The inventions relate to offshore drilling operations and, more specifically, to a deepwater subsea blowout preventer stack configuration and its control system architecture, system interface, and operational parameters.
When drilling in deepwater from a floating drilling vessel, a blowout preventer stack (BOP Stack) is typically connected to a wellhead, at the sea floor, and a diverter system, which is mounted under the rig sub-structure at the surface via a marine riser system. Although pressure containing components, connectors, structural members, reentry guidance systems, load bearing components, and control systems have been upgraded for the operational requirement, the overall system architecture has remained common for more than two decades.
The BOP Stack is employed to provide a means to control the well during drilling operations and provide a means to both secure and disconnect from the well in the advent of the vessel losing position due to automatic station keeping failure, weather, sea state, or mooring failure.
A conventionally configured BOP Stack is typically arranged in two sections, including an upper section (Lower Marine Riser Package) which provides an interface to a marine riser via a riser adapter located at the top of the package. The riser adapter is secured to a flex-joint which provides angular movement, e.g. of up to ten degrees (10°), to compensate for vessel offset. The flex-joint assembly, in turn, interfaces with a single or dual element hydraulically operated annular type blowout preventer (BOP), which, by means of the radial element design, allows for the stripping of drill pipe or tubulars which are run in and out of the well. Also located in the Lower Marine Riser Package (or upper section) is a hydraulically actuated connector which interfaces with a mandrel, typically located on the top of the BOP Stack lower section. The BOP Stack lower section typically comprises a series of hydraulically operated ram type BOPs connected together via bolted flanges in a vertical plane creating a ram stack section. In turn, the ram stack section interfaces to a hydraulically latched wellhead connector via a bolted flange. The wellhead connector interfaces to the wellhead, which is a mandrel profile integral to the wellhead housing, which is the conduit to the wellbore.
Conduit lines integral to the marine riser provide for hydraulic fluid supply to the BOP Stack Control System and communication with the wellbore annulus via stack mounted gate valves. The stack mounted gate valves are arranged in the ram stack column at various positions allowing circulation through the BOP Stack column depending on which individual ram is closed.
The unitized BOP Stack is controlled by means of a control system containing pilot and directional control valves which are typically arranged in a control module or pod. Pressure regulators are typically included in the control pod to allow for operating pressure increase/decrease for the hydraulic circuits which control the functions on the unitized BOP Stack. These valves, when commanded from the surface, either hydraulically or electro-hydraulically direct pressurized hydraulic fluid to the function selected. Hydraulic fluid is supplied to the BOP Stack via a specific hydraulic conduit line. In turn, the fluid is stored at pressure in stack-mounted accumulators, which supply the function directional control valves contained in redundant (two (2)) control pods mounted on the lower marine riser package or upper section of the BOP Stack.
Currently, most subsea blowout preventer control systems are arranged with “open” circuitry whereby spent fluid from the particular function is vented to the ocean and not returned to the surface.
A hydraulic power unit and accumulator banks installed within the vessel provide a continuous source of replenishment fluid that is delivered to the subsea BOP Stack mounted accumulators via a hydraulic rigid conduit line and stored at pressure. The development and configuration of BOP Stacks and the control interface for ultra deep water applications has in effect remained conventional as to general arrangement and operating parameters.
Recent deepwater development commitments have placed increased demands for well control systems, requiring dramatic increases in the functional capability of subsea BOP Stacks and, in turn, the control system operating methodologies and complexity. These additional operational requirements and complexities have had a serious effect on system reliability, particularly in the control system components and interface.
Although redundancy provisions are provided by the use of two control pods, a single point failure in either control pod or function interface is considered system failure necessitating securing the well and retrieving the lower marine riser package, containing the control pods, or the complete BOP Stack for repair.
Retrieving any portion of the BOP Stack is time consuming creating “lost revenue” and rig “down time” considering the complete marine riser must be pulled and laid down.
Running and retrieving a subsea BOP Stack in deepwater is a significant event with potential for catastrophic failure and injury risk for personnel involved in the operation.
In addition, vessel configuration, size, capacity, and handling equipment has been dramatically increased to handle, store, and maintain the larger more complex subsea BOP Stacks and equipment. The configuration and pressure rating of the overall BOP Stack requires substantial structural members be incorporated into the assembly design to alleviate bending moment potential, particularly in the choke and kill stab interface area between the Lower Marine Riser Package and BOP Stack interface. These stab interfaces may see in excess of two hundred and seventy five thousand (275,000′) ft/lbs. separating forces, again requiring substantial section modulus in the structural assemblies, which support these components.
Further, a lower marine riser package apron or support assembly size has increased to accommodate the contemporary electro-hydraulic control pods and electronic modules necessary to control and acquire data from an overall Unitized BOP Stack assembly.
Substantial increases in the overall weight and size of high pressure BOP Stacks has created problems for drilling contractors who have a high percentage of existing vessels, which will not accommodate these larger stacks without substantial modifications and considerable expense. In most cases, the larger, heavier and more complex units are requiring by operators for “deep water” applications and reduce the potential for negotiating a contract for the particular rig without this equipment.
The various drawings supplied herein are representative of one or more embodiments of the present inventions.
a are schematics of an exemplary modular blowout preventer stack module comprising a predetermined modular blowout preventer function non-electric, fail-safe mechanical module (
Referring now to
In a preferred embodiment, BOP Stack 1 comprises riser connector 10, BOP assembly 100, and wellhead connector 50.
BOP assembly 100 includes control modules 200 that, in a preferred embodiment, are arranged in a vertical array and positioned adjacent to the particular function each control module 200 controls, such as hydraulic functions. Composition of control module 200 sections preferably include materials that are compatible on both the galvanic and galling scales and be suitable for long term immersion in salt water.
BOP assembly 100 is configured to accept and allow the use of distributed functional control modules 200 which are remotely operated vehicle (ROV) retrievable (the ROV is not shown in the figures). The use of this modular distributed control system architecture in subsea BOP Stack applications allows for the re-configuration of existing BOP stack arrangement designs to reduce weight and complexity in the integration and unitization of the elements required to form the overall BOP Stack 1.
BOP assembly 100 may be unitized and may comprise elements such as a hydraulic connector to interface to the subsea wellhead, one or more blowout preventers 115 (e.g. ram type blowout preventers), annular 110 or spherical type blowout preventers, a plurality of hydraulic connectors to interface to a marine riser (not shown in the figures) and hydraulically operated gate type valves for isolation and access for choke and kill functions.
Riser connector 10 comprises riser adapter 11, guideline-less reentry assembly 14, and multi-bore connector 15. Flex joint 13 is disposed intermediate riser adapter 11 and multi-bore connector 15. One or more flex loops 12 may be present and in fluid communication with ports on riser adapter 11. Multi-bore connector 15 provides an interface to BOP assembly 100.
BOP assembly 100 may be further adapted to receive one or more control modules 200 into docking stations 202 as well as other modules, e.g. annular preventer 110, RAM preventer 115, blowout preventers (not specifically shown), connectors (not specifically shown), “Fail Safe” gate valves (not specifically shown), sub system interface values (not specifically shown), or the like, or combinations thereof. One or more lines 120, e.g. kill and/or choke lines, may be present as well as various control pathways such as hydraulic conduit 101 and/or MUX cables (e.g. cables 26 in
Hang-off beams 102 may be provided to allow for support of BOP assembly 100 during certain operations, e.g. in a moon pool area such as for staging and/or testing prior to running
Referring now to
In a preferred embodiment, one or more subsea wet mateable connectors 21 are also integrated into riser connector 10 for interfacing with BOP assembly 100 (
In certain embodiments, riser connector 10 may also include riser connector control module 28 which comprises one or more junction boxes and subsea electronics module which may be integral with junction box 27. Using riser connector control module 28 may allow control of riser connector 10 and lower marine riser package functions independent of the BOP stack in the event the marine riser must be disconnected from BOP stack 100 (
In a preferred embodiment, subsea electronics module 27 may provide for connections such as electrical connections and may be equipped with connector receptacles for interfacing to ROV devices, e.g. ROV retrievable control modules 200 (
In a preferred embodiment, subsea electronics module 27 provides one or more interfaces from main multiplex cables 26 to a lower marine riser package which contains multibore riser connector 15. Wet make/break electrical connectors which may be present, e.g. 21, may be integral to riser connector 15, e.g. via pressure balanced, oil-filled cables.
Apron plate 30, which is of sufficient area to provide for mounting of junction boxes 27, may be present to provide a transition from main multiplex control cable connectors to the wet mateable assemblies located in multi-bore connector 15. Power and other signals to riser connector control module 28 may be effected via an oil filled pressure compensated cable assembly (not shown) that is connected to electrical junction boxes 27 mounted on apron plate 30. In a preferred embodiment, two junction boxes 27 are provided for redundancy and each may be distinguished from the other, e.g. labeled or provided with different colors. Apron plate 30 may be attached to guideline-less reentry funnel 16 (
In a preferred embodiment, riser connector 10 includes flex joint 13 and one or more flex loops 12, e.g. to allow for angular movement to compensate for vessel offset. The upper flange adapter or flex-joint top connection typically interfaces to a flange of riser adapter 11 containing kick-out flanged assemblies for connection of lines 120 (
Referring now to
In a preferred embodiment, riser connector mandrel flange 23 is of the API ring-groove type and interfaces with a matching flange which forms the lower connection of flex-joint assembly 13 or additional elements, e.g. annular blowout preventers which may be mounted on lower marine riser package.
Guideline-less receiver assembly 24 comprises guideline-less reentry funnel 16 and guideline-less reentry receiver 17. Multi-bore connector 15 may be arranged to reside in guideline-less reentry funnel 16 and guideline-less reentry receiver 17 may be attached to the top of BOP assembly 100 (
In further configurations, orientation dogs 20 and corresponding orientation slots 29 may be used to align riser connector 10 with respect to BOP assembly 100 (
The connector upper flange of multi-bore connector 15 may be of an API ring groove type and interface with a matching flange which forms a lower connection of flex joint 13.
In a preferred embodiment, the bottom or lower flex loop connection 12 interfaces to multi-bore connector 15, e.g. a studded ring groove connection, via an API flange.
Referring to
Hydraulic fluid is typically supplied to control module 200 via supply manifold 226. Control module 200 communicates with BOP assembly 100 (
Control module 200 is connected to BOP assembly 100 (
In an embodiment, hydraulic seals 210, also called packer seals, mount into stab 212 and are positioned and retained in a machined counterbore which is common to the hydraulic porting through the body of stab 212. When mated, the stab internal ports containing packer seals 210 align and interface with the matching ports contained in female receptacle 270 (
In preferred embodiments, wet mateable connector 228 comprises conductors or pins to supply power, data signals, or both to electronics (not shown) within control module 200, for example induction couplers, fiber optic couplers, or the like, or combinations thereof. In addition, a fiber optic conductor connection interface (not shown) may be included for signal command or data acquisition requirements depending on the functional application of the particular module assignment.
SPM valve 224 may further include vent port 214. SPM valve 224 (
Supply manifold 226 porting and arrangement may vary for valve operation in normally open or normally closed modes. Hydraulic fluid is supplied to pilot valves 216 through a dedicated port through the stab 212. Pressure regulators integral to the supply manifold 226 are provided for supply to function circuits requiring reduced or regulated pressures.
Pilot valves 216 interface with solenoid actuators that are contained in pressure compensated solenoid housing 218. Pressure compensated solenoid housing 218 is preferably filled with di-electric fluid providing a secondary environmental protection barrier.
Referring to
SPM valve 224 (
Modern manufacturing techniques, such as investment casting, may be employed for components such as the SPM valve 240, SPM valve 224, and supply manifold 226 providing substantial weight reduction and machining operations.
Referring to
Pressure compensating bladder 262 is contained within pressure compensated solenoid housing 218 to aid in equalizing the housing internal pressure, e.g. with seawater head pressure. An open seawater port 254 may be provided and a relief valve (not shown), e.g. a ten p.s.i. relief valve, may be contained within pressure compensated solenoid housing 218 to limit pressure build up inside pressure compensated solenoid housing 218, allowing equalization of the compensator bladder 262 volume against pressure compensated solenoid housing 218 volume, including a pressure compensated chamber 250. Pressure compensated chamber 250 may be accessed through an oil fill port 252.
A mandrel, e.g. conduit 268, may be disposed more or less centrally through pressure compensated solenoid housing 218 to provide a conduit, at preferably one atmosphere, for electrical/fiber optic conductors from a wet make/break connector half located in stab 212 (
Pressure compensated solenoid housing 218 interfaces with atmosphere chamber 260 containing the electronics module. In an embodiment, atmosphere chamber 260 mates to pressure compensated solenoid housing 218 via a bolted flange, which is machined with an upset mandrel containing redundant radial seals. In addition, the internal wire/fiber optic conduit, e.g. conduit 268, mates to an internal counterbore profile via a matching male mandrel also containing redundant radial a-ring seals. Atmosphere chamber 260 may further be equipped with flanged top providing access to the electronics chassis, wiring harness, and pigtail wiring connection. In embodiments, the flanged top is also provided with an upset mandrel containing redundant O-ring seals which interface to the top of atmosphere chamber 260.
In a preferred embodiment, all seal interfaces are machined with test ports to provide a means to test the internal and external O-ring seals to ensure integrity prior to module installation. In addition, housing 260 is typically equipped with “charge” and “vent” ports 258 for purging housing 260, such as with dry nitrogen, providing further environmental protection for the electronics components. Each port 258 may further be equipped with a shut-off valve and secondary seal plug.
In deep subsea use, electrical/electronic interface integrity may be assured by the environmental protection of electrical or fiber optic conductors using a stainless steel conduit spool equipped with redundant seal sub type interface, or the like.
In a preferred embodiment, the base of male stab 272 is machined with a counterbore profile to accept the male half of the connector insert containing male pins. The counterbore is recessed deep enough to allow the insert to be set back in the stab body providing protection for the individual pins and alleviating the potential for damage during handling.
A corresponding male mandrel profile is machined into the female receptacle base to accept the female half of a connector pair. Both the male mandrel in female receptacle 270 and female counterbore in the male stab 272 are machined with matching tapers, which provide a centering function and positive alignment for the male/female connector halves when stab 272 enters female receptacle 270. In addition, this centering/alignment method further assures correct hydraulic port, equal packer seal alignment, squeeze and loading when male stab 272 is mated in female receptacle 270.
The connection between male stab 272 and female receptacle 270 is maintained by a hydraulic latch 278, and communication is achieved through a wet mateable connector assembly 284, which is preferably of the wet make/break type. Hydraulic communication between male stab 272 and female receptacle 270 is maintained through packer seal assemblies 282.
Male stab 272 interfaces with SPM valve 240 (
Additionally, fitting 280 may be present to terminate a cable at receptacle 270. For example, fitting 280 may be an SAE.-to-J.I.C. adapter fitting to terminate a pressure balanced, oil filled cable at receptacle 270.
Referring now to
Referring now to
Modular BOP stack receiver diagnostic tool 500 typically further comprises a mechanical component such as one or more solenoids 543, valves 541, pressure transducers 540 operatively in communication with modular BOP stack receiver diagnostic tool electronics 510, or the like, or a combination thereof. Any of these mechanical components may also be configured to be exercised hydraulically and/or electrically. If hydraulically exercised, modular blowout preventer stack diagnostic module 500 may further comprise hydraulic coupler 544 operatively in fluid communication with the mechanical component and configured to operatively couple with an ROV hydraulic stab 306 or similar ROV hydraulic source such as a source provided by ROV skid 302.
One or more fluid couplers 503, 504 (two being illustrated in
In embodiments, modular blowout preventer stack diagnostic module 500 may further a plurality of controllable hydraulic functions. In other embodiments, modular blowout preventer stack diagnostic module 500 may further comprise analog feedback sensors (not shown in figures) disposed within or proximate to BOP stack receiver diagnostic electronics 510 providing pressure, voltage, current, and other diagnostic information. In other embodiments, modular blowout preventer stack diagnostic module 500 may have no hydraulic control and might simply be a data acquisition module that collects feedback from one or more sensors. It is understood that modular BOP stack receiver diagnostic tool 500 may be fitted to belly skid 302 that fits under ROV 300 where ROV 300 maneuvers belly skid 302 proximate BOP stack 1 and mates modular BOP stack receiver diagnostic tool 500 into modular blowout preventer stack module receiver 238.
Referring now to
As illustrated in
Referring now to
Additionally, accumulator 612 may be configured to activate a function upon activation of accumulator such as a hydraulic pilot signal from ROV mechanically activated handle 614. Accordingly, modular blowout preventer stack non-electric failsafe mechanical module 600 may further comprise one or more hydraulic ports 613 configured to receive ROV hydraulic stab 306 and receive hydraulic fluid through hydraulic ports 613 to aid in or otherwise allow for control as well as to recharge accumulator 612.
ROV mechanically activated handle 614 may be operatively connected to one or more ports, valves, and/or controllers such as non-electric controller 600 which may, in turn, be operatively connected to fluid lines 503, 504. Turning ROV mechanically activated handle 614 can, for example, control one or more such non-electric controller 600 and operatively open or close fluid flows 503,504.
Referring additionally to
In the operation of a preferred embodiment, distributed function control module 200 (
As the need arises, e.g. for maintenance or repair, an ROV may be positioned proximate end 220 (
Referring again to
Once installed in modular blowout preventer stack module receiver 238, modular BOP stack receiver diagnostic tool electronics 510 is interfaced to the predetermined modular blowout preventer function generator such as annular preventer 110, RAM preventer 115 (
Additionally, modular BOP stack receiver diagnostic tool 500 may be used to help in determining, or otherwise autonomously determine, the existence of faulty operation of the predetermined modular blowout preventer function generator such as annular preventer 110, RAM preventer 115 (
As an example, if the predetermined function comprises a hydraulic operation, testing the hydraulic operation may further comprise using ROV 300 to monitor module inlet pressure and the output pressure of each hydraulic function when controlled from BOP stack 1 (
Once interfaced, modular BOP stack receiver diagnostic tool 500 may be used to continue to monitor the obtained data. If the predetermined function comprises a power operation, the monitoring may further comprise using modular BOP stack receiver diagnostic tool electronics 510 to test electrical power in modular blowout preventer stack module receiver 238.
As a further example, modular BOP stack receiver diagnostic tool 500 may be connected to ROV 300 through one or more of communications interfaces 501 (
Modular BOP stack receiver diagnostic tool 500 may contain electronics such as analyzer 510 that can get its power and/or data communications from BOP 100 (
ROV 300 can then remove modular BOP stack receiver diagnostic tool 500. If the BOP Stack Receiver is working correctly, then the problem was in the removable electronic module which can be replaced with a new electronic module. If the problem on the BOP stack is electrical, ROV 300 can insert a non-electrical fail safe mechanical module such as modular blowout preventer stack module 600. The functions of modular blowout preventer stack module 600 are controlled by ROV 300 either through manual control of handle 614 or through hydraulic activation of selected functions from ROV 300. If the problem on the BOP stack is its hydraulic supply, ROV 300 can insert modular blowout preventer stack module 600 where accumulator 612 or ROV 300 provides the hydraulic source. BOP 100 (
Referring to
Referring now generally to
In a further scenario, involving special function box 400 (
The foregoing disclosure and description of the invention is illustrative and explanatory. Various changes in the size, shape, and materials, as well as in the details of the illustrative construction and/or an illustrative method may be made without departing from the spirit of the invention.
This application is a continuation-in-part of U.S. patent application Ser. No. 12/729,929 filed on Mar. 23, 2010 which was a continuation of U.S. patent application Ser. No. 11/205,893, filed on Aug. 17, 2005 now U.S. Pat. No. 7,216,714, issued May 15, 2007 which claims the benefit of U.S. Provisional Application No. 60/603,190, filed on Aug. 20, 2004.
Number | Date | Country | |
---|---|---|---|
60603190 | Aug 2004 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 11205893 | Aug 2005 | US |
Child | 12729929 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 12729929 | Mar 2010 | US |
Child | 14061687 | US |