The invention relates to filtration systems that are used to pre-filter storm water entering underground water management detention or retention systems.
Nearly any new development of land must incorporate a system for managing water run-off from the developed land. Current regulatory schemes typically require developers to install underground water detention and/or retention systems that effectively maintain a flow of water into and off of the developed land that mimics the natural (i.e., pre-development) flow from the land.
Such systems typically are installed under large concrete or asphalt surfaces and often must be capable of bearing highly variable weight loads (e.g., a parking lot). Ideally, such systems should maximize water storage while occupying as small a “footprint” as possible in order to minimize land usage.
In addition, urban and suburban landscapes generate a variety of contaminants that can enter storm water, polluting downstream receiving waters. Many regulatory schemes require not only controlling water run-off, but also water quality. Typically, developed land accumulates pollutants that can contaminate water run-off, particularly after storms. The entrance of gross pollutants, such as trash, debris and coarse sediments, into typical storm water filtration systems is known to reduce efficiency, increase maintenance frequency of the storm water filtration systems, and escalate the costs.
Ideally, underground water management systems should pre-treat water flow from the developed land prior to releasing it. Pre-filtration systems may be used to separate and retain gross pollutants from the filtering systems. They also can be used to capture and retain sediment, oils, metals, and other constituents found in storm water. Such pre-filtration systems should be incorporated into the underground water retention or detention system to minimize land usage, but also should be accessible for intermittent cleaning, repair, and/or other maintenance.
Generally, large (normally pre-cast concrete) pre-filtration structures are installed next to or along the side of the underground water detention or retention system. The pre-filtration structures are connected to the underground water detention or retention system by piping. This type of pre-filtration structure requires additional material and labor costs. It also requires the use of more space to accommodate the pre-treatment structure that sits next to or along the side of the underground water detention or retention system.
The present invention provides for a modular pre-filtration system installed at least partially above a storm water retention or detention system (also known as metering system). The pre-filtration system may be used anywhere requiring filtration and hydromodification of storm water, for example in commercial, industrial, or residential settings.
The present invention allows for the treatment of storm water before it enters one or more underground storm water retention or detention systems, while reducing or eliminating much of the related storm drain piping that connects the pre-filtration system and the storm water retention or detention system. The elimination or reduction in the piping allows for shallower facilities and less excavation.
In addition, the placement of the pre-filtration system above the storm water retention or detention system can reduce overall space demands. This allows for a significant reduction in the overall “footprint” of the storm water management system. The layout of the pre-filtration system simplifies construction and installation. It also allows for a reduction in the overall cost of the storm water management system.
The present invention facilitates the incorporation of a range of filtration devices into underground water management systems. This allows for the treatment of different storm water flows and contaminants.
The present invention also provides for a modular, scaleable design. The pre-filtration system may include different quantities of the filtration media (filter cartridges) to accommodate different storm water flow rates. The pre-filtration system may include different types of filtration media to treat different levels and types of contamination. The components of the pre-filtration system may be positioned in different configurations above a metering system. This allows the user to place the pre-filtration system with reference to different surface structures and to ensure alignment with surface improvements. The pre-filtration system may also be positioned above different types of metering systems.
In one embodiment, the present invention provides for a pre-filtration system for an underground water management system comprising an inlet chamber comprising an inlet opening; and a filtration chamber connected to the inlet chamber, comprising filtration medium and an outlet opening; wherein at least part of the pre-filtration system is disposed above a storm water detention system.
In another embodiment, the present invention provides for a pre-filtration system for an underground water management system comprising an inlet chamber and a filter chamber, wherein the pre-filtration system is disposed directly above a storm water detention system. The inlet chamber may comprise four side surfaces, a top surface, a bottom surface, and an access opening on at least one of said surfaces for incoming water. The filtration chamber may comprise filtration medium.
The inlet chamber may comprise a high flow bypass system to allow water overflow through openings in the inlet chamber. The high flow bypass system may comprise a baffle comprising at least two vertical walls, one wall being lower than the other wall, and an annular space between the two walls. In one embodiment, the high flow exits through a bypass system underneath the inlet chamber or filtration chamber. In another embodiment, the high flow is directed into a horizontal outlet pipe.
In another embodiment, the present invention provides for a method of pre-filtering storm water. Incoming water flows from the inlet chamber to one or more filtration chambers. The filter chamber can contain filter cartridges (for example, single or multiple stack heights). The inlet and filtration chambers may be connected together by bolts, sealants or pipes (or a combination thereof) in various configurations to add additional filtration capacity. Incoming flows may be directed to different sides of the storage system (split), reducing the size requirement of the filter housing and eliminating related piping.
In another embodiment, the present invention accepts water through one or more incoming pipes. In yet another embodiment, a catch basin chamber accepts surface water through a grate and/or through one or more incoming pipes.
In another embodiment, single or multiple filter chambers may be placed anywhere over the top of the storm water retention or detention system. This allows for alignment with surface improvements.
Removable covers incorporated into the pre-filtration system allow for access to the inlet and filtration chambers for removal of gross pollutants, as well as routine inspection and maintenance of the system. In one embodiment, the removable covers are set directly over the pre-filtration system. In another embodiment, the removable covers are set directly over adjustable risers, which are set over the pre-filtration system. This allows the adjustment of the depth of the system to match the finished surface.
In another embodiment, the at least one of the inlet chamber and filtration chamber is disposed above a pipe manifold system.
In another embodiment, the pre-filtration system can be connected to another pre-filtration system. In this embodiment, an outlet “pan style” adapter is used.
It is contemplated that the dimensions and structural configuration of the filter housings can vary dependent on one or more design factors including but not limited to: desired overall size of the assembly, desired load-bearing tolerance for assembly, desired amount of water flow to be managed, number and location of inlet and outlet pipes, number and location of pre-treatment zones and filtration systems, alignment with surface structures, and/or the desired access space for inspection and maintenance purposes.
Embodiments of the present invention may be described with reference to the accompanying drawings.
As used herein, the terms “comprises,” “comprising,” “includes,” “including,” “has,” “having” or any other variation thereof, are intended to cover a non-exclusive inclusion. For example, a process, method, article, or apparatus that comprises a list of elements is not necessarily limited to only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Further, unless expressly stated to the contrary, “or” refers to an inclusive or and not to an exclusive or. For example, a condition A or B is satisfied by any one of the following: A is true (or present) and B is false (or not present), A is false (or not present) and B is true (or present), and both A and B are true (or present).
Also, use of the “a” or “an” are employed to describe elements and components of the invention. This is done merely for convenience and to give a general sense of the invention. This description should be read to include one or at least one and the singular also includes the plural unless it is obvious that it is meant otherwise.
Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. Although methods similar or equivalent to those described herein may be used in the practice or testing of the present invention, suitable methods and materials are described herein. All publications, patent applications, patents, and other references mentioned herein are incorporated by reference in their entirety. In case of conflict, the present specification, including definitions, will control. In addition, the materials, methods, and examples are illustrative only and not intended to be limiting.
In the following description, numerous specific details are provided, such as the identification of various system components, to provide an understanding of embodiments of the invention. One skilled in the art will recognize, however, that embodiments of the invention may be practiced without one or more of the specific details, or with other methods, components, materials, etc. In still other instances, well-known structures, materials, or operations are not shown or described in detail to avoid obscuring aspects of various embodiments of the invention.
Reference throughout this specification to “one embodiment” or “an embodiment” means that a particular feature, structure, or characteristic described in connection with the embodiment is included in at least one embodiment of the present invention. Thus, the appearance of the phrases “in one embodiment” or “in an embodiment” in various places throughout this specification are not necessarily all referring to the same embodiment. Furthermore, the particular features, structures, or characteristics may be combined in any suitable manner in one or more embodiments.
The present invention provides a pre-filtration system for water management applications. A wide range of water management applications may be addressed using the systems described herein. These include, but are not limited to, all water retention and detention applications (or metering systems), such as those typically addressed with underground caverns, chambers, or cisterns and typically made using simple piping, pre-cast concrete, and/or plastic “milk crate” type assemblies. Particular applications include underground storm water retention and/or detention, rainwater harvesting, and other water run-off related issues.
The pre-filtration system of the present invention may be installed above a water retention and/or detention system to filter and meter storm water flow as illustrated in
The pre-filtration system includes an inlet chamber and filtration chamber. The inlet and filtration chambers may be combined within a single assembly with a common wall or similar partitions at least partially separating the two chambers. Alternatively, the inlet and filtration chambers may be separate structures that are bolted to each other or otherwise connected to each other through a mechanical connection.
The pre-filtration system may be placed over (directly or indirectly) one or more existing metered systems (or water storage and retention systems).
By installing all or at least part of the pre-filtration system over a water retention or detention system, the present invention effectively reduces the size of the “footprint” on the surface. This configuration can also reduce the depth of the underground water management system.
A. The Inlet Chamber
As illustrated in
The inlet chamber 2 also includes an access opening (not shown) located along a surface of the inlet chamber. In a “vault” assembly, the access opening may be a hole with a substantially circular solid manhole cover 6. The manhole cover 6 may be removed to allow for inspection of the inlet chamber. Removal of the manhole cover 6 allows for the periodic maintenance of the pre-filtration system. Gross pollutants may be removed from the inlet chamber 2 by vacuum. This can avoid clogging of the inlet chamber 2. Removal of the gross pollutants can also allow for the continued flow of storm water through the pre-filtration system.
The inlet chamber can also be designed to accept storm water from different sources.
As illustrated in
B. The Filtration Chamber
As shown in
The filtration chamber 5 also includes an access opening located along a top of the chamber. The access opening may be an opening with a substantially square grate 10. The grate 10 may be removed to allow for inspection of the filtration chamber 5. Removal of the grate 10 allows for the periodic maintenance of the pre-filtration system, such as removal of fine sediment and other pollutants. This avoids clogging of the filtration chamber 5 and allows for the periodic inspection and replacement of filter medium.
This “first flush” entering the filtration chamber 5 may be treated by one or more known filtration devices, including a filter cartridge 11 disposed within the filtration chamber 5. In one embodiment, the filtration chamber contains a cylindrical filtration device, such as The Perk Filter™ Media Filtration device to capture and retain sediment, oils, metals, and other target constituents (KriStar Enterprises, Inc., Santa Rosa, Calif.). The cylindrical filtration device is manufactured from durable polymeric components with a polymer-coated steel support screen and stainless steel hardware. The filtration device is approximately 18 inches in diameter and contains generally known filtration media, such as activated carbon or zeolites. The filtration media is designed to capture very fine sediments (typically less than about 100 μm), nutrients, metals, oils and grease, organics, and bacteria.
After contacting the filtration media, the filtered flows exit the filtration chamber 5 through an outlet opening in one or more side walls or the bottom surface. The filtered storm water can then be directed to metered filtration systems. The metered filtration system may include a modular underground water management system with an assembly of modular systems. The modular underground water management system may be a substantially cubic or “milk-crate” structure with a solid shell impermeable to water and an arched opening in each of six faces. Passages for water flow extend through the center of the structure to each opposing face, as described in “Modular Underground Water Management System” by Douglas Allard et al., U.S. Application Ser. No. 61/052,574, which is incorporated by reference herein.
C. High Flow Bypass
The pre-filtration system includes a high flow bypass to accommodate periods of increased storm water flow. During such periods, the flow rate of the storm water entering the pre-filtration system exceeds the treatment capacity of the filtration chamber 5.
In one embodiment, an internal bypass system contained within the pre-filtration system may be used. As shown in
A more detailed drawing of an internal high flow bypass is shown in more detail in
An external bypass system may also be implemented in the pre-filtration system. In one embodiment, bypass flow can be directed into a horizontal outlet pipe (not shown) connected to the floor or one or more side walls of the inlet chamber. The external bypass can also be located in the filtration chamber. During periods of high flow, bypass flows exit the pre-filtration system through the external bypass system, while filtered flows are directed to the filtration chamber and down into the water storage area.
During periods of high flow, the bypass flow can also exit through internal side plugs (not shown) that are connected to the floor or sides of the inlet chamber. The bypass flow is then directed to the outside of the pre-filtration system. The high flow can also be directed to another filtration system for treatment.
When an external bypass system is implemented, a sloped ramp or hood 14 may be incorporated onto one or more of the vertical walls of the baffle, as shown in
The inlet chamber also includes a drain down tube 19, as shown in
In one embodiment, one high flow bypass is installed in the pre-filtration system, as illustrated in
D. Adjustable Risers
To allow for added flexibility, the access covers of the pre-filtration system can be positioned on adjustable risers. As shown in
To allow for added flexibility, the inlet chamber and filtration chambers may be assembled in one of multiple configurations above a metered system. Factors that may determine the configuration include but are not limited to: desired overall size of the assembly, desired load-bearing tolerance for the assembly, the flow rate of the storm water, number and location of inlet and outlet pipes, number and location of pre-treatment zones and filtration systems, alignment with surface structures, and the desired placement of the access openings for inspection and maintenance purposes.
A. Single Cartridge Configuration
B. Two-Cartridge Configuration
The pre-filtration system may also be sized to include two filtration cartridges to accommodate higher storm water flow rates. As shown in
For a narrower “trench-like” landscape, the two cylindrical filtration cartridges could also be arranged in a side-by-side configuration. In this embodiment, the cylindrical filtration cartridges each measures approximately 18 inches in diameter. As shown in
C. Four-Cartridge Configuration
The pre-filtration system may also be sized to include four filtration cartridges to accommodate even higher storm water flow rates. As shown in
D. Additional Configurations
The above configurations are provided by way of example only. Additional filtration cartridges (and inlet and filtration chamber sizes) may be used to accommodate different storm water flow rates and levels of contaminants. In one embodiment, the filtration cartridges are arranged in a single layer. In another embodiment, the filtration cartridges may be stacked, increasing the filtration capacity without increasing the system footprint. This is a critical feature for sites with restricted area and a smaller footprint is a less expensive installation.
In another embodiment, as illustrated in
In one embodiment, two cartridges can filter about 32 gallons of storm water per minute. Thus, depending on the eventual flow and filtration requirements for a given land development, an engineer can determine the number of filtration cartridges required to treat the storm water flow prior to the commencement of construction. As shown in
For additional capacity, an inlet chamber measuring approximately 4 feet in the horizontal direction and 4 feet in the lateral direction may be used in connection with one to five different filtration chambers (each containing four cylindrical filtration devices). In this embodiment, the pre-filtration device can be used with as many as twenty cylindrical filtration devices.
In addition, a single inlet chamber may be adapted for use with different filtration chambers. This modular feature allows for the use of pre-fabricated components that can be combined in different ways. In this way, an engineer can tailor the pre-filtration system (different combinations of inlet and filtration chambers) for different surface structures and land development sites using pre-fabricated components. This can reduce the overall cost and time for manufacture and installation.
In addition to the cubic or “milk crate” metered systems shown in
The pre-filtration system empties into a pipe manifold system, which includes a series of horizontal pipes located underground 20. The pipe manifold system may be connected to one or more outlets of the pre-filtration system using a riser pipe 30. Alternatively, when a shallower configuration is desired, the pre-filtration system may rest directly over the pipe manifold system. The outlet of the pre-filtration system is directed vertically into the storage area instead of connecting into the riser pipe.
During normal use, storm water flows from the inlet pipe 22 into an opening along the side of the inlet chamber 21. Normal flow passes into the filtration chamber 23, where it is then filtered by one or more filtration cartridges 25. The filtered flow exits the pre-filtration system through an opening in the floor of the filtration system 26. Further, during periods of high flow, storm water is allowed to accumulate in the inlet chamber until it enters the annular space between the vertical walls of the baffle 27. The bypass flow is then allowed to exit the pre-filtration system by way of an opening in the inlet chamber 28.
An outlet pan 29 collects the filtered and bypass flows. An example of an outlet pan of the pre-filtration system is shown in
Multiple (or supplemental) filtration chambers can be used to treat storm water over a pipe manifold system. As illustrated in
This configuration is also applicable when there is a surface feature that will interfere with the pre-treatment configuration. In other words, a connector pipe 39 can be used to connect two filtration chambers located at a distance from each other. In addition, in this configuration, the pre-filtration system can reduce the size and filtration load of any given pre-filtration system by splitting the flow of storm water to different filtration chambers. By connecting the filtration chambers together, the storm water levels can rise and fall at approximately the same time in all the connected filtration chambers. This equalizes the flow and filtration load in all filtration chambers.
In another embodiment, the pre-filtration system may be installed over a chamber style system containing half an arch. In another embodiment, the pre-filtration system can be used in connection with a bioretention system or a conventional “tree box filter.” In yet another embodiment, the pre-filtration system can be used with other filtration systems, such as a grassy swale pre-filter. This is shown in
The ordinary artisan will recognize that the absolute dimensions of the openings in the pre-filtration system can be selected to accept industry standard pipe connections and fittings (e.g., rubber boots). Such fittings can offer flexible and watertight connections between modular systems and control piping for controlling water flow into and out of an assembled pre-filtration system. There need not be a mechanical connection between the pre-filtration system and the subsequent system to which the storm water is directed. Rather, in one embodiment, the pre-filtration system can be placed over the metered systems with a hydraulic seal between the pre-filtration system and one or more metered systems. The hydraulic seal can be formed using any of the methods known in the art, for example, using mastic, caulking, sealant or adhesive compositions.
The above features offer increased flexibility to a design engineer. As discussed, the modular nature of the pre-filtration system allows for the placement of inlet chambers and filtration chambers anywhere over the top (directly or indirectly) of a water storage area.
The above disclosure is sufficient to enable one of ordinary skill in the art to practice the invention, and provides the best mode of practicing the invention presently contemplated by the inventor. While there is provided herein a full and complete disclosure of specific embodiments of this invention, it is not desired to limit the invention to the exact construction, dimensional relationships, and operation shown and described. Various modifications, alternative constructions, design options, changes and equivalents will readily occur to those skilled in the art and may be employed, as suitable, without departing from the true spirit and scope of the invention. Such changes might involve alternative materials, components, structural arrangements, sizes, shapes, forms, functions, operational features or the like.
This application claims priority to International Application No. PCT/US2010/030206 filed on Apr. 7, 2010, which claims priority to U.S. Provisional Application Ser. No. 61/167,746 filed on Apr. 8, 2009, the subject matter of which are herein incorporated by reference in their entirety.
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/US10/30206 | 4/7/2010 | WO | 00 | 10/6/2011 |
Number | Date | Country | |
---|---|---|---|
61167746 | Apr 2009 | US |