"Amoco Plans Test of Nitrogen Injection for Coalbed Methane"; Oil & Gas Journal, Oct. 28, 1991; pp. 30. |
"Stewart & Stevenson Petroleum Products"; 1991-1992 Catalog; pp. 10, 11 and 32-35. |
"Membrane Separation Offers Low-cost Inert Gas Safety"; Ocean Industry, Jul. 1990; pp. 27-29. |
"Liquid Nitrogen Developments and Applications in Drilling and Completion Operations"; Journal of Canadian Petroleum; Winter 1964-65, Montreal; pp. 158-164. |
"Chementator"; Chemical Engineering; Jun. 29, 1981; p. 18. |
"Use of An Inert Drilling Fluid to Control Geothermal Drill Pipe Corrosion"; Corrosion/81; Paper No. 224 (Apr. 6-10, 1981)(6 pages). |
New Release; Dateline: Houston, TX; Apr. 17, 1991; "Stewart & Stevenson and Generon Systems Introduce High Tech Nitrogen Pumper". |
News Release: Skid Mounted Nitrogen Unit Developed May, 1991, Pennwell Publishing Co. (One Page). |
"Development of the Cotton Valley Geopressure Zone in Panola County, Texas, Using Air/N.sup.2 Drilling and Openhole Completion Techniques"; Society of Petroleum Engineers; SPE 14657, (1986)(12 pages). |
"Out of Thin Air"; Chemical Engineering; Jun. 1991, beginning on p. 30 (7 pages). |
"Drilling With Air, Field Experience and Investigations Shed More Light on Down-Hole Explosions"; The Petroleum Engineer; Jan. 1956; pp. B-21-B24. |
Power News; vol. 31, No. 1; Spring, 1991; pp. 1-4. |
Anthony J. Welker; The Oil & Gas Book; Chapter 7; "Casing and Primary Cementing"; pp. 79-99, 120 and 121; Sci. Data Pub. (1985). |
Jacques Hagoort et al.; J. of Pet. Tech. (Apr. 1988); pp. 463-469. |
Introduction to Artificial Lift and Gas Lift; pp. 1-10. |
"Nitrogen Takes Hold for Advanced Recovery"; published by Niject Services Company (5 pages). |
Earl R. Beaver et al., EnergyProgress, vol. 6, No. 3, pp. 149-154 (Sep. 1986). |
Thomas L. Hardenburger et al., "Optimization Of On-Site Non-Cryogenic Nitrogen Systems Relative Nitrogen Use Patterns" 1992 AICHE Meeting (8 pages). |
Letter to D. Richardson dated Jul. 21, 1989 with attachment (total 10 pages). |
NOWSCO Eng. Tech update EUO0006 (3 pages). |
NOWSCO Well Services Ltd "Under-Balance Drilling Options" (8 pages). |
Feasibility Study EKO Fisk Nitrogen Production Vessel (Nov. 1985) ( 7 pages). |
Stewart & Stevenson Annual Report 19912, pp. 16-17. |
CADE/CAODC Spring Drilling Conference, Bruce Thistle et al., "Horizontal Drilling of a Low Pressure Fracture Shale Reservoir With Crude Oil and Nitrogen", pp. 1-18 (Apr. 14-16, 1993). |
PanCanadian tries coiled-tubing completion. Improved Recovery Week, vol. 2, No. 7, p. 1 (2), (Feb. 22, 1993). |
John Gunn "Damage Control: Underbalanced Drilling is moving to the top of the Toolbox" Oilweek, vol. 45, No. 12, p. 20(1), (Mar. 21, 1994). |
Permia, Inc. PRISM Alpha Membrane Separators (8 pages) (1987). |
"High Tech Nitrogen Pumper is Developed" Am Oil and Gas Reporter, Jul. 1991, pp. 58 and 59. |
T. Johannessen "Presentation of a 6000 Nm.sup.3 /h Nitrogen System based on Membrane Separation of Air" Swiss. Chem., vol. 9, No. 6A (1987) (6 pages). |
Zwick Energy Research "Nitrogen Generating Systems" (2 pages). |
PERMEA Marine Protection Regarding PRISM Nitrogen Systems (4 pages). |
P.D. Alan "Nitrogen Drilling System for Gas Drilling Applications" SPE 69.sup.th Annual Technical Conference (Sept. 25-28, 1994). |