MOISTURE REDUCTION AND MOLD AND MOISTURE DAMAGE PREVENTATIVE SYSTEM AND METHOD IN CONSTRUCTION

Information

  • Patent Application
  • 20150121716
  • Publication Number
    20150121716
  • Date Filed
    January 08, 2015
    9 years ago
  • Date Published
    May 07, 2015
    9 years ago
Abstract
A moisture removal system and method employing air movers, dehumidifiers, heaters and attendant methods for reducing moisture in a construction project. The method and system include operating moisture removal equipment and testing moisture content levels sufficient to reduce the moisture content levels to a desired threshold to reduce the likelihood of mold growing or moisture damage in the construction after it is completed.
Description
BACKGROUND OF THE INVENTION

This invention relates to buildings and construction, and more particularly to controlling moisture to reduce the likelihood of mold growth and moisture damage.


Mold and mildew problems in buildings are becoming more common, and can lead to substantial remediation efforts, with associated costs or litigation.


In building construction, whether commercial or single or multiple family residential, problems can arise if a particular level of moisture remains in walls at the time the walls are sealed. During construction, these buildings are typically wet, either from rain/snow or from wet construction materials being used, for example, wet wood, or materials that are applied in a wet state and then need to dry. Mold will typically grow in wood or other construction material when there is sufficient moisture present, for example, above 20% moisture in Douglas fir.


Mold spores can grow if sufficient moisture is sealed into construction material and there is an available food source. Should mold develop, it is often detected immediately, or sometimes such detection is delayed. In some cases, it is never detected.


Mold remediation, such as removal and prevention of future growth, is costly and time consuming. The existence of mold in a construction project can cause public relations issues, wherein the builder or project developer can be equated with the bad publicity related to the mold issues. Still further, legal issues can arise, related to the costs and delay of remediation, alleged health issues from occupants of the affected buildings, and contractual disputes arising over purchase or lease of the affected property, as a purchaser might wish to cancel a property transaction based on the mold issues.


Apart from mold issues, the presence of moisture alone can also lead to damage to structures and materials, resulting in costly remediation with corresponding issues to those noted hereinabove with respect to mold.


Financing and monetary requirements demand that structures be built as quickly as possible, to minimize the duration of construction financing, for example, and to increase construction-related revenue. Such time constraints result in framing being covered up as quickly as possible. These time constraints do not allow a builder to have a partially completed structure sit for weeks to allow any moisture in the construction materials to naturally reach equilibrium with its environment, and this increases the likelihood that wet materials may be sealed up, leading to a higher likelihood of mold growth or moisture damage occurring. Depending on climate factors, the business cycle of construction may not allow sufficient time for waiting for the natural drying process.


In particular in new construction, building practices resulting in an energy efficient structure may severely restrict airflow between the interior and exterior of a structure, resulting in trapping of moisture inside the structure. This can increase the likelihood of mold or moisture problems in structures today.


Heretofore, the issue of mold has been addressed as an afterthought in reactive fashion, only being tackled when mold appears, advising cleaning up mold quickly when it appears, for example.


SUMMARY OF THE INVENTION

In accordance with the invention, a system and method is provided for removing moisture from a construction project, to ensure sufficiently low moisture content is present in the construction before it is sealed.


Accordingly, it is an object of the present invention to provide an improved method for reducing moisture in construction projects below a desired level.


It is a further object of the present invention to provide an improved system for removing moisture from construction projects.


The subject matter of the present invention is particularly pointed out and distinctly claimed in the concluding portion of this specification. However, both the organization and method of operation, together with further advantages and objects thereof, may best be understood by reference to the following description taken in connection with accompanying drawings wherein like reference characters refer to like elements.





BRIEF DESCRIPTION OF THE DRAWINGS


FIG. 1 is a block diagram of the process according to the present invention.





DETAILED DESCRIPTION

The system according to a preferred embodiment of the present invention comprises a system and method for reducing moisture content in a building or portion of a building under construction, wherein said reduction is made as a curative and preventative measure that takes place at a specific phase in the construction process.


Referring now to FIG. 1, which is a block diagram of the moisture reduction process according to the present invention, the system and method are typically employed, in the case of construction, after the roof, windows and doors are installed and before the so called finish trades (wall board, insulation, cabinetry, etc.) are done. When a decision to take the preventative measure has been made, initial readings of moisture content of construction materials, relative humidity and temperature are taken in the building under test (step 12). These measurements are made to determine how to effect moisture removal in the building and may be made, for example, with a GE Protimeter MMS Plus model by GE Protimeter, 500 Research Drive, Wilmington, Mass., US, or the Tramex Moisture Meter, from Tramex Ltd. of Dublin, Ireland moisture meter in particular embodiments.


Next, in step 16, a determination is made based on the results of the readings, whether preventative moisture removal is warranted. For example, if moisture content of Douglas fir is below 20% moisture content, moisture removal treatment may not be needed. If further treatment is not needed, then the process is complete at block 18. However, if further treatment is deemed advisable, then the process continues to block 20, wherein moisture reduction equipment is placed within the space that is to be treated. The specific moisture reduction equipment employed can vary based on the moisture removal needs of the structure, but typically will include air moving equipment, such as blowers, for circulating the air within the space, dehumidifiers to extract the moisture from the air and either contain it within the dehumidifier or dispose of it external to the space (by a drain tube, for example). Additionally, heating equipment may be employed, to raise the temperature within the space to increase the speed of moisture removal.


Examples of typical equipment that may be employed in the system and performing the method is as follows:


Blower: An electric portable blower that provides a continuous, high velocity airflow, such as model #797 Ace TurboDryer, from Dri-Eaz of Burlington, Wash., US, or the Dri-Eaz Santana SX model turbodryer, or the Gale Force air mover by Dry Air Technology of Burlington, Wash.


Dehumidifier: #721 DrizAir 1200, by Dri-Eaz of Burlington, Wash., US. This is a refrigerant dehumidifier which provides a 15 gallon per day maximum moisture removal output level, while drawing 6.4 amps current at 120V. Also, the DrizAir 2000, a 25 gallon per day model can be employed. Alternatively, a DriTec desiccant dehumidifier may be employed, which uses silica gel to adsorb moisture from the air, manufactured by Dri-Eaz of Burlington, Wash.


Heater: portable heaters, such as propane/natural gas powered heaters, such as the Dri-Eaz K85 mobile furnace, by Dri-Eaz of Burlington, Wash., US.


In a typical installation, four or five blowers or fans will be grouped together with one dehumidifier and heater in a given space.


Depending on the particular characteristics of the space being treated, openings into other rooms or other parts of a building are sealed off with some sort of vapor barrier (for example, plastic sheeting in roll form and duct tape to seal the sheeting to close off the opening). Also, window or door openings that do not yet have the windows or doors installed may be sealed in corresponding fashion.


Once the equipment is in place, the blowers and dehumidifier are activated (and heaters, if present) and they are allowed to run for a period of time (block 22), typically a 24 hour period, whereupon further moisture readings are taken (block 24) to track the progress of moisture removal. At decision block 26, a determination is made whether sufficient moisture has been removed from the space. If not, then the equipment is allowed to continue to operate. Optionally, the equipment may be moved around to different locations within the space being treated (block 28). The process loops back to allow the passage of time at block 22, and the time/readings/determine whether acceptable moisture content reduction has occurred cycle continues until the result of the decision block 26 is that yes, the moisture content has been reduced to an acceptable level (for example, 20% or lower moisture content). Then the moisture removal process is completed and the equipment is removed (block 30).


A typical time between the initial placement of the equipment and determination that the space has a sufficiently low moisture content level is 4 to 7 days. Of course this depends on a number of factors, including the initial moisture content of the space, the capacity of the moisture control equipment that is installed, and relative humidity and temperature, for example.


Some other possible variations in the process can occur. For example, if at block 24, when further readings are taken after the passage of time, it is determined that the moisture level is not being reduced (or is not being reduced at a sufficient rate), then additional blower/dehumidifier/heating equipment may be added. Further, if after a passage of time, the moisture levels are not reducing in a desired fashion, this typically indicates that moisture is leaking into the space from an outside source (for example an improperly installed roof is leaking) and investigation of the source of the moisture should be made.


Examples of application of the system and method are given below. The measurement goal for all tests in these particular examples is 18% moisture content:


Example 1
New Construction, 1500 Square Feet

Day 1, temperature 71.5.degree. F., 36.7% relative humidity. 2 measurements were taken low along wall studs, giving 16 and 18% moisture content. 4 measurements were taken high along wall studs, giving 16, 24, 21 and 21%.


Moisture removal equipment was installed and allowed to run for the rest of day 1. On day 2, temperature was 64.7.degree. F., 46.9% relative humidity. 2 measurements were taken low along wall studs, giving 16 and 18% moisture content. 4 measurements were taken high along wall studs, giving 16, 18, 18 and 18% moisture content. The moisture removal operation was judged completed.


Example 2
New Construction, 2200 Square Feet

Day 1, temperature 69.4.degree. F., 49.1% relative humidity. 7 measurements were taken low along wall studs, giving 25, 20, 25, 25, 15, 25 and 22% moisture content. 7 measurements were taken high along wall studs, giving 21, 19, 25, 25, 25, 25 and 25%.


Moisture removal equipment was installed and allowed to run. On day 2, temperature was 65.1.degree. F., 55.3% relative humidity. 7 measurements were taken low along wall studs, giving 20, 17, 25, 25, 20, 21 and 20% moisture content. 7 measurements were taken high along wall studs, giving 22, 18, 23, 23, 15, 21 and 20% moisture content. The moisture removal operation was continued, and then further measurements were taken on day 3. 6 lower level measurements of 20, 18, 18, 18, 15 and 21% moisture content were taken, and 7 upper level measurements of 18, 17, 20, 23, 18, 18 and 20% were recorded. Moisture removal was continued and on day 4, 7 measurements were taken at both lower and upper levels, resulting in: lower 18, 18, 18, 18, 15, 18, 17; and upper 16, 16, 17, 16, 18, 16, 15. The moisture removal operation was judged completed at this state.


Example 3
New Construction, 2300 Square Feet

Day 1, temperature 63.2.degree. F., 38.0% relative humidity. 7 measurements were taken low along wall studs, giving 15, 20, 15, 15, 30, 30, and 16% moisture content. 7 measurements were taken high along wall studs, giving 30, 30, 30, 18, 25, 24 and 20%.


Moisture removal equipment was installed and allowed to run until day 2, when further measurements are made, temperature was 80.2.degree. F., 29.5% relative humidity. Measurements low along wall studs were 15, 15, 15, 15, 20, 15 and 16% moisture content. High location measurements were 25, 20, 25, 18, 23, 20 and 20% moisture content. The moisture removal operation was continued until day 3, when measurements as follows were judged to have sufficiently accomplished the desired moisture removal: low, 15, 15, 15, 15, 18, 15, 16%; and high 18, 17, 18, 18, 16, 15, 18%.


Example 4
New Construction, 1500 Square Feet

Day 1, temperature 68.8.degree. F., 43.0% relative humidity. 4 measurements were taken low along wall studs, giving 21, 18, 15 and 17% moisture content. 7 measurements were taken high along wall studs, giving 15, 25, 25, 21, 16, 15 and 18%.


Moisture removal equipment was installed and allowed to run. On day 2, when further measurements are made, temperature was 58.4.degree. F., 59.4% relative humidity. Measurements low along wall studs were 18, 18, 15 and 17% moisture content. High location measurements were 15, 18, 18, 17, 16, 15 and 18% moisture content. This was sufficient moisture removal to complete the operation.


Example 5
New Construction, 2150 Square Feet

Day 1, temperature 57.4.degree. F., 97.4% relative humidity. 7 measurements were taken low along wall studs, giving 20, 15, 20, 21, 40, 18 and 16% moisture content. Measurements taken high along wall studs were 20, 20, 23, 40, 22, 17 and 30%.


Moisture removal equipment was installed and allowed to run until day 2, when further measurements are made, temperature was 67.0.degree. F., 47.9% relative humidity. Measurements low along wall studs were 15, 15, 15, 15, 18, 18 and 16% moisture content. High location measurements were 15, 15, 18, 16, 15, 17 and 17% moisture content. This was a sufficient moisture level to complete the operation.


Example 6
New Construction, 2500 Square Feet

Day 1, temperature 68.0.degree. F., 36.6% relative humidity. 7 measurements were taken low along wall studs, giving 13, 11, 12, 11, 11, 13 and 10% moisture content. Measurements taken high along wall studs were 12, 11, 13, 10, 12, 13 and 11%.


Since all measurements were below the target level, no moisture removal was performed as the area was already at a sufficiently low moisture content.


In making measurements, any wood surfaces are measured, but typically moisture content measurements are made at base plates, studs and floors. It is not necessary to measure every stud in the structure, because if a stud with moisture content above the moisture threshold is detected in an area, then moisture removal will be performed in the area, so it isn't required to keep measuring at that point. Thus, for example, if the first set of measurements taken is beyond the acceptable moisture threshold, taking additional measurements is not necessary, but can be completed if desired, to provide historical data for comparison when the moisture removal is completed, and more measurements might be taken to further show overall moisture levels. Thus, in performing the process, typically moisture content tests are made throughout the structure, but moisture removal is only needed to be done in those areas where the moisture content level is too high.


Thus, in accordance with the system and method, a preventative moisture removal is accomplished to bring the moisture content level within a space to a desired level below that which would support mold growth, to reduce the likelihood that mold or moisture damage problems will arise in the finished construction. Should mold or moisture damage problems arise later, however, the builder has useful information to help locate the cause of the mold growth or moisture damage, as it is known from the use of the system and method that at a crucial point in the construction process, the moisture content level had been reduced sufficiently to prevent such growth or water damage. This information can help in determining what party might bear the responsibility for costs involved in mold or moisture damage remediation procedures. It can also assist in determining the construction stage at which a mold infestation or moisture entry took place.


While in the preferred embodiment, the moisture content level of 20% is a desired threshold, applied to Douglas fir wood, for example, below which the moisture content is desirably reduced, and while 18% was given as the threshold level in the illustrative examples herein, different levels may be appropriate in other types of wood and in other materials such as engineered woods (oriented strand board, plywood, fiberboard, etc.), wallboard or other materials.


While a preferred embodiment of the present invention has been shown and described, it will be apparent to those skilled in the art that many changes and modifications may be made without departing from the invention in its broader aspects. The appended claims are therefore intended to cover all such changes and modifications as fall within the true spirit and scope of the invention.

Claims
  • 1. A system, comprising: means for measuring a moisture content at a plurality of locations within a building, wherein the measured moisture content is compared with a threshold moisture content level to determine if a drying operation needs to be performed in the building;means for substantially sealing a space of the building; andmeans for drying the sealed space in order to reduce the moisture content, wherein the means for drying is entirely located within the building during the drying operation, wherein the means for drying comprises a number of drying devices, and wherein the number of drying devices is determined based, at least in part, on the measured moisture content.
  • 2. The system of claim 1, wherein the space comprises the building, and wherein the building is substantially sealed relative to outside of the building.
  • 3. The system of claim 1, wherein the space comprises one or more rooms of the building, and wherein the one or more rooms are substantially sealed relative to other rooms of the building.
  • 4. The system of claim 1, wherein the means for drying is entirely located within the space.
  • 5. The system of claim 1, wherein the means for drying comprises means for drying, prior to the measuring, the space for a period of time, and wherein the moisture content is measured after drying the space for the period of time.
  • 6. The system of claim 5, further comprising means for determining whether additional operation of the means for drying is required in order to further reduce the moisture content.
  • 7. The system of claim 6, wherein the means for determining whether additional operation of the means for drying is required comprises means for determining whether to increase the number of drying devices.
  • 8. The system of claim 6, wherein the means for determining whether additional operation of the means for drying is required comprises means for determining whether to move a portion of the number of drying devices to new locations within the space.
  • 9. The system of claim 1, wherein the plurality of locations comprise a high location within the space and a low location within the space, and wherein the means for measuring comprises means for measuring both the high location and the low location.
  • 10. The system of claim 9, wherein both the high location and the low location are measured on one or more exposed studs within the space.
  • 11. A method, comprising: measuring a moisture content at a plurality of locations within a building, wherein the measured moisture content is compared with a threshold moisture content level to determine if a drying operation needs to be performed in the building;substantially sealing a space of the building; anddrying, with a number of drying devices, the sealed space in order to reduce the moisture content, wherein the number of drying devices are entirely located within the building during the drying operation, and wherein the number of drying devices is determined based, at least in part, on the measured moisture content.
  • 12. The method of claim 11, wherein the space comprises the building, and wherein the building is substantially sealed relative to outside of the building.
  • 13. The method of claim 11, wherein the space comprises one or more rooms of the building, and wherein the one or more rooms are substantially sealed relative to other rooms of the building.
  • 14. The method of claim 11, wherein the number of drying devices are entirely located within the space.
  • 15. The method of claim 11, wherein the measuring comprises: measuring the moisture content at a high location within the space; andmeasuring the moisture content at a low location within the space.
  • 16. The method of claim 11, wherein the drying comprises drying, prior to the measuring, the space of the building for a period of time, and wherein the moisture content is measured after drying the space of the building for the period of time.
  • 17. The method of claim 16, further comprising: determining whether the moisture content is being reduced;identifying, in response to determining that the moisture content is not being reduced, a source of a moisture leak into the sealed space.
  • 18. The method of claim 16, further comprising determining whether additional operation of the number of drying devices is required in order to further reduce the moisture content.
  • 19. The method of claim 18, further comprising, in response to determining the additional operation is required, increasing the number of drying devices operating during the additional operation.
  • 20. The method of claim 18, further comprising, in response to determining the additional operation is required, moving a portion of the number of drying devices to new locations within the space prior to the additional operation.
CROSS-REFERENCE TO RELATED APPLICATION

This application is a Divisional of U.S. patent application Ser. No. 14/035,292, filed Sep. 24, 2014, which is a Continuation of U.S. patent application Ser. No. 10/621,859, filed Jul. 16, 2003, now U.S. Pat. No. 8,567,688, issued Oct. 29, 2013, the contents of which are herein incorporated by reference in their entireties.

Divisions (1)
Number Date Country
Parent 14035292 Sep 2013 US
Child 14592110 US
Continuations (1)
Number Date Country
Parent 10621859 Jul 2003 US
Child 14035292 US