Abstract
The invention relates to an operation diagram-based method for automatically changing a route to turn back in case of interruption. The method obtains an alternative turn-back point according to the position of a fault point and the information of a line turn-back station, calculates a corresponding turn-back plan of the alternative turn-back point according to an operation diagram of the current day, and finally automatically changes an online train route according to the new turn-back plan, so as to realize automatic turn-back of a train after route adjustment in case of interruption. Compared with the prior art, the method has the advantage of being able to keep the compatibility with an existing operation diagram while quickly changing a route in case of partial line interruption, so as to facilitate quick recovery of planned operation after a fault is removed.
Description
TECHNICAL FIELD

The invention relates to operation control of urban rail transit, in particular to an operation diagram-based method for automatically changing a route to turn back in case of interruption.


RELATED ART

Line interruption in urban rail transit refers to the phenomenon that some stations or sections are out of service due to unexpected events such as train collision, derailment, and failures and damage of facilities and equipment, which results in the destruction of road network connectivity. Sudden interruption greatly reduces the reliability and carrying capacity of subway operation and disrupts the travel plan of passengers, and if a passenger evacuation strategy cannot be adopted in time, accidents such as a stampede may be caused.


When interruption occurs to a subway, some lines become inaccessible. Generally, traffic organization will be adjusted in real time according to the line interruption situation. The adjustment strategies include the following:

  • unilateral to-and-fro, that is, a train runs back and forth on one side only, which is mainly used in case of unilateral interruption;
  • route adjustment, that is, changing a train route, so as to avoid a fault area and allow a train to run normally in a non-fault area, which is applicable to the situation where a station is completely interrupted and there are turn-back stations in a non-interruption zone; and
  • a combination mode, that is, using unilateral to-and-fro and route adjustment flexibly according to different interruption area structures, which is suitable for complex line structures.


The research on train organization adjustment under line interruption in China mainly focus on the research of emergency plans. Every time a train turns back during route adjustment, manual operation is required, and dependence on human experience leads to errors easily. Therefore, automation of route adjustment has become a research focus. Many achievements have been made in the automation of equal-interval turn-back, but the research on how to match an original operation diagram plan after route adjustment is still in the initial stage.


It is found through searching that China Patent No. CN10860903A discloses an automatic turn-back control method for unmanned trains, and China Patent No. CN110936987A discloses a full-automatic turn-back control method for urban rail transit trains, both of which are automatic turn-back control technologies used in the process of automatic driving. However, neither of the two patents mentions the change of turn-back lines in case of interruption, so how to quickly and effectively change a turn-back point in case of interruption becomes a technical problem to be solved.


SUMMARY OF INVENTION

In order to overcome the defects in the prior art, the invention provides an operation diagram-based method for automatically changing a route to turn back in case of interruption.


The purpose of the invention can be realized by the following technical scheme.


According to one aspect of the invention, an operation diagram-based method for automatically changing a route to turn back in case of interruption is provided. The method obtains an alternative turn-back point according to the position of a fault point and the information of a line turn-back station, calculates a corresponding turn-back plan of the alternative turn-back point according to an operation diagram of the current day, and finally automatically changes an online train route according to the new turn-back plan, so as to realize automatic turn-back of a train after route adjustment in case of interruption.


As a preferred technical scheme, the method comprises the following steps:

  • step S1) inputting fault position information, original operation diagram plan information and line station type diagram information;
  • step S2) finding an affected original planned route, the alternative turn-back point and an alternative route according to the information input in step S1;
  • step S3) obtaining a departure interval of the alternative route obtained in step S2 according to a planned interval of the original planned route;
  • step S4) calculating a turn-back time of the alternative route according to the departure interval of the alternative route obtained in step S3;
  • step S5) making a matched new turn-back plan for an online train according to the original operation diagram planned time and the position of the online train input in step S1;
  • step S6) updating a running path of the online train according to the new turn-back plan obtained in step S5;
  • step S7) conducting turn-back number changing according to the turn-back plan obtained in S5 after the train with route changed in step S6 reaches the alternative turn-back point; and
  • step S8) after the train arrives at another terminal of the alternative route, if the terminal is a non-alternative turn-back point, turning back according to a planned train number obtained after number changing in step S7.


As a preferred technical scheme, step S2) specifically comprises:

  • step S21, finding a platform affected by the fault according to the fault position information input in step S1, and then obtaining the affected original planned route;
  • step S22, searching for a nearest turn-back platform at both ends of a fault area according to the fault position information input in S1 to obtain the alternative turn-back point; and
  • step S23, searching for the alternative route according to the alternative turn-back point of step S22 and the original planned route of step S21.


As a preferred technical scheme, step S4) specifically comprises:

  • step S41) determining whether there are multiple routes at the alternative turn-back point, and calculating the constraint relationship between the routes if yes; and
  • step S42) for a multi-route turn-back point, calculating a turn-back time according to the constraint relationship obtained in step S41, and for a single-route turn-back point, using a default turn-back time.


As a preferred technical scheme, in step S41), specifically,

  • assuming that there are n routes at the alternative turn-back point A, the running cycle of the route n is Tfull cycle n =Tturnback n + Toperation n, where Toperation n is the to-and-fro time except turn-back, Tturnback n is the turn-back time of the turn-back point A, the departure interval is Tinterval n, and the number of trains required for the route n is Ntrain n = Tfull cycle n/Tinterval n, where Tinterval n is departure interval; and
  • after route changing, the train runs according to the original planned time, that is, the original planned to-and-fro running time except turn-back is Toperation n = Tplan n, and the following constraint relationship is obtained:
  • Ntrainn/Ntrain n-1=Tturnback n+Tplan n*Tinterval n-1/Tturnback n-1+Tplan n-1*Tinterval n.


As a preferred technical scheme, step S5) specifically comprises:

  • step S51, calculating an arrival plan of the alternative turn-back point;
  • step S52, calculating the time when the train arrives at the alternative turn-back point after route changing; and
  • step S53, according to the time obtained in step S52 and the arrival plan of the alternative turn-back point obtained in step S51, making a matched turn-back plan for the online train based on time.


As a preferred technical scheme, the step S51 is based on the passenger on/off time of the original operation diagram input in step S1 and the turn-back time of the alternative turn-back point obtained in step S4.


As a preferred technical scheme, the method keeps the compatibility with the existing operation diagram.


As a preferred technical scheme, in case of interruption, the method automatically changes a train route for a zone with turn-back conditions, so that the train runs in a non-fault zone as planned.


As a preferred technical scheme, the method automatically generates a turn-back plan of the alternative turn-back point according to the position of the online train.


Compared with the prior art, the invention has the following advantages.


1) The invention provides an operation diagram-based adjustment method in case of line interruption, which is different from an existing equal-interval adjustment method in that it keeps the compatibility with an existing operation diagram, so as to facilitate quick recovery of planned operation after a fault is removed.


2) The invention automatically searches for an alternative turn-back point and generates a running route according to a fault position and a line structure, which can effectively reduce manual work.


3) The invention automatically generates a turn-back plan of the alternative turn-back point according to the position of an online train, without excessively relying on manual experience.





BRIEF DESCRIPTION OF DRAWINGS


FIG. 1 is a flowchart of the invention.





DESCRIPTION OF EMBODIMENTS

Hereinafter, the technical scheme in the embodiments of the invention will be described clearly and completely with reference to the drawings in the embodiments of the invention. Obviously, the described embodiments are only part of the embodiments of the invention, not all of the embodiments. Based on the embodiments of the invention, all other embodiments obtained by those of ordinary skill in the art without creative labor are within the scope of the invention.


The invention provides an operation diagram-based method for automatically changing a route to turn back in case of interruption. In case of interruption, the method automatically changes a train route for a zone with turn-back conditions, so that the train runs in a non-fault zone as planned.


The invention specifically comprises the following steps:

  • step S1, inputting fault position information, original operation diagram plan information and line station type diagram information;
  • step S2, finding an affected original planned route, the alternative turn-back point and an alternative route according to information such as the fault position input in step S1;
  • step S3, obtaining a departure interval of the alternative route obtained in step S2 according to a planned interval of the original planned route;
  • step S4, calculating a turn-back time of the alternative route according to the departure interval of the alternative route obtained in step S3;
  • step S5, making a matched new turn-back plan for an online train according to the original operation diagram planned time and the position of the online train input in step S1;
  • step S6, updating a running path of the online train according to the plan obtained in step S5;
  • step S7, conducting turn-back number changing according to the turn-back plan obtained in S5 after the train with route changed in step S6 reaches the alternative turn-back point; and
  • step S8, after the train arrives at a non-alternative turn-back point of the alternative route, turning back according to a planned train number obtained in step S7.


The step S2 specifically comprises:

  • step S21, finding a platform affected by the fault according to the fault position information input in S1, and then obtaining the affected original planned route;
  • step S22, searching for a nearest turn-back platform at both ends of a fault area according to the fault position information input in S1 to obtain the alternative turn-back point; and
  • step S23, searching for the alternative route according to the alternative turn-back point of step S22 and the original planned route of step S21.


The step S4 specifically comprises:

  • step S41, determining whether there are multiple routes at the alternative turn-back point, and calculating the constraint relationship between the routes if yes; and
  • step S42, for a multi-route turn-back point, calculating a turn-back time according to the constraint relationship obtained in step S41, and for a single-route turn-back point, using a default turn-back time.


In step S41, specifically,

  • assuming that there are n routes at the alternative turn-back point A, the running cycle of the route n is Tfull cycle n =Tturnback n + Toperation n, where Toperation n is the to-and-fro time except turn-back, Tturnback n is the turn-back time of the turn-back point A, the departure interval is Tinterval n, and the number of trains required for the route n is Ntrain n = Tfull cycle n/Tinterval n, where Tinterval n is departure interval; and
  • after route changing, the train runs according to the original planned time, that is, the original planned to-and-fro running time except turn-back is Toperation n = Tplan n, and the following constraint relationship is obtained:
  • Ntrainn/Ntrain n-1=Tturnback n+Tplan n*Tinterval n-1/Tturnback n-1+Tplan n-1*Tinterval n.


The step S5 specifically comprises:

  • step S51, calculating an arrival plan of the alternative turn-back point based on the passenger on/off time of the original operation diagram input in step S1 and the turn-back time of the alternative turn-back point obtained in step S4;
  • step S52, calculating the time when the train arrives at the alternative turn-back point after route changing; and
  • step S53, according to the time obtained in S52 and the arrival plan of the alternative turn-back point obtained in S51, making a matched turn-back plan for the online train based on time.


Specific Embodiments

The method of the invention will be described with reference to FIG. 1. The method comprises the following steps:

  • step S1, a fault position G, original operation diagram plan information (including two routes A-B and A-C) and a line station type diagram are input;
  • step S2, according to the information input in step S1, the fault point G is on an original planned route A-B, and the original planned route cannot directly run to B because of fault interruption of A; turn-back platforms C and D which have the shortest distance are searched for at both ends of the fault point G, C and D are alternative turn-back points, and A-B is decomposed into alternative routes A-Cnew and D-B;
  • step S3, a departure interval of the original planned route A-B is Tinterval A-B, and after the turn-back point becomes C, a departure interval Tinterval A-C new of the alternative route A-Cnew is equal to Tinterval A-B;
  • step S4, according to the step S3, it can be known that a 1:1 proportional relationship exists between the number of trains required for the route A-Cnew and the number of trains on A-C, and the constraint relationship is as follows:
  • N train A-C new/Ntrain A-C=Tturn-back A-C new+ToperationA-C new*Tinterval A-C new/Tturn-back A-C+Toperation A-C*Tinterval A-C=1;
  • according to the original operation diagram plan, the proportional relationship between Tinterval A-C new and Tinterval A-C can be obtained; assuming Tinterval A-C new/ Tinterval A-C plan=1, the turn-back time of the route A-Cnew at the turn-back point C is Tturn-back A-C new=Tturn-back A-C+Toperation A-C-Toperation A-C new; assuming that the default turn-back time of the turn-back point D is TD default, only the route B-Dnew turns back at the turn-back point D, and it can be known from step S3 that the turn-back time of the route B-Dnew at the turn-back point C is Tturn-back D-B=TD default;
  • step S5, according to the planned time of the train at the passenger on/off platform closest to the alternative turn-back points C and D and the turn-back time obtained in step S4, the planned arrival time of the turn-back points C and D is calculated, then the estimated time when the online train arrives at the turn-back points C and D is calculated, and a planned number with the closest matching time is allocated to the online train;
  • step S6, according to the planned number obtained in step S5, the online train running path is updated to A-Cnew or D-B;
  • step S7, after the train 1 with the original running route A-B reaches the alternate turn-back points C and D, a departure planned turn-back number obtained in S6 is 003; and
  • step S8, the train 1 turns back at the turn-back point A according to the planned number 003.


The above are only specific embodiments of the invention, but the protection scope of the invention is not limited thereto. Any person familiar with the technical field can easily think of various equivalent modifications or substitutions within the technical scope disclosed by the invention, and these modifications or substitutions should fall within the protection scope of the invention. Therefore, the protection scope of the invention shall be subject to the protection scope of the claims.

Claims
  • 1. An operation diagram-based method for automatically changing a route to turn back in case of interruption, wherein the method comprises: obtaining an alternative turn-back point according to a position of a fault point and the information of a line turn-back station, calculating a corresponding turn-back plan of the alternative turn-back point according to an operation diagram of the current day, and finally automatically changing an online train route according to a new turn-back plan, so as to realize automatic turn-back of a train after route adjustment in case of interruption.
  • 2. The operation diagram-based method for automatically changing a route to turn back in case of interruption according to claim 1, wherein the method comprises following steps: step S1) inputting fault position information, original operation diagram plan information and line station type diagram information;step S2) finding an affected original planned route, the alternative turn-back point and an alternative route according to information input in step S1;step S3) obtaining a departure interval of the alternative route obtained in step S2 according to a planned interval of the original planned route;step S4) calculating a turn-back time of the alternative route according to the departure interval of the alternative route obtained in step S3;step S5) making a matched new turn-back plan for an online train according to original operation diagram planned time and a position of the online train input in step S1;step S6) updating a running path of the online train according to the new turn-back plan obtained in step S5;step S7) conducting turn-back number changing according to the turn-back plan obtained in step S5 after the online train with route changed in step S6 reaches the alternative turn-back point; andstep S8) after the online train arrives at another terminal of the alternative route, if the another terminal is a non-alternative turn-back point, turning back according to a planned train number obtained after number changing in step S7.
  • 3. The operation diagram-based method for automatically changing a route to turn back in case of interruption according to claim 2, wherein step S2 specifically comprises: step S21, finding a platform affected by fault according to the fault position information input in step S1, and then obtaining the affected original planned route;step S22, searching for a nearest turn-back platform at both ends of a fault area according to the fault position information input in step S1 to obtain the alternative turn-back point; andstep S23, searching for the alternative route according to the alternative turn-back point of step S22 and the original planned route of step S21.
  • 4. The operation diagram-based method for automatically changing a route to turn back in case of interruption according to claim 2, wherein step S4 specifically comprises: step S41) determining whether there are multiple routes at the alternative turn-back point, and calculating constraint relationship between the routes if yes; andstep S42) for a multi-route turn-back point, calculating a turn-back time according to the constraint relationship obtained in step S41, and for a single-route turn-back point, using a default turn-back time.
  • 5. The operation diagram-based method for automatically changing a route to turn back in case of interruption according to claim 4, wherein step S41 specifically comprises: assuming that there are n routes at the alternative turn-back point A, a running cycle of the route n is Tfull cycle n =Tturnback n +Toperation n, where Toperation n is to-and-fro time except turn-back, Ttumback n is turn-back time of the turn-back point A, a departure interval is Tinterval n, and a number of trains required for the route n is Ntrain n = Tfull cycle n/Tinterval n; andafter route changing, the online train runs according to original planned time, that is, original planned to-and-fro running time except turn-back is Toperation n = Tplan n, and following constraint relationship is obtained: Ntrain n/Ntrain n-1=Tturn-back n+Tplan n*Tinterval n-1/Tturn-back n-1+Tplan n-1*Tinterval n .
  • 6. The operation diagram-based method for automatically changing a route to turn back in case of interruption according to claim 2, wherein step S5 specifically comprises: step S51, calculating an arrival plan of the alternative turn-back point;step S52, calculating time when the online train arrives at the alternative turn-back point after route changing; andstep S53, according to the time obtained in step S52 and the arrival plan of the alternative turn-back point obtained in step S51, making a matched turn-back plan for the online train based on time.
  • 7. The operation diagram-based method for automatically changing a route to turn back in case of interruption according to claim 6, wherein the step S51 is based on passenger on/off time of original operation diagram input in step S1 and the turn-back time of the alternative turn-back point obtained in step S4.
  • 8. The operation diagram-based method for automatically changing a route to turn back in case of interruption according to claim 1, wherein the method comprises keeping compatibility with existing operation diagram.
  • 9. The operation diagram-based method for automatically changing a route to turn back in case of interruption according to claim 1, wherein in case of interruption, the method comprises automatically changing a train route for a zone with turn-back conditions, so that the online train runs in a non-fault zone as planned.
  • 10. The operation diagram-based method for automatically changing a route to turn back in case of interruption according to claim 1, wherein the method comprises automatically generating a turn-back plan of the alternative turn-back point according to a position of an online train.