The present invention relates to a circuit breaker system as claimed in the introductory part of patent claim 1.
A circuit breaker system of this kind contains a plurality of phase conductors, a circuit breaker having a plurality of circuit breaker poles, and a short-circuit link which has a star point and a plurality of link conductors which are combined at the star point. A circuit breaker system of this kind can be used, with the aid of the short-circuit link, to check safety settings and simulate possible fault situations when starting up power plants or switchgear assemblies.
A circuit breaker system of the abovementioned type is described in the product brochure “Generator Circuit-Breaker Systems HECS” from ABB Schweiz AG, Zurich/Switzerland (1 HC0072302 E02/AA09). The described circuit breaker system is in the form of a generator circuit breaker system and has selectively one of two short-circuit links, of which one is designed such that it can be manually installed and the other is designed such that it can be operated by motor. Trained installation personnel are required to set up the two short-circuit links, and set-up is therefore comparatively complicated and time-consuming.
The invention, as specified in the patent claims, is based on the object of providing a circuit breaker system of the kind cited in the introductory part which allows simulation experiments to be carried out with the aid of a short-circuit link in a time- and cost-saving manner.
The present invention provides a circuit breaker system containing a plurality of phase conductors, a circuit breaker having a plurality of breaker poles, and a short-circuit link which has a star point and a plurality of link conductors which are combined at the star point, wherein each of the phase conductors is electrically conductively connected to in each case one of the breaker poles, and wherein each link conductor is electrically conductively connected to in each case one of the phase conductors by means of in each case one of several first disconnectors to which short-circuit current can be applied. Said breaker system further contains a second disconnector which, when it is closed, electrically conductively connects the star point to ground and which is opened when a short-circuit current is applied to the short-circuit link.
Simulation experiments which serve to check the safety settings of power plants or switchgear assemblies or to simulate fault situations can be carried out centrally by a control center in the circuit breaker system according to the invention. The use of trained installation personnel is therefore dispensed with, and, firstly, assembly costs can be saved in this way. Secondly, downtimes of the circuit breaker system which are necessary for installation and removal work are also avoided in this way at the same time.
In the circuit breaker system according to the invention, the second disconnector can be designed such that a ground current can be applied to said second disconnector, said ground current being lower than a maximum permissible short-circuit current in the short-circuit link.
Advantageously, the first disconnector and the second disconnector can each have a drive, which can be driven by a central control system, for opening and closing an isolating gap, the phase conductors, the breaker poles of the circuit breaker and the first disconnector can be arranged in a grounded encapsulation, the star point can be arranged outside the encapsulation, each of the link conductors can be routed out of the encapsulation in an electrically insulated manner, and, when the second disconnector is closed, each of the first disconnectors can form in each case one of several earthing switches of the circuit breaker system.
The circuit breaker system according to the invention may be intended for installation in an outgoing generator line which is arranged between a generator and a transformer, wherein each of the link conductors electrically conductively connects a generator-end section of in each case one of the phase conductors to the star point by means of in each case one of the first disconnectors. The second disconnector can then be in the form of a medium-voltage circuit breaker or in the form of a low-voltage circuit breaker.
The circuit breaker system according to the invention may also be intended for installation in a gas-insulated metal-encapsulated high-voltage switchgear assembly. The second disconnector can be in the form of a high-voltage circuit breaker in this case.
The invention will be explained in greater detail below with reference to drawings, in which:
The three-phase generator circuit breaker system illustrated in a single phase in
Reference symbol KSV denotes two short-circuit links. Each of these two short-circuit links electrically conductively connects the phase conductors L of the three phases to a star point S which is arranged in an electrically insulated manner. Therefore, the link conductors LK of the short-circuit link KSV, which link conductors connect the star point S to in each case one of the phase conductors L, are routed through the encapsulation K in an electrically insulated manner and the star point S is located outside the encapsulation. A short-circuit link KSV of this kind can be used to check safety settings and simulate possible fault situations when starting up power plants and switchgear assemblies.
The short-circuit link KSV can be manually installed before the generator circuit breaker system is started up or after operation of said system is interrupted, this being achieved by disconnecting the operating current and by subsequently connecting the generator-end current connection and the transformer-end current connection of the breaker poles P to ground with the aid of the closed earthing switches ES1 and ES2. After the earthing switches ES1 and ES2 are opened, short-circuit current can be fed to the short-circuit link KSV by closing the breaker poles GP of the generator circuit breaker, and the simulation experiments can now be carried out.
In order to allow normal operation of the generator circuit breaker system, the manually installed short-circuit link is intended to be manually removed again after the experiments are complete. To this end, the earthing switches ES1 and ES2 are initially closed after the breaker poles GP are opened, and the short-circuit link KSV is then manually removed from the circuit breaker system. In addition to removing the short-circuit link, care should also be taken here that openings in the encapsulation K, through which the link conductors LK have been routed during installation as prescribed by regulations, are again closed as prescribed by regulations.
A short-circuit link KSV which is of manual design is illustrated above the axis A in
In contrast to the above-described generator circuit breaker system, the use of the disconnectors T1 reduces the expenditure on installing and removing the short-circuit link KSV, but the installation and removal work which are still necessary considerably delay and make it more expensive to execute the simulation experiments and also to subsequently start up the generator circuit breaker system.
The embodiment of the circuit breaker system according to the invention which is illustrated in
During normal operation of the circuit breaker system according to
After the experiments are complete, the generator circuit breaker is opened again and, with the generator circuit breaker open, the disconnectors T1 are then opened and, with the disconnectors T1 open, the disconnector T2 is closed, as a result of which the disconnectors T1 again form the earthing switches ES1 and the circuit breaker system can again be operated as intended.
As shown in
The circuit breaker system according to the invention is not restricted to an encapsulated generator circuit breaker system which can be installed between a generator of a power plant and a transformer of a high-voltage power supply system; said circuit breaker system can also be used in a gas-insulated metal-encapsulated high-voltage system. The earthing switch TR2 is generally in the form of a high-voltage circuit breaker in this case.
The circuit breaker system according to the invention does not necessarily require an encapsulation K and can therefore also be installed in outgoing generator lines which are kept free of an encapsulation, or else in outdoor switchgear assemblies.
Instead of three phase conductors, the circuit breaker system according to the invention can also contain four or more phase conductors.
Number | Date | Country | Kind |
---|---|---|---|
13190375 | Oct 2013 | EP | regional |
Number | Name | Date | Kind |
---|---|---|---|
5495372 | Bahlmann | Feb 1996 | A |
Number | Date | Country |
---|---|---|
WO 2012171694 | Dec 2012 | WO |
Entry |
---|
European Search Report for EP 13190375 dated Mar. 17, 2014. |
ABB: “Generator Circuit Breaker HECS”, Oct. 26, 2011, cited on internet—http://www05.abb.com/global/scot/scot245.nsf/veritydisplay/d3e2d8908070c731c1257935003f8f8d/$file/hecs—1hc0072302aa—en—high.pdf. |
Number | Date | Country | |
---|---|---|---|
20150116886 A1 | Apr 2015 | US |