Claims
- 1. A method for installing an offshore compliant tower jacket having a plurality of flexpiles, comprising:
- a. driving a temporary support pile into the sea floor such that said temporary support pile extends a predetermined distance above the sea floor;
- b. driving a plurality of foundation piles into the sea floor;
- c. driving at least two docking piles into the sea floor such that said docking piles extend above the sea floor higher than said foundation piles and one of said docking piles extends higher above the sea floor than the remaining docking piles; and
- d. lowering the compliant tower jacket such that guide sleeves provided on the tower receive said docking piles, the flex piles receive said foundation piles, and closed end temporary support tubes provided on said tower receive said temporary support piles whereby the compliant tower jacket is supported on said temporary support piles.
- 2. The method of claim 1, further comprising driving conductors into the sea floor before lowering the compliant tower jacket.
- 3. A method for installing an offshore compliant tower jacket having a plurality of flexpiles, comprising:
- a. driving a plurality of foundation piles into the sea floor such that said foundation piles extend a predetermined distance above the sea floor;
- b. driving at least two docking/temporary support piles into the sea floor such that said docking/temporary support piles extend above the sea floor higher than said foundation piles and one of said docking/temporary support piles extends higher above the sea floor than the remaining docking/temporary support piles; and
- c. lowering the compliant tower jacket such that the flex piles receive said foundation piles and closed end temporary support tubes provided on said tower receive said docking/temporary support piles whereby the compliant tower jacket is supported on said temporary support piles.
- 4. A method for installing an offshore jacket having a plurality of legs, comprising:
- a. providing one or more sleeves attached to the legs of the offshore jacket;
- b. driving a temporary support pile into the sea floor such that said temporary support pile extends a predetermined distance above the sea floor;
- c. driving a plurality of foundation piles into the sea floor;
- d. driving at least two docking piles into the sea floor such that said docking piles extend above the sea floor higher than said foundation piles and one of said docking piles extends higher above the sea floor than the remaining docking piles; and
- e. lowering the offshore jacket such that guide sleeves provided on the jacket receive said docking piles, the sleeves on the legs of the jacket receive said foundation piles, and closed end temporary support tubes provided on the offshore jacket receive said temporary support piles whereby the offshore jacket is supported on said temporary support piles.
- 5. A method for installing an offshore jacket having a plurality of legs, comprising:
- a. driving a plurality of foundation piles into the sea floor such that said foundation piles extend a predetermined distance above the sea floor;
- b. driving at least two docking/temporary support piles into the sea floor such that said docking/temporary support piles extend above the sea floor higher than said foundation piles and one of said docking/temporary support piles extends higher above the sea floor than the remaining docking/temporary support piles; and
- c. lowering the offshore jacket such that the legs of the offshore jacket receive said foundation piles and closed end temporary support tubes provided on said offshore jacket receive said docking/temporary support piles whereby the offshore jacket is supported on said temporary support piles.
- 6. A method for installing an offshore compliant tower jacket having a plurality of flexpiles, comprising:
- a. placing a template on the sea floor, said template having slots for receiving piles and conductor guides;
- b. driving a temporary support pile into the sea floor such that said temporary support pile extends a predetermined distance above the sea floor;
- c. driving a plurality of foundation piles into the sea floor;
- d. driving at least two docking piles into the sea floor such that said docking piles extend above the sea floor higher than said foundation piles and one of said docking piles extends higher above the sea floor than the remaining docking piles;
- e. driving conductors into the sea floor; and
- f. lowering the compliant tower jacket such that guide sleeves provided on the tower receive said docking piles, the flex piles receive said foundation piles, and closed end temporary support tubes provided on said tower receive said temporary support piles whereby the compliant tower jacket is supported on said temporary support piles.
Parent Case Info
This application claims benefit of provisional application No. 60/009,894 filed Jan. 11, 1996.
US Referenced Citations (7)