A. Bettison et al, “Limits—A System for UNIX Resource Administration”, ACM, pp. 686-692, 1989.* |
J. Huang, “Resource Management for Continuous Multimedia Database Applications”, IEEE, pp. 46-54, 1994.* |
D. Anderson, “Metascheduling for Continuous Media”, ACM, vol. 11, No. 3, pp. 226-252, Aug. 1993.* |
D. Fergoson, et al, “Satisfying Response Time Goals in Transaction Processing Systems”, IEEE, pp. 138-147, 1993.* |
Application S/N 08/222,755, “Apparatus and Method for Managing a Data Processing System Workload According to Two or More Distinct Processing Goal Types” by J.D. Aman et al., filed Apr. 4, 1994. |
Application S/N 08/222,752, “Apparatus and Method for Managing Server Workload According to Client Performance Goals in a Client/Server Data Processing System” by C. Eilert et al., filed Apr. 4, 1994. |
Application S/N 08/383,168, “Apparatus and Method for Managing a Distributed Data Processing System Workload According to a Plurality of Distinct Processing Goal Types”, by C. Eilert et al., Filed Feb. 3, 1995. |
Anonymous, “Goal Oriented Central Processing Unit Scheduling,” IBM Technical Disclosure Bulletin, vol. 36, No. 12, Dec., 1993, pp. 425-432 (XP000419021). |
Anonymous, “Method for Workload Performance Measurement,” IBM Technical Disclosure Bulletin, vol. 34, No. 6, Nov. 1991, pp. 387-389 (XP000212786). |
“Task migration algorithm for load balancing in a distribut” System Science, 1989 Annual Hawaii Int'l, IEEE.* |
“Dynamic Load Balancing in a distributed System Vsz a Send” Local computer Networks, 1988, 13th Conference, IEEE. |