Blowout preventers (BOPs) provide a variety of safety and sealing functions for a well as part of the drilling process. In land-based drilling, the BOPs are typically positioned below the drilling floor. A deck, commonly referred to as a “Texas deck,” can be provided adjacent to or around the BOPs, facilitating human access to the various components of the BOP. The deck is typically suspended or otherwise connected to the rig structure, e.g., the drill floor.
Recently, there has been a shift to movable or “walking” rigs that support pad drilling of several wells in a location. Such walking rigs can, for example, drill a well or a section of a well, and then move independently of external drivers to a different location and drill another well (or section). This is referred to as “pad drilling.”
The BOPs are typically moved when the rig moves. Moving the BOP generally includes disassembling the Texas deck, and then re-assembling the Texas deck once the BOP is positioned at the next well location. In applications where several (or dozens or more) wells may be drilled by walking the rig from one site to another on a pad, the rig-up time associated with disassembling and re-assembling the Texas deck can be substantial.
Embodiments of the disclosure may provide a multi-level deck system for a blowout preventer. The system includes a first deck positioned at least partially around and coupled to the blowout preventer, a second deck positioned at least partially around and coupled to the blowout preventer and vertically spaced apart from the first deck, and a third deck positioned at least partially around the blowout preventer and vertically spaced apart from the second deck.
Embodiments of the disclosure may further provide a blowout preventer assembly that includes a blowout preventer comprising a stack of components, a first deck coupled to the blowout preventer between first and second components of the stack of components, a second deck coupled to a third component of the stack of components, and a third deck positioned at least partially around a fourth component of the stack of components.
Embodiments of the disclosure may also provide a method that includes supporting a blowout preventer in a horizontal configuration using a movable BOP handler. First, second, and third decks are positioned at least partially around and secured to the blowout preventer in the horizontal configuration. The method also includes raising the blowout preventer from the horizontal configuration to a vertical configuration using the movable BOP handler. The first, second, and third decks remain secured to the blowout preventer in the vertical configuration. The method further includes connecting the blowout preventer to a wellhead.
The present disclosure may best be understood by referring to the following description and accompanying drawings that are used to illustrate one or more embodiments. In the drawings:
The following disclosure describes several embodiments for implementing different features, structures, or functions of the invention. Embodiments of components, arrangements, and configurations are described below to simplify the present disclosure; however, these embodiments are provided merely as examples and are not intended to limit the scope of the invention. Additionally, the present disclosure may repeat reference characters (e.g., numerals) and/or letters in the various embodiments and across the Figures provided herein. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various embodiments and/or configurations discussed in the Figures. Moreover, the formation of a first feature over or on a second feature in the description that follows may include embodiments in which the first and second features are formed in direct contact, and may also include embodiments in which additional features may be formed interposing the first and second features, such that the first and second features may not be in direct contact. Finally, the embodiments presented below may be combined in any combination of ways, e.g., any element from one exemplary embodiment may be used in any other exemplary embodiment, without departing from the scope of the disclosure.
Additionally, certain terms are used throughout the following description and claims to refer to particular components. As one skilled in the art will appreciate, various entities may refer to the same component by different names, and as such, the naming convention for the elements described herein is not intended to limit the scope of the invention, unless otherwise specifically defined herein. Further, the naming convention used herein is not intended to distinguish between components that differ in name but not function. Additionally, in the following discussion and in the claims, the terms “including” and “comprising” are used in an open-ended fashion, and thus should be interpreted to mean “including, but not limited to.” All numerical values in this disclosure may be exact or approximate values unless otherwise specifically stated. Accordingly, various embodiments of the disclosure may deviate from the numbers, values, and ranges disclosed herein without departing from the intended scope. In addition, unless otherwise provided herein, “or” statements are intended to be non-exclusive; for example, the statement “A or B” should be considered to mean “A, B, or both A and B.”
The multi-level deck system 200 may be connected to any of the components of the blowout preventer 100, so as to allow access to the various components thereof, e.g., for maintenance purposes. For example, the multi-level deck system 200 may include a first or “lower” deck 202, which may be coupled to and positioned at least partially around the blowout preventer 100, e.g., between the single ram 104 and the mud cross-over 105, below the double ram 106. The multi-level deck system 200 may also include a second or “middle” deck 204, which may be coupled to and positioned at least partially around the blowout preventer 100, e.g., above the double ram 106, at the base of the annular 108. The multi-level deck system 200 may further include a third or “upper” deck 206, which may be positioned at least partially around the blowout preventer 100, e.g., around the rotating control device 110, or may be positioned farther upward, away from the middle deck 204, to allow access to flow lines along the bottom of the drilling rig floor. The upper deck 206 may be supported by the middle deck 204, as will be explained in greater detail below.
In at least one embodiment, the decks 202, 204, 206 of the multi-level deck system 200 may not be connected to the rig floor, but rather may be connected to (either directly or indirectly) to the blowout preventer 100. Further, the decks 202, 204, 206 may be vertically spaced apart, e.g., to allow access and movement of a human user on each of the decks 202, 204, 206. It will be appreciated that although the illustrated embodiment of the multi-level deck system 200 includes three decks, this is not to be considered limiting; indeed, two, three, four, five, or more decks may be employed in various embodiments of the multi-level deck system 200.
Further, each of the decks 202, 204, 206 may be accessible from the ground via an access ladder 208, 210, 212. The access ladders 208, 210 for the lower and middle decks 202, 204 may extend to the ground, while the access ladder 212 for the upper deck 206 may extend to the middle deck 204. Each of the decks 202, 204, 206 may also include a safety rail 214, 216, 218, respectively. Further, the lower, middle and upper decks 202, 204 and 206 may include safety gates 220, 222, 223 respectively.
The lower and middle decks 202, 204 may each include two pivotal sections, e.g., pivotal sections 224, 226 for the lower deck 202, and pivotal sections 228, 230 for the middle deck 204. The pivotal sections 224, 226 and 228, 230 may be pivotal with respect to one another, and may be latched together, so as to secure together and selectively allow the pivotal sections 224, 226, 228, 230 to swing away from one another. The gates 220, 222 may be positioned at an interface between the pivotal sections 224, 226, so as to allow the safety rails 214, 216 to separate when the pivotal sections 224, 226 and 228, 230 pivot apart.
As shown, the upper deck 206 may be generally semi-circular in shape, with half of its circumference truncated. Accordingly, when being configured for transportation, to avoid exceeding regulatory height and/or width regulations, the gates 220, 222 may be released, and the pivotal sections 224, 226, 228, 230 pivoted away from one another, thereby collapsing the lower and/or middle decks 202, 204. As such, the multi-level deck system 200 may be reduced in size in at least one dimension (as pictured, front to back). In some embodiments, the upper deck 206 may also include such pivotal sections to reduce the dimensions thereof, e.g., for transport. Further, in some embodiments, the lower, middle, and/or upper decks 206 may include three or more pivotal sections.
The upper deck 206 may be connected to the middle deck 204 via posts 232. The posts 232 may have a fixed length in some embodiments, but in other embodiments, may be extendible supports. For example, the posts 232 may be extendible hydraulically as by a screw jack 234 or another device configured to adjust the distance between the middle and upper decks 204, 206. Such variable distance between the middle and upper decks 204, 206 may facilitate movement along the middle deck 204 (e.g., providing increased clearance) and/or may facilitate accessing higher or lower components via the upper deck 206.
As can also be seen in
The BOP handler 300 includes a carriage frame 307 that is movable horizontally along the base frame 304. The BOP handler 300 may also include second lifting cylinders 308 (
Accordingly, referring to
The method 700 may also include raising the blowout preventer 100 from the horizontal configuration to a vertical configuration (e.g.,
Once the blowout preventer 100 is in the vertical configuration, the method 700 may include connecting the blowout preventer 100 to a wellhead, as at 706, e.g., using the bottom connector 102. The BOP handler 300 may be employed to accomplish this by including a hydraulic lifting assembly configured to move the blowout preventer 100 vertically and horizontally, e.g., while in the vertical configuration, into position at the wellhead, as described above.
In an embodiment, to move the blowout preventer 100 from one wellsite to another (e.g., when walking the rig), the method 700 may include disconnecting the blowout preventer 100 from the wellhead, as at 708. The method 700 may include moving the blowout preventer 100 by walking the rig, while the BOP handler 300 supports the blowout preventer 100 in the vertical configuration, as at 709. The method 700 may also include lowering the blowout preventer 100 from the vertical configuration to a horizontal configuration, as at 710. The first, second, and third decks 202, 204, 206 may remain secured to the blowout preventer 100 in the horizontal configuration, e.g., before, during, and after lowering the blowout preventer 100. The method 700 may also include moving the blowout preventer 100 away from the wellhead by moving the BOP handler 300 (e.g., by connection to a base box or another part of the substructure of a walking rig), as at 712.
In an embodiment, the method 700 further includes raising or lowering the third deck relative to the second deck, e.g., when in the vertical configuration. For example, the second deck 204 may be positioned above the first deck 202, and the third deck 206 may be positioned above the second deck 204.
In an embodiment, the method 700 may include pivoting apart pivotal sections 224, 226 of the first deck 202 to reduce a dimension of the first deck 202 for transport, while the first deck 202 is (and/or any other decks are) secured to the blowout preventer 100.
In an embodiment, the method 700 may also include pivoting apart pivotal sections 224, 226 of the first deck 202 to allow for clearance of a lifting frame 306 of the BOP handler 300. Further, the method 700 may include lifting the blowout preventer 100 using the raising frame 306 of the BOP handler 300.
In an embodiment, the method 700 may include accessing the first, second, and/or third decks 202, 204, 206 from a ground below a drilling rig floor, e.g., by climbing up the ladders 208, 210, 212.
As used herein, the terms “inner” and “outer”; “up” and “down”; “upper” and “lower”; “upward” and “downward”; “above” and “below”; “inward” and “outward”; “uphole” and “downhole”; and other like terms as used herein refer to relative positions to one another and are not intended to denote a particular direction or spatial configuration. The terms “couple,” “coupled,” “connect,” “connection,” “connected,” “in connection with,” and “connecting” refer to “in direct connection with” or “in connection with via one or more intermediate elements or members.”
The foregoing has outlined features of several embodiments so that those skilled in the art may better understand the present disclosure. Those skilled in the art should appreciate that they may readily use the present disclosure as a basis for designing or modifying other processes and structures for carrying out the same purposes and/or achieving the same advantages of the embodiments introduced herein. Those skilled in the art should also realize that such equivalent constructions do not depart from the spirit and scope of the present disclosure, and that they may make various changes, substitutions, and alterations herein without departing from the spirit and scope of the present disclosure.
Number | Name | Date | Kind |
---|---|---|---|
2066984 | Lamb | Jan 1937 | A |
3498375 | McEwen et al. | Mar 1970 | A |
3718266 | Donnally | Feb 1973 | A |
3902554 | Hooper | Sep 1975 | A |
4007782 | Nybo et al. | Feb 1977 | A |
4108318 | Rode | Aug 1978 | A |
4230190 | Guinn | Oct 1980 | A |
4359089 | Strate et al. | Nov 1982 | A |
5121793 | Busch et al. | Jun 1992 | A |
5299653 | Nebel | Apr 1994 | A |
5407302 | Springett | Apr 1995 | A |
5704427 | Buck | Jan 1998 | A |
5816565 | McGuffin | Oct 1998 | A |
5845708 | Burge | Dec 1998 | A |
5954305 | Calabro | Sep 1999 | A |
5957431 | Serda, Jr. | Sep 1999 | A |
6053255 | Crain | Apr 2000 | A |
6079490 | Newman | Jun 2000 | A |
6276450 | Seneviratne | Aug 2001 | B1 |
6494268 | Ljungdahl | Dec 2002 | B1 |
6681894 | Fanguy | Jan 2004 | B1 |
6848539 | Lee | Feb 2005 | B2 |
6902007 | Orr | Jun 2005 | B1 |
6955223 | Orr | Oct 2005 | B2 |
7040411 | Kainer | May 2006 | B2 |
7073592 | Polsky | Jul 2006 | B2 |
7086474 | Trevithick | Aug 2006 | B1 |
7389820 | Day | Jun 2008 | B2 |
7469749 | Folk | Dec 2008 | B2 |
7896083 | Vickery | Mar 2011 | B2 |
8235126 | Bradley | Aug 2012 | B2 |
8347983 | Hoyer | Jan 2013 | B2 |
8770298 | Gustafson | Jul 2014 | B2 |
8938930 | Bryant, Jr. | Jan 2015 | B2 |
8997878 | Brown | Apr 2015 | B2 |
9080336 | Yantis | Jul 2015 | B1 |
9416600 | Golovinskij | Aug 2016 | B2 |
9488023 | Vogt | Nov 2016 | B2 |
9500040 | Holst | Nov 2016 | B2 |
9580977 | Vogt | Feb 2017 | B2 |
9689233 | Nguyen | Jun 2017 | B2 |
9738199 | Shamas | Aug 2017 | B2 |
10072465 | Olivier | Sep 2018 | B1 |
20030221822 | Polsky | Dec 2003 | A1 |
20040011592 | Lee | Jan 2004 | A1 |
20040231857 | Kainer et al. | Nov 2004 | A1 |
20070193749 | Folk | Aug 2007 | A1 |
20090151955 | Bamford | Jun 2009 | A1 |
20100224357 | Rodgers | Sep 2010 | A1 |
20110036662 | Smith | Feb 2011 | A1 |
20110100637 | Gustafson | May 2011 | A1 |
20110253476 | Earl | Oct 2011 | A1 |
20110266002 | Singh | Nov 2011 | A1 |
20110266003 | Singh | Nov 2011 | A1 |
20120318520 | Lugo | Dec 2012 | A1 |
20150376907 | Nguyen | Dec 2015 | A1 |
20170335637 | Nelsen | Nov 2017 | A1 |
Entry |
---|
Schlumberger Oilfield Glossary entries for “annular BOP”, “BOP”, “BOP stack”, “mud return line”, “ram BOP”, “rotating control device”, and “snubbing”, accessed Mar. 2, 2019 via www.glossary.oilfield.slb.com. |
Number | Date | Country | |
---|---|---|---|
20180283110 A1 | Oct 2018 | US |