The present invention relates to the field of optical fiber drawing and manufacturing, which is used for cooling the optical fiber in high-speed drawing production, so that the optical fiber enters the coating system at a suitable temperature, ensuring the optical fiber coating quality.
During the high-speed drawing production, the baking temperature of the optical fiber is at about 2000 degrees. Directly entering the coating process with such a high temperature will lead to abnormal coating, thus, interrupting the production. For handling this, the cooling pipe needs to be used for forced cooling of the optical fiber. Chinese patent CN1450009A describes an optical fiber cooling pipe proposed by the applicant Alcatel. The cooling pipe is composed of a lumen and a set of suction pipe and intake pipe. Gas injection and pumping can be used to improve the cooling effect, but it is difficult for processing and hard to clean when producing. When the ordinary cooling pipe is used, large amount of helium gas will be consumed, and the cooling is uneven, high-speed drawing is prone to the problem of large diameter fluctuation of the coating. Besides, the air holes in ordinary tubular cooling pipe are difficult to clean and the cavity of the cooling pipe not only absorbs the internal heat, but also absorbs the heat from the surroundings, thus affecting the cooling effect and optical fiber strength.
The technical problem to be solved by the present invention is to improve the cooling effect of the existing cooling pipe. On the basis of the current cooling pipe, the present invention provides a novel cooling system for optical fiber drawing, further reducing consumption of the helium gas, stabilizing the coating diameter of the optical fiber and ensuring the strength of the optical fiber.
In order to solve the above technical problem, the technical solution of the present invention is shown as below:
A novel cooling system for optical fiber drawing, the invention point is as follows: the novel cooling system for optical fiber drawing includes upper and lower shutters of a cooling pipe, a helium gas drainage plug, a cooling pipe body, a cooling water circulation and cooling device, a coating diameter meter, coating diameter control system, cooling water pipes and gas pipes.
The upper of the lower shutter of the cooling pipe is installed with the helium gas drainage plug, the upper end of the helium gas drainage plug is connected to the cooling pipe body; and a coating device, a curing device and a coating diameter meter are provided below the cooling pipe body. The helium gas drainage plug is connected to the first mass flow meter and the drainage pump through the gas pipe in sequence.
The cooling pipe body includes a single-section cooling pipe and a helium gas intake device, the cooling pipe body is composed of three to six of the single-section cooling pipes, the single-section cooling pipes are connected to each other from end to end by means of the helium gas intake device. The upper end and lower end of the single-section cooling pipe respectively has a water hole, two adjacent water holes between the single-section cooling pipes are connected through the cooling water pipe. The water holes at the uppermost end and the lowermost end of the cooling pipe body are connected through the cooling water pipe, and the cooling water circulation and cooling device is connected in series, the helium gas intake device is connected to the second mass flow meter and the helium gas.
The coating diameter meter is connected to the coating diameter control system, and the coating diameter control system is connected to the first mass flow meter and the second mass flow meter.
Further, the cooling water circulation and cooling device is composed of a cooling water tank, a water pump and a refrigeration unit.
Further, the length of the single-section cooling pipe is 2 m, lumen diameter of the single-section cooling pipe is 20-30 mm, the outer wall of the single-section cooling pipes is covered with a polystyrene foam thermal insulating layer, the upper end and the lower end of the single-section cooling pipe body are provided with threads.
Further, the helium gas intake device is composed of an upper ring and a lower ring, threads are provided on the inner and outer walls of the upper ring, the lower ring is provided with an internal thread, and the internal thread of the upper ring is connected with the single-section cooling pipe of the upper segment, the external thread of the upper ring cooperates with the internal thread of the lower ring, and four gas inlets are provided around the middle of the lower ring. The air inlet hole communicates with the lumen at an elevation angle of 45° , helium gas is blown into the interior of the cooling pipe body through the gas inlet, and the lower ring is connected to a cooling pipe in lower segment through threads.
1) The present invention has the characteristics of easy cleaning, good cooling effect, high optical fiber coating quality, stable coating diameter and less consumption of helium gas.
2) In the present invention, the optical fiber is cooled by the helium gas at a certain angle opposite to the optical fiber movement direction by a unique helium gas intake device, to disturb the boundary layer gas and improve the cooling effect.
3) The outer wall of the cooling pipe is covered with a polystyrene foam thermal insulating layer to reduce the heat exchange between the cooling pipe and the outside air and improve the heat exchange effect between the cooling pipe and the gas in the pipe.
4) Under the control of the coating diameter control system, the helium gas drainage device can improve the cooling effect by leading the air flow in the pipe under the cooling pipe body with a certain drainage flow rate, thereby reducing the helium gas consumption.
5) The flow rate of drainage and the injection rate of helium gas are controlled by the coating diameter control system. When the diameter value detected by the coating diameter meter is fed back to the system, the system compares the detected value with the standard control value and adjusts the drainage speed and helium gas inlet flow rate, so that coating diameter can be maintained stable during production process.
6) The helium gas intake device not only has the function of gas intake, that is, the helium gas is blown into the cooling pipe through this component, but is also the connecting piece of each single-section cooling pipe. In the helium gas intake device, two cylindrical rings are screwed together through the threads, both inside and outside of the internal cylindrical ring are provided with threads. The helium gas intake device is connected to the upper and lower cooling pipes through the threads. In addition, gas inlets are arranged around the middle of the lower ring of the helium gas intake device, each inlet communicates with the lumen at 45° elevation angle. The helium gas is blown into the cooling pipe through the gas inlet. The component can be removed when not in production, which is easy to clean and avoid residues affecting optical fiber strength. The helium gas intake device can be unlocked in the initial lifting stage of drawing to check the position of the optical fiber in the cooling pipe. By adjusting the position of the cooling pipe, the situations that drawing production and optical fiber strength affected by the poor cooling pipe alignment can be avoided, at the same time, the optical fiber is kept in a better cooling state.
A novel cooling system for optical fiber drawing is shown in
Helium gas intake device 3b as shown in
The optical fiber sequentially passes through upper shutter 1 of the cooling pipe, cooling pipe body 3, helium gas drainage plug 2, lower shutter 1 of the cooling pipe, and coating and curing device 5. Cooling water circulation and cooling device 4 injects cold water into cooling pipe body 3, and draws back the warm water. Coating diameter control system 6 controls second mass flow meter 9b to inject helium gas 11 into helium gas intake device 3b. At the same time, coating diameter control system 6 controls first mass flow meter 9a to adjust the flow rate of the drainage and to pull the gas in the pipe.
The basic principles and main features of the present invention, as well as the advantages of the present invention, are shown and described above. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and description only illustrate the principle of the present invention. Without departing from the spirit and scope of the present invention, the present invention also has various modifications and improvements which fall within the scope of the claimed invention. The scope of protection demanded by the present invention is defined by the appended claims and their equivalents.
Number | Date | Country | Kind |
---|---|---|---|
201510542005.1 | Aug 2015 | CN | national |
This application is the national phase entry of International Application No. PCT/CN2015/099437, filed on Dec. 29, 2015, which is based upon and claims priority to Chinese Application No.201510542005.1, filed on Aug. 31, 2015, the entire contents of which are incorporated herein by reference.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/CN2015/099437 | 12/29/2015 | WO | 00 |