The present invention relates to a mooring system for a tanker, i.e. mooring of a conventional tanker to an installation with fixed orientation, according to the preamble of the claims.
Mooring of a conventional tanker i.e. a tanker without dynamic positioning and bow loading equipment for load transfer to/from a fixed or floating platform with a fixed orientation, is traditionally done via a loading station. The loading station comprises a hawser which connects the tanker to the platform and where the transfer of load takes place through a hose leading from the platform to the mid-ship manifold of the tanker.
In order to keep the tanker in position, an auxiliary vessel is necessary to keep is the tanker away from the platform. An incorrect operation of the auxiliary vessel or line tear off has with this type of mooring led to collision between the tanker and the platform.
In case of changing wind and/or current conditions, this can lead to that a loading operation must be interrupted. An interrupted loading operation can easily lead to one or several days delay, which can be very costly for the owner of the tanker but also for supplier due to tight delivery conditions.
It is therefore an object of the present invention to provide a mooring system for conventional tankers, which on one side shall reduce the need for costly auxiliary vessels during the loading operation of the tanker and on the other side reduce the risk and the need for interruptions in the loading process. This is achieved with the mooring system according to the present invention as it is defined by the features of the appended claims.
The present invention will be described further in connection with an embodiment and with reference to the drawings, in which
The mooring system according to the invention is based on mooring a conventional tanker 3 in four points A,B,C,D on the tanker 3, where the hawsers to the points C,D are connected on board a platform 1 and the hawsers to the points A,B are connected to two separate buoys 4, 5. Each buoy 4, 5 is anchored by means of a rope consisting of a wire, chain and/or polyester rope, down to at least one anchor on the seabed. The anchor can be at least one of the anchors used by the platform.
With reference to
The auxiliary vessel on the platform will now be subject to a routine as follows (ref
During this procedure the tanker 3 will move in the sailing direction 6 until the hawsers 7, 8, 9, 10, which are connected aft and forward, are tightened in order to place the tanker 3 in the most favorable position to wind, current and waves.
In
Referring to
Number | Date | Country | Kind |
---|---|---|---|
2006 4700 | Oct 2006 | NO | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/NO2007/000361 | 10/16/2007 | WO | 00 | 7/1/2009 |