The present invention relates to the field of civil engineering more particularly a temporary support structural system for power/transmission lines. It helps in creating a bypass corridor by providing temporary support to the transmission lines, until the permanent restoration of failed transmission line towers so that the monetary as well as service losses can be minimized.
Electricity generated in power plants is transported to distribution substations using high voltage transmission/power lines. These transmission lines are designed to function for different terrains, climatic conditions and physical environments and are always at risk to experience extreme/fatal events, both climate related and manmade. Climate related events include high winds, ice formation, storms, earthquakes, floods, land-slides, erosion and or settlement of foundations and so on. Power transmission interruption due to natural calamities are very often; whereas, the interruption caused by humans are limited. These include human error in design, fabrication or erection of towers and transmission lines, vehicular accidents, member thefts, vandalism, terrorism and maintenance issues.
The transmission line infrastructure is always at certain level of damage risk causing interruption in power supply to the critical infrastructure facilities, also concern to public safety. Power utilities have to be prepared for theses emergencies and hence, it is important to understand the reasons of failures and have plan to attend the same immediately and efficiently. Different kind of failures may occur in transmission line structures, such as tower and or its foundation failure, conductor outages due to failure in splices, failure of strands, ageing, snapping due to falling trees, insulator and its hardware failure, etc.
In above situations it is necessary to restore the power transmission as quickly as possible for the benefit of consumers. The important concern is to minimize the economic impact of the costs associated with the destruction and rebuilding. The cost of rebuilding or restoring a failed transmission line and total losses are dependent of restoration time. Therefore, the emergency restoration plan is seen as combination of technical or engineering processes and financial planning. Reference may be made to Picciano (1990), Aristizabal et al. (1993), Agrawal et al. (2000), Pohlman (2000), Schweiner et al. (2003), Lindsey (2015), Vadivel (2017) and Prasad et al. (2017) wherein an economic justification has been given for the use of emergency restoration of power lines using temporary solution. Further, the need of extensive planning and training for effective implementation in successful restoration of power is explained with the help of numerous examples. It is also highlighted to adopt uniform design practices for temporary restoration system and use of IEEE 1070 standard is recommended.
Based on the literature review, it is found that the research towards the development of temporary support structural system for emergency restoration of power lines is the state-of-the-art. To this, there are different solutions available in market but either their design and construction/fabrication is cumbersome or handling is difficult, reference may be made to Lindsey (1988) and Zhao (2009) wherein the modules of lightweight guyed masts are developed from open cross section, i.e. angles or reference may be made to Doinne (2018) wherein box modules fabricated using plates with large slotted holes. The drawbacks of both the systems are, they are susceptible to local buckling and angles are additionally susceptible to torsional buckling modes. Hence, the design weights will increase compared to normal to overcome these mode of failures. There are some more systems available in market, the reference may be made to Xu (2016) wherein emergency repair poles used for lower voltage lines up to 110 kV or reference may be made to De Abreu (2016) wherein guyed mast solution is provided to support transmission lines. The drawback of these solutions are, that they are not used as temporary support system. Almost in all the systems mentioned above separate box sections are required for connections which increases additional inventory and the gimbal joint is made with spherical ball assembly or shafts with special casting, thus requires precision machining or complicated forged components. Moreover, whole assembly of the gimbal joint needs to be handled at site which is difficult as it is bulky and heavy.
In addition, the available systems design and construction/fabrication is cumbersome, handling is difficult at site and their cost is very high. In view of the above, a cost effective scalable temporary support structural system for power lines with improved, safe and stable light weight design, easy to fabricate and install at site is the need of the hour.
i. Patent Citation:
An easy to use and plan, temporary support structural system has been developed to support the power/transmission lines during the permanent restoration of failed transmission line tower(s). While developing the present system number of inventive features has been added to it which makes the system more efficient, cost effective and novel compared to other solutions available in market. In this system the modules of guyed mast are designed with closed sections (square hollow sections) made of structural grade aluminum alloy which makes it lightweight, robust and improves overall structural stability. Further an easy to connect connection system and easy to construct foundation system has been developed which reduces the installation time of guyed mast at site. The use of unique two-pin gimbal joint provides hinge support between guyed mast bottom panel and foundation system, this helps in eliminating torsional forces on the mast due to unbalanced lateral loads. Experimental investigations were carried out as per IEEE 1070-2006(R2012) standard at various stages at component level on main parts and accessories and their assemblies at sub-structure level and on prototype as per IS: 802 (Part III)-1978 (Reaffirmed 2003) and IEC 60652: 2002 for the design loads calculated as per IS 802 (Part 1/Sec 1): 2015 for a system equivalent to 220 kV single circuit transmission line tower to ascertain the structural responses for their comparison with the design standards values. The design, development and experimental works has been completed. This is a scalable system, which provides support to various voltage class power lines from 33 to 800 kV.
Performance evaluation of demo temporary support structural system for power line having a typical configuration (double circuit) with a typical voltage class (400 kV) suspension type tower confirming to IS 802 (Part 1/Sec 1): 2015 and CBIP Manual on Transmission Lines Publication No. 323. July 2014 has been observed over three years' period under practical conditions.
The present invention is illustrated in
Accordingly, the present invention provides temporary support structural system for power lines which comprises
In an embodiment of the present invention a temporary support structural system for power lines is developed which obviates the drawbacks of the hitherto known prior art.
In another embodiment of the present invention the design is carried out for the fabrication of lightweight robust modules with square hollow (closed) sections made of structural grade aluminum alloy for above system which confirmed the qualification criteria as per IEEE 1070 standard.
In yet another embodiment of the present invention the design and fabrication of easy to connect connections and easy to construct foundation system is carried out for the above mentioned system.
In still another embodiment of the present invention, use of two pin gimbal joint as structural hinge to the guyed mast of above system which will be made of light weight material, easy to handle and easy to assemble or dismantle at site is demonstrated.
In further another embodiment of the present invention the scalable system is designed to support the various voltage class: power lines from 33 to 800 kV.
Details of the present invention are shown in
The lightweight unique two pin gimbal joint (8) made of structural grade aluminum alloy is used as structural hinge between the easy to construct mast foundation plate (9) and bottom conical panel (7) of guyed mast.
The leg (11) and bracing (12) members of robust lightweight panels (6) and lightweight bottom conical panel (7) are designed and fabricated using closed (square hollow) sections made of structural grade aluminum alloy. The lightweight end plate of the panels (13) are strengthened with the strengthening plates (14) designed and fabricated from structural grade aluminum alloy to facilitate the end to end connection of panels and direct connection of guy wires (5) and any one arm of insulated cross arms (4). Further plurality of stiffener plates (15) to increase the panel end stiffness against the lateral loads causing bending of individual panel. The insulator plate (16) strengthened with additional plates (17 and 18) are provided at regular intervals in panel. The insulator plate (16) are provided to facilitate the direct connection of insulated cross arm (4) with panels (6) of guyed mast (1). The assembly of panels (6) and bottom conical panel (7) are supported over the unique two pin gimbal joint (8), this joint (8) is placed over the box (19) provided above the foundation plate (9).
The easy to construct guy wire anchor foundation system (10) consists anchor rod (20) connected at bottom end with cross plates (21), which increases its uplift force resistance capacity and top end with coupler (22) welded with gusset plates to facilitate the connection guy wire (5) through turn buckle and pin.
The above explained components form the present invention which is light weight as all the components and accessories are made of structural grade aluminum alloy except the hardwares and fixtures. It is easy to use and plan, compact yet economical, easy to transport and handle at site due to lightweight, easy to assemble and dismantle, scalable cost effective system to support power lines during the failure of transmission line towers.
Although the invention has been described in detail herein, it should be understood that the invention is not limited to the embodiments herein disclosed. Various changes, substitutions and modifications can be made thereto by those skilled in the art without departing from the spirit or scope of the invention as described and defined by the appended claims.
The following examples given by way of illustration of the working of the invention in actual practice and should not be construed to limit the scope of the present invention in any way.
Based on the typical configuration of temporary support structural system numerical results and analytical equations are derived to design its components and accessories. These components and accessories are designed for the various probable failure modes occur in an actual system under the combinations of loads applied/occur on the system during its service life.
The tests on different accessories of temporary support structural system as suggested in IEEE 1070 standard are shown in
Prototype test was conducted on present invention i.e. temporary support structural system for an equivalent to 220 kV single circuit suspension type transmission line tower. The guyed mast for equivalent system was erected on test pad and rigging was carried out using steel wire ropes for the application of test loads at various load points, At the tower end of load points, load cells were employed to monitor the test loads. The other ends of wire ropes were connected to hydraulic actuators for load applications. The loads cells were calibrated with the standard proving rings and real time digital control system. Further the real time digital control system is connected with the load cells and hydraulic actuators in servo control close loop circuit. The equivalent guyed mast of present invention was tested as per IS: 802 (Part III)-1978 (Reaffirmed 2003) and IEC 60652: 2002 guidelines for the test loads derived from IS 802 (Part 1/Sec 1): 2015 for 220 kV voltage class. To maintain the initial stability and verticality of guyed mast the guy wire pretensions kept 5% of the breaking load of respective guy wire. The guy wire tensions were monitored throughout the test using load cells at anchor end and found to be in limits.
The results of experimental investigations indicated in above examples proved that all the envisaged objectives related to the invention are successfully achieved.
Advantages of the Present Invention
The Main Advantages of the Present Invention are: