Mooring system for a conventional tanker

Information

  • Patent Grant
  • 8333163
  • Patent Number
    8,333,163
  • Date Filed
    Tuesday, October 16, 2007
    16 years ago
  • Date Issued
    Tuesday, December 18, 2012
    11 years ago
  • Inventors
  • Original Assignees
  • Examiners
    • Olson; Lars A
    • Polay; Andrew
    Agents
    • Frommer Lawrence & Haug LLP
    • Santucci; Ronald R
Abstract
Mooring system for a tanker, i.e. a mooring of a conventional tanker to an installation with fixed orientation, wherein a conventional tanker (3) which is to be moored to the installation is arriving in a direction favorable to wind, current and waves. By mooring a conventional tanker (3) in four points (A, B, C, D) on a tanker (3), wherein the hawsers to the points (C, D) are connected on board a platform (1) and hawsers to the points (A, B) are connected to two separate buoys (4, 5) and then tightening/slackening the hawsers until the tanker (3) has arrived in the desired/correct position.
Description

This is a 371 filing of International Patent Application No. PCT/NO2007/000361 filed Oct. 16, 2007 and published on Jul. 10, 2008 under publication number WO 2008/082306 A and claims priority benefits to Norwegian Patent Application Number 2006 4700 filed Oct. 17, 2006, the disclosure of which is hereby incorporated by reference.


The present invention relates to a mooring system for a tanker, i.e. mooring of a conventional tanker to an installation with fixed orientation, according to the preamble of the claims.


Mooring of a conventional tanker i.e. a tanker without dynamic positioning and bow loading equipment for load transfer to/from a fixed or floating platform with a fixed orientation, is traditionally done via a loading station. The loading station comprises a hawser which connects the tanker to the platform and where the transfer of load takes place through a hose leading from the platform to the mid-ship manifold of the tanker.


In order to keep the tanker in position, an auxiliary vessel is necessary to keep is the tanker away from the platform. An incorrect operation of the auxiliary vessel or line tear off has with this type of mooring led to collision between the tanker and the platform.


In case of changing wind and/or current conditions, this can lead to that a loading operation must be interrupted. An interrupted loading operation can easily lead to one or several days delay, which can be very costly for the owner of the tanker but also for supplier due to tight delivery conditions.


It is therefore an object of the present invention to provide a mooring system for conventional tankers, which on one side shall reduce the need for costly auxiliary vessels during the loading operation of the tanker and on the other side reduce the risk and the need for interruptions in the loading process. This is achieved with the mooring system according to the present invention as it is defined by the features of the appended claims.





The present invention will be described further in connection with an embodiment and with reference to the drawings, in which



FIG. 1 shows a tanker approaching the platform for load transfer,



FIG. 2 shows how an auxiliary vessel from the platform helps out with the hawsers to the tanker,



FIG. 3 shows how the tanker independently can turn according to wind and current by adjusting the hawsers, and



FIG. 4 shows a conventional tanker ready moored to a platform and with load transfer hoses attached to the mid-ship manifold.





The mooring system according to the invention is based on mooring a conventional tanker 3 in four points A, B, C, D on the tanker 3, where the hawsers to the points C,D are connected on board a platform 1 and the hawsers to the points A,B are connected to two separate buoys 4, 5. Each buoy 4, 5 is anchored by means of a rope consisting of a wire, chain and/or polyester rope, down to at least one anchor on the seabed. The anchor can be at least one of the anchors used by the platform.


With reference to FIGS. 1 and 2, a conventional tanker 3 which is to be moored to a platform 1, is approaching. The tanker 3 arise in a direction which is favourable for wind, current and waves to a position between the nearest buoy 5 and the platform 1. On/by the platform 1 is an auxiliary vessel 2 which is to assist in the delivery of hawsers to the tanker 3. In the sailing direction 6 to the tanker 3 another buoy 4 is positioned, which also is to be used to moor the tanker 3.


The auxiliary vessel on the platform will now be subject to a routine as follows (ref FIG. 2):

    • 1) The auxiliary vessel 2 has in turn arrived and fixed a hawser 7, with a fore-runner if necessary, to the buoy 5 nearest the arriving tanker 3 and thereafter provide the forerunner to someone on board the tanker. The tanker 3 will then lay down the line on the aft capstan A and take control of the hawser 7.
    • 2) The auxiliary vessel 2 will then proceed to the next buoy 4 and connects a hawser 8, with a forerunner if necessary, to this buoy and thereafter provide the forerunner to someone on board the tanker. The tanker 3 will then lay down the line on the forward capstan B and take control over the hawser 8.
    • 3) The auxiliary vessel 2 will then return to the platform 1 and fetch a hawser 9 with a forerunner if necessary, and thereafter provide the forerunner for the hawser to someone on board the tanker. The tanker 3 will then lay down the line on the aft capstan C and take control over the hawser 9.
    • 4) The auxiliary vessel 2 will then once again return to the platform 1 and fetch another hawser 10, with a forerunner if necessary, and thereafter provide the forerunner to someone on board the tanker. The tanker 3 will then lay down the line on the forward capstan D and take control over the hawser 10.
    • 5) The auxiliary vessel 2 then return to the platform 1.


During this procedure the tanker 3 will move in the sailing direction 6 until the hawsers 7, 8, 9, 10, which are connected aft and forward, are tightened in order to place the tanker 3 in the most favorable position to wind, current and waves.


In FIG. 3 it is shown how the tanker 3, on its own, can position itself by tightening or slackening the hawser 7, 8, 9, 10 to obtain a suitable distance to the platform and orientation with regards to the waves, wind and current as indicated by the dotted lines of the tanker and hawsers.


Referring to FIG. 4, the tanker 3 is shown ready moored in the four points in relation to the platform 1 and at least one loading hose 11 is transferred to the tanker 3 mid-ship manifold in order to start the loading.

Claims
  • 1. Method for mooring a conventional tanker between at least one buoy and an installation of fixed orientation, wherein an auxiliary vessel on the platform is subjected to the following steps: 1) the auxiliary vessel drives out and connects a hawser with a forerunner to the buoy nearest the arriving tanker and thereafter provide the forerunner to someone on board the tanker who will position this line on the aft capstan and take control over the hawser,2) the auxiliary vessel drives to the next buoy and connects a hawser with a forerunner to this buoy and thereafter provide the forerunner to someone on board on the tanker who then position the line on the forward capstan and take control over the hawser,3) the auxiliary vessel drives to the platform and collects a hawser with a forerunner providing the forerunner of the hawser to someone on board the tanker who then position the line on the aft capstan and take control over the hawser,4) the auxiliary vessel will then once again return to the platform and fetch another hawser with a forerunner providing the forerunner to someone on board the tanker who will then lay down the line on the forward capstan and take control over the hawser,5) the auxiliary vessel drives back to the platform.
Priority Claims (1)
Number Date Country Kind
20064700 Oct 2006 NO national
PCT Information
Filing Document Filing Date Country Kind 371c Date
PCT/NO2007/000361 10/16/2007 WO 00 7/1/2009
Publishing Document Publishing Date Country Kind
WO2008/082306 7/10/2008 WO A
US Referenced Citations (12)
Number Name Date Kind
102878 Street May 1870 A
3552343 Scott Jan 1971 A
4067280 Serfess Jan 1978 A
4169580 Hatlapa et al. Oct 1979 A
4372535 Gibson et al. Feb 1983 A
4771987 Priest Sep 1988 A
6073917 Plummer Jun 2000 A
6463870 Beato et al. Oct 2002 B2
6571723 Bech et al. Jun 2003 B1
6983712 Cottrell et al. Jan 2006 B2
7117808 Kulikov et al. Oct 2006 B2
20100218710 Feger Sep 2010 A1
Foreign Referenced Citations (3)
Number Date Country
WO 9747516 Dec 1997 WO
WO 9835874 Aug 1998 WO
WO 0110707 Feb 2001 WO
Related Publications (1)
Number Date Country
20100024704 A1 Feb 2010 US