The present disclosure pertains to the technical field of water conservancy projects, and in particular relates to a movable water-permeable pile spur dike and an operation method thereof.
A spur dike is a hydraulic structure widely used in river restoration, with one end connected to an embankment, and the other end deep into the river, showing a “T” shape. As natural rivers usually have navigation obstruction phenomena such as insufficient water depth in dry seasons, dangerous water flow states and dangerous shoals in clusters, as well as frequent inshore erosion phenomenon, the hydraulic structures such as spur dikes perform an important function in reducing scouring damage to river banks caused by direct erosion, removing sand with converging flow, improving waterways, restoring rivers and protecting hydrogeologic diversity.
With epoch development and in-depth research on the flow field around a spur dike, the spur dike can also be gradually sorted into a water-permeable spur dike and a traditional spur dike. Traditional spur dike are mainly a fixed, continuous and water-impermeable gravity spur dike, the bodies of which have complicated water flow structure around them, and majority in the form of a single longitudinal slope, resulting in poor adaptability to the river bank as well as incapability to be easily dismantled once built. Under the long-term erosion of water flow, it is easy to cause the dike head to be eroded and its foundation to be hollowed out, resulting in partial instability of the dike body, which causes huge daily maintenance to the spur dike and reduces in its economic and engineering effects.
Compared with the traditional spur dike, the water-permeable spur dike reduces the scouring erosion of the water flow on the dike body, due to consideration that ecological factors reduces the partition between aquatic organisms and natural bank slopes to a certain extent, it has a better ecological protection function. However, in the case of great changes in annual river environment, due to the constant length and the range-fixed water-permeability of the spur dike, the spur dike is not universally operated, and still lacks a good self-adaptive adjustment capability, which is not beneficial to use the spur dike in the long term. In addition, in the actual project, in order to effectively improve the effect of river restoration, people adopt the method of changing a single spur dike to a spur dike group, but the backflow areas between spur dikes in the spur dike group are fixed, and its adjustment capacity is limited as same as the single spur dike.
In the existing patent such as CN106677121B, the movable water-permeable spur dike structure that prevents seashores from being eroded and adopts a spur dike in the form of several open caissons arranged at intervals, not only has a good coastal erosion-prevention effect, but also can reduce the engineering amount, but it still does not have the rapid adjustment and response mechanism that can be self-adaptive to changes in coastal flow in time. Although the self-lifting spur dike automatically adjusting height according to water level (CN109853465A) can realize automatically adjusting the height of spur dikes and enhance the protection to spur dike foundations, the spur dike still cannot avoid problems in long-term use such as hollowing out of its foundation caused by scouring erosion, and instability of the dike body.
In order to overcome the deficiencies in the prior art, an objective of the present disclosure is to provide a movable water-permeable pile spur dike, which can be used in a complicated river environment, and can change its shape and water permeability based on control, so as to enhance the stable arrangement of the dike body.
Another objective of the present disclosure is to provide an operation method of a movable water-permeable pile spur dike, which can control the movable water-permeable pile spur dike to form the shape and the water permeability that adapt to the changes of the surrounding environment according to the changes in the flow velocity of rivers and pressure borne by the spur dike, so as to reduce the scouring damage to river banks caused by direct erosion, improve the protection effect and the stability of the movable water-permeable pile spur dike itself, and better meet the requirements of river navigation, flood control and ecological protection.
Technical solution: in order to achieve the above objective, one aspect of the present disclosure provides a movable water-permeable pile spur dike, comprising a fixed rail, a plurality of movable rails, a plurality of movable water-permeable piles, pressure sensors, flow meters and a control platform,
wherein one end of each movable rail is slidably connected to one side of the downstream face of the fixed rail, and can move relatively in the extending direction of the fixed rail;
the plurality of movable water-permeable piles are arranged on the fixed rail and the plurality of movable rails;
the pressure sensor and the flow meter are arranged at each monitoring point on the outer side wall of each movable water-permeable pile and respectively used to monitor the changes in the water pressure on each monitoring point and the changes in the water flow velocity about it;
the plurality of movable rail, the plurality of movable water-permeable pile, each pressure sensor and each flow meter are respectively connected to the control platform in a communication mode, which is used for analysis and calculation according to the monitoring data from each pressure sensor and each flow meter and adjusts the positions of each movable rail and each movable water-permeable pile, so that the water flow velocity and spur dike's pressure at each monitoring point are both less than a corresponding flow velocity threshold value and pressure threshold value, and the spur dike's water permeability falls within a setting range.
Preferably, each movable water-permeable pile includes a hollow cylinder, of the hollow cylinder, the upstream face is provided with a plurality of upstream face permeable holes whose diameters increase from top to bottom, and the downstream face is provided with a plurality of downstream face permeable holes whose diameters decrease from top to bottom, each upstream face permeable hole and each downstream face permeable hole penetrate through the water-permeable pile to its hollow, and the upstream face permeable holes and the downstream face permeable holes are completely alternately arranged in the vertical direction.
Preferably, the upper surfaces of the fixed rail and the plurality of movable rail are provided with two or more than two pile-sliding grooves arranged in parallel, two sides of each pile-sliding groove are provided with tooth-shaped grooves;
the bottom of each water-movable permeable pile is provided with two or more than two rows of pile roller groups, each of which corresponds to one pile-sliding groove, and each of which includes one or more than one pile roller unit, each pile roller unit includes a connector, a pile roller and an electromagnetic group, of the connector, the top is embedded inside the mobile water-permeable pile, the middle part is a hollow connecting block, and the two ends of the bottom extend downwards to form connecting pieces, both of which are connected by a connecting rod, the connecting rod passes through the center of the pile roller, a pile-fixing clamp is sleeved on the connecting rod, the electromagnetic group is arranged in the hollow connecting block of the connector, the pile roller and the electromagnetic group are connected with the control platform in a communication mode, so as to be rolled and magnetically adsorb the pile-fixing clamp under the control of the control platform, respectively;
in the case that the electromagnetic group has not magnetically adsorbed the pile-fixing clamp, the pile-fixing clamp is embedded in the tooth-shaped grooves of its rail under the action of gravity, in the case that the electromagnetic group has magnetically adsorbed the pile-fixing clamp, the pile-fixing clamp leaves the tooth-shaped grooves.
Preferably, the pile-fixing clamp includes 2 U-shaped bent iron sheets, the two ends of each U-shaped bent iron sheet are respectively sleeved on the connecting rod, and can rotate around the connecting rod, in the case that the electromagnetic group has not magnetically adsorbed the pile-fixing clamp, the two U-shaped bent iron sheets, under the action of gravity, respectively, are embedded in the tooth-shaped grooves of their rails in the opposite direction.
Preferably, the sides of the two straight ends of each U-shaped bent iron sheet are fan-shaped.
Preferably, the 2 U-shaped bent iron sheets are connected with each other through a telescopic chain net, the telescopic chain net is made from elastic wear-resistant material, in the case that the electromagnetic group has magnetically adsorbed the 2 U-shaped bent iron sheets, the telescopic chain net shrinks, in the case that the electromagnetic group has not magnetically adsorbed the 2 U-shaped bent iron sheets, the telescopic chain net spreads out and covers the surface of the pile roller after its both ends being stretched.
Preferably, the fixed rail is an irregular curved rail, or a broken-line rail formed by splicing multiple segments of straight sub-rails.
Preferably, the lower surface of the fixed rail is provided with one or more than one four-sided hollowed-out pyramid sinking in the river bed, the quadrilateral bottom surface of the four-sided hollowed-out pyramid is embedded in the lower surface of the fixed rail, and has a pyramided outer frame formed by metal wires, each hollowed out surface also has a plurality of metal wires wound across its edges, the plurality of four-sided hollowed-out pyramids are arranged along such three straight lines, as the edges of the corresponding fixed rail and the central axis of the long end, and the four-sided hollowed-out pyramids along the two adjacent straight lines are alternated with each other.
Preferably, one side of the downstream face of the fixed rail is provided with a groove whose inside is provided with a movable rail groove, one end connecting each movable rail to the fixed rail is provided with a moving slider, and the bottom of one end away from the fixed rail is provided with a movable rail roller, which is inlaid into the movable rail groove inside the groove, the movable rail roller is connected with the control platform in a communication mode, and can roll along the matched convex single rail fixed on the river bed under the control of the control platform, thereby driving the moving slider to slide, so as to adjust the position of the corresponding movable rail.
Another aspect of the present disclosure further provides an operation method of the movable water-permeable pile spur dike, comprising the following steps:
Compared with the prior art, the present disclosure has the following the beneficial effects: (1) The water-permeable piles are hollow piles, and have permeable holes with different diameters front and rear alternately arranged on the upstream and downstream faces, thus the water flow passes through the permeable holes of each pile, reducing the flow around the spur dike head and influencing 3D flow field distribution rule of the water flow at the spur dike head and near the dike body, with an effective decrease in the partial maximum flow velocity of the dike head at the axis of the spur dike, which reduces scouring the spur dike head and the hollowing out the dike body foundation with benefit to stably arrange the dike body, and also reduces affecting on the river ecological environment owing to the built spur dike, alleviating the partition between aquatic organisms and bank slopes to a certain extent. (2) The spur dike is formed by grouping movable water-permeable piles at the bottom of which the rollers have a simple structure performing as a pile-fixing clamp, which can move and stop in real time, and has the bottom of each group embedded with four-sided hollow pyramids made of metal material sinking with the bottom into the river bed, increasing the contact surface between the bottom of the spur dike and the river bed, and enhancing the stability of the dike body. (3) The length of the spur dike can be determined by using a reasonable number of movable water-permeable based on the actual situation of a river, or by arranging several rows of multiple water-permeable pile groups to form a movable water-permeable pile spur dike group, so that each water-permeable pile group is front and rear alternately arranged to make use of the water flow area between the spur dikes for mixture and energy dissipation. (4) After the spur dike is removed, the components therefrom can also be recycled, reducing the waste of building materials and engineering losses. (5) By means of pressure sensors, water flow velocity monitoring devices and other technical means, we can obtain changes of a river, and feedback the data signal to the control platform on the river bank, enabling the control platform to achieve the reasonable movement of the water-permeable piles according to an operation method, make full use of the self-adaptive adjustment capability of the movable water-permeable spur dike, change the water permeability of the spur dike and the shape of the dike body, and form an effective response mechanism to the changes of the river.
We shall further describe the present disclosure as follows in combination with the drawings and specific examples, but the protection scope of the present disclosure is not limited to the enumerated examples.
As shown in
Each movable water-permeable pile 1 includes a hollow cylinder, that is a cylindrical concrete pile whose interior is hollowed out. Each movable water-permeable pile 1 has the arc-shaped upstream face with 3 permeable holes whose diameters increase from top to bottom on its center line, as well as the arc-shaped downstream face with 3 permeable holes whose diameters decrease from top to bottom on its center line, and the permeable holes on each face may be set as a combination of permeable holes with multi-diameters of 50 cm, 20 cm, and 10 cm. The permeable holes on both faces of the water-permeable pile penetrate through the water-permeable pile to its hollow, and the permeable holes on both face are completely alternately arranged in the vertical direction. In this way, the water flow passes through the permeable holes of each pile, reducing the flow around the spur dike head and influencing 3D flow field distribution rule of the water flow at the spur dike head and near the dike body, with an effective decrease in the partial maximum flow velocity of the dike head at the axis of the spur dike, which reduces scouring the spur dike head and the hollowing out the dike body foundation with benefit to stably arrange the dike body, and also reduces affecting on the river ecological environment owing to the built spur dike, alleviating the partition between aquatic organisms and bank slopes to a certain extent.
In order to realize the movement of the movable water-permeable pile 1 along the fixed rail 2 and the movable rails 3, the upper surfaces of the fixed rail 2 and each movable rail 3 are provided with a pile-sliding groove 21, and the pile-sliding groove 21 is respectively arranged on the upper surface of the fixed rail 2 or the movable rail 3 along two parallel lines, and two sides of the pile-sliding groove 21 are provided with symmetrical tooth-shaped grooves 2101. The bottom of each water-movable permeable pile 1 is provided with two rows of pile roller groups, each of which corresponds to one pile-sliding groove 21, and each of which includes two pile roller units. Each pile roller unit includes a connector, a pile roller 61 and an electromagnetic group 6301. The pile roller 61 is also provided with a pile-fixing clamp 63. Specifically, of the connector, the top is embedded on both sides of the bottom of the corresponding mobile water-permeable pile 1, the middle part is a hollow connecting block 6203 used to arrange a driver and the electromagnetic group 6301, and the two ends of the bottom extend downwards to form connecting pieces 6202, both of which are connected by a connecting rod 6201. The connecting rod 6201 passes through the center of the pile roller 61, as shown in
Preferably, reinforced concrete can be poured to form the main body of the fixed rail 2, ½ of which sinks in the river bed, and the lower surface of which is provided with a plurality of four-sided hollowed-out pyramids 22 sinking in the river bed. Each four-sided hollowed-out pyramid 22 is positioned with its pyramid tip downwards, and its quadrilateral bottom surface is embedded in the lower surface of the fixed rail 2, connected with the reinforced concrete inside it, and has a pyramided outer frame formed by metal wires. Each hollowed out surface also has a plurality of metal wires wound across its edges. The above-mentioned plurality of four-sided hollowed-out pyramids 22 are arranged along such three straight lines, as the edges of the corresponding fixed rail and the central axis of the long end, and the four-sided hollowed-out pyramids along the two adjacent straight lines are alternated with each other, so this structure can increase the contact area with the river bed and have an advantage to stabilize the spur dike body.
The ½ height of the downstream face of the fixed rail 2 is horizontally cut inwards to form a groove 2201 whose vertical side is provided with a movable rail groove 2202. One end connecting each movable rail 3 to the fixed rail 2 is provided with a moving slider 33, and the bottom of one end away from the fixed rail is provided with a movable rail roller 31, which is inlaid into the movable rail groove 2202 inside the groove 2201 and can move in the movable rail groove 2202 inside the groove 2201. The movable rail roller 31 is connected with the control platform 4 in a communication mode, and can roll along the matched convex single rail 32 fixed on the river bed under the control of the control platform, thereby driving the moving slider 33 to slide smoothly in the vertical water flow direction, so as to adjust the position of the corresponding movable rail 3. The convex single rail 32 is parallel to the fixed rail and used to move the movable rail, so that the sediments carried by the water flow will not hinder the movable rail roller 31 from rolling.
In this example, the fixed rail 2 is an integrally-formed linear rail. It should be noted that, in other examples, the fixed rail 2 can also be an irregular broken-line rail, a curved rail, or a linear rail, a broken-line rail or a curved rail formed by splicing multiple segments of straight sub-rails, as shown in
In this example, the control platform 4 is arranged on the river bank, including a signal transmission device, a control system and some electromechanical equipment. The signal transmission device receives the data signals coming from the pressure sensors and the flow meters, and then transmits them to the control system, which will analyze and process the received data signal of the river changes and the situation of the spur dike partially bearing pressure to make an appropriate adjustment plan for the water-permeable pile spur dike, and then the control platform sends instructions to the electromechanical equipment, thereby moving the movable water-permeable piles to make an appropriate adjustment step, so as to change the water permeability of the spur dike body and the spur dike shape, replying the changes in the river and the spur dike. In other examples, the control platform 4 can also be arranged at other positions, and contain some electromechanical equipment that can also be installed at appropriate positions on the spur dike after waterproofing, for example, near the movable rail roller 31 or the pile roller 61.
The spur dike is arranged in the river, so that the water flow is respectively divided by ways of flowing around the dike head, passing through the water-permeable piles, and penetrating through the free flow area between the permeable piles. The permeable piles of the spur dike can move freely on each rail.
In the dry season of a river, in the case that the pressure and flow values of the spur dike are within a corresponding preset threshold value, the required water permeability range is smaller than that in the flood season, providing a certainty to decrease the distance Li between the permeable piles and the water permeability a of the spur dike, improve a water-blocking effect and bank up the water level, and an advantage to maintain the navigable water depth of the river. In the case that the water pressure partially borne by the spur dike is gradually more than the threshold value H, the spur dike's pressure P increase so as to seriously scour the partial permeable pile foundation, having a disadvantage to stabilize the dam itself. By simulation-optimization calculation, we know that the water permeability a of the spur dike needs to be increased. When both the pressure and flow velocity of the spur dike are less than the preset threshold value in the control system, the control platform 4 simulates the optimal water permeability of the spur dike to increase the distance between the partial fixed rail piles through the signal transmission device, thereby enhancing the flow capacity of dike body and reducing the partial pressure borne by the spur dike. At the same time, the water-permeable piles on the partial movable rail is reduced in the distance to the fixed rail, with the distance increased between the parallel movable rails, thereby enhancing the overall compressive strength of the spur dike and ensuring the stability and the effective operation effect of the spur dike.
In the flood season of the river, according to the measured hydrologic data in the early flood season of previous years, an optimized plan had been deduced in advance for arrangement, providing a certainty to previously increase the number of the water-permeable piles on the rail. With the approach of the river flood season, the river flow increases, in the case that the spur dike's pressure or the flow velocity exceeds the corresponding preset threshold value, the control platform receives a current warning data signal, and simulates and predicts an optimal plan to adjust the dike body, that is, the spacing Li between the piles in the middle section of the spur dike body is increased, and the movable rails are moved to the horizontal centerline between the adjacent piles, appearing in an alternate arrangement. The piles on the movable rail move away from the fixed rail to enhance the flow capacity of the spur dike body, alleviate scouring the dike head, and stabilize the spur dike body, so that the water pressure and the flow velocity borne by the spur dike body are gradually less than the preset threshold value.
Therefore, the present disclosure also provides an operation method of the movable water-permeable pile spur dike, comprising the following steps:
The movable water-permeable spur dike in the above-mentioned examples can also be applied to put together a spur dike group, providing a certainty to adjust the water permeability of each permeable spur dike and the shape of the spur dikes in the spur dike group respectively, so that the spur dike group can enhance a water blocking effect, decompose the impact force of the water flow on the spur dike body stage by stage and slow down the flow velocity of the water flow, so as to ensure that the trajectory bucket effect of the spur dike is good and the spur dike group is stable.
As shown in
The above examples do not impose limitations on the present disclosure, and the present disclosure is not limited to the above examples. Any changes, modifications, additions or substitutions within the scope of the present disclosure made by a person skilled in the art also fall within the protection scope of the present disclosure.
Number | Date | Country | Kind |
---|---|---|---|
202010984671.1 | Sep 2020 | CN | national |
This Application is a national stage application of PCT/CN2021/078635. This application claims priorities from PCT Application No. PCT/CN2021/078635, filed Mar. 2, 2021, and from the Chinese patent application 202010984671.1 filed Sep. 17, 2020, the content of which are incorporated herein in the entirety by reference.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/CN2021/078635 | 3/2/2021 | WO |