is placed in the concrete form before the concrete is poured at the factory. After the concrete is poured and hardens, the conduit is embedded in the resulting concrete slab. The plumbing and mechanical piping and ductwork are installed in conjunction with the finished cabinetry, floors, ceilings, interior walls (dry wall), and appliances. In other words, each modular unit 900 is fully completed before it leaves the factory and is shipped to the construction site.
The above embodiments are only a few of many possible configurations. This modular system allows architectural freedom with respect to dimensions and layout, and is only limited by the required placement of the modular shear walls, which depends on the seismic activity of the particular geographic region.
Referring to
As described above, the various modular units are coupled together using devices and methods that facilitate assembly and disassembly of the final structure/building without damage to, or destruction of, any of the modular units. Examples of such coupling devices and methods are described above with reference to
After the modular units 900 are placed and anchored/connected, the utilities are connected. As described above, all of the utilities are located in the utilities section 910. The utilities section 910 is accessible via a hallway running between rows of modular units. Further, in some embodiments, certain utilities, such as plumbing, can be run under raised floors, and certain utilities, such as HVAC and fire sprinklers can be installed above dropped ceilings. Moreover, non-load bearing walls, cabinets, fixtures, and appliances may also be installed in the prefabrication stages.
In some embodiments, depending on the intended height of the building, a foundation is first laid before the first modular unit 900 is installed. In other embodiments, a foundation is not necessary.
The present building system and method saves time over a traditional site built process. Traditional construction methods are a linear process. The present system and method, however, enable a building to be fabricated while the construction site is being prepared. This results in cost savings because of decreased carrying costs. The present system and method also allows the completed project to generate revenue sooner because the building is completed faster.
Referring to
Referring to
At the construction site, multiple shear core sections 1500 are stacked on top of one another to form an entire stairwell or elevator shaft. The shear core sections 1500 are connected to one another using any of the connection methods discussed above.
In another embodiment, the crane 1404 can be mounted on the shear core and move up and down the core/shaft as needed for placing modular units.
Referring to
Referring to
In operation, in one embodiment, crane cables (not shown) are attached to the hoist frame and work platform assembly 1710 at “pick points,” i.e., balance points determined by the center of gravity, which allow the modular unit 100 to remain balanced while being lifted. The platform 1710 is lowered onto a slab 1730 that has two columns 1732 already lowered into place, which are, however, not yet anchored. The side of the platform 1710 that includes the work platform 1716 is lowered to rest on the columns 1732 such that threaded rods 1734 protruding from the ends of the columns 1732 extend through the access holes 1724. Further, the side of the platform that includes two support legs 1714 is lowered so that the support legs 1714 rest on the slab 1730. Each of the plurality of tie down cables 1722 is connected to the slab 1730 at tie down points 1736 (
The crane then lifts the platform 1710 while it is anchored to the slab 1730 and the columns 1732 and moves the entire modular assembly to another location for installation.
After the entire modular assembly has been placed in its final installation position, workmen, using the ladder 1720 to access the work platform 1716, access the threaded rods 1734 and detach them from the platform 10 and add grout or other locking/anchoring means to secure the columns 1732 in place. Thereafter, the tie down cables 1722 are detached from the slab 1730 and the platform 1710 is lifted off the column-slab assembly and moved to another location (via a crane connected to the pick point) for further installation of other modular building units.
In still another embodiment, the hoist frame and work platform assembly 1710 can be connected to a crane, lifted up, and lowered over a modular unit slab alone with columns that have yet to be installed. The tie down cables 1722 are connected to the slab at the tie down points 1736. Thereafter, the crane lifts the platform 1710 along with the slab so that the slab can be moved to another location for installation.
In yet another embodiment, the hoist frame and work platform assembly 1710 can be connected to a crane, lifted up, and lowered over a pair of concrete columns that have yet to be installed. In this case, the columns, standing vertically, are spaced apart from each so that when the platform 1710 is lowered over them, the threaded rods (e.g., rods 1734) extend through the access holes 1724. The columns are anchored to the platform 1710 so that the columns can be lifted and moved to another location (i.e., onto a concrete slab) for installation.
In some embodiments, the platform 1710 is made of steel, and the tie down cables 1722 are made of braided steel cables that include hooks or bolts disposed at the ends used for anchoring the platform 1710 to a concrete slab.
In another embodiment, the platform 1710 is lowered onto, and anchored to, a column-slab assembly at a staging site. In this case, the safety railings 1718 are folded down flat against the work platform 1716 and secured, and the ladder 1720 is folded or disconnected and secured to a part of the platform. The entire platform/column-slab assembly is covered with a tarp and shipped to an installation site.
In still another embodiment, one or more additional braces 1742 (
Variations, modifications, and other implementations of what is described herein may occur to those of ordinary skill in the art without departing from the spirit and scope of the disclosed subject matter. Further, the various features of the embodiments described herein also can be combined, rearranged, or separated without departing from the spirit and scope of the disclosed subject matter. Accordingly, the invention is not to be defined only by the preceding illustrative description.
This is a U.S. national stage of application No. PCT/US2010/039485, filed on Jun. 22, 2010. Priority is claimed on the following applications: U.S. Application No.: 61/219,048, filed on Jun. 22, 2009 and U.S. Application No.: 61/269,322 filed on Jun. 23, 2009, the content of which is incorporated here by reference.
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/US2010/039485 | 6/22/2010 | WO | 00 | 12/21/2011 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2010/151539 | 12/29/2010 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
1516074 | Borg | Nov 1924 | A |
1960575 | Davison | May 1934 | A |
2078069 | Eliel | Apr 1937 | A |
2387659 | Hafsos | Oct 1945 | A |
2543692 | Glover | Feb 1951 | A |
2592634 | Wilson | Apr 1952 | A |
2611262 | Dodson et al. | Sep 1952 | A |
2783638 | Henderson | Mar 1957 | A |
2819692 | Johnson et al. | Jan 1958 | A |
2920475 | Graham | Jan 1960 | A |
3162863 | Wokas | Dec 1964 | A |
3230683 | Foster | Jan 1966 | A |
3243927 | Hilson | Apr 1966 | A |
3261135 | Knabe | Jul 1966 | A |
3354593 | Zukas | Nov 1967 | A |
3369334 | Berg | Feb 1968 | A |
3372519 | Russell | Mar 1968 | A |
3487597 | Gutt | Jan 1970 | A |
3494092 | Bottjer et al. | Feb 1970 | A |
3566558 | Fisher | Mar 1971 | A |
3566560 | Wakefield et al. | Mar 1971 | A |
3596417 | Zachry | Aug 1971 | A |
3604177 | Clyne et al. | Sep 1971 | A |
3621626 | Tylius | Nov 1971 | A |
3635354 | Martin | Jan 1972 | A |
3642339 | Ruderfer | Feb 1972 | A |
3713259 | Tkach | Jan 1973 | A |
3714304 | Carner et al. | Jan 1973 | A |
3724141 | Kelleher | Apr 1973 | A |
3745731 | Simpson et al. | Jul 1973 | A |
3762115 | Mccaul, III et al. | Oct 1973 | A |
3782061 | Minutoli et al. | Jan 1974 | A |
3818660 | Dillon | Jun 1974 | A |
3828512 | Johnson | Aug 1974 | A |
3830025 | Wainshal | Aug 1974 | A |
3831332 | Weese | Aug 1974 | A |
3894373 | Willingham | Jul 1975 | A |
3959423 | Boyd | May 1976 | A |
3965627 | Fencl | Jun 1976 | A |
3969872 | Wesse | Jul 1976 | A |
3991528 | Dillon | Nov 1976 | A |
3999355 | Stucky | Dec 1976 | A |
4010579 | Galvagni | Mar 1977 | A |
4023315 | Stucky | May 1977 | A |
4048772 | Gaul | Sep 1977 | A |
4060948 | Brownlee | Dec 1977 | A |
4065907 | Rice | Jan 1978 | A |
4068425 | Czorniak | Jan 1978 | A |
4081936 | Wise | Apr 1978 | A |
4099360 | Outram | Jul 1978 | A |
4184296 | Vitalini | Jan 1980 | A |
4191002 | Rice | Mar 1980 | A |
4194339 | Fisher | Mar 1980 | A |
4214413 | Gonzalez Espinosa de Los Monteros | Jul 1980 | A |
4250671 | Hirsch et al. | Feb 1981 | A |
4277921 | Gianfranco | Jul 1981 | A |
4282690 | Meheen | Aug 1981 | A |
4302915 | Stocks | Dec 1981 | A |
4408434 | Collins | Oct 1983 | A |
4441286 | Skvaril | Apr 1984 | A |
4461130 | Shubow | Jul 1984 | A |
4527363 | Saether | Jul 1985 | A |
4528793 | Johnson | Jul 1985 | A |
4557099 | Johnson | Dec 1985 | A |
4558797 | Mitchell | Dec 1985 | A |
4583336 | Shelangoskie et al. | Apr 1986 | A |
4603522 | Johnson | Aug 1986 | A |
4640070 | Moffat | Feb 1987 | A |
4640214 | Bruns | Feb 1987 | A |
4658551 | Roux | Apr 1987 | A |
4694621 | Locke | Sep 1987 | A |
4726316 | Bruns | Feb 1988 | A |
4788802 | Wokas | Dec 1988 | A |
4907660 | Staggs et al. | Mar 1990 | A |
4945695 | Majurinen | Aug 1990 | A |
4989382 | Spronken | Feb 1991 | A |
5044134 | Brockway | Sep 1991 | A |
5081805 | Jazzar | Jan 1992 | A |
5088263 | Horii et al. | Feb 1992 | A |
5123220 | Simenoff | Jun 1992 | A |
5152118 | Lancelot | Oct 1992 | A |
5177913 | Erel | Jan 1993 | A |
5216860 | Thomson et al. | Jun 1993 | A |
5243794 | Pikor | Sep 1993 | A |
5261198 | McMillan | Nov 1993 | A |
5267419 | Yokota et al. | Dec 1993 | A |
5305563 | Erel | Apr 1994 | A |
5351454 | Hahne et al. | Oct 1994 | A |
5366672 | Albrigo et al. | Nov 1994 | A |
5412913 | Daniels et al. | May 1995 | A |
5491942 | Prokasky | Feb 1996 | A |
5528866 | Yulkowski | Jun 1996 | A |
5586834 | Tsuji | Dec 1996 | A |
5596853 | Blaney et al. | Jan 1997 | A |
6065263 | Taguchi | May 2000 | A |
6073401 | Iri et al. | Jun 2000 | A |
6074101 | Bloom | Jun 2000 | A |
6119413 | Shaw et al. | Sep 2000 | A |
6195955 | Kostopoulos | Mar 2001 | B1 |
6237297 | Paroly | May 2001 | B1 |
6327829 | Taguchi | Dec 2001 | B1 |
6367214 | Monachino | Apr 2002 | B1 |
6431797 | Greenberg | Aug 2002 | B2 |
6434900 | Masters | Aug 2002 | B1 |
6493996 | Alexander et al. | Dec 2002 | B1 |
6505450 | Locke et al. | Jan 2003 | B1 |
6588296 | Wessel | Jul 2003 | B2 |
6658799 | Stoodley | Dec 2003 | B1 |
6826879 | Allen et al. | Dec 2004 | B1 |
6871453 | Locke | Mar 2005 | B2 |
6925761 | De La Marche | Aug 2005 | B1 |
6978572 | Bernklau et al. | Dec 2005 | B1 |
7033116 | Ward et al. | Apr 2006 | B1 |
7121061 | Jazzar | Oct 2006 | B2 |
7143559 | Ritter | Dec 2006 | B1 |
7444793 | Raftery et al. | Nov 2008 | B2 |
7921609 | Kordelin | Apr 2011 | B2 |
7941975 | Ingjaldsdottir et al. | May 2011 | B2 |
8011147 | Hanlan | Sep 2011 | B2 |
8074414 | Carrion et al. | Dec 2011 | B2 |
8166714 | Ziegelman | May 2012 | B2 |
8341902 | Kusuma | Jan 2013 | B2 |
8397467 | Krell | Mar 2013 | B2 |
8429871 | Ingjaldsdottir et al. | Apr 2013 | B2 |
8434280 | Liberman | May 2013 | B2 |
8479471 | Liberman | Jul 2013 | B2 |
8756898 | Backhaus et al. | Jun 2014 | B1 |
8844242 | Liberman | Sep 2014 | B2 |
20030019167 | Baume et al. | Jan 2003 | A1 |
20030101680 | Lee | Jun 2003 | A1 |
20040083663 | Englekirk et al. | May 2004 | A1 |
20040118080 | Jazzar | Jun 2004 | A1 |
20040182016 | Locke | Sep 2004 | A1 |
20050044809 | Thompson | Mar 2005 | A1 |
20050115164 | Han | Jun 2005 | A1 |
20050204687 | Raftery et al. | Sep 2005 | A1 |
20050210762 | Broberg | Sep 2005 | A1 |
20050217190 | Simmons | Oct 2005 | A1 |
20050241918 | Alldredge et al. | Nov 2005 | A1 |
20060196132 | Ruano | Sep 2006 | A1 |
20060283105 | Bertrand | Dec 2006 | A1 |
20060288657 | Jaecklin | Dec 2006 | A1 |
20070044392 | LeBlang | Mar 2007 | A1 |
20080016805 | Walter | Jan 2008 | A1 |
20080060293 | Hanlon | Mar 2008 | A1 |
20080236090 | Liberman | Oct 2008 | A1 |
20090094915 | Liberman | Apr 2009 | A1 |
20100132271 | Fernandez Fernandez | Jun 2010 | A1 |
20100325987 | Ely, Jr. | Dec 2010 | A1 |
20110023383 | Brouillard | Feb 2011 | A1 |
20110047889 | Gad et al. | Mar 2011 | A1 |
20110162293 | Levy et al. | Jul 2011 | A1 |
20110173907 | Katsalidis | Jul 2011 | A1 |
20110225905 | Kusuma | Sep 2011 | A1 |
20110289862 | Larouche et al. | Dec 2011 | A1 |
20110296769 | Collins et al. | Dec 2011 | A1 |
20120023840 | Yuan | Feb 2012 | A1 |
20120096634 | Schultz et al. | Apr 2012 | A1 |
20130263551 | Liberman | Oct 2013 | A1 |
Number | Date | Country |
---|---|---|
1857602 | Nov 2007 | EP |
WO 2008124003 | Oct 2008 | WO |
Entry |
---|
International Preliminary Report on Patentability for PCT/US2010/039485 dated Jan. 4, 2012 (7 pages). |
Number | Date | Country | |
---|---|---|---|
20120110928 A1 | May 2012 | US |
Number | Date | Country | |
---|---|---|---|
61219048 | Jun 2009 | US | |
61269322 | Jun 2009 | US |