Offshore structure support

Information

  • Patent Grant
  • 6783305
  • Patent Number
    6,783,305
  • Date Filed
    Monday, May 20, 2002
    22 years ago
  • Date Issued
    Tuesday, August 31, 2004
    20 years ago
Abstract
A pile based braced caisson structural support device includes a number of legs. These legs are configured in a teepee type configuration such that the footprint of the base is larger than the footprint of the opposing end. This structural support can be used as a base for an offshore drilling platform in that the support reduces the lateral forces on the support caused by wave action.
Description




BACKGROUND OF THE INVENTION




1. Field of the Invention




This invention generally relates to structural supports. In particular, this invention relates to structural supports for, for example, offshore drilling platforms, or the like.




2. Description of Related Art




Conventional offshore platforms have deck legs that are vertical or are battered outward as they extend downwards. The conventional arrangement provides structurally efficient support for the deck but the associated dimensions of the platform at the water surface result in increased expense for the platform.




SUMMARY OF THE INVENTION




Pile are configured in a “teepee” type configuration, where the piles are arranged to generally form a conical shape with their intersection being approximately at the elevation of, for example, a waterline. The tops of the piles extend pass this intersection to support, for example, a platform or structure, such as a drilling platform. The opposite ends of the piles are proportionally spaced on or below another surface, such as the mudline on an ocean floor.




The basic concept of using conical spaced piles can be extended such that two or more piles can be used to support, for example, a structure at a first end, while also providing support for, for example, a central member, such as a drill pipe, that extends through a central axis of the assembly. However, it is to be appreciated, that three or more piles can be used without a center member to support a structure as discussed above. Furthermore, two or more supports can be used with one or more center members to also support a structure as discussed above.




For example, two piles can be offset substantially 180° from each other, e.g. X shaped, three piles offset substantially 120° from each other, four piles offset substantially 90° from each other, e.g, teepee shaped, or the like. However, it is to be appreciated that the specific offset between the piles, and the number of piles, can be varied depending on, for example, expectant forces on the structure, the topology of the surface the assembly is to be secured to, the weight, structure and anticipated forces of the device that sits on top of the piles, or like.




An aspect of the invention relates to providing a structure support with at least three legs that are positioned in a teepee configuration.




Aspects of the present invention also relate to providing a structure support with four or more legs positioned in a teepee configuration.




Accordingly, an aspect of the invention allows piles to be configured such that the footprint has a greater surface area than the area formed by the opposing ends of piles.




Additional aspects of the invention related to minimizing the bracing required for a structural support in a wave zone.




Aspect of the invention additionally relate to a support structure that reduces lateral wave forces on the structure.




Aspects of the invention additionally relate to providing a structure in which the majority of the components can be installed and welded in-place above a waterline.




Aspects of the invention also relate to reducing drilling platform size.




These any other features and advantages of this invention are described in or are apparent from the following detailed description of the embodiments.











BRIEF DESCRIPTION OF THE DRAWINGS




The embodiments of the invention will be described in detail, with reference to the following figures, wherein:





FIG. 1

is a view in side elevation of an offshore platform of according to the present invention;





FIG. 2

is a view in front elevation of the offshore platform according to the present invention;





FIG. 3

is a view in side elevation showing the setting of the deck frame for the offshore platform according to the present invention;





FIG. 4

is a view in side elevation showing the setting of the main deck for the offshore platform according to the present invention;





FIG. 5

is a view in side elevation showing the setting of the helideck for the offshore platform according to the present invention;





FIGS. 6-19

illustrate an exemplary method of assembling a braced caisson according to this invention; and





FIGS. 20-27

illustrate another exemplary method of assembling a caisson according to this invention.











DETAILED DESCRIPTION OF THE INVENTION




The exemplary embodiments of this invention will be described in relation to a support structure, such as drilling platform, supported by three piles and a central vertical member, such as drill pipe. However, to avoid unnecessarily obscuring the present invention, the following description omits well-known structures and devices that may be shown in block diagram form or otherwise summarized. For the purposes of explanation, numerous specific details are set forth in order to provide a thorough understanding of the present invention. It should be appreciated that the present invention may be practiced in a variety of ways beyond these specific details. For example, the systems and methods of this invention can be generally expanded and applied to support any type of structure. Furthermore, while exemplary distances and scales are shown in the figures, it is to be appreciated the systems and methods of this invention can be varied to fit any particular implementation.





FIGS. 1 and 2

show an inward batter guide offshore platform indicated generally at


10


in which battered bracing piles


12




a-e


are arranged so as to minimize platform dimensions at the water surface


14


while maximizing the spacing of the piles as they extend upward from the water surface so that loads from a deck


16


at the top of the piles are transferred directly to the piling. The platform includes a pile guide structure


18


which fits over and is connected to a central vertical member


20


to receive the piles


12




a-e


at the water surface. The piles extend angularly through guides


22


of the pile guide structure in such a manner that the distance between piles is minimized at the water surface, but the distances between angled piles is maximized both at the ends supporting the deck


16


as well as at the opposed end buried below the mudline


24


. The pile guide connects the piles to act in unison to restrain lateral movement of the entire offshore platform


10


including the central vertical member


20


. The pile guide


18


also supports appurtenances such as ladders, boat landings, stairs, or the like, so that they can be installed in the field as a unit, thereby, for example, reducing installation expense for the platform. The legs


26


of the deck structure are connected to the tops of the piles. The increased pile spacing at the pile tops provides, for example, more structurally efficient support for the deck, reduced structural vibration periods for the platform and increased resistance to the rotation that results if the deck mass is eccentric to the central vertical member


20


than if the deck is supported by the central member. All field connections can be made above the water surface where structural integrity of the connections can be more easily verified than if the connections were made below the water surface.




With reference to

FIG. 3

, once the piles


12


are in place, the deck frame


28


can be set on top of the piles and connected to the upper ends of the piles. Then, as shown in

FIG. 4

, the main deck


16


is set on the deck frame, and finally, as shown by

FIG. 5

, a helideck


30


is set in place.





FIGS. 6-19

illustrate an exemplary method for assembling a structure in accordance with an exemplary embodiment of this invention with, for example, a barge boat, around a SSC


50


(Self Sustaining Caisson). In this exemplary embodiment, the SSC has been installed by a drilling rig, such as a rig drilling an exploration well. In

FIG. 6

, the position and orientation of the legs are determined and a lift boat


55


anchored and jacked-up relative to the installation point of the SSC. Next, as illustrated in

FIG. 7

, the jack-up orientation of the liftboat relative to the SSC is shown. Next, as illustrated in

FIG. 8

, the guide structure


65


is unloaded from the barge


60


. Then, as illustrated in

FIG. 9

, the legs or piles


70


, are unloaded, placed in the guide structure, and in

FIG. 10

, installed via the guide structure into, for example, the ocean floor with the aid of a hydraulic hammer. As can be seen from this illustration, the piles


70


intersect at a point just above the water line. This allows, for example, the piles and all associated connection to be made above water.




In

FIG. 11

, the barge


60


is relocated and the deck frame


75


is unloaded. In

FIG. 12

the deck frame


75


installed on the piles. Next, in

FIGS. 13-16

, the southskid


80


, northskid and ventroom


85


, and helideck


90


, respectfully, are unloaded from the barge and installed on the piles. In particular,

FIG. 16

illustrates how the various portions of the rig are installed at an end of the piles above the intersection point, and thus above the water line. Then, in

FIGS. 17-18

, the main deck


95


unloaded and installed.





FIG. 19

illustrates the completed rig where the barge has been unloaded and the vent boom


100


rotated into position.





FIGS. 20-27

illustrate exemplary steps for constructing a structure support according to an alternative exemplary embodiment of this invention where a SSC is not initially present at a well head. In particular, this exemplary method utilizes a jack-up drilling rig and derrick barge to construct the rig. Specifically, in

FIG. 20

, a jack-up drilling rig is mobilized and the first conductor with a mudline suspension is drilled. Next, as illustrated in

FIG. 21

, the jack-up rig installs a sub-sea template


200


that is used as a guide structure for the well head and the subsequent installation of the SSC. Then, in

FIG. 22

, a second conductor with a mudline suspension is drilled and installed via the sub-sea template


200


.





FIG. 23

illustrates the installation of the caisson by, for example, a derrick barge


210


. Next as illustrated in

FIG. 24

, for example, the derrick barge


210


installs the inward batter guide structure


220


. Then, as illustrated in

FIG. 25

, the piles


70


are installed.

FIG. 26

illustrates the installation of the deck frame


230


and

FIG. 27

the helideck


240


.




It is, therefore, apparent that there has been provided, in accordance with the present invention, a support and method for assembling the support to support a structure. While this invention has been described in conjunction with a number of illustrative embodiments, it is evident that many alternatives, modifications, and variations would be or are apparent to those of ordinary skill in the applicable arts. Accordingly, the disclosure is intended to embrace all such alternatives, modifications, equivalents and variations that are within in the spirit and scope of this invention.



Claims
  • 1. A structure support comprising:at least three elements configured in a substantially teepee shaped configuration, said at least three elements bordering a self sustaining caisson; a first end of the at least three elements capable of being affixed to a structure; and a second end of the at least three elements adapted to be placed on a surface, wherein the at least three elements intersect between the first end and the second end.
  • 2. The support of claim 1, wherein the structure is at least one of a platform, a drilling platform, and an offshore drilling platform.
  • 3. The support of claim 1, wherein the surface is a sea floor and the second end extends below a mudline.
  • 4. The support of claim 1, where the at least three elements intersect above a waterline or at a waterline.
  • 5. The support of claim 1, wherein an angular guide maintains an orientation at least between the at least three elements.
  • 6. The support of claim 1, wherein the at least three elements are offset from each other by 120°.
RELATED APPLICATION DATA

This application claims the benefit of and priority under 35 U.S.C. §119(e) to U.S. Provisional Patent Application Serial No. 60/291,637, filed May 18, 2001, entitled “Offshore Platform,” which is incorporated herein by reference in its entirety.

US Referenced Citations (3)
Number Name Date Kind
3805534 Brasted Apr 1974 A
4723875 Sutton Feb 1988 A
6299385 Barnes Oct 2001 B1
Provisional Applications (1)
Number Date Country
60/291637 May 2001 US