Information
-
Patent Grant
-
6651961
-
Patent Number
6,651,961
-
Date Filed
Monday, February 14, 200024 years ago
-
Date Issued
Tuesday, November 25, 200321 years ago
-
Inventors
-
-
Examiners
Agents
- Keeling; Kenneth A.
- Hudson, III; James E.
-
CPC
-
US Classifications
Field of Search
US
- 254 284
- 254 285
- 254 286
- 254 337
- 254 336
- 254 399
-
International Classifications
-
Abstract
A multi-block rigging system for a heavy crane, pulling or lifting device. The system uses sheave blocks in series orientation to enable the use of standard, economical or preferred, size winch drums and standard, economical or preferred, diameter and length wire rope, each forming a separate set of reeving lines. Each set of reeving lines moves its corresponding load block a proportional distance of the total travel length for the load hook. Alternatively, different line parts of line for each reeved set enables different travel speeds of the load block for different capacity requirements.
Description
CROSS-REFERENCE TO RELATED APPLICATIONS
Not applicable.
STATEMENT REGARDING FEDERALLY SPONSORED RESEARCH OR DEVELOPMENT
Not applicable.
BACKGROUND OF THE INVENTION
1. Field of Invention
This invention relates to a system of hoisting blocks for heavy cranes and hoisting devices. Specifically, the invention describes a system of load blocks connected in series to enable heavy lifts to be conducted with standard/conventional winch drums and hoist lines that by conventional rigging, would not be able to provide the capabilities of combined lift capacity and hoisting height.
2. Related Art
The art of rigging and developing mechanical lifting advantage using pulleys has long been known. The development of heavy capacity cranes, however, has changed the load demands on load lines and reeved systems. Heavy capacity cranes have the mechanical and structural ability to lift heavy loads, but the strength of the load line, the winches' maximum line pull and the capacity of the drums to hold sufficient wire rope are often limiting factors. In addition, load blocks reeved for heavy lifts are restrictive in hoisting speed, and those reeved for speed for lift are limited in lift capacity. One way to overcome these limitations is the use of oversized high strength wire rope. The use of oversized wire rope poses operational problems. Since it is thicker and heavier than conventional wire rope, high strength wire rope requires large capacity hoisting drums and sheaves for adequate wrapping, is difficult to handle during set-up and rigging due to its weight and inflexibility, may require special linear winches, and is more expensive than conventional wire rope.
The typical alternative to the use of oversized wire rope by heavy cranes is the use of multiple part reeving, which uses standard strength wire rope. Multiple part reeving distributes the weight of the load over multiple parts of the wire rope. Heavy capacity cranes typically use double load lines operating in parallel, each line having a dedicated set of boom and load block sheaves forming distinct reeving systems.
Heavy capacity cranes typically have long booms, to be able to lift tall objects, have a long horizontal reach, and/or have a high vertical reach. Boom lengths over 300 meters are becoming more common. If standard wire rope is used, the long boom length of the high capacity crane, combined with the reeving requirements to support a heavy load, require long lengths of standard load line. The amount of line required is at least the length of the boom plus that length multiplied by the number of parts in the multiple reeving. Thus, a boom with a 100-meter boom and an eight part reeving from each drum requires a total of 900 meters of wire rope for each load line. Spooling this length of line requires special handling equipment for the wire rope, including a large capacity hoist drum. It would be a new and useful improvement over the prior art for a hoisting system be capable of using standard wire rope and standard size hoist drums in a high capacity crane. It is understood that there are many sizes of wire rope and hoist drums. However, the term “standard” is nonetheless used to denote sizes that are economical and are not oversized. Also, the words “winch drum” are used herein to describe a mechanical means of applying a tensile (pulling) force to a wire rope or other flexible tensile load support mechanism, and is intended to cover other means of applying the pulling force, such as a linear winch, hydraulic jacks and so forth.
BRIEF SUMMARY OF THE INVENTION
Accordingly, the objectives of this invention are to provide, inter alia, a new and improved load block system for heavy cranes and lifting devices that:
uses standard size (i.e. economical sized) wire rope for the load line;
uses standard size (i.e. economical sized) hoisting drums;
uses standard boom sheaves and load block sheaves;
enables light capacity with high hoist speed and heavy capacity with low hoist speeds all with the one reeving arrangement;
enables large capacity lifts on long boom lengths with hoisting equipment that was previously designed for shorter boom lengths only; and
is interchangeable between cranes.
These objectives are addressed by the structure and use of the inventive multiple load block system. Multiple load block sheaves are vertically oriented in series, each forming distinct sets of reeving lines between lower load block sheaves and upper sheaves or attachment points. This orientation only requires each set of sheaves to move vertically through a proportional percentage of the total vertical height of the boom tip. The use of multiple load blocks vertically oriented in series allows the use of standard sized winch drums, since each set of reeving lines must only traverse a portion of the total travel distance of the load hook. If the number of parts of line in the reeving lines is different, then the different reeving line sections afford different travel speeds. In addition, both high capacity lifts at slow speeds and lower capacity lifts at higher speeds can be effected by the use of this system. As an example, consider a two part reeved system in series with the top set of reeving being reeved for heavy lifts (many parts of line) and the lower set of reeving being reeved for light lifts (few parts of line). When light lifting duties are required, the bottom set of reeving will be run up and down at a resulting high speed, providing a good cycle time. When a heavy lift is required, first the lower and middle set of blocks will be lowered down to the ground, then interconnecting steel link plates will be connected between the lower and middle blocks, effectively bypassing the lower system (and removing the weak link) and then the upper system of reeving will be used for the heavy lift.
Other objects of the invention will become apparent from time to time throughout the specification hereinafter disclosed.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1
depicts a prior art heavy crane with a single hook block.
FIG. 2
depicts prior art double-line single-block reeving.
FIG. 3
depicts prior art single-line single-block reeving.
FIG. 4
depicts a heavy crane using the inventive multiple-line multiple-block reeving.
FIG. 5
depicts the preferred embodiment of the inventive multiple-line multiple-block reeving.
FIG. 6
depicts the preferred embodiment of the invention showing a single-line multi-block rigging having at least three traveling blocks.
FIG. 7
depicts an alternative embodiment of the inventive single-line multiple-block reeving.
DETAILED DESCRIPTION OF THE INVENTION
The present invention is described as system
10
, which comprises at least one upper rigging unit
100
and one lower rigging unit
300
, each rigging unit comprising boom head sheaving, traveling sheave blocks and load lines. Winch drums, hook, boom and power drives typically are associated with heavy crane
15
and the operation of system
10
as described in this disclosure.
Prior art for block rigging for heavy crane
15
is shown in FIG.
1
and FIG.
2
. For purposes of clarity, reeving may be illustrated as two part reeving. It is understood, however, that typically reeving comprises multiple line parts numbering greater than two. To support heavy loads, heavy cranes typically use a double-line reeving system operating in parallel, as shown in FIG.
2
. First main hoist line
20
and second main hoist line
21
reeve over boom head sheaves
25
and reeve down to load block sheaves
30
, forming first reeving lines
26
and second reeving lines
28
. First reeving lines
26
and second reeving lines
28
terminate their dead ends at load block
32
if the number of reeving line parts are odd, or typically at boom tip
27
if the number of reeving line parts are even.
The load (not shown) attached to hook
40
is supported by the combination of first reeving lines
26
and second reeving lines
28
. First reeving lines
26
are formed by first main hoist line
20
, which is payed in and out from first winch drum
22
mounted on body
35
of heavy crane
15
, shown in FIG.
1
. Second reeving lines
28
are formed by second main hoist line
21
, which is payed in and out from second winch drum
23
in payed line length synchrony with main hoist line
20
. This synchrony (and equal parts of line in each first reeving lines
26
and second reeving lines
28
) assures an even vertical travel of load block
32
, which is typically supported equally by both first reeving lines
26
and second reeving lines
28
. The synchronization is achieved by connective, mechanical and/or electrical coordination of the rotation of first winch drum
22
and second winch drum
23
.
Alternatively, prior art reeving using a single load line
20
is depicted in FIG.
3
. First main hoist line
20
pays in and out from first winch drum
22
, forms first reeving lines
26
by reeving over boom head sheaves
25
, down and under load block sheaves
30
, and terminating at boom tip
27
or load block
32
, depending on the number of reeving line parts. Single load line reeving is typically used for lighter load duty lifts.
The present invention system
10
is shown in
FIGS. 4-7
. In a first embodiment having a double series reeved system, depicted in FIG.
4
and
FIG. 5
, there are two traveling load blocks, shown as upper load block set
132
and lower load block
332
. It is understood, however, that the number of traveling load blocks can be more than two, the number limited only by the number of winch drums available and physical constraints of the body
35
and boom
17
. Each load block is supported and moved by at least two rigging means operating in parallel, each having a winch drum, load line, and upper and lower sheaves.
In
FIG. 5
, upper rigging unit
100
is defined by two upper load lines
120
forming upper reeving lines
126
that reeve over the boom head sheaving of boom head sheaves
25
, down to and under upper load block sheaves
130
, and terminate at a termination point, typically boom tip
27
if there are an even number of line parts in upper reeving lines
126
. If upper reeving lines
126
have an odd number of line parts, upper reeving lines
126
terminate at upper load block set
132
. Upper load line
120
is payed in and out from upper winch drums
122
, which are physically, mechanically or electrically synchronized to pay upper load lines
120
in and out at the same rate.
Lower rigging unit
300
is defined by lower load lines
320
forming lower reeving lines
326
that reeve over boom head sheaves
25
, down to lower load block sheaves
330
and up to the load block sheaves in upper load block set
132
, and terminate at a lower reeving line
326
termination point, that point typically being upper load block set
132
if there are an even number of line parts in lower reeving lines
326
. If there are an odd number of parts of reeving line, lower reeving lines
326
terminate at lower load block
332
. Lower load line
320
is payed in and out from lower winch drums
322
, which are physically, mechanically or electrically synchronized to pay lower load lines
320
in and out at the same rate.
As seen in
FIG. 6
, system
10
can incorporate intermediate rigging unit
200
, defined by intermediate load lines
220
reeving over boom head sheaves
25
, down to intermediate load block set
232
having intermediate load block sheaves
230
and up to higher adjacent load block sheaves
110
, and terminating at an intermediate reeving line
226
termination point. Higher adjacent load block sheaves
110
are upper load block sheaves
130
when intermediate load block set
232
is the only intermediate load block set
232
, or is the uppermost intermediate load block set
232
in a plurality of intermediate load block sets
232
. When a lower intermediate load block set
232
is of a plurality of intermediate load block sets
232
and is not the uppermost intermediate load block set
232
, higher adjacent load block sheaves
110
are the intermediate load block sheaves
230
higher and adjacent to the lower intermediate load block set
232
. Where there are an even number of reeving parts in intermediate reeving lines
226
, the termination point for intermediate reeving lines
226
is a higher positioned intermediate load block set
232
, unless intermediate load block set
232
is the uppermost intermediate load block set
232
, wherein the attachment point for its intermediate reeving lines
226
is upper load block set
132
. If there are an odd number of reeving parts of line, intermediate reeving lines
226
terminate at the intermediate load block set
232
being supported by those intermediate reeving lines
226
.
Further depicted in
FIG. 6
, lower load block
332
reeves to the lowest intermediate load block set
232
. Lower load lines
320
reeve over boom head sheaves
25
, down to and under lower load block sheaves
330
and up to the lowest intermediate load block sheaves
230
. Lower reeving lines
326
, formed by lower load lines
320
, terminate either at lower load block
332
or the lowest intermediate load block set
232
, depending on the number of parts of line in lower reeving lines
326
.
For the sake of clarity,
FIG. 6
depicts each rigging unit having a single load line. It is understood, however, that in the preferred embodiment, multiple load lines analogous to those depicted in
FIG. 5
are used to provide additional strength to the reeving lines. Further, each sheave set shown may be split into two parallel interconnected sets of sheaves in the vertical plane. That is, the vertical systems of reeving and block sets shown in the
FIG. 5
can be duplicated to provide multiple planes of reeved sets to provide additional parallel lifting systems supported from the single boom head.
Alternatively, system
10
can use single load lines as depicted in FIG.
7
. The rigging of upper reeving lines
126
and lower reeving lines
326
is analogous to that described in the preferred embodiment above. The alternative system
10
having single lines is typically used in the following examples. When loads being lifted by heavy crane
15
are relatively light, single lines of normal size and capacity reeving in moderate line parts numbers will drum around first winch drum
22
and second winch drum
23
. If the length of boom
17
is short enough, a high number of parts of line in the reeving lines can be accommodated by the winch drums. If heavy capacity line is used, typically with a linear winch, a minimal number of parts of line in the reeving is required allowing long travel lengths of upper load block set
132
and lower load block
332
.
OPERATION
In the preferred embodiment shown in FIG.
4
and
FIG. 5
, hook
40
is raised and lowered by paying in and out upper load lines
120
and/or lower load lines
320
. Upper load line
120
a
forms upper reeving lines
126
a
, while upper load line
120
b
forms upper reeving lines
126
b
. Upper reeving lines
126
a
and upper reeving lines
126
b
raise and lower upper load block set
132
at the same synchronized rate. To accomplish this synchronization in
FIG. 5
, left upper winch drum
122
a
and right upper winch drum
122
b
rotate such that upper load line
120
a
and upper load line
120
b
pay in and out at the same rate, assuming reeving and sheaves are equivalent.
Lower load lines
320
must likewise be coordinated to accomplish even movement of lower load block
332
. To accomplish this synchronization, left lower winch drum
322
a
and right lower winch drum
322
b
must rotate such that lower load line
320
a
and lower load line
320
b
pay in and out at the same rate, assuming reeving and sheaves are equivalent.
In
FIG. 5
, when upper rigging unit
100
and lower rigging unit
300
have equivalent reeving, upper load block set
132
and lower load block
323
are each required to travel only half the total lift distance defined by the height of boom
17
. The travel distance of each load block is determined by the amount of load line payed in and out to its associated reeving lines. Thus, each load line must only be long enough to afford travel distance half the height of the load lift height. Typically, to lower a load attached to hook
40
, lower load block
332
is lowered by paying out lower load lines
320
until no more lower load line
320
is safely available, at which point upper load block set
132
is lowered by paying out upper load lines
120
until the load reaches the ground or other lower destination. To raise a load requires the reverse steps to be taken, although the opposite order may be used so long as the bounds of free travel of each load block set is not exceeded, resulting in unwanted contact between two load blocks.
In an alternative embodiment, upper reeving lines
126
and lower reeving lines
326
have a different number of reeving line parts. For example, the number of line parts in lower reeving lines
326
may be less than those found in upper reeving lines
126
or may be of different diameter or strength characteristics. This allows the upper load block set
132
and upper reeving lines
126
to have a higher lifting capacity and lower load block and lower reeving lines
326
to have a faster and greater range of motion, affording flexibility to the operator of heavy crane
15
. When light lifting duties are required, lower reeving lines
326
and lower load block
332
will be run up and down at a resulting high speed, providing a good cycle time. When a heavy lift is required, upper load block set
132
is first lowered to the ground. Interconnecting steel link plates (not shown) mechanically then connect upper load block set
132
and lower load block
332
, effectively bypassing the weak link when there are a smaller number of lines in lower reeving lines
326
. The stronger and more numerous parts of line in upper reeving lines
126
are then used for the heavy lift. Load attachment hook
40
must therefore be of a capacity suitable for the heaviest duty to be performed in that configuration. Likewise, interconnecting steel link plates (not shown) can be used to mechanically connect upper load block set
132
and intermediate load block set
232
, intermediate load block set
232
and lower load block
332
, or any combination of connections affording the requisite circumvention of the weakest link of the rigging system having the smaller number and/or weaker lines.
In an alternative embodiment depicted in
FIG. 6
, system
10
comprises upper rigging unit
100
, intermediate rigging unit
200
and lower rigging unit
300
as defined above. First winch drum
22
controls upper reeving lines
126
, second winch drum
23
controls lower reeving lines
326
, and third winch drum
19
controls intermediate reeving lines
226
. First winch drum
22
, second winch drum
23
and third winch drum
19
may operate in synchrony, independently or in a relative mode, as described below in the alternative embodiment depicted in FIG.
7
. Operation is analogous to the embodiment described in
FIG. 5
, with the additional operation of intermediate rigging unit
200
. For purposes of clarity,
FIG. 6
depicts single line rigging units. It is understood, however, that in the preferred embodiment, upper rigging unit
100
, intermediate rigging unit
200
and lower rigging unit
300
have multiple load lines, as depicted in FIG.
5
.
In the alternative embodiment depicted in
FIG. 7
, first winch drum
22
and second winch drum
23
may operate in synchrony, independently, or in a relative mode. In
FIG. 7
, when the number of parts of line in upper reeving lines
126
and lower reeving lines
326
are equal, and upper load block sheaves
130
and lower load block sheaves
330
have equal diameters, the following occurs. If first winch drum
22
and second winch drum
23
are turning in synchrony, hook
40
travels twice as fast compared to a single winch drum turning at the same speed. If first winch drum
22
and second winch drum
23
operate independently, then the vertical travel rate of upper load block set
132
is linearly independent of lower load block
332
. If first winch drum
22
and second winch drum
23
operate in a relative mode, upper load block set
132
and lower load block
332
move at vertical speeds relative to the relative speeds of first winch drum
22
and second winch drum
23
. These conditions as described are representative of some of the many permutations available with different reeving, drums and sheaves. Many other permutations are obviously possible with different combinations of components described in system
10
.
In the preferred embodiment, the winch drums and/or the load lines described in system
10
are of the same size and capacity. Thus, they are interchangeable between different cranes and rigging units. If additional capacity is required for a lift, then additional standard sized winch drums with standard size load line are added to heavy crane
15
. This affords the option of additional parts of reeving lines, with the difference in lift distance required by the additional reeving being made up by the additional rigging units.
It is also understood that each rigging unit described above may have the same number of parts of reeving lines. The advantage afforded in this arrangement is that a higher lift height at high capacity (through a high number of reeving parts of line) can be provided economically with conventional sized winch drums and hoist lines. Each rigging unit is responsible for the vertical travel distance of a portion of the total vertical height of lift required.
It is further understood that while all embodiments are depicted as a vertical lifting device, the invention may also be utilized in a pulling device, either on an inclined plane or horizontally with the same benefits as described in the use with a crane or similar lifting device.
The foregoing disclosure and description of the invention is illustrative and explanatory thereof. Various changes in the details of the illustrated construction may be made within the scope of the appended claims without departing from the spirit of the invention. The present invention should only be limited by the following claims and their legal equivalents.
Claims
- 1. A multiple block system for a hoisting device for a load, comprising:a boom head sheaving; said boom head sheaving oriented generally above an upper rigging unit and a lower rigging unit; said upper rigging unit oriented generally above said lower rigging unit; an upper load block set; said upper load block set having an upper load block upper sheaving and an upper load block lower sheaving; said upper rigging unit comprising said upper load block upper sheaving, at least one upper load line and an upper reeving line termination point; each said upper load line reeving around said boom head sheaving and said upper load block upper sheaving, attaching to said upper reeving line termination point and attaching to an upper load line winch; a lower load block having lower load block sheaving; said lower rigging unit comprising said upper load block lower sheaving, at least one lower load line and a lower reeving line termination point; each said lower load line reeving around said boom head sheaving, said lower load block sheaving and said upper load block lower sheaving, attaching to said lower reeving line termination point and attaching to a lower load line winch; said upper load line operable independently of said lower load line; and said lower load line operable independently of said upper load line.
- 2. A multiple block system as in claim 1, wherein said hoisting device is a crane.
- 3. A multiple block system as in claim 1, wherein said hoisting device is a pulling device for inclined planes through to the horizontal.
- 4. A multiple block system as in claim 1, further comprising at least one interconnecting steel link plate;said at least one interconnecting steel link plate mechanically connecting said upper load block set and said lower load block, such that said at least one lower load line does not directly support said load.
- 5. A multiple block system for a hoisting device for a load, comprising:a boom head sheaving, an upper rigging unit, at least one intermediate rigging unit and a lower rigging unit; said boom head sheaving located generally above said upper rigging unit; said upper rigging unit oriented generally above said at least one intermediate rigging unit; said at least one intermediate rigging unit oriented generally above said lower rigging unit; an upper load block set; said upper load block set having an upper load block upper sheaving and an upper load block lower sheaving; said upper rigging unit comprising said upper load block upper sheaving, at least one upper load line and an upper reeving line termination point; each said upper load line reeving around said boom head sheaving and said upper load block upper sheaving and attaching to said upper reeving line termination point; at least one intermediate load block set; each said at least one intermediate load block set having an intermediate load block upper sheaving and an intermediate load block lower sheaving; each said at least one intermediate rigging units comprising said intermediate lower load block upper sheaving, at least one intermediate load line and an intermediate reeving line termination point; one of said intermediate load lines reeving around said boom head sheaving, one said intermediate lower load block upper sheaving and said upper load block lower sheaving of the next higher said intermediate load block set, attaching one of said intermediate reeving line termination points and attaching at least one intermediate load line winch; other of said intermediate load lines reeving around said boom head sheaving, one said intermediate lower load block upper sheaving, and one said intermediate load block lower sheaving, attaching one of said intermediate reeving line termination points and attaching at least one intermediate load line winch; said lower rigging unit comprising a lower load block including lower load block sheaving, at least one lower load line and a lower reeving line termination point; each said lower load line reeving around said boom head sheaving, said lower load block sheaving and one said intermdeiate load block lower sheaving of lowest said intermediate load block set, attaching said lower reeving line termination point and attaching a lower line winch; and said upper load line, each said intermediate load line and said lower load line independently operable.
- 6. A multiple block system as in claim 5, wherein said hoisting device is a crane.
- 7. A multiple block system as in claim 5, further comprising at least one interconnecting steel link plate;said at least one interconnecting steel link plate mechanically connecting one said intermediate load block set and said lower load block.
- 8. A multiple block system as in claim 5, further comprising at least one interconnecting steel link plate;said at least one interconnecting steel link plate mechanically connecting said upper load block set and one said intermediate load block set.
- 9. A multiple block system as in claim 5, further comprising at least one interconnecting steel link plate comprising a first at least one interconnecting steel link plate and a second at least one interconnecting steel link plate; whereinsaid first at least one interconnecting steel link plate mechanically connecting said upper load block set and one said intermediate load block set; and said second at least one interconnecting steel link plate mechanically connecting one said intermediate load block set and said lower load block.
- 10. A multiple block system as in claim 5, further comprising a plurality of interconnecting steel link plates;said plurality of interconnecting steel link plates selectively mechanically connecting said upper load block set to said top intermediate load block set, any of said intermediate load block sets to a subsequently lower intermediate load block set, and a lowest intermediate load block set and said lower load block.
- 11. A method of lifting a heavy load with a lifting device, comprising:reeving a plurality of rigging units, each of said plurality of rigging units comprising a block sheaving and a set of reeving lines, said plurality of rigging units connected in series with a load suspended below said plurality of rigging units, said plurality of rigging units comprising a first rigging unit and at least one subsequent rigging unit, said first rigging unit having a greater number of line parts in said set of reeving lines than a first said subsequent rigging unit, each subsequent said subsequent rigging unit having a lesser number of line parts in said set of reeving lines from a preceding said subsequent rigging units; lifting a lightest load by engaging said subsequent rigging unit having a smallest number of line parts in said set of reeving lines; lifting subsequently a heavier load by mechanically connecting said preceding said subsequent rigging unit having a greater number of line parts in said set of reeving lines with said subsequent said subsequent rigging unit having a lesser number of line parts in said set reeving lines, and engaging said preceding said subsequent rigging unit having a greater number of line parts in said set of reeving lines; and lifting a heaviest load by mechanically connecting all of said subsequent rigging units and engaging said first rigging unit.
- 12. A method as in claim 11, further comprising:providing a plurality of uniform length load lines and a plurality of uniform sized winch drums, wherein each of said plurality of uniform length load lines makes up each said set of reeving lines.
- 13. A method of lifting a heavy load with a lifting device, comprising:reeving a plurality of rigging units, each of said plurality of rigging units comprising a block set and a set of reeving lines, said plurality of rigging units connected in series with a load suspended below said plurality of rigging units, said plurality of rigging units comprising a first rigging unit and at least one subsequent rigging unit, said first rigging unit having an equal number of line parts in said set of reeving lines to a first said subsequent rigging unit, each subsequent said subsequent rigging unit having an equal number of line parts in said set of reeving lines to a preceding said subsequent rigging units; and lifting a load by selectively engaging serially or concurrently said plurality of rigging units.
US Referenced Citations (7)