Claims
- 1. A method of gravel packing a branch wellbore extending outwardly from a parent wellbore, the method comprising the steps of:
conveying a gravel packing assembly into the parent wellbore, the gravel packing assembly including a first packer, a well screen, a tubular string interconnected between the packer and the well screen, and a discharge device for discharging a gravel slurry from the tubular string; positioning the well screen and discharge device in the branch wellbore; setting the first packer in the parent wellbore; and flowing the gravel slurry out of the discharge device and into the branch wellbore about the well screen.
- 2. The method according to claim 1, wherein the branch wellbore extends outwardly from a window formed in the parent wellbore, and wherein the flowing step further comprises preventing the gravel slurry from flowing into the window.
- 3. The method according to claim 2, wherein in the flowing step, the tubular string extends through the window, the first packer is set in the parent wellbore, and the discharge device is positioned in the branch wellbore.
- 4. The method according to claim 1, wherein the positioning step further comprises positioning the well screen in an open hole portion of the branch wellbore.
- 5. The method according to claim 4, wherein the setting step further comprises setting the first packer in a cased portion of the parent wellbore.
- 6. The method according to claim 1, wherein the positioning step further comprises positioning a ported cementing sub in the branch wellbore.
- 7. The method according to claim 6, wherein the gravel slurry flowing step further comprises flowing the gravel slurry through the cementing sub.
- 8. The method according to claim 6, further comprising the step of flowing cement out of the cementing sub and into the branch wellbore about the tubular string.
- 9. The method according to claim 8, wherein the cement flowing step further comprises flowing the cement into the branch wellbore between gravel deposited in the branch wellbore in the gravel slurry flowing step and an intersection between the branch and parent wellbores.
- 10. The method according to claim 9, wherein the cement flowing step further comprises flowing the cement into the parent wellbore from the branch wellbore.
- 11. The method according to claim 10, further comprising the step of cutting off the cement and tubular string extending into the parent wellbore from the branch wellbore.
- 12. The method according to claim 1, wherein the gravel slurry flowing step further comprises flowing the gravel slurry through the tubular string into the branch wellbore, and returning a fluid portion of the slurry through the tubular string to the parent wellbore.
- 13. A method of gravel packing a branch wellbore extending outwardly from a window in a parent wellbore, the method comprising the steps of:
depositing gravel about a well screen in the branch wellbore; and then flowing cement into the branch wellbore, the cement extending in the branch wellbore at least into the window.
- 14. The method according to claim 13, wherein the flowing step further comprises flowing the cement through the window.
- 15. The method according to claim 13, wherein the flowing step further comprises flowing the cement into the parent wellbore.
- 16. The method according to claim 15, wherein the gravel depositing step further comprises flowing a gravel slurry through a tubular string extending from the parent wellbore into the branch wellbore, and further comprising the step of cutting off the cement and the tubular string at the window.
- 17. The method according to claim 16, wherein the gravel slurry flowing step further comprises returning a fluid portion of the slurry through the tubular string to the parent wellbore.
- 18. The method according to claim 13, wherein the cement flowing step further comprises flowing the cement through a ported cementing sub positioned in the branch wellbore.
- 19. The method according to claim 18, further comprising the step of setting a packer between the cementing sub and the gravel deposited in the branch wellbore prior to the cement flowing step.
- 20. The method according to claim 18, wherein the gravel depositing step further comprises flowing a gravel slurry through the cementing sub.
- 21. A method of gravel packing a branch wellbore extending outwardly from a parent wellbore, the method comprising the steps of:
positioning a tubular string, a well screen and a gravel slurry discharge device in the branch wellbore; discharging a gravel slurry from the tubular string via the discharge device, gravel from the slurry being deposited into the branch wellbore about the well screen; cementing the tubular string in the branch wellbore, so that a portion of the tubular string with cement thereabout extends from the branch wellbore into the parent wellbore; and cutting off the portion of the tubular string extending into the parent wellbore.
- 22. The method according to claim 21, further comprising the step of setting a packer in the parent wellbore, the packer being connected to the tubular string, prior to the gravel slurry discharging step.
- 23. The method according to claim 22, wherein in the gravel slurry discharging step, the gravel slurry is flowed through the packer while the packer is set in the parent wellbore.
- 24. The method according to claim 23, wherein the cementing step further comprises flowing the cement through the packer and outward into the branch wellbore through a ported cementing sub positioned in the branch wellbore.
- 25. The method according to claim 24, wherein the gravel slurry discharging step further comprises flowing the gravel slurry through the cementing sub.
- 26. The method according to claim 21, wherein the gravel slurry discharging step further comprises returning a fluid portion of the slurry through the tubular string to the parent wellbore.
- 27. The method according to claim 21, further comprising the step of setting a packer in the branch wellbore, the packer being connected to the tubular string, prior to the gravel slurry discharging step.
- 28. The method according to claim 27, wherein in the gravel slurry discharging step, the gravel slurry is flowed through the packer while the packer is set in the branch wellbore.
- 29. The method according to claim 28, wherein the cementing step further comprises flowing the cement through the packer and outward into the branch wellbore through a ported cementing sub positioned in the branch wellbore.
- 30. The method according to claim 29, wherein the gravel slurry discharging step further comprises flowing the gravel slurry through the cementing sub.
Priority Claims (1)
| Number |
Date |
Country |
Kind |
| PCT/US01/46880 |
Nov 2001 |
US |
|
CROSS-REFERENCE TO RELATED APPLICATION
[0001] This application claims the benefit of the filing date under 35 USC §119 of prior international application no. PCT/US01/46880, filed Nov. 8, 2001, the disclosure of which is incorporated herein by this reference.