The field of the invention is fracturing and more particularly a method for fracturing in open hole without external zone isolators.
There are two commonly used techniques to fracture in a completion method.
A variation of this scheme is to eliminate the perforation by putting into the casing wall telescoping members that can be selectively extended through the cement before the cement sets to create passages into the formation and to bridge the cemented annulus. The use of extendable members to replace the perforation process is illustrated in U.S. Pat. No. 4,475,729. Once the members are extended, the annulus is cemented and the filtered passages are opened through the extending members so that in this particular case the well can be used in injection service. While the perforating is eliminated with the extendable members the cost of a cementing job plus rig time can be very high and in some locations the logistical complications of the well site can add to the cost.
More recently, external packers that swell in well fluids or that otherwise can be set such as 40, 42, 44, 46, and 48 in
What is needed and provided by the method of the present invention is a technique to pinpoint the applied frac pressure to the desired formation while dispensing with expensive procedures such as cementing and annulus packers where the formation characteristics are such as that the hole will retain its integrity. The pressure in the string is delivered through extendable conduits that go into the formation. Given banks of conduits are coupled with an isolation device so that only the bank or banks in interest that are to be fractured at any given time are selectively open. The delivered pressure through the extended conduits goes right to the formation and bypasses the annular space in between. Those and other features of the present invention will be more readily understood to those skilled in the art from a review of the description of the preferred embodiment and the associated
A fracturing operation is done in open hole without annular space isolation. The annular space is spanned by telescoping members that are located behind isolation valves. A given bank of telescoping members can be uncovered and the telescoping members extended to span the annular space and engage the formation in a sealing manner. Pressurized fracturing fluid can be pumped through the telescoped passages and the portion of the desired formation fractured. In a proper formation, cementing is not needed to maintain wellbore integrity. The telescoping members can optionally have screens. Normally, the nature of the formation is such that gravel packing is also not required. A production string can be inserted into the string with the telescoping devices and the formation portions of interest can be produced through the selectively exposed telescoping members.
a and 5b show a telescoping member extended with a sliding sleeve and opened for formation access at the same time; and
a and 6b show a running string with extendable devices for extending the telescoping passages to the formation.
The array of telescoping members 116 selectively covered by a valve 110 can be in any number or array or size as needed in the application for the expected flow rates for fracturing or subsequent production. The telescoping assembly 116 is shown in the retracted position in
The valve 110 associated with each telescoping assembly 116 can also be operated with a sleeve shifter tool in any desired order. Each valve can have a unique profile that can be engaged by a shifting tool on the same or in separate trips to expedite the fracturing with one valve 110 and its associated telescoping array 116 ready for fracturing or more than one valve 110 and telescoping array 116.
As another alternative for closing the valve 110 articulated ball seats can be used that accept a ball of a given diameter and allow the valve 110 to be operated and the ball to pass after moving the seat where such seat movement configures a another seat in another valve 110 to form to accept another object that has the same diameter as the first dropped object and yet operate a different valve 110. Other techniques can be used to allow more than one valve to be operated in a single trip in the well. For example an articulated shifting tool can be run in and actuated so that on the way out or into the well it can open or close one or more than one valve either based on unique engagement profiles at each valve, which is preferably a sliding sleeve or even with common shifting profiles using the known location of each valve and shifting tool actuation before reaching a specific valve that needs shifting.
Alternatively rupture discs set to break at different pressure ratings can be used to sequence which telescoping passages will open at a given pressure and in a particular sequence. However, once a rupture disc is broken to open flow through a bank of telescoping passages, those passages cannot be closed again when another set of discs are broken for access to another zone. With sliding sleeves all the available volume and pressure can be directed to a predetermined bank of passages but with rupture discs there is less versatility if particular zones are to be fractured in isolation.
The method of the present invention allows fracturing in open hole with direction of the fracture fluid into the formation without the need for annular barriers and in a proper formation the fracturing can take place in open hole without cementing the liner. Such a technique in combination with valves at most or all of the telescoping assemblies allows the fracturing to pin done in the needed locations and in the desired order. After fracturing, some or all the valves can be closed to either shut in the whole well where fracturing took place or to selectively open one or more locations for production through the liner and into a production string (not shown). The resulting method saves the cost of cementing and the cost of annulus barriers and allows the entire process to the point of the fracturing job to be done in less time than the prior methods such as those described in
While telescoping assemblies are discussed as the preferred embodiment other designs are envisioned that can effectively span the gap of the surrounding annulus in a manner to engage the formation in a manner that facilitates pressure transmission and reduces pressure or fluid loss into the surrounding annulus. Those skilled in the art will appreciate that this method is focused on well consolidated formations where hole collapse is not a significant issue.
One alternative to extending the assemblies 116 hydraulically is to do it mechanically. As shown as 130 in
Another alternative to pushing out the assemblies 116 with pressure using telescoping components is to incorporate expansion of the liner 104 to get the assemblies to the surrounding formation. This can be with a combination of a telescoping assembly coupled with tubular expansion. The expansion of the liner can be with a swage S whose progress, indicated by the associated arrow in
Optionally, the leading ends of the outermost telescoping segment 122 can be made hard and sharp such as with carbide or diamond inserts to assist in penetration into the formation as well as sealing against it. The leading end can be castellated or contain other patterns of points to aid in penetration into the formation.
The above description is illustrative of the preferred embodiment and many modifications may be made by those skilled in the art without departing from the invention whose scope is to be determined from the literal and equivalent scope of the claims below:
Number | Name | Date | Kind |
---|---|---|---|
3245472 | Zandmer | Apr 1966 | A |
3347317 | Zandmer | Oct 1967 | A |
4285398 | Zandmer | Aug 1981 | A |
4475729 | Costigan | Oct 1984 | A |
5425424 | Reinhardt et al. | Jun 1995 | A |
5479986 | Gano et al. | Jan 1996 | A |
7267172 | Hofman | Sep 2007 | B2 |
7387158 | Murray et al. | Jun 2008 | B2 |
7387165 | Lopez de Cardenas et al. | Jun 2008 | B2 |
7392841 | Murray et al. | Jul 2008 | B2 |
7401648 | Richard | Jul 2008 | B2 |
7422058 | O'Malley | Sep 2008 | B2 |
7422069 | Richard et al. | Sep 2008 | B2 |
7441596 | Wood et al. | Oct 2008 | B2 |
7475729 | Johnson | Jan 2009 | B2 |
7699101 | Fripp et al. | Apr 2010 | B2 |
7866383 | Dusterhoft et al. | Jan 2011 | B2 |
8443892 | Richard et al. | May 2013 | B2 |
20040079535 | Richard et al. | Apr 2004 | A1 |
20060048939 | Johnson | Mar 2006 | A1 |
20060124310 | Lopez de Cardenas et al. | Jun 2006 | A1 |
20070107908 | Vaidya et al. | May 2007 | A1 |
20080035349 | Richard | Feb 2008 | A1 |
20080121390 | O'Malley et al. | May 2008 | A1 |
20100230103 | Parker | Sep 2010 | A1 |
20110220362 | Huang et al. | Sep 2011 | A1 |
Number | Date | Country |
---|---|---|
2009070175A | Apr 2009 | WO |
2010120469 | Oct 2010 | WO |
Entry |
---|
Garfiled, G., et al., “Novel Completion Technology Eliminates Formation Damage and Reduced Rig Time in Sand Control Applications”, SPE 93518, Mar. 2005, 1-5. |
Garfiled G., “New One-Trip Sand-Control Completion System That Eliminates Formation Damage Resulting From Conventional Perforating and Gravel-Packing Operations”, SPE 96660, Oct. 2005, 1-5. |
McElfresh, P., et al., “Maximizing Inflow Performance in Soft Sand Completions Using New One-Trip Sand Control Liner Completion Technology”, SPE 94622. May 2005, 1-5. |
Hill, Leo E., et al., “Completion Tools Proven Successful in Deepwater Frac Packs and Horizontal Gravel-Packing,” IADC/SPE 74492, Feb. 2002, pp. 1-15. |
Coronado, Martin P., et al., “Development of a One-Trip ECP Cement Inflation and Stage Cementing System for Open Hole Completions,” IADC/SPE 39345, Mar. 1998, pp. 473-481. |
Henriksen, K.H., et al., “Integration of New Open Hole Zonal Isolation Technology Contributes to Improved Reserve Recovery and Revision in Industry Best Practices,” SPE 97614, Dec. 2005, pp. 1-6. |
Number | Date | Country | |
---|---|---|---|
20100263871 A1 | Oct 2010 | US |