This application is the U.S. national phase of International application No. PCT/EP2014/078630 filed 19 Dec. 2014, which designated to the U.S. and claims priority to EP Patent Application Nos. 13199074.9 filed 20 Dec. 2013, 14153073.3filed 29 Jan. 2014, 14153075.8 filed 29 Jan. 2014, and 14153082.4 filed 29Jan. 2014, the entire contents of each of which are hereby incorporated by reference.
The present invention relates to an on-site mobile facility for shielding when constructing, renovating or assembling a building, a bridge or a wind turbine, or when building temporary sports arenas, amusement facilities, or concert venues. The present invention also relates to a facility mounting method for mounting the on-site mobile facility according to the present invention.
When renovating buildings or making a metro station below the ground, such constructions are not easily covered during the construction period. Thus, covering facilities have to be very strong to have the required wide, free span and are therefore made to be of a more permanent character in order to be able to bear this wide free span and withstand the wind forces acting on the facility during high winds. Furthermore, in the northern countries, such constructions have to withstand the heavy load from snowfall.
Furthermore, the assembly of such temporary cover or production facility over an existing building or future underground station is also very difficult, as the cranes for lifting the covering structures cannot stand underneath due to the building to be renovated or the fact that there is a hole in the ground where the descent to the station is to be built. Therefore, very large and thus very expensive cranes are required for mounting such cover or production facility. And this adds substantial costs to the process of renovating a building or constructing an underground station.
It is an object of the present invention to wholly or partly overcome the above disadvantages and drawbacks of the prior art. More specifically, it is an object to provide an improved on-site facility which is easier to mount over a large element such as a building, a bridge, a wind turbine or a future railway station.
The above objects, together with numerous other objects, advantages, and features, which will become evident from the below description, are accomplished by a solution in accordance with the present invention by an on-site mobile facility for shielding from wind exerting a wind load on the facility, rain or snow when constructing, renovating or assembling a building, a bridge or a wind turbine, the on-site mobile facility covering an area having boundaries and corners, comprising:
The shielding arrangement covering the side area of each module may be connected directly to the legs carrying the roof structure.
Moreover, the side area may be the area of the module exposed to the highest wind load.
By having each side area covered by a separate shielding arrangement, the on-site mobile facility can be designed substantially as a more light-weight construction than known facilities, since the shielding arrangements can quickly by pulled up if the wind forces on the construction become too high. Thus, the facility construction does not have to be capable of withstanding wind pressure on all sides of the facility, as the shielding arrangement can be retracted and the wind allowed to flow underneath the facility. In known facilities, the whole side of the facility is covered by one tarpaulin. Consequently, the side cannot be easily removed, and the design of known facilities has to be stronger and thus more massive. When having a more light-weight design, the facility can be mounted with much smaller cranes, reducing mounting costs substantially. Furthermore, the facility, when built from modules, can be mounted several meters off the ground, e.g. above a building to be renovated or across a larger opening, such as when building a metro station where supporting legs in the middle of the facility is not an option.
By mounting the facility starting with a corner, the facility can be built off the ground, e.g. 30 meters off the ground covering an existing building. Furthermore, the facility can be mounted with smaller cranes, since the whole facility roof structure does not have to be hoisted in one piece. By using a smaller crane, the facility is less costly to mount than known facilities.
In addition, the elements of the shielding arrangement may be directly connected with the legs or beam carrying the roof structure.
Furthermore, the side area may be defined as delimited by two adjacent legs and a horizontal beam carrying the roof structure.
Thus, two adjacent legs and a horizontal beam carrying the roof structure may be presenting borders of the side area.
The on-site mobile facility as described above may further comprise a guide system slidably connecting the elements with one of the beams or the adjacent legs without any further frame structure there between.
Also, the shielding arrangement may have a shielding position in which the elements have a first mutual distance and an open position in which the elements have a smaller mutual distance than the first mutual distance in the shielding position, so that the wind is allowed to pass the uncovered side area in the second position.
Moreover, the guide system may comprise a motor for bringing the elements from a shielding position to an open position or vice versa.
In addition, the elements may be slidably connected with the beam or legs by a rail connection.
Also, the elements may have a tongue engaging a groove in the beam or legs.
The cover material may be divided into cover parts, each cover part being arranged between two adjacent elements.
Additionally, the shielding arrangement may have an outer face and an inner face facing an inside of the facility, at least a first cover part of the cover material being connected to the element at the outer face of the shielding arrangement and at least a second cover part of the cover material being connected to the element at the inner face of the shielding arrangement.
Furthermore, a space is formed between the first and second cover parts, which space may be fully or partly filled with sound-absorbing material, sound insulation, and/or layers of material having different properties.
Moreover, the cover material may be connected to grooves in the elements.
Furthermore, at least the element being furthest away from the beam may be connected with a hoist system by a hoisting means, such as a wireline, a cord or a chain, so that this element and the intermediate elements are hoisted by pulling in the hoisting means.
Further, the guide system may comprise a wind sensor.
The present invention also relates to an on-site mobile facility for shielding when constructing, renovating or assembling a building, a bridge or a wind turbine, the on-site mobile facility covering an area having boundaries and corners, comprising:
Said crane may be used for bringing the elements from a shielding position to an open position or vice versa.
Further, the motor or the crane may be operated by remote control.
The projecting flange structures may be in the same level of height, so that a crane is capable of travelling across the facility underneath the facility roof structure in a first direction and in a second direction perpendicularly to the first direction.
Additionally, the beams may be connected by corner blocks forming a squared grid structure.
Also, the corner blocks of the on-site mobile facility may further comprise projecting structures defining rails for a crane moving along the projecting structures.
The corner blocks may have a projecting flange structure forming part of the rails of the crane.
Moreover, projecting flanges structures may be suspended from the facility roof structure and connected with the beams, the projecting flanges or structure defining rails for a crane moving along the projecting structures or rails.
Further, the projecting structures may face downwards from the beams/corner blocks.
The projecting flange structure of the corner blocks may be in the same level of height as the projecting flange structures connected with the beams, so that a crane is capable of travelling across the facility underneath the facility roof structure in a first direction and in a second direction perpendicularly to the first direction.
Furthermore, rails for a crane may be integrated in the beams and the corner blocks so as to form a grid of rails so that the crane can travel in two perpendicular directions across the facility underneath the facility roof structure.
The on-site mobile facility as described above may further comprise grid beams connections connecting the joist connections.
The on-site mobile facility as described above may further comprise base structures adapted to be firmly fastened to or in a ground of the area, wherein the legs may be fastened to the base structures.
The present invention also relates to an on-site mobile facility for shielding when constructing, renovating or assembling a building, a bridge or a wind turbine, the on-site mobile facility covering an area having boundaries and corners, comprising:
Also, each leg may be fastened to a base structure.
Said base structure may be partly submerged into the ground and covered by ground material.
Furthermore, each base structure may comprise a base plate which is substantially horizontal when arranged in a hole in the ground.
In addition, at least a first partition may be arranged perpendicularly to the base plate in a raised position.
The first partition may be arranged at least partly in the ground.
Moreover, the base structure may further comprise a second partition connected with the base plate and arranged perpendicularly to the first partition and perpendicularly to the base plate.
The first and second partitions may be adapted to be arranged at least partly in the ground.
By having partitions arranged at least partly in the ground, the ground material is divided by the partitions, and when the wind pulls in the facility, the forces acting on the facility are distributed to the base structure and the ground. Consequently, the forces can only move the facility, if the ground material is also moved.
Further, the second cover material may have a curved shape when the pyramidal roof structure is unfolded.
The joists may be connected in a joist connection and the second cover material may have a tip connected with the joist connection by means of a rod creating a distance between the joists and the cover material.
Moreover, the second cover material may constitute the roof of each module.
Furthermore, the first ends of each joist of the pyramidal roof structure may be fastened to one of the corner blocks.
The on-site mobile facility as described may further comprise a lifting beam for hoisting the beam down between two adjacent legs for aligning the legs to have a mutual distance between them matching a length of the beam.
Said lifting beam may comprise two sets of control wheels for engaging the legs between which legs the beam is to be mounted.
The legs may each comprise a control pin arranged in a top part of the legs facing upwards when mounted in an upright position.
The present invention also relates to a facility mounting method for mounting the on-site mobile facility according to any of the preceding claims at a site and covering an area having boundaries and corners, comprising the steps of:
In the above facility mounting method, the step of raising the beam may comprise the step of hoisting the beam down by means of a lifting beam so that control wheels of the lifting beam engage control pins of the corner block to align the mutual distance between the legs to match a length of the beam to be mounted there between.
Said facility mounting method may further comprise the step of installing the guide system to the legs/beam.
Also, the facility mounting method described above may further comprise the step of fastening the elements with cover material to the legs/beam and connecting the elements to the guide system.
The invention and its many advantages will be described in more detail below with reference to the accompanying schematic drawings, which for the purpose of illustration show some non-limiting embodiments and in which
All the figures are highly schematic and not necessarily to scale, and they show only those parts which are necessary in order to elucidate the invention, other parts being omitted or merely suggested.
The on-site mobile facility 1 comprises a plurality of modules 2 as shown in
By a side area is meant the face of the module being substantially horizontal and the face of each module exposed to the highest wind load. Thus, the roof structure is also exposed to wind load, but to less than 50% of the wind load compared to the side area. Each side area is defined as the area of each module between two legs of the main structure of the module. The shielding arrangement covering the side area of each module is connected directly to the legs carrying the roof structure.
One module of the on-site mobile facility 1 is shown in a front view in
The guide system 12 of the on-site mobile facility is slidably connecting the elements with one of the beams 5 (shown in
As shown in
In the shielding position shown in
Returning to
As shown in
The beams 5 and the corner blocks 34 of the on-site mobile facility further comprise projecting structures 47, as shown in
The crane 15 may be a traverse crane suspended from the facility roof structure. The aforementioned motor for pulling up the shielding arrangement 9 may be replaced by the crane which could be operating most of the shielding arrangements for moving them between an open, a partly open and shielding position. Both the motor and the crane may be remotely controlled, so that the facility manager, when hearing of storm or high winds, can send a control signal to the crane and/or motors to bring up the shielding arrangements. The guide system may further comprise a wind sensor 33 and thus be self-operable if excessive winds are measured by the sensor, as the sensor thus sends a signal to the motors and/or crane to pull up the shielding arrangement.
As shown in
When mounting the on-site mobile facility 1 at a certain location above a building as shown in
The base structure 36 shown in
Although the invention has been described in the above in connection with preferred embodiments of the invention, it will be evident for a person skilled in the art that several modifications are conceivable without departing from the invention as defined by the following claims.
Number | Date | Country | Kind |
---|---|---|---|
13199074 | Dec 2013 | EP | regional |
14153073 | Jan 2014 | EP | regional |
14153075 | Jan 2014 | EP | regional |
14153082 | Jan 2014 | EP | regional |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/EP2014/078630 | 12/19/2014 | WO | 00 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2015/091896 | 6/25/2015 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
1363407 | Goudie | Dec 1920 | A |
2124242 | Bellman | Jul 1938 | A |
2513729 | Lemen | Jul 1950 | A |
2764107 | Niswonger | Sep 1956 | A |
3103709 | Bolt | Sep 1963 | A |
3481073 | Yoshida | Dec 1969 | A |
4229914 | Lucas | Oct 1980 | A |
4245809 | Jackson | Jan 1981 | A |
4890634 | Dalo | Jan 1990 | A |
4961297 | Bernard | Oct 1990 | A |
5000211 | Speare | Mar 1991 | A |
5291931 | Kraeutler | Mar 1994 | A |
5379823 | Kraeutler | Jan 1995 | A |
5592789 | Liddell, Sr. | Jan 1997 | A |
5809699 | Joly | Sep 1998 | A |
8074697 | Iglesias Ballester | Dec 2011 | B2 |
20030014928 | Kerney | Jan 2003 | A1 |
20150361703 | McDonald | Dec 2015 | A1 |
Number | Date | Country |
---|---|---|
697 00 213 | Jan 2000 | DE |
2 014 866 | Jan 2009 | EP |
2 861 121 | Apr 2005 | FR |
2 901 820 | Dec 2007 | FR |
58-13862 | Jan 1983 | JP |
10-212821 | Aug 1998 | JP |
2004-324065 | Nov 2004 | JP |
2008-007938 | Jan 2008 | JP |
Entry |
---|
International Search Report and Written Opinion for PCT/EP014/078630, dated Jun. 19, 2015, 21 pages. |
Extended Search Report for EP 13199074, dated Apr. 9, 2014, 13 pages. |
Number | Date | Country | |
---|---|---|---|
20160298345 A1 | Oct 2016 | US |