Claims
- 1. A method of replacing an existing fendering system on a leg of an offshore platform with the assistance of a support vessel having a crane, comprising the steps of:
- coupling a jib crane to said leg above said existing fendering system;
- detaching a first upper load cell of said existing fendering system from said leg, said first upper load cell being attached to said leg at a first preselected position;
- detaching a first lower load cell of said existing fendering system from said leg, said first lower load cell being attached to said leg at a second preselected position;
- by means of said crane, removing said existing fendering system;
- by means of said crane, placing a new fendering system proximate said leg, said new fendering system comprising an elongated cylindrical bumper, a second upper load cell coupled to said bumper, and a second lower load cell coupled to said bumper in spaced relation to said second upper load cell;
- by means of said jib crane, raising said new fendering system to position said second upper load cell at said first preselected position and to position said second lower load cell at said second preselected position; and
- coupling said second upper load cell and said second lower load cell to said leg.
- 2. A jib crane adapted to be coupled to a leg of an offshore platform for replacement or maintenance of an existing fendering system, comprising:
- a boom having a pivoting coupling for coupling said boom to said leg such that said boom is operable to selectively pivot generally horizontally; and
- a hoist rollably coupled to said boom, said hoist having a vertically moveable hook being operable to lift objects, said hoist being operable to translate along said boom.
- 3. The jib crane of claim 2, wherein said boom is generally horizontally disposed such that said boom is operable to pivot in a horizontal plane.
- 4. The jib crane of claim 2, wherein said boom includes:
- an inboard end;
- a cantilever member pivotally coupled to said inboard end by said pivoting coupling; and
- a cylindrical clamp coupled to said cantilever member and being adapted to couple to said leg.
- 5. A method of replacing an existing fendering system on a leg of an offshore platform, comprising the steps of:
- removing said existing fendering system; and
- coupling an integrally fabricated new fendering system to said leg, said new fendering system comprising an elongated cylindrical bumper, a replacement upper load cell coupled to said bumper, and a replacement lower load cell coupled to said bumper in spaced relation to said replacement upper load cell.
- 6. A method of replacing an existing fendering system on a leg of an offshore platform, comprising the steps of:
- removing said existing fendering system; and
- coupling an integrally fabricated new fendering system to said leg, said new fendering system comprising an elongated cylindrical bumper, a replacement upper load cell coupled to said bumper, and a replacement lower load cell coupled to said bumper in spaced relation to said replacement upper load cell;
- wherein said step of removing said existing fendering system includes the steps of:
- detaching a first upper load cell of said existing fendering system from said leg, said first upper load cell of said existing fendering system being attached to said leg at a first preselected position; and
- detaching a first lower load cell of said existing fendering system from said leg, said first lower load cell of said existing fendering system being attached to said leg at a second preselected position.
- 7. The method of claim 6, wherein said step of coupling includes the steps of:
- raising said new fendering system to position said replacement upper load cell at said first preselected position and to position said replacement lower load cell at said second preselected position; and
- coupling said replacement upper load cell and said replacement lower load cell to said leg.
- 8. The method of claim 7, including the step of coupling a jib crane to said leg above said existing fendering system.
- 9. The method of claim 8, wherein said step of raising is accomplished by means of said jib crane.
- 10. A method of replacing an existing fendering system on a leg of an offshore platform, comprising the steps of:
- removing said existing fendering system; and
- coupling an integrally fabricated new fendering system to said leg, said new fendering system comprising an elongated cylindrical bumper, a replacement upper load cell coupled to said bumper, and a replacement lower load cell coupled to said bumper in spaced relation to said replacement upper load cell;
- including the step of removing an elongated stabilizer coupled between said replacement upper load cell and said replacement lower load cell.
- 11. A jib crane adapted to be coupled to a leg of an offshore platform for replacement or maintenance of an existing fendering system, comprising:
- a boom having a pivoting coupling for coupling said boom to said leg such that said boom is operable to selectively pivot generally horizontally; and
- a hoist rollably coupled to said boom, said hoist having a vertically moveable hook being operable to lift objects, said hoist being operable to translate along said boom;
- wherein said boom includes:
- an inboard end;
- a cantilever member pivotally coupled to said inboard end by said pivoting coupling; and
- a cylindrical clamp coupled to said cantilever member and being adapted to couple to said leg;
- wherein said pivoting coupling includes a tongue and fork connection.
- 12. A jib crane adapted to be coupled to a leg of an offshore platform for replacement or maintenance of an existing fendering system, comprising:
- a boom having a pivoting coupling for coupling said boom to said leg such that said boom is operable to selectively pivot generally horizontally; and
- a hoist rollably coupled to said boom, said hoist having a vertically moveable hook being operable to lift objects, said hoist being operable to translate along said boom;
- wherein said boom includes:
- an inboard end;
- a cantilever member pivotally coupled to said inboard end by said pivoting coupling; and
- a cylindrical clamp coupled to said cantilever member and being adapted to couple to said leg;
- which includes a locking pin coupled to said boom to prevent pivoting movement of said boom.
- 13. An assembly for an offshore platform, said assembly comprising:
- a leg of the offshore platform;
- a fendering system on the leg of the offshore platform; and
- a hoist coupled to the leg of the offshore platform above the fendering system for hoisting the fendering system during replacement or maintenance of the fendering system.
- 14. The assembly as claimed in claim 13, wherein the hoist is a component of a jib crane mounted to the leg of the offshore platform above the fendering system.
- 15. The assembly as claimed in claim 13, further including a clamp for detachably mounting the hoist to the leg of the offshore platform above the fendering system.
- 16. The assembly as claimed in claim 13, wherein the fendering system includes an elongated bumper, an upper load cell coupled to the bumper, a lower load cell coupled to the bumper in spaced relation to the upper load cell, and a stabilizer element mounted to the upper load cell and to the lower load cell for stabilizing relative position between the upper load cell and the lower load cell during mounting of the fendering system onto the leg of the offshore platform.
- 17. An assembly for an offshore platform, said assembly comprising:
- a leg of the offshore platform;
- a fendering system on the leg of the offshore platform; and
- a rigging support coupled to the leg of the offshore platform above the fendering system for hoisting the fendering system during replacement or maintenance of the fendering system.
- 18. The assembly as claimed in claim 17, wherein the rigging support includes a generally horizontal boom coupled to the leg of the offshore platform above the fendering system.
- 19. The assembly as claimed in claim 18, wherein the rigging support further includes an inclined tension member having a first end coupled to the leg of the offshore platform above the boom, and a second end coupled to the boom at a location spaced from the leg of the offshore platform.
- 20. The assembly as claimed in claim 17, wherein the fendering system includes an elongated bumper, an upper load cell coupled to the bumper, a lower load cell coupled to the bumper in spaced relation to the upper load cell, and a stabilizer element mounted to the upper load cell and to the lower load cell for stabilizing relative position between the upper load cell and the lower load cell during mounting of the fendering system onto the leg of the offshore platform.
- 21. A fendering system comprising:
- an elongated bumper,
- an upper load cell coupled to the bumper;
- a lower load cell coupled to the bumper in spaced relation to the upper load cell; and
- a stabilizer element mounted to the upper load cell and to the lower load cell for stabilizing relative position between the upper load cell and the lower load cell.
- 22. A fendering system for an offshore platform, said fendering system comprising:
- an elongated bumper;
- an upper load cell coupled to the elongated bumper and having an upper mount for mounting to a leg of the offshore platform;
- a lower load cell coupled to the elongated bumper in spaced relation to the upper load cell, and having a lower mount for mounting to the leg, of the offshore platform; and
- a stabilizer element mounted to said upper mount and to said lower mount for stabilizing relative position between the upper mount and the lower mount during mounting of the fendering system onto the leg of the offshore platform.
- 23. The fendering system as claimed in claim 22, wherein the lower mount includes a clamp for clamping the lower load cell to the leg of the offshore platform.
- 24. A fendering system for an offshore platform, said fendering system comprising:
- an elongated bumper;
- a load cell coupled to the elongated bumper and having an upper mount for mounting to a leg of the offshore platform;
- a lower mount coupled to the elongated bumper in spaced relation to the upper mount for mounting to the leg of the offshore platform; and
- substantially rigid stabilizer structure mounted to the upper mount for stabilizing relative position between the upper mount and the lower mount during mounting of the fendering system onto the leg of the offshore platform.
- 25. A fendering system for an offshore platform, said fendering system comprising:
- an elongated bumper;
- an upper load cell coupled to the elongated bumper and having an upper mount for mounting to a leg of the offshore platform;
- a lower load cell coupled to the elongated bumper in spaced relation to the upper load cell, and having a lower mount for mounting to the leg of the offshore platform; and
- a substantially rigid elongated stabilizer element having an upper end mounted to and terminating at said upper mount and a lower end mounted to and terminating at said lower mount for stabilizing relative position between the upper mount and the lower mount during mounting of the fendering system onto the leg of the offshore platform.
Parent Case Info
This application is a continuation of application Ser. No. 08/504,897, filed on Jul. 20, 1995, now abandoned.
US Referenced Citations (27)
Foreign Referenced Citations (1)
Number |
Date |
Country |
1088867 |
Oct 1967 |
GBX |
Continuations (1)
|
Number |
Date |
Country |
Parent |
504897 |
Jul 1995 |
|