The field of the invention is generally drilling and completion optimization and more specifically the combination of multiple functions in a single trip such as liner or casing directional drilling with cementing and expansion capabilities to form a monobore.
Drilling a hole and advancing casing or liner as the hole is drilled and reamed are known as described in U.S. patent and published applications: U.S. Pat. Nos. 5,845,722; 6,196,336; 6,419,033; 2003/0056991; 2003/0106688; U.S. Pat. Nos. 5,348,095; 6,371,203; 2002/0040787; 2002/0189863; 2004/0011534; 2005/6854533; 2007/0144784; 2007/0175665; 2007/0267221; 2008/0135289; 2009/0090508 and 2010/7784552.
Some of the art also has a focus on hole orientation while drilling such as US Publication 2009/0056938 and 2005/0126825. Casing drilling with expansion is discussed in US Publication 2007/7287603. Other prior art discusses drilling a wellbore and forming a monobore, such as US Publication 2006/0196663; 2011/0114336; 2010/0032167 and 2008/7383889. Drilling and cementing is discussed in UP Publication 2009/0107675. Expanding and cementing is covered in US Publication 2012/0061097. Using folded tubulars and reforming them in a wellbore coupled with further expansion as a possibility is discussed in 2011/0265941.
The present invention seeks to make drilling and completion more efficient by enabling in some embodiments the drilling and reaming of a borehole while advancing casing, liner or a patch with the further ability to expand and cement in either order. The expansion device can be run top down or bottom up when using a swage that can be built to multiple diameters for creating a bottom bell on the tubular advanced with the bottom hole assembly (BHA), expand the tubular and fixate the tubular to an existing tubular through which the expanded tubular has just been run. Cementing can be accomplished before or after expansion and expansion can be accomplished with an inflatable instead of a swage. A monobore can be created with an expansion tool that adapts to several diameters. The BHA can be driven by a fluid motor such as a Moineau pump and supported by rigid or coiled tubing. The tubular can be solid, with single or multiple walls or slotted 101. The swage can be advanced with a hydraulic anchor/stroker tool alone or with force delivered through the running string or combinations of the two. Steering tools can be incorporated in the BHA as well as sensors to determine the location of the string being advanced. Drilling pressure at the bit can be controlled with adjustable chokes associated with the tubular being drilled in. The swage can be used as a tubular support during running in and drilling. A folded liner can be advanced and then made round with a swage or by application of internal pressure. The string can be rotated during cementing to distribute cement with the downhole motor to do the rotation if coiled tubing is used for the running string. Expansion can also be accomplished with roller expanders, conical swages or internal pressure in the string. Expansion direction can be top down or bottom up. Cementing can occur bottom up or top down and can occur before or after expansion. Expansion can also occur at one end or another first and then proceed from the opposite end or with a middle section expanded first followed by opposed ends. Top down expansion can be aided by adding string weight by setting down weight at the surface. Those skilled in the art will better appreciate these and other aspects of the present invention from a review of the detailed description of the preferred embodiment and the associated drawings while recognizing that the full scope of the invention is to be found in the appended claims.
A tubular string is advanced with a bottom hole assembly as the hole is drilled and reamed in a desired direction with the aid of directional drilling equipment adjacent the bit. When the advanced tubular forms the desired lap to the existing tubular, the assembly can be configured to cement the tubular and expansion can then be accomplished to fill the annular space and enhance the cement bonding. The expansion equipment can create a bottom bell on the expanded tubular and expand the top end into a bell of the existing tubular so that a monobore is created as the process is repeated with each added string. Numerous variations are contemplated for each single trip including but not limited to the direction of expansion, whether cementing or expansion occurs first, reforming folded tubing in the hole as well as the nature of the expansion tool and pressure control when drilling.
Referring to
The open hole packer 15 is there to keep the cement 24 from moving downhole toward the reamer 8 and the bit 9. Low pressure open hole packer 12 is secured to the lower end of the tubular 11 and is there for the purpose of preventing cement 24 backup out of the annular space 38 as an alternative to check valves associated with openings 32. The packer 12 can also be of the multi-layered cup shape petal design where the petals move relatively to each other to open. Cement delivery merely displaces the cup shape inwardly as the cement 24 passes and thereafter the weight of the cement above the packer 12 urges its overlapping layers outwardly so that the cement 24 is prevented from reversing direction.
At the top of the tubular 11 and extending into the annular space 38 is a schematically illustrated choke that can be used to control the fluid pressure at the bit 9 when more hole is made within a desired pressure range to enhance the rate of penetration and to minimize formation damage. Alternatively, such pressure control at the bit 9 could also be accomplished at the well surface.
The major components of the assembly having been described a preferred sequence of operation will now be reviewed followed by possible variations and other options.
In
The assembly can also be centered using an inflatable in the recently reamed section before building the expansion assembly 6.
In a top down expansion the chances of getting the expander 6 stuck are reduced as the expander 6 can be reconfigured to a smaller dimension and simply pulled out of the tubular string 11 or it can be retracted without having its swaging dimension reduced first. Top down also affords the option of building the expander 6 outside the tubular string 11 to the initial desired dimension. Again, extraction of the expander 6 with top down is far simpler than a bottom up expansion.
The expander 6 is preferably buildable to multiple dimensions so that it can make an end bell for a monobore completion and then be reconfigured to the desired dimension for completion of the expansion of the tubular string 11.
The open hole packer 12 can serve the function of a hanger. The drill string can be rigid pipe or coiled tubing. Alternatively the bit 9 can be attached to the tubular string 11 directly when the tubular string happens to be casing. The expansion process can also be initiated and monitored with sensors to detect the proper positioning of the tubular string 11 with respect to the existing tubular to which it will be attached by expansion and the sensors can monitor the progress of the expansion to determine when it is time to reconfigure the expansion assembly 6 after the tubular sting 11 is attached to the existing tubular above. The tubular string can be solid wall or slotted to facilitate the expansion.
The bypass 17, see
The expander 6 when placed below the tubular string 11 for running in can support the tubular string 11 for running in the hole before drilling resumes.
The tubular string need not have a circular cross section when running in. It can be fluted, as in
Those skilled in the art will appreciate that the present invention allows for tubular sting expansion in the context of liner drilling with a drill string or with a casing drilling application. A monobore or some other type of completion can be achieved. In some applications cementing would be optional. Cementing can be done before or after expansion and in the same trip. The drilling can be steerable so that liner and casing can be advanced into a properly oriented bore and expanded and if desired cemented in the same trip. In some applications such as when setting a patch the cement can be allowed to flow toward the bit and the reamer. Expansion that takes place after cementing increases the cement bond and saves money by reducing the amount of cement needed for the completion. In some applications the cementing can be optional, which saves additional sums. Expansion increases the internal tubular diameter to allow greater flow capacities and less pressure drop for a given flow rate. Future drilling out of the cement such as when making a lateral can also be reduced when expansion results in a thinner layer of cement in the surrounding annulus. Use of known components of known integrity can be used such as reamer blades that can be retracted for removal of the drill string to get the next tubular string section to be advanced into the wellbore. The roller expander can be used instead of a cone type expander to get the various dimensions to build an end bell at a lower end and to expand the bulk of the string length as well as to secure the string to an existing tubular at an opposite end.
Top down expansion can also be accomplished with string weight added to the expander as an expansion option. In a bottom up expansion the movement of the expander can distribute the cement and while pushing up the cement take voids out of the cement.
A single wall tubular such as casing 60 can be used with cement 62 as shown in
It is also desirable to rotate the tubular string 11 which can be done by rotation of the drill string if the drill string is rigid. The fluid motor 4 can also be selectively engaged to the tubular string with a swivel mount for the motor 4 to allow relative rotation as shown schematically by 54 in
In the case of casing drilling the expander 6 can be carried within the casing and then when drilling to the needed depth the expander 6 can latch the bit 9 and be extended out the lower end of the casing so that it can be built and conduct the expansion bottom up while retrieving the bit and reamer behind it. Alternatively the expander 6 can be supported above the casing string using a running tool and an anchor with a stroker for expansion in a top down direction. The configuration for cementing can be as previously described.
Seals 12 or 15 can be inflatable seals actuated with the delivered cement 24.
“Cement” as used herein is intended to encompass all materials capable of sealing tubulars downhole.
The above description is illustrative of the preferred embodiment and many modifications may be made by those skilled in the art without departing from the invention whose scope is to be determined from the literal and equivalent scope of the claims below:
| Number | Name | Date | Kind |
|---|---|---|---|
| 5348095 | Worrall et al. | Sep 1994 | A |
| 5794702 | Nobileau | Aug 1998 | A |
| 5845722 | Makohl et al. | Dec 1998 | A |
| 6196336 | Fincher et al. | Mar 2001 | B1 |
| 6253850 | Nazzai et al. | Jul 2001 | B1 |
| 6371203 | Frank et al. | Apr 2002 | B2 |
| 6419033 | Hahn et al. | Jul 2002 | B1 |
| 6446724 | Baugh et al. | Sep 2002 | B2 |
| 6543552 | Metcalfe et al. | Apr 2003 | B1 |
| 6854533 | Galloway et al. | Feb 2005 | B2 |
| 7114559 | Sonnier et al. | Oct 2006 | B2 |
| 7128146 | Baugh et al. | Oct 2006 | B2 |
| 7383889 | Ring et al. | Jun 2008 | B2 |
| 7784552 | Brouse | Aug 2010 | B2 |
| 7861779 | Vestavik et al. | Jan 2011 | B2 |
| 8132619 | Smith, Jr. et al. | Mar 2012 | B2 |
| 20020040787 | Cook et al. | Apr 2002 | A1 |
| 20020189863 | Wardley | Dec 2002 | A1 |
| 20030056991 | Hahn et al. | Mar 2003 | A1 |
| 20030106688 | Saugier | Jun 2003 | A1 |
| 20030132032 | Metcalfe et al. | Jul 2003 | A1 |
| 20040011534 | Simonds et al. | Jan 2004 | A1 |
| 20040079528 | Metcalfe et al. | Apr 2004 | A1 |
| 20050121203 | Richard et al. | Jun 2005 | A1 |
| 20050126825 | Moriarty et al. | Jun 2005 | A1 |
| 20060005973 | Harrall et al. | Jan 2006 | A1 |
| 20060196663 | Keller | Sep 2006 | A1 |
| 20060272807 | Adam et al. | Dec 2006 | A1 |
| 20070068703 | Tessari et al. | Mar 2007 | A1 |
| 20070144784 | Head et al. | Jun 2007 | A1 |
| 20070175665 | Tessari et al. | Aug 2007 | A1 |
| 20070267221 | Giroux et al. | Nov 2007 | A1 |
| 20070287603 | Norris et al. | Dec 2007 | A1 |
| 20080135289 | Ford | Jun 2008 | A1 |
| 20080264690 | Khan et al. | Oct 2008 | A1 |
| 20090056938 | Treviranus et al. | Mar 2009 | A1 |
| 20090090508 | Brouse | Apr 2009 | A1 |
| 20090107675 | Eriksen et al. | Apr 2009 | A1 |
| 20100032167 | Adam et al. | Feb 2010 | A1 |
| 20100116490 | Lynde et al. | May 2010 | A1 |
| 20110061939 | Boyle | Mar 2011 | A1 |
| 20110114336 | Lehr et al. | May 2011 | A1 |
| 20110265941 | Jiral et al. | Nov 2011 | A1 |
| 20120061097 | O'Connor et al. | Mar 2012 | A1 |
| 20120186816 | Dirksen et al. | Jul 2012 | A1 |
| Number | Date | Country |
|---|---|---|
| WO 2011044012 | Apr 2011 | WO |
| Entry |
|---|
| Stockmeyer, Carl F., et al., “Expanable-Drilling-Liner Technology: First Commercial Deployment of a Monobore Liner Expansion”, SPE 108331. Sep. 2007, 1-10. |
| Stockmeyer, C.F., et al., “Development and Commercial Deployment of an Expandable Monobore Liner Extension”, SPE 102150, Sep. 2008, 1-14. |
| Coronado, Martin P., et al., “Development of a One-Trip ECP Cement Inflation and Stage Cementing System for Open Hole Completions” IADC/SPE 39345, Mar. 1998, 473-481. |
| Stockmeyer, Carl F., et al., Expandable Monobore Drilling Liner Extension Technology: Applications and Implementations following the First Commercial Introduction and Development:, SPE 113901, Jun. 2008, 1-13. |
| Number | Date | Country | |
|---|---|---|---|
| 20130299169 A1 | Nov 2013 | US |