The present invention relates to a molten metal transporting container that is used for supplying molten metal to a holding furnace at a casting site or for delivering molten aluminum from a manufacturer to a user.
When conducting aluminum casting, etc., it is inefficient to remelt aluminum that was once molten by a manufacturer and solidified into an ingot. Therefore, molten aluminum is delivered to a casting site using a molten metal transporting container without changing the condition that was obtained by a smelter.
Furthermore, since the combined use of a centralized melting furnace and a small melting furnace increases equipment and labor costs, some manufacturers outsource the production of molten metal without installing a melting furnace in their factories, and conduct casting by being supplied with molten metal from outside using a molten metal transporting container.
Such a molten metal transporting container is provided with a long-reach-pouring spout to bring the pouring outlet near the molten metal surface in the holding furnace. This structure shortens the time for the molten metal to be in contact with air after it is taken out of the molten metal transporting container, and therefore reduces air oxidation of the molten metal. This calms the molten metal surface and reduces the generation of oxide. It is also possible to further reduce the oxidation of the molten metal by dipping a pouring outlet provided on top of the long-reach-pouring spout into the molten metal in the holding furnace.
However, long-reach-pouring spouts are obstructive when molten metal transporting containers are transported, and the number of ladles that can be loaded into the loading space of a truck, etc., may be limited due to the space occupied by the long-reach-pouring spout.
A structure that may prevent the above problem is one in which the long-reach-pouring spout is rotatably connected to the pouring spout by means of a pin and is rotated so as to fit to the container body when transported. This structure prevents the long-reach-pouring spout from becoming obstructive when transported, makes it possible to smoothly transport the molten metal transporting container inside a factory or on an ordinary road using a fork lift, a truck, etc., and prevents the number of ladles loaded into the loading space of a truck, etc., from being limited due to the long-reach-pouring spout.
However, because a hardened layer of molten metal adheres to the inner side of the connection between the pouring spout and the long-reach-pouring spout, if the long-reach-pouring spout is rotated with the hardened layer of molten metal adhered to the connecting portion when the molten metal is supplied, the hardened layer of molten metal will become clamped between the long-reach-pouring spout and the pouring spout. This damages the connecting portion or deforms the pin, causing defects in the connection.
An object of the present invention is to provide a molten metal transporting container in which a long-reach-pouring spout is pulled toward the container body after removing the hardened layer of molten metal adhered to the inner side of the connecting portion between the long-reach-pouring spout and the pouring spout.
In order to achieve the above object, the present invention provides a molten metal transporting container having a long-reach-pouring spout connected to a pouring outlet of a pouring spout and projects toward the outside of the container body, the molten metal transporting container further having a spout operating member for separating the long-reach-pouring spout from the pouring spout by raising the long-reach-pouring spout while it is projected from the container body, and a spout drawing member for drawing the long-reach-pouring spout that was separated from the pouring spout toward the container body.
It is preferable that the spout drawing member be provided with a rotation shaft for drawing the long-reach-pouring spout that was separated from the pouring spout toward the container body by rotating it.
It is preferable that the pouring spout be provided with a protrusion or concave portion for aligning the pouring spout with the long-reach-pouring spout, and that the long-reach-pouring spout be provided with a protrusion or concave portion that fits in the protrusion or concave portion of the pouring spout in such a manner that the distance between the pouring spout and the long-reach-pouring spout that was separated from the pouring spout is greater than the height of the protrusion.
It is also preferable that the rotation shaft be suspended from the long-reach-pouring spout, and that a hole to which the rotation shaft is loosely fit be provided in the pouring spout, wherein the molten metal transporting container further includes a spout operating member that separates the long-reach-pouring spout from the pouring spout by raising the rotation shaft, and connects the long-reach-pouring spout to the pouring spout by lowering the rotation shaft.
a) is a side elevational view showing a molten metal supply operation according to the present embodiment, and
a) is a perspective view showing a positioner for positioning the long-reach-pouring spout of the present embodiment, and
Hereunder, an embodiment of the present invention is explained with reference to drawings.
A molten metal transporting container A is provided with a container body 1 for storing the molten metal, a pouring spout 2 having a pouring outlet 2a on top thereof, a long-reach-pouring spout 3 connected to the pouring outlet 2a and projecting toward the outside of the container body 1, a compressed air inlet port 4 for introducing compressed air into the container body 1, a locking device 5 for locking the long-reach-pouring spout 3 to the pouring spout 2, a spout operating member 6 for connecting the long-reach-pouring spout 3 to the pouring outlet 2a and separating it from the pouring spout 2, a spout drawing member 7 for drawing the long-reach-pouring spout 3 toward the container body 1 while the molten metal transporting container A is being transported, and an opening and closing means for the pouring outlet 8 provided with a pouring stopper C35 for covering the pouring outlet 2a while the molten metal transporting container A is being transported.
The container body 1 is formed by lining a shell case 1a with a thermal insulating material and a refractory layer 1b formed of a castable refractory material, wherein a molten metal inlet port 1c is formed in the base-end portion of the container body 1, a pouring spout 2 is connected to the molten metal inlet port 1c, and the pouring spout 2 protrudes upward while being slanted about 70° relative to a horizontal line.
The pouring spout 2 is formed by lining the inner side of the metal tube 2a with a refractory layer 2b and a refractory tubular molded element 2c. Use of the tubular molded element 2c improves the corrosion resistance of the pouring spout 2, making the lining process easier. The pouring outlet 2a of the pouring spout 2 is provided with a pouring spout nozzle 9 formed of cast iron, wherein a flange 10 is fixed to the pouring spout nozzle 9, and a groove 10a is formed in two locations on the periphery of the flange 10 disposed 180° apart from each other. The inner surface of the pouring spout nozzle 9 has a mortar-like shape in which the pouring stopper C35 of the opening and closing means for the pouring outlet 8 can fit in. This structure allows the pouring stopper C35 to fit in the pouring spout nozzle 9 and improves the sealing of the pouring outlet 2a, preventing the molten metal from leaking while being transported, etc. The pouring spout 2 is formed so as to have a straight linear axis, so that the entire inside of the pouring spout 2 can be visually checked from the pouring outlet 2a. This makes it possible to easily check the condition of the inner side of the pouring spout 2 such as aluminum ingot adhesion or damage to the refractory layer.
The long-reach-pouring spout 3 is formed by lining the metal tube 3a with a refractory layer 3b made of a calcium silicate refractory material. This refractory layer 3b improves the heat insulation property and abrasion resistance against the flowing of molten metal in the long-reach-pouring spout 3. A flange 11 is provided on the base-end portion of the long-reach-pouring spout 3, and a groove 11a is formed in two locations of the periphery of the flange 11 while remaining apart from each other by an interval of 180°. It is preferable that the top of the long-reach-pouring spout 3 be covered with a refractory material such as silicon nitride so that damage to the top of the long-reach-pouring spout 3 can be prevented when it touches the molten metal.
The long-reach-pouring spout 3 is bent in two locations, so that the top of the long-reach-pouring spout 3 faces the surface of the molten metal in the holding furnace 100 to which additional molten metal is supplied without slanting the molten metal transporting container A. Therefore, the molten metal released from the pouring outlet 2a of the molten metal transporting container A by applying pressure as described later is directed to the outside of the container body 1 due to the long-reach-pouring spout 3, flowed downwardly and then poured into the holding furnace 100. This makes it possible to pour while locating the extension pouring outlet 3a below the molten metal surface 101 in the holding furnace 100 as shown in
The spout drawing member 7 is provided with a rotation shaft 7a. The rotation shaft 7a is provided so as to be suspended from the flange 11 of the long-reach-pouring spout 3. The flange 10 of the pouring spout 2 is provided with a through-hole 10b, and a shaft guide cylinder 12 that communicably opens to the through-hole 10b is provided so as to be suspended from the flange 10. By inserting the rotation shaft 7a into the through-hole 10b and the shaft guide cylinder 12, it is possible to rotate the long-reach-pouring spout 3 around the rotation shaft 7a as shown by the arrow in
As shown in
By moving the handle C15 upward as shown in
In order to align the pouring spout 2 with the long-reach-pouring spout 3, a protrusion 21 is provided on the pouring spout 2 and a concave portion 31 that fits the protrusion 21 is provided in the long-reach-pouring spout 3. Therefore, the distance between the pouring spout 2 and the long-reach-pouring spout 3 that was separated from the pouring spout 2 is designed to be greater than the height of the protrusion 21.
In contrast, by moving the handle C15 downward as shown in
As shown in
As shown in
When the handle C32 is rotated upwardly as shown in
When the stopper arm C31 is raised, the toggle clamp C3 is horizontally rotatable with the rotation shaft 8b as its center, and this allows the pouring stopper C35 to be separated from the pouring outlet 2a.
The structures of other components of the molten metal transporting container A are as follows: A stopper 14 is provided on the side wall of the container body 1 for locking the molten metal transporting container to the loading space of a truck while being transported, and a fork insertion member 15 is provided on the base-end portion of the container body 1. The molten metal transporting container A is transported in such a manner that the forks (not shown) of a fork lift are inserted into a fork insertion member 15, and a temperature sensor 16 for a refractory lining is provided on the side wall of the container body 1.
As shown in
Numerical symbol 19 in the figure indicates a flue that is covered by the cover 19a during transport or pouring.
Pouring is conducted in the following manner using a molten metal transporting container A having the above-described structure:
When a molten metal transporting container A containing molten metal is transported, the long-reach-pouring spout 3 is positioned along the container body 1 by drawing it toward the container body 1 using the spout drawing member 7, so that it will not obstruct the transporting or other operations. The pouring outlet 2a is also covered by a pouring stopper C35.
The pouring preparation is as follows: First, the pouring stopper C35 is separated from the pouring outlet 2a by raising the handle using the opening and closing means for the pouring outlet 8, then the toggle clamp C3 is rotated around the rotation shaft 8b to retract the pouring stopper C35 from above the pouring outlet 2a. Subsequently, the long-reach-pouring spout 3 is rotated by the spout drawing member 7 so that the long-reach-pouring spout 3 projects outward from the container body 1. Thereafter, the long-reach-pouring spout 3 is brought down by the spout operating member 6, connected to the pouring outlet 2a in the pouring spout 2, and then locked to the pouring outlet 2a by the locking device 5.
Pouring into the holding furnace 100 is conducted in the following manner. The compressed air inlet port 4 is connected to a compressed-air supplier (compressor, not shown), and the container body 1 is pressurized by compressed air. As a result of the pressure of the compressed air, the molten metal is supplied from the pouring outlet 2a of the pouring spout 2 via the long-reach-pouring spout 3 to the holding furnace, etc. This structure allows the molten metal transporting container A to function as a pressurized pouring container by which molten metal can be supplied using the long-reach-pouring spout 3 projecting from the container body 1, and therefore pouring can be conducted without tilting the molten metal transporting container A as shown in
After the pouring operation is completed, the long-reach-pouring spout 3 is unlocked, raised to the lift height A using the spout operating member 6, and pulled toward the container body 1 by the spout drawing member 7. Thereafter, the pouring outlet 2a is covered by the pouring stopper C35. The molten metal transporting container A is transported to the pouring site in this condition.
In the present embodiment, because the locking device 5, the spout operating member 6, and the opening and closing means for the pouring outlet 8 of the long-reach-pouring spout 3 are located in the vicinity of the pouring outlet 2a, and a toggle clamp is employed, the efficiency of the pouring operation is increased. Furthermore, these components may be small, and therefore they do not become obstacles even if they are attached to the outside of the container body 1 as protrusions. This makes the transfer of molten metal within a casting site, the delivery of molten metal using a vehicle, and the receipt and supply of molten metal smooth.
Note that the molten metal transporting container A in the present embodiment is a pressurized-type container; however, it is also possible to conduct pouring without applying pressure but by tilting the molten metal container.
A molten metal transporting container A having the structure described below was used. Because the molten metal could be poured without tilting the molten metal transporting container A, no special skills were necessary for pouring, and therefore the pouring operation was completed in an easy, quick, and safe manner. Compared to a conventional tilting-type pouring container, the container of the present invention had the following advantages: the molten metal supplied through the long-reach-pouring spout 3 calmed the surface of the molten metal in the holding furnace; and the generation of oxide was reduced because the molten metal was in contact with the air for a shortened time, improving the quality of the molten metal. Furthermore, since the long-reach-pouring spout 3 was drawn toward the container body and the protrusions were made smaller, it was possible to make the molten metal transporting container compact, simplify the transporting operation, increase the number of containers that could be loaded onto a truck, and significantly simplify the pouring operation.
The specifications of the container are as follows:
As described above, the molten metal transporting container of the present invention is provided with a spout operating member for separating the long-reach-pouring spout from the container body by raising the long-reach-pouring spout while it is projected from the container body; and a spout drawing member that pulls the long-reach-pouring spout that was separated from the pouring spout toward the container body. Therefore, a force to separate the hardened layer of molten metal that adheres inside the portion connecting the long-reach-pouring spout with the pouring spout from inside the tube is applied by raising the long-reach-pouring spout, and the hardened layer of molten metal exposed between the pouring spout and the long-reach-pouring spout can be removed using a scraper, etc. This prevents an incomplete connection due to the connecting portion of the tube being damaged by the hardened layer of molten metal.
Furthermore, if the spout drawing member is provided with a rotation shaft for rotating the long-reach-pouring spout that was separated from the pouring spout to bring it near the container body, the long-reach-pouring spout can be easily brought near the container body by rotating the long-reach-pouring spout around the rotation shaft.
If a protrusion or concave portion for aligning the pouring spout with the long-reach-pouring spout is provided on the pouring spout and a protrusion or concave portion that fits the above-mentioned protrusion or concave portion is provided on the long-reach-pouring spout, and the distance of the long-reach-pouring spout that was separated from the pouring spout is made greater than the height of the protrusion, even if an alignment protrusion exists, the long-reach-pouring spout can be drawn without being disturbed by the projection.
If the container of the present invention has a rotation shaft that is suspended from the long-reach-pouring spout, wherein the rotation shaft is rotatably fitted in a hole in the pouring spout side, and a spout operating member is provided to separate the long-reach-pouring spout from the pouring spout by raising the rotation shaft and to connect the long-reach-pouring spout to the pouring spout by bringing the rotation shaft down, it is possible to separate the long-reach-pouring spout from the pouring spout, and connect it to the pouring spout, merely by raising the rotation shaft.
Number | Date | Country | Kind |
---|---|---|---|
2003-428094 | Dec 2003 | JP | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/JP2004/010900 | 7/23/2004 | WO | 00 | 6/23/2006 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2005/061154 | 7/7/2005 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
6953548 | Mancusi | Oct 2005 | B2 |
7204954 | Mizuno et al. | Apr 2007 | B2 |
20040070122 | Mizuno et al. | Apr 2004 | A1 |
Number | Date | Country |
---|---|---|
1 304 184 | Apr 2003 | EP |
02-052164 | Feb 1990 | JP |
2002-254159 | Sep 2002 | JP |
2002-307159 | Oct 2002 | JP |
2003-225757 | Aug 2003 | JP |
2003-225758 | Aug 2003 | JP |
2003-230954 | Aug 2003 | JP |
2003-305561 | Oct 2003 | JP |
2005-169446 | Jun 2005 | JP |
Number | Date | Country | |
---|---|---|---|
20070152387 A1 | Jul 2007 | US | |
20080088069 A2 | Apr 2008 | US |