1. Technical Field
This invention relates to methods and apparatus for the installation of telecommunications cables, in particular optical fibre installed into pre-installed optical fibre tubes by “blowing” techniques.
2. Description of Related Art
The method and apparatus used to install optical fibre transmission lines into optical fibre tubes or ducts using the viscous drag provided a high-speed flow of a fluid medium, often air, is known from EP108590 and subsequent publications. A blowing head is used for the installation of the optical fibre unit into the optical fibre tubes or ducts. (In this description, references to “fibre” and “fibre units” shall be deemed to include individual fibre members and fibre bundles, and vice versa, as the context allows.)
The blowing head comprises a chamber, into which pressurised air is pumped. The air is directed to flow into the mouth of a fibre tube, and then through the tube which is connected to the blowing head. The fibre unit is initially fed into the tube by a pushing force, so that when there is sufficient fibre surface within the tube for pressurised air to work on, the effects of viscous drag take over at least part of the task of advancing the fibre within the tube.
In use, the blowing heads of the prior art suffer from a number of problems.
First, it was found that the fibre unit was susceptible to buckling during installation. As discussed in EP253636, optical fibre is flexible and necessarily smaller in cross section than the fibre tube it is populating. For example, part of the advancing fibre unit could stop moving within the tube due to excessive friction build up between the fibre and the interior of the tube. A buckle develops if the blowing head continues to drive the fibre unit regardless. A buckled fibre unit could adversely affect the performance of the fibre when installed, or even physically damage it. At the least, buckling would delay the installation process.
This problem of fibre buckle was addressed in EP253636 and WO98/12588, wherein methods and apparatus are described to sense fibre buckle, feed back the existence of a buckle in the fibre unit to the blowing head, and then to use the information to adjust the pushing force driving the fibre forward. In these solutions, the effect of fibre buckle within the tube is “transmitted” back to the blowing head and the fibre unit will buckle into a “buckle cavity”. Sensors are located within the cavity to detect the buckle.
JP H04-335604 similarly proposes a method in a magnetic clutch-based blown fibre unit installation system, to use sensed information to control the pushing force applied. The sensing is done not by detecting buckles, but by sensing with an ammeter, the load put on the pushing mechanism during an installation. The aim is to provide smooth and controlled playout of fibre by the blowing head, and thus to avoid buckle. However this method is unlikely to achieve that end as the method and apparatus proposed is not sufficiently responsive nor repeatable owing to a hysteresis loop lag in a magnetic clutch system.
A second problem concerned the amount of air leakage from the blowing head. Air is fed into the chamber of the blowing head under considerable pressure, typically from 5 to 15 bar. This high pressure is required because a fibre tube has a very small internal diameter (typically not exceeding 3.5 mm by today's standards), but may be of very great length: fibre tubes populated by the blowing technique which exceed 1,000 meters are currently not uncommon. The chamber of the blowing head, being comprised of a bore, is typically about 1.1 to 1.2 mm. Air fed into the chamber will seek escape at high pressure from every possible vent and fissure in the blowing head.
Also, not all blowing sessions involved the fibre unit being fed into the mouth of a tube, and to have the fibre emerge at the other end of the tube. Sometimes a blowing session would start from an intermediate point in the intended path of the fibre when installed; this is sometimes known as a bi-directional installation. Such an installation method can be used to populate longer tubes, where the total distance to be covered exceeds that possible in a single blowing session. In brief, one tip of the fibre unit is fed into a first tube and blown in one direction until the end emerges from the far end of the tube; the process is repeated using the other tip of the fibre unit and blowing it in the opposite direction. To cope with the change of blowing direction in bi-directional installations, WO98/12588 shows how the blowing head can be opened along the line of the fibre unit travel, allowing the user to remove the installed fibre after completing the first part of the task. This however means that the blowing head is now made up of typically two halves which have to be sealed shut (e.g. by clamping) during an installation session. There are thus numerous points of escape for the pressurised air: not only at the two ends of the bore making up the chamber (where the fibre unit enters and exits), but also along the seams where the parts of the blowing head meet when clamped shut.
Deformable seals were typically used to defend against air leakage, but these proved to lack durability on account of its exposure to the glass microspheres which coat the protective sheath of a fibre unit or bundle. The glass beads are used on blown fibre units to reduce the friction generated between the fibre and the inside tube surface, as further described in e.g. EP186753. As deformable seals are typically made from rubber or such materials, they are highly susceptible to damage by the glass, making frequent replacement a costly necessity.
As a result of air leakage from the blowing head, the amount available to generate the required viscous drag within the fibre tube decreases. It is thus necessary to employ expensive high-volume air compressors to compensate for the loss of air. In addition to the expense of procuring and operating such compressors to make good the wastage, the weight and bulk of the machinery has necessitated the employment of more than one operative, with associated cost implications.
A third problem arises from developments in the size of fibre bundles (comprising a number of fibre units or members) and the size of fibre tubes. British Telecommunications plc in the UK deploys, or has deployed in the past 18 years, bundles ranging from 2 to 12 fibres members. Tube sizes vary accordingly. It is unknown what other sizes may be adopted in the future. While the blowing heads of the prior art attempt to build in a measure of flexibility in the range of fibre bundles and tubes they can handle, the sheer range in sizes in current use means that a single blowing head capable of handling the entire range of sizes would be cost-efficient and greatly advantageous.
Yet another problem with blowing heads of the prior art has been cost: cost in terms of manufacture and in operation. Up to now, the experience has been that blown fibre has been deployed chiefly in the business or commercial context. This is because the need for fibre-based communications outweighs the cost of obtaining it. For residential users however, “last mile” issues—where ultimate users still use limited bandwidth copper wire in an otherwise all-fibre network—arise in no small part to the cost-sensitivity of such customers.
As a result of lower take up in the residential sphere, there is no real critical mass for the deployment of blowing head. However, it is anticipated that with rising consumer demand, ubiquitous fibre to the home (“FTTH”) will become a reality in the United Kingdom and elsewhere in the near future. The provision of a low-cost fibre installation service at high volumes becomes crucial to the provision of this service. Indeed, cost is a major factor in determining the rate of adoption of FTTH.
There is thus a need for a blowing head that can be manufactured at a low price, and which can be operated cheaply. As cost used to be less of a consideration, the blowing heads of the prior art tended to be seen as specialised pieces of equipment tooled from expensive materials. Owing to high levels of air leakage in use, powerful and expensive air compressors had to be used with the prior art blowing heads.
Prior art blowing heads had also to be operated by skilled users. Each blowing session is unique. For example, there are differences in the size of fibre/fibre bundle and tube, length of tube to be populated, the atmospheric conditions (e.g. dewpoint levels affect the quality of the air pumped into the blowing head). The users need to be able to accurately read the conditions to ensure the correct setup of the blowing head. Moreover they need to be alert to the possibility of problems such as fibre buckle, and to take quick remedial steps by making adjustments to the blowing head. Aside from the need for skilled operators, prior art blowing heads required at least two people in an installation session, which was due in part to the need for a large compressor needing more than one person to move and to set up.
In short, prior art blowing heads are too expensive to make and to use, to be sensibly feasible for mass deployment to provide fibre connections to private premises.
The applicants have now devised a new blowing head which addresses the above problems, to provide a solution to overcome the issues related to fibre buckle, excessive air loss, bi-directional installation, inflexibility in use with different-sized fibre bundles and tubes, and cost.
According to a first aspect of the invention there is provided a blowing head for installing blown cable, comprising a low-inertia motor using electrical current, operable to obtain the advance of the cable within the blowing head, adjusting means operable to vary the level of current of the motor, and low-inertia sensing means to sense movement and changes in the level of movement of the cable within the blowing head, wherein in use the adjusting means varies the level of current used by the motor in response to changes in the level of movement sensed by the sensing means, and wherein the varying level of current does not exceed a maximum current level.
According to a second aspect of the invention there is provided a system for installing cable into a cable tube, comprising a low-inertia motor using electrical current, operable to obtain the advance of the cable within the blowing head, adjusting means operable to vary the level of current of the motor, and low-inertia sensing means to sense movement and changes in the level of movement of the cable within the blowing head, wherein in use the adjusting means varies the level of current used by the motor in response to changes in the level of movement sensed by the sensing means, and wherein the varying level of current does not exceed a maximum current level.
According to a further aspect of the invention there is provided a method for installing blown cable in an installation session using the blowing head of claim 1, comprising the steps of inserting an end of a cable into the blowing head, increasing the level of current to the motor until the cable has advanced through the blowing head, setting a maximum current level for the motor during the installation session, based at least partly on the level of current obtained in step (iii), and maintaining the level of current obtained in step (iii).
The use of a low inertia motor together with means for preventing more than a maximum amount of current (which is set in a way which depends upon the operating environment as will be explained in greater detail below) to be drawn from a power supply, provides a very responsive system which will automatically slow the rate at which the cable is advanced into the tube should it encounter any resistance much greater than that required to advance the tube when it is not encountering any snags. In many circumstances, simply slowing the rate of advance is sufficient to enable the snagging condition to resolve itself and for the installation to then resume normally, but it is ideal if this can be done without increasing the amount of force applied to the cable by the motor (it will be appreciated that without the use of a current limiter, as the motor slows down, the reduction in the back electromotive force (EMF) would tend to cause the motor to draw more current form the power supply and thus increase the amount of force applied to the snagged cable, which is undesirable).
The invention will now be described, by way of example only, with reference to the following drawings in which:
The air chamber comprises a bore (54) running through the length of the air chamber. In a typical installation session, optical fibre is laid along the bore path, and the two sections are then clamped together with a clamp (4). The end or tip of the fibre points in the direction described by the arrow X. The fibre tube to be populated is connected to the blowing head at receiving portion (58), typically via a fibre tube connector.
In a blowing session, the air chamber is closed and clamped. A first drive wheel (12A) engages tightly with the second drive wheel (12B), with the fibre sitting therebetween. The motor (10) is turned on to cause the rotation of drive wheel (12A) in the direction of arrow X. The second drive wheel (12B) is not powered by the motor, but being tightly engaged with the first drive wheel, also rotates. Together both drive wheels propel the fibre in the direction described by the arrow X into the waiting fibre tube at the fibre outlet end of the blowing head.
Pressurised air is pumped into the air chamber via the air inlet (60), with the intention that all or most of the air moves at speed into the fibre tube to create the effects of viscous drag along the fibre according to the methods described in EP108590.
The blowing head of
The housing in
As in prior art blowing head of
The upper half of the open housing (not shown) is attached to the part which is shown, via hinges (104).
The air chamber is a modular component comprising two parts (152 and 154) which in use is fixed or clamped together. In this figure, one half (152) of the air chamber is shown to be installed into the housing. The air chamber (154) is shown in an unassembled state. One half (152) is shown sitting within its slot in the housing. The two halves can be secured together by screws into screw holes (102), or other securing means. The air chamber can be removed from the housing in its assembled or unassembled state.
In use, the fibre to be installed is laid along the bore path (180) of the air chamber, with the fibre tip pointing in the direction of arrow Y. The fibre tube (not shown) is attached to the blowing head via a tube connector (98) at the receiving portion (140) of the air chamber. The fibre unit is initially pushed through the blowing head by the drive wheels into the tube, and eventually helped along by the additional effect of viscous drag.
Optical Fibre Unit Buckle
We now consider the issues related to fibre buckle during installation of optical fibre using the blown fibre technique. As outlined above, it was found during installation sessions that a thin flexible fibre—even a fibre bundle comprising several fibre members—was susceptible to buckling within the tube. A certain level of flex is acceptable and harmless to the fibre, but excessive buckling sets up compressive or tensile stresses along its length, which could at an extreme, damage the fibre and/or the blowing head. At the very least, buckles delay the installation process.
As discussed above, methods to deal with the problem are described in EP0253636 and PCT/GB97/02507. In both cases, methods and apparatus were developed to sense fibre buckle, to feed this back to the blowing head, wherein the information is used to adjust the speed of the wheels driving the fibre forward. As a result, buckle detectors were used either in conjunction but separately from the blowing head (e.g. EP253636 with EP108590) or together in a single integrated blowing head (e.g. WO98/12588).
The detection method adopted by the applicants for use in the blowing head of
A blowing head incorporating buckle detectors necessarily increased the bulk and weight of the installation equipment. While this is might be acceptable for installations in the past (cost being relatively less of a consideration), the advent of FTTH creates a pressing need for a more economical solution with more lightweight and compact equipment that can be managed by fewer personnel.
This embodiment is slightly different from those shown in
As described above, the fibre is installed in the direction of the arrow Y. There are a number of ways to initially insert the fibre into the blowing head so that the fibre unit extends through the air chamber and part-way into the fibre unit tube. First, the fibre tip can be manually inserted into the fibre unit inlet (130) by the operative, and pushed until it urges against the drive wheels (118 and 120). At that point, the fibre unit can continue to be pushed manually through to the fibre outlet section: this is possible because the two drive wheels only lightly touch each other—indeed they may not touch at all. This contrasts with the drive wheels of the prior art blowing head which tightly engage each other, imparting a “crushing force”. As an alternative to manually pushing the fibre unit all the way through the air chamber, the motor (110) could be programmed to take over this part of the operation, described below in connection with
At the other end of the blowing head at the fibre outlet end, a tube connector (98) is fitted onto the air chamber (150); the fibre tube (not shown) is fitted to the tube connector. There is thus described a continuous path from the fibre inlet (130) to the fibre tube.
In use, the motor (110) is started up, which powers both drive wheels (118 and 120), via the gear arrangement (116) in the direction of the arrow Y. In this embodiment, the gear ratio is 4:1. Although a range of gear ratios is possible, the system works optimally in a low-inertia environment.
As the drive heads start moving the fibre in the direction of arrow Y, air can be pumped into the air chamber via the air inlet (140). During the early stages of installation session, the drive wheels continue to push the fibre into the tube. Indeed a large part of a typical session would require the pushing effects of the drive wheels at least in part to secure the advance of the fibre unit into the tube.
It will be noted that there is no buckle detection system in the blowing head according to the invention. JP H04-335604 (supra), proposes a method to avoid fibre buckle without using a buckle detection system, but as discussed, the method is unlikely to achieve its aim in a magnetic clutch-based system with hysteresis lag and system inertia.
The applicants on the other hand, have found that by capping the current to be applied to the motor during the installation session, in conjunction with a low-inertia motor and drive wheel system, their apparatus and methods does significantly reduce buckle occurrence.
In this embodiment, the unit cover (204) includes buttons to allow the user various options, such as those discussed below in connection with
According to the invention, voltage levels determine the speed of fibre movement, while current levels are used to control the amount of force output by the motor. Voltage levels are typically pre-set prior to the start of an installation session, but can be varied during the session, e.g. to correct speed of installation.
The varying of the voltage to control motor speed is achieved in the present embodiment using pulse width modulation (PWM). PWM is also used to control the maximum current supplied to the motor. The PWM control signals are generated by a microprocessor. An analogue comparator is used to compare the current drawn by the motor with the maximum permitted by the microprocessor and in the event that more than the maximum amount set by the microprocessor is detected as being drawn, the switching of the output state of the comparator causes the flow of current through the motor to be hindered, thus preventing it from rising above the maximum allowed value.
The user then makes a selection on the control unit to start the installation of the fibre, by pressing a button. In this embodiment of the control unit, the user controls the installation session with four options: “Menu” (O1), “Stop” (O2), “Reset” (O3) or “Load Fibre” (O4). The sequences for these options are shown in
An encoder (112) monitors the motor activity throughout the session. This device serves to detect and feedback to the microprocessor controller the level of motor activity (e.g. in terms of mechanical rotations), to provide input for the control software to process. An E4 optical rotary encoder (e.g. from Trident Engineering; their technical specifications for this item are at http://www.tridenteng.co.uk/media/pdf41add17df22ed.pdf) is mounted on the motor in the present embodiment of the invention on account it being small, but any similar device performing the same function can be used.
As long as no selection is made by the user, the motor continues in its idle/“ready” state. When the user selects “Start Blowing” (O2) on the control unit, motor current is gradually increased, until the pushing power transmitted to the drive wheels causes the fibre to start moving. When the fibre moves, the level of current at that point is sufficient to overcome all the forces preventing fibre movement—such as friction within the air chamber, inertia of the drive wheels and the gear arrangement, as well as the “piston effect” of the air escaping under pressure in a direction opposite to the desired fibre movement.
This level of the current required to start fibre movement is captured by the control circuit, and used by the controller to calculate a cap on the current level. This cap on the current is thereafter used to prevent excessive pushing by the motor for the duration of the installation session. After the end of the installation session, the current capping value is discarded, so that a new value is set for each installation session.
There are significant benefits to this method of capturing the value of the current level required by the motor to obtain fibre movement at each installation session. As noted above, the blowing conditions are different for each session—depending on factors ranging from the route length and topology, to the size of the fibre and tubes themselves. A blowing head having a factory-preset level of pushing force would not be able to optimise the session based on such conditions. A highly experienced operative may be able to obtain good results, but such personnel would be expensive.
If a blowing session is abandoned midway (i.e. when the fibre is only part-way installed), or in a bi-directional installation session, the current cap value can be reset when the session resumes/starts again. It would however be obvious to the skilled person that alternatives are available, such a discarding a current cap value only if the session is not resumed within a certain period of time.
To obtain the value for the current level cap, the applicants have adopted a practice of adding about 12.5% to the current level required to start fibre movement within the blowing head. This serves to allow for fluctuations and variations in the blowing system as well as in the blowing environment and conditions. This figure is of course a mere rule of thumb, and the scope of invention would include current levels caps derived from other values added to, or indeed deducted from, the level required to start fibre movement.
The steps involved in the installation process are further described in the flow charts of
The flow chart of
Current levels vary during an installation session as the amount of force required to push the fibre vary. For example, fibre speed increases on account of the effects of viscous drag taking over during the installation session, the level of current needed by the motor drops. Conversely, the amount of pushing force required will increase if the fibre is stalled or if fibre movement reduces—this will increase the current required by the motor. The effect of the current cap is that the motor will not output excessive force by excessively pushing the fibre, thus reduce the probability of excessive buckling.
This method of controlling the output of force by the motor is to be used in a low-inertia system, so that the motor, gear arrangement and drive wheels are as responsive as possible, to maximise sensitivity to changes in fibre movement during installation.
In practical terms therefore, if the fibre stops moving, the current levels of the motor will quickly increase in response. If the level reaches the capped value, the motor will stop outputting the pushing force, and the drive wheels stop pushing the fibre into the fibre tube. Here, the user will select the button 3 on the control unit for the “Stop” sequence (O2 in
As long as the current does not exceed the capped value, the system deems that the fibre is being installed smoothly and without excessive buckle into the tube. Optionally, a user may choose to optimise—i.e. increase—the installation speed in the manner described in
If the fibre stops moving between the drive wheels, this change in fibre movement status will transmit rapidly back to the motor in the low-inertia system via the drive wheels. The control unit will go into a “Fibre Stalled” state (
Where the fibre continues to move, but where a undesirably high level of force (resulting in the current levels reaching the capped value) is required to obtain the movement, the controller goes into a “Anti-Fibre Shunt” state (
Excessive Air Leakage
One of the greatest problems in using the prior art blowing head of
As noted earlier, a consequence is that very large and powerful air compressors need to be used with such blowing heads, to make good the deficiency. With the drive for inexpensive, mass-deployment blown installations in FTTH, this level of loss is unacceptable. At the same time, the need for an adaptable piece of equipment adaptable for both bi- and single direction blowing is as great as the requirement to reduce air loss.
The air chamber can be made from plastic or metal, but preferably the section coming into direct contact with the fibre unit should be a durable material for reasons elaborated below in connection with
When the two parts of the chamber are assembled, the two parts (152, 154) co-operate so that the channels meet together to form a throughbore extending along the length of the chamber. An air inlet, through which air is pumped during an installation session, is provided in air chamber part (152). The air inlet comprises an air inlet bore which communicates with the throughbore a junction (160).
As can be seen from
The following is a table showing the levels of air loss for various combinations of dimensions for the fibre inlet bore section, based on tests using a fibre of diameter 1 mm in the air chamber of
As can be seen in the test results above, the greatest air loss is experienced in a relatively short, wide bore (the 1.18 mm/12.5 mm combination above), as compared to a longer, reduced bore (1.08 mm/175 mm). Subject to the constraints of physically tooling the channels and allowing sufficient leeway for the fibre to move through the throughbore therefore, the narrower the bore the less room for air to escape. This effect is augmented by increasing the length of the bore.
It can further be observed that all the results in the above table are considerable improvements on the previous air leakage rate of about 80 litres per minute experienced in the prior art blowing head of
After assembly, the air chamber is secured together by screws (shown in
By sealing the throughbore itself (instead of remotely around the bore as in the prior art air chamber of
As noted above, rubber-based seals are highly prone to wear by the glass microspheres coating the fibre travelling at speeds of up to a meter per second. It has been found that use of the prior art blowing head, the seal (80 in
It should also be noted that the use of separate halves of the blowing head which are not hinged together as in the prior art but rather are linearly assembled together using fixing pins extending perpendicular to the mating surfaces of the two halves of the blowing head enables a much better fit to be made to the mating surfaces, and it avoids any shearing forces against the mating surfaces which could damage the mating parts. In this way, a very good seal can be formed even without using a deformable seal, which, as noted above, tends to deteriorate quickly in the harsh conditions experienced within a blowing head during operation.
To improve sealing further, whilst reducing the exposure of a deformable seal to the harsh conditions of high pressure, micro-seals and shear forces, a deformable seal can be used together with a non-deformable seal, with the deformable material being located away from the direct cutting effect of the glass-coated fibre. This maintains the advantages of linear assembly which reduces shear stress on the deformable seal, and the non-deformable seal is somewhat protected from the effect of the microspheres by the non-deformable seal (which is naturally much tougher than the deformable seal).
The skilled person will realise that further various alternatives and combinations are possible within the scope of the invention.
Number | Date | Country | Kind |
---|---|---|---|
0506589.1 | Mar 2005 | GB | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/GB2006/001134 | 3/29/2006 | WO | 00 | 9/20/2007 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2006/103419 | 10/5/2006 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
2729424 | Eppensteiner | Jan 1956 | A |
4676310 | Scherbatskoy et al. | Jun 1987 | A |
4793048 | Kashiwaya et al. | Dec 1988 | A |
5813658 | Kaminski et al. | Sep 1998 | A |
6012621 | Hoium et al. | Jan 2000 | A |
6264171 | Hoium et al. | Jul 2001 | B1 |
6364290 | Barker | Apr 2002 | B1 |
6386512 | Pecot et al. | May 2002 | B1 |
7225533 | Sylvia et al. | Jun 2007 | B2 |
20090026429 | Barker et al. | Jan 2009 | A1 |
Number | Date | Country |
---|---|---|
09 197228 | Jul 1997 | JP |
WO 9523988 | Sep 1995 | WO |
WO 9812588 | Mar 1998 | WO |
WO 9934492 | Jul 1999 | WO |
Entry |
---|
International Search Report PCT/GB2006/001134. |
Number | Date | Country | |
---|---|---|---|
20090026429 A1 | Jan 2009 | US |