The invention relates to a method, a gluing apparatus arrangement and a computer program product, with which the efficiency of the manufacturing arrangement of the glue paste can be improved by adjusting the open time of the used glue paste.
In the gluing of large part elements together, usually glue mixtures are used, which are manufactured during gluing by mixing two or more glue components with an appropriate mixing device. Examples of possible glue components, which are manufactured by mixing two or more components, are different polyurethane and epoxy glues.
For example, epoxy glue and polyurethane glue are two-component glues. There are countless different kinds of polyurethanes depending on the required properties. The properties can be, among others, open time, clamping time, thermal resistance, chemical resistance and strength. The components of the polyurethane glue are stored in two separate containers before manufacturing the glue mixture.
When manufacturing the glue, the components are mixed and simultaneously a hardener is added, which starts the cross-linking process in the glue. After this, the glue is spread either as one or more layers onto the surfaces to be glued and the surfaces are clamped together. The hardener causes a chemical reaction in the glue, as a result of which the glue mixture is cross-linked to its final hardness.
The glue is adhesive during a so-called open time, which is a glue type specific property. The open time varies from glue to glue from couple of seconds to even several hours. The basic components used in the glue and the selected hardener affect the length of the open time. The open time also determines the clamping time necessary for the gluing, the magnitude of which clamping time is 1-3 times the length of the open time.
In the example of
If the temperature of the space, where the gluing is performed, changes to one direction or the other, then the open time of the selected glue mixture in
The object of the invention is to provide a new glue paste manufacturing method and manufacturing apparatus, with which the time required by the gluing process of a multilayer laminate to be manufactured by gluing can be shortened compared to the time required by the gluing according to the prior art.
In the glue paste manufacturing method and manufacturing apparatus according to the invention the ambient temperature of the production area is taken into consideration. Furthermore, the open time of the glue paste finished in the manufacturing method and in the manufacturing apparatus is shortened towards the end of the gluing process by adding the proportion of the glue component having a short open time in the glue mixture to be used. An advantage of the invention is that the clamping time needed in the gluing of a part element of a multilayer laminate together can be shortened by 50% compared to the gluing process according to the prior art.
Further, an advantage of the invention is that the change of the ambient temperature of the gluing object to one direction or the other can be compensated by the method according to the invention so that the change of temperature does not affect the final result of the gluing.
Further, an advantage of the invention is that the reaction rate curves of the glue mixtures measured experimentally in different temperatures can be used in selecting the glue mixture when starting the gluing.
The gluing method according to the invention for gluing part elements of a laminate structure together, in which method the at least two glue components and the hardener to be used in the gluing of the elements are selected in the control unit of the glue manufacturing apparatus, is characterized in that in the gluing method, the control unit controls the mixing ratio of the glue components to be administered on a part element as a function of time so that the open time of the glue coming out from the mixing unit shortens after each part element fastened to the laminate structure towards the end of the gluing process, whereby the clamping time of the part elements of the laminate structure is as long as the clamping time of the last administered glue layer having the shortest open time, upon the expiry of which all the glue layers have reached the target hardness.
The manufacturing arrangement of a laminate structure comprised of part elements according to the invention, which arrangement comprises material containers for the glue paste components, a separate pump for each glue paste component, which pumps are arranged to pump the components of the glue paste to be manufactured through the outlet pipes to the mixing unit, a control unit of the glue manufacturing apparatus, which control unit is arranged:
A computer program product according to the invention for manufacturing a laminate structure comprised of part elements, which computer program product comprises code means:
is characterized in that the computer program product further comprises code means, which, for gluing the part elements of the laminate structure, are arranged to control the mixing ratio of the glue components as a function of time so that the open time of the glue coming out from the mixing unit shortens after every part element fastened to the laminate structure towards the end of the gluing process, whereby the clamping time of the part elements to be glued together of the laminate structure to be manufactured is as long as the clamping time of the last glue layer having the shortest open time, upon the expiry of which time all the glue layers have reached the target hardness.
Some advantageous embodiments of the invention are presented in the dependent claims.
The basic idea of the invention is the following: In the glue paste manufacturing method according to the invention the open times of the different components of the glue to be manufactured are utilized so that the clamping time of the part elements of the laminate to be glued together can be shortened. The glue paste manufacturing apparatus to be used in the glue paste manufacturing method according to the invention comprises a control unit, which determines or by which the optimal starting mixing ratio of the different glue components is determined at the starting moment of the gluing process on the basis of the temperature of the production area used in the gluing of the elements together and on the basis of the temperature of the part elements of the laminate to be glued. Further, the reaction rate curves measured experimentally with a mixing ratio of the different components can be preferably utilized in the determination of the starting mixing ratio.
When the gluing progresses, the control unit preferably continuously and steplessly controls the preferably known reaction rate curve by using the mixture ratio of the different components of the glue to be manufactured so that towards the end of the glue manufacturing process the proportion of the glue component having the shortest open time is increased in the finished glue. By proceeding this way, in order to obtain gluing, the clamping time of the part elements of the laminate is mainly determined by the clamping time required by a glue component having the shortest open time after the fact that the spreading of the glue having the shortest open time on the last part element of the laminate is finished before the expiry of the open time of the first glue layer.
In the following, the invention will be described in detail. In the description, reference is made to the enclosed drawings, in which
The embodiments in the following description are only exemplary and a person skilled in the art can carry out the basic idea of the invention also in some other way than what is described in the description. Even though it may be referred to an embodiment or embodiments in several places of the description, this does not mean that the reference would be directed to only one described embodiment or that the described characteristic would be usable only in one described embodiment. The individual characteristics of two or more embodiments may be combined and new embodiments of the invention may thus be provided.
The glue needed in the gluing object 60 is mixed in the mixing unit 30 from two or more glue components to meet the requirements of the gluing object 60.
The first component of the glue to be used is in the material container 1, reference 10. Due to the properties of the glue to be manufactured, other components are mixed to the first component from at least one further material container 2, reference 11. The components can be for example a hardener and different kinds of filling agents.
Each material container 10-12 of the glue component is connected to its own pump through a feeding pipe. In the example of
Preferably, in the beginning of the glue manufacturing process, the open times of all glue components and also the ambient temperature in the gluing object are taken into consideration in the determination of the mixture ratio of the components. All these affect the open time to be generated for the glue mixture to be manufactured.
From each pump 20-22, an outlet pipe 20a, 21a and 22a of its own is connected to the inlet of the mixing unit 30. The operation principle of the mixing unit 30 can be selected according to the glue to be manufactured and/or according to the gluing object 60. The mixing unit 30 can be for example a contrarotary spiral mixer. The glue paste manufactured in the mixing unit 30 is guided through the outlet pipe 30a to the actual gluing object 60.
The operation of the glue paste manufacturing apparatus 100 is controlled by the control unit 40. The control unit 40 receives the ambient temperature information either trough a wireless or wire data transmission 51 from an electronic thermometer 50, which is near the gluing object 60. In a preferred embodiment of the invention the thermometer measures the surface temperature of the part elements to be glued together of the laminate to be manufactured at the starting moment of the gluing. The open time scheduled for the gluing object 60 can be preferably entered through the user interface, which belongs to the control unit 30.
On the basis of the measured ambient temperature or the surface temperature of the part elements to be glued, on the basis of the reaction rate curves measured for the different mixing ratios of the glue components and on the basis of the open time scheduled for the gluing object 60, the determination and control program of the glue mixing ratio installed in the control unit 40 determines the mixture ratio of the glue components, with which mixture ratio the glue manufacture is started in the mixing unit 30. Preferably, at the starting moment of the manufacture, 80% of the glue component having the longest open time is added to the glue mixture and the rest 20% can be of one or more glue components having a shorter open time.
The starting commands, which preferably comprise running speed determinations of the pumps 20, 21 and 22, by which the mixture ratio of the components of the glue to be manufactured is determined, are sent by the control unit 40 through the connections 40a, 40b and 40n. The operation and mode of the mixing unit 30 are controlled and monitored by the control unit 40 through the connections 41 and 42.
In the glue manufacturing apparatus 100 according to the invention, the mixture ratio of the components of the glue to be manufactured is continuously changed during the glue manufacture. The ambient temperature data stored in the control unit 40 and the open time of the glue mixture set as a target are utilized by the control unit 40 when changing the mixture ratio of the components of the glue mixture so that when the glue layers of the last two part elements of the laminate are finished, 80% of the glue mixture is of the glue component having the shortest open time and 20% is of the glue component having the longest open time.
The control unit 30 preferably continuously (steplessly) changes the mixture ratio of the glue to be manufactured from the starting mixture ratio towards the end mixture ratio.
In a preferred embodiment of the invention, the mixture ratios of the glue to be manufactured are preferably changed stepwise when a new glue layer is spread on the existing already glued part element in the gluing object 60. Also in this embodiment, the lowest (the first) glue layer has the longest open time and the uppermost (the last) glue layer between the two uppermost part elements of the laminate has the shortest open time.
When using both manufacturing methods according to the invention, the clamping time needed for one gluing is approximately shortened by 50% compared to the gluing according to the prior art (
In the example of
When the gluing progresses from the layer number 1, which is the glue layer between the two lowest part elements of the laminate to be manufactured to the layer number 5, with which the uppermost part element of the laminate is glued to the laminate, the mixture ratio A/B of the glue is changed so that in the glue manufacture, when the need of glue for the gluing object 60 ends in point “Y”, the mixture ratio A/B of the glue is 80/20%. In that case, the open time of the glue is slightly longer than the open time of 15 minutes of the component B. In point “Y”, also the last glue layer has been spread, whereby the clamping of the elements can be started. In the beginning of the clamping, the last spread glue layers are still in the open time mode, wherein the start of the clamping stage is possible after 30 minutes. In about 60 minutes from the start of the gluing process all the glue layers 1-5 between the part elements of the laminate have hardened substantially equally hard, wherein the laminate to be glued can be removed from the clamping device.
Depending on the purpose of application (how hard the glue must be hardened) the necessary clamping time can be either shorter or longer than what can be calculated from the open time alone.
In the first preferred embodiment of the invention the mixture ratio A/B of the glue components is continuously changed as a function of time from the mixture ratio of 20/80% of the starting situation to a mixture ratio of 80/20%. By acting this way, the clamping time of the last glue layer and the clamping time required by the lowest layer substantially expire at the same time in about 60 minutes from the start of the gluing in the gluing object 60. In this case, the hardness of the glue layers 1-5 between all part elements of the laminate to be manufactured is of the same hardness category, wherein the clamping can be stopped. With the gluing method and the gluing apparatus 100 according to the invention, by shortening the clamping time, a time saving of about 30% compared to the gluing time needed with a manufacturing technique according to the prior art of
In another preferred embodiment of the invention the mixture ratio NB of the glue components is changed stepwise when a new glue layer is laminated on the already existing glue layer in the gluing object 60.
In stage 300, the glue manufacture is started.
In stage 340, the pumps 20-22 of the glue components and the mixing unit 30 are started, whereby the glue manufacture starts.
In stage 310, the control unit 40 of the glue paste manufacturing apparatus 100 stores the temperature measured by the thermometer 50 in the gluing object 60 in its memory.
In stage 320, the different glue components A and B are selected. The selection can either be based on the choices made by the person operating the glue manufacturing apparatus or the selection can, in some cases, be made by the control unit 40 of the glue manufacturing apparatus 100 with an artificial intelligence software stored therein.
In stage 330, the control unit 40 determines the mixture ratio of the glue components A/B at the starting moment of the glue manufacture. The determination of the mixture ratio is based on the selected glue components A and B, on the measured ambient temperature and on the target-oriented time needed for the gluing, which time is calculated from the open times and clamping times needed with different mixture ratios of the glue components A/B. Also the reaction rate curves measured experimentally with the mixture ratios of the different components in different temperatures can be preferably utilized in the determination of the starting mixture ratio.
In stage 340, the control unit 40 of the glue paste manufacturing apparatus 100 sends the starting commands to the mixing unit 30 and to the pumps 20-22. The starting commands of the pumps include standard values for such rotation speeds, that the mixture ratio A/B of the glue of the starting situation corresponds to the mixture ratio determination made in stage 330, for example the mixture ratio A/B of 20/80% of
In stage 350, the pumps 20-22 of the glue paste manufacturing apparatus 100 pump the different glue components in a mixture ratio A/B determined by the control unit 40, each with its own outlet pipe 20a, 21a and 22a to the inlet connectors 30 of the mixer. The pumps 20-22 suck the glue components A and B from the material containers 10-12 through the pump-specific feeding pipes 10a-12a.
In stage 360, the glue mixing unit 30 and the pumps 20-22 are in operation. The control unit 40 of the glue paste manufacturing apparatus 100 continuously economizes the rotation rate of the pumps 20-22 so that the mixture ratio of the glue components A/B changes so that the open time of the glue mixture shortens as a function of time towards the open time of the glue component B having the shortest open time. The glue received from the mixing unit 30 is spread during the stage 360 as one or more glue layers on the surface of at least one element to be glued.
In stage 370, it is stated that all the glue layers necessary for the manufacture of the laminate between the different part elements of the laminate are finished (point “Y” in
In stage 380, the elements to be glued together are clamped against each other. The clamping stage lasts about 30 minutes with the values of the open time and of the clamping time of the glue components A and B having the open time and clamping time according to the example of
In stage 390, the elements are glued together.
The process steps describing the gluing process shown in
Some advantageous embodiments of the gluing method and the manufacturing apparatus arrangement of the laminate structure according to the invention have been described above. The invention is not limited to the solutions described above, but the inventive idea can be applied in numerous ways within the scope of the claims.
Number | Date | Country | Kind |
---|---|---|---|
20175055 | Jan 2017 | FI | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/FI2018/050027 | 1/16/2018 | WO | 00 |