Option apparatuses adapted to be connected to remote apparatus and image formation apparatus

Information

  • Patent Grant
  • 6516167
  • Patent Number
    6,516,167
  • Date Filed
    Thursday, March 15, 2001
    23 years ago
  • Date Issued
    Tuesday, February 4, 2003
    21 years ago
Abstract
An image formation apparatus has a controller which performs monitoring and control over a directly connected option apparatus by communicating with a controller of the directly connected option apparatus. Monitoring and control over another option apparatus that itself has a controller is performed not by the controller of the image formation apparatus but by the controller of the option apparatus close to the image formation apparatus. The image formation apparatus can keep track of the situation of a far-off option apparatus without performing direct monitoring or control thereof, by the controller of the option apparatus sending to the controller of the image formation apparatus a notice indicating the situation of the option apparatus sent from the controller of yet another option apparatus.
Description




FIELD OF THE INVENTION




The present invention relates to an image formation apparatus connectable with a plurality of option apparatuses and the option apparatuses.




BACKGROUND OF THE INVENTION




A variety of option apparatuses connectable to an image formation apparatus are conventionally provided to expand the function of the image formation apparatus according to the user's desire and operating environment. Such option apparatuses include a paper feed option apparatus to allow volume feeding of paper, sorter, duplex printing unit, etc. each having a structure allowing communication with the image formation apparatus.




For example, when a plurality of paper feed option apparatuses is placed and connected downstream from the image formation apparatus, the image formation apparatus and the plurality of paper feed option apparatuses transport recording media (hereinafter referred to as “sheets”) such as paper from a desired paper feed option apparatus to another image formation apparatus located downstream on the transport path while communicating with each other.




Conventionally, when an image formation apparatus is connected to a paper feed option apparatus that supplies recording media to perform media transport control, a controller in the image formation apparatus monitors transport control of sheets in all the paper feed option apparatuses and sends control data to the option apparatuses if necessary, thus carrying out all sheet transport control and monitoring processing. And also for a paper ejection option apparatus that performs a post-processing on sheets ejected from the image formation apparatus, a controller in the image formation apparatus performs the sheet transport control and monitoring processings for all the paper ejection option apparatuses.




Furthermore, as another example, it is provided that the sheet transport control and monitoring processings of the paper feed and paper ejection option apparatuses are separated from the controller in the image formation apparatus, and an option controller performs the sheet transport control and monitoring processings of all the option apparatuses.




However, such a conventional image formation apparatus has such problems as shown below:




If the number of paper feed option apparatuses is one or the sheet transport speed is not high, when the controller in the image formation apparatus or the option controller performs sheet transport control and monitoring processing of the paper feed option apparatus, an increase in the processing load of the controller would not be significant. However, when a plurality of option apparatuses is connected or the sheet transport speed is high, processing of the controller becomes more complicated, higher processing is required, the load of control and monitoring processing increases, which will require a high-speed and expensive processing unit such as a CPU to be used as the controller.




SUMMARY OF THE INVENTION




Therefore, it is an object of the present invention to provide an image formation apparatus, option apparatuses of the image formation apparatus and an image formation system made up of these image formation apparatus and option apparatuses capable of suppressing the increase of processing load on the controller of the image formation apparatus or the option controller when a plurality of option apparatuses is connected.




That is, a subject of the present invention is to provide an option apparatus for an image formation apparatus connectable directly or via another option apparatus to the image formation apparatus, capable of connecting a further option apparatus while being connected to the image formation apparatus, comprising directly connected communication means for communicating with the image formation apparatus or other option apparatuses and option apparatus controlling means for controlling the own operation based on an instruction received from an image formation apparatus directly connected on the image formation apparatus side or other option apparatuses via the communication means, characterized in that the option apparatus controlling means controls and/or monitors the operation of the other option apparatus directly connected away from the image formation apparatus and sends the state of the other option apparatuses to be controlled and/or monitored to the image formation apparatus directly connected on the image formation apparatus side or a further option apparatus using the communication means.




It is another subject of the present invention to provide an image formation apparatus that allows connection of a single and/or multiple option apparatuses of the image formation apparatus of the present invention, comprising image formation controlling means for controlling image formation processing using an option apparatus, characterized in that the image formation controlling means monitors and/or controls the operation of the option apparatus directly connected and monitors the states of the option apparatuses connected after the directly connected option apparatus through a communication with the directly connected option apparatus.




Furthermore, it is another subject of the present invention to provide an image formation system comprising an image formation apparatus and an option apparatus connectable directly or via another option apparatus to the image formation apparatus, capable of connecting a further option apparatus while being connected to the image formation apparatus, characterized in that the option apparatus comprises directly connected communication means for communicating with the image formation apparatus or another option apparatus and option apparatus controlling means for controlling the own operation based on an instruction received from an image formation apparatus directly connected on the image formation apparatus side or another option apparatus via the communication means, controls and/or monitors the operation of the other option apparatus directly connected away from the image formation apparatus and sends the state of the other option apparatus to be controlled and/or monitored to an image formation apparatus directly connected on the image formation apparatus side or a further option apparatus using the communication means, and the image formation apparatus comprises image formation controlling means for controlling image formation processing using an option apparatus and monitoring and/or controlling the operation of the option apparatus directly connected through a communication with the option apparatus controlling means of the option apparatus, characterized in that the image formation controlling means monitors the states of the option apparatuses connected after the directly connected option apparatus through a communication with the option apparatus controlling means owned by the directly connected option apparatus.




Furthermore, it is another subject of the present invention to provide a recording medium that stores a program that can be executed by a computer apparatus, characterized in that the apparatus that executes the program is allowed to function as an option apparatus of the image formation apparatus of the present invention.




Furthermore, it is another subject of the present invention to provide a recording medium that stores a program that can be executed by a computer apparatus, characterized in that the apparatus that executes the program is allowed to function as the image formation apparatus of the present invention.




Furthermore, it is another subject of the present invention to provide a recording medium that stores a program that can be executed by a computer apparatus, characterized in that the apparatus that executes the program is allowed to function as the image formation apparatus or option apparatus in the image formation system of the present invention.




Other features and advantages of the present invention will be apparent from the following description taken in conjunction with the accompanying drawings, in which like reference characters designate the same or similar parts throughout the figures thereof.











BRIEF DESCRIPTION OF THE DRAWINGS




The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments of the invention and, together with the description, serve to explain the principles of the invention.





FIG. 1

illustrates a configuration of an image formation apparatus and option apparatuses according to an embodiment of the present invention;





FIG. 2

is a block diagram showing an outlined configuration of the image formation apparatus and controllers in the option apparatuses according to the embodiment of the present invention;





FIGS. 3A

to


3


C are flow charts showing a powering-on and connection state setting procedure of the image formation apparatus and option apparatuses according to the embodiment of the present invention;





FIGS. 4A

to


4


D are flow charts showing a sheet transport processing procedure of an image formation apparatus and option apparatuses according to a first embodiment of the present invention;





FIGS. 5A

to


5


C are flow charts showing a sheet transport processing procedure of the image formation apparatus and option apparatuses according to the first embodiment of the present invention;





FIGS. 6A

to


6


C are flow charts showing sheet transport processing procedure of the image formation apparatus and option apparatuses according to the first embodiment of the present invention;





FIGS. 7A

to


7


C are flow charts showing sheet transport processing procedure of the image formation apparatus and option apparatuses according to the first embodiment of the present invention;





FIGS. 8A

to


8


C are flow charts showing a sheet transport processing procedure of an image formation apparatus and option apparatuses according to a second embodiment of the present invention;





FIGS. 9A

to


9


C are flow charts showing sheet transport processing procedure of the image formation apparatus and option apparatuses according to the second embodiment of the present invention; and





FIGS. 10A

to


10


C is a flow chart showing a sheet transport processing procedure of an image formation apparatus and option apparatuses according to a third embodiment of the present invention.











DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS




Preferred embodiments of the present invention will now be described in detail in accordance with the accompanying drawings.




First Embodiment




(Configuration of Image Formation Apparatus)





FIG. 1

illustrates a configuration example of an image formation system made up of an image formation apparatus and option apparatuses according to an embodiment of the present invention. In this embodiment, the image formation apparatus forms toner images on a sheet through electrophotographic process.




In the figure, reference numeral


100


denotes an image formation apparatus, reference numerals


101


and


102


denote paper feed option apparatuses and reference numerals


133


and


134


denote paper ejection option apparatuses. The image formation apparatus


100


is placed above the option apparatus


101


and the option apparatus


101


is placed above the option apparatus


102


.




Reference numerals


104


to


107


denote sheets to which images are transferred by the image formation apparatus and a plurality of sheets is loaded. Sheets


104


and


105


are placed in a paper feed apparatus built in the image formation apparatus. Reference numerals


108


to


111


denote pickup rollers that send sheets and groups of rollers


112


to


120


transport sheets to an electrophotographic process section


103


.




A roller pair


117


is placed downstream on the transport path from the position where a sheet transported in the image formation apparatus


100


joins a sheet transported from the option apparatus


101


. When the image formation apparatus


100


is already transporting a sheet, a sheet from the option apparatus


101


is temporarily stopped at the position just before the roller pair


117


.




A roller pair


119


is placed downstream from the position where a sheet transported in the option apparatus


101


joins a sheet transported by the option apparatus


102


. When the option apparatus


101


is already transporting a sheet, a sheet from the option apparatus


102


is temporarily stopped at the position just before the roller pair


119


.




Reference numeral


121


denotes a connector that connects the image formation apparatus


100


and option apparatus


101


enabling communication with each other and relays a communication line


130




a


used to communicate a controller


127


in the image formation apparatus


100


, a controller


128


in the option apparatus


101


and a controller


129


in the option apparatus


102


, and a power supply control signal line


130




b


. As in the case of reference numeral


121


, reference numeral


122


denotes a connector that connects the option apparatus


101


and the option apparatus


102


and relays the communication line


130




c


and the power supply control signal line


130




d.






Reference numeral


123


denotes a tray to hold sheets with images formed by the electrophotographic process section


103


in the image formation apparatus and sheets are transported by a roller pair


124


with the side on which images are formed face down.




Reference numeral


125


denotes an ejection port for sheets with images formed by the electrophotographic process section


103


in the image formation apparatus and sheets are transported by a roller pair


126


with the side on which images are formed face up.




The plurality of sheets


104


to


107


is transported by the roller groups along the transport path indicated by dotted lines and arrows in FIG.


1


and ejected onto the tray


123


or through the ejection port


125


with images formed on their surfaces.




Reference numeral


131


denotes a confluence (1) of sheet transport paths in the image formation apparatus


100


and is located just before (upstream) the roller pair


117


. The confluence (1)


131


indicates the position at which a sheet


105


transported in the image formation apparatus


100


joins a sheet


106


transported from the option apparatus


101


.




Reference numeral


132


denotes a confluence (2) of sheet transport paths in the option apparatus


101


and is located just before the roller pair


119


. The confluence (2)


132


indicates the position at which a sheet


106


transported in the option apparatus


101


joins a sheet


107


transported from the option apparatus


102


.




Reference numeral


133


denotes an option apparatus connected downstream from the image formation apparatus


100


and ejects a sheet ejected from the image formation apparatus onto a tray provided for the option apparatus


133


or to an option apparatus


134


downstream.




Reference numeral


134


denotes an option apparatus installed below the option apparatus


133


and transports and ejects sheets transported from the option apparatus


133


.




Reference numerals


135


and


136


denote trays to hold sheets transported by the option apparatuses


133


and


134


and reference numerals


137


to


142


denote roller pairs to transport sheets ejected from the image formation apparatus


100


. For simplicity of explanations,

FIG. 1

shows only roller pairs


138


and


142


to transport sheets out to the trays


135


and


136


, but roller pairs to transport sheets out to other trays are also provided in the actual system.




Reference numerals


143


and


144


denote controllers of the option apparatuses


133


and


134


and are connected via a signal line


145




c


and power supply control line


145




d


. A signal line


145




a


and power supply control line


145




b


connect the controller


127


in the image formation apparatus


100


and the controller


143


. Reference numerals


149


and


150


denote connectors between the image formation apparatus


100


and the option apparatus


133


and between the option apparatuses


133


and


134


, respectively and relay the signal lines


145




a


and


145




c


and power supply control signal lines


145




b


and


145




d.






However, the connectors


121


,


122


,


149


and


150


can also be replaced by cables or other communication means connectable in the order of transport paths.




(Controller Configuration)





FIG. 2

is a block diagram showing configurations and connection relationships of the controller


127


in the image formation apparatus


100


, the controller


128


in the option apparatus


101


and the controller


129


in the option apparatus


102


. However, the controllers


143


and


144


in the option apparatuses


133


and


134


have the same configurations as those of the controllers


128


and


129


, and therefore these are not shown.




Reference numeral


200


denotes a CPU that is located inside the controller


127


and controls the image formation apparatus to control image formation and sheet transport. The CPU


200


incorporates a ROM


200




a


, a RAM


200




b


and a timer


200




c


. However, the ROM


200




a


, RAM


200




b


and timer


200




c


can also be installed outside the CPU


200


.




The ROM


200




a


stores the processing content to be executed by the CPU


200


all the time and software regarding the image formation processing, sheet transport processing and communication processing is written therein.




The RAM


200




b


stores data temporarily required to execute image formation processing, sheet transport processing and communication processing by the CPU


200


.




The timer


200




c


generates various timings to execute image formation processing, sheet transport processing and communication processing.




Reference numeral


201


denotes an image formation circuit and is a circuit to carry out electrophotographic process when an image is formed on a sheet by the image formation apparatus.




Reference numeral


202


denotes a circuit to control various actuators (not shown) driven when sheet transport and image formation processing are carried out by the image formation apparatus.




Reference numeral


203


denotes a circuit to input output signals from various sensors (not shown) to the CPU


200


when sheet transport and image formation processing are carried out by the image formation apparatus.




Reference numeral


204


denotes a circuit to carry out processing of turning ON/OFF power from the image formation apparatus to the option apparatuses and controls the power supply circuit of the option apparatus


101


via a power supply control signal line


205


.




Reference numeral


206


denotes a circuit to carry out communication processing between the image formation apparatus and option apparatuses and is bus-connected to the option apparatus via a communication line


130




d


. However, the connection mode is not limited to a particular mode.




Reference numerals


207


and


214


denote CPUs that are located in the controller


128


and


129


and control the option apparatuses


101


and


102


, respectively to control sheet transport to the image formation apparatus


100


. The CPUs


207


and


214


contain ROMs


207




a


and


214




a


, RAMs


207




b


and


214




b


and timers


207




c


and


214




c


. However, the ROMs


207




a


and


214




a


, RAMs


207




b


and


214




b


and timers


207




c


and


214




c


can also be installed outside the CPUs


207


and


214


.




The ROMs


207




a


and


214




a


store the processing content to be executed by the CPUs


207


and


214


all the time and software regarding the sheet transport processing and communication processing is written therein.




The RAMs


207




b


and


214




b


store data temporarily required to execute sheet transport processing and communication processing by the CPUs


207


and


214


.




The timers


207




c


and


214




c


generate various timings to execute sheet transport processing and communication processing.




Reference numerals


212


and


218


denote circuits to control various actuators (not shown) driven when sheet transport is carried out by the option apparatuses


101


and


102


.




Reference numerals


213


and


219


denote circuits to input output signals from various sensors (not shown) to the CPUs


207


and


214


when sheet transport is carried out by the option apparatuses


101


and


102


.




Reference numerals


209


and


216


denote circuits to carry out processing of turning ON/OFF power from one option apparatus to the other option apparatus and the circuit


209


controls the power supply circuit of the option apparatus via a power supply control signal line


130




d.






Reference numerals


211


and


217


denote circuits to carry out communication processing between the image formation apparatus


100


and option apparatuses


101


and


102


and are connected to the option apparatuses via a communication line


130




c


. However, the connection mode is not particularly limited.




(Operation When Power is Turned On)





FIGS. 3A

to


3


C are flow charts showing the processing procedure after the power to the image formation apparatus


100


, option apparatuses


101


,


102


,


133


and


134


is turned on.

FIG. 3A

, FIG.


3


B and

FIG. 3C

show the operations of the image formation apparatus


100


, option apparatuses


101


and


133


, and option apparatuses


102


and


134


, respectively.




In step S


100


, immediately after the power to the image formation apparatus


100


is turned on, the CPU


200


is initialized. In the next step S


101


, the timer


200




c


is started to measure the time until the power to the option apparatus


101


connected is turned on. This is intended to prevent a voltage fluctuation in a surrounding AC line (not shown) caused by turning on power to all apparatuses simultaneously by providing starting time differences and to recognize option apparatuses connected upstream or downstream one by one starting with the option apparatus closest to the image formation apparatus


100


.




In step S


102


, i t is checked with the timer


200




c


start ed in step S


101


whether a predetermined time has elapsed or not and if the predetermined time has elapsed, a signal to turn on the power to the option apparatus


101


is output in the next step S


103


.




On the other hand, in step S


200


(FIG.


3


B), the option apparatus


101


turns on power by a signal output to the option apparatus


101


and initializes the CPU


207


in the option apparatus


101


in step S


201


.




In step S


202


, the timer


207




c


is started to turn on the power to the option apparatus


102


connected upstream from the option apparatus


101


.




In step S


203


, it is checked through the timer


207




c


started in step S


200


whether a predetermined time has elapsed or not and if it is confirmed that the predetermined time has elapsed, a signal for turning on the power to the option apparatus


102


located further upstream is output in step S


204


.




In step S


205


, the information of the option apparatus


101


is sent to the image formation apparatus


100


through communication processing a predetermined time after the power to the option apparatus


101


is turned on. This transmission content is the information concerning the function and state of the option apparatus


101


.




The data sent in step S


205


is received by the image formation apparatus


100


(step S


104


) and the image formation apparatus


100


recognizes in step S


105


that the option apparatus


100


is connected one step upstream on the sheet transport path and sets the state of connection with the option apparatus


101


on the RAM


207




b.






On the other hand, in step S


300


(FIG.


3


C), the option apparatus


102


receives the power-on signal output by option apparatus


101


in step S


204


and turns on the power to the option apparatus


102


and then initializes the CPU


214


in the option apparatus


102


in step S


301


.




In step S


303


, the option apparatus performs processing of turning on the power to the option apparatus connected further upstream. Although in this embodiment, no option apparatus is connected further upstream from the option apparatus


102


, signals for turning on the power are output also in the configuration having three or more option apparatuses in which further paper feed option apparatuses are connected upstream from the option apparatus


102


.




Then, in step S


305


, the information of the option apparatus


102


is sent to the downstream option apparatus


101


. The option apparatus


101


that has received the information of the option apparatus


102


in step S


206


(

FIG. 3B

) recognizes in step S


207


that the option apparatus


102


is connected one step upstream from the option apparatus


101


, sets the state of connection with the option apparatus


102


in the RAM


200




b


and transfers the apparatus information of the option apparatus


102


to image formation apparatus


100


.




In step S


305


, it is also possible to configure the option apparatus


102


to directly send the own information to the image formation apparatus


100


.




In step S


107


, the image formation apparatus


100


recognizes that the option apparatus


102


is connected two steps upstream on the sheet transport path and sets the state of connection with the option apparatus


102


in the RAM


200




b.






Also in the configuration having three or more option apparatuses in which a plurality of paper feed option apparatuses are further connected upstream from the option apparatus


102


, the apparatus information is sequentially transmitted to a downstream option apparatus, and the receiving downstream option apparatus retains the apparatus information of the option apparatus connected upstream from it. And, the image formation apparatus


100


sets the apparatus information and the connection states of all the option apparatuses connected upstream from it in the RAM


200




b.






However, as the processing for setting the state of connection between the option apparatuses


101


and


102


, it is also possible to configure the option apparatus


102


to send the information of the own apparatus only to the image formation apparatus


100


without sending it to the option apparatus


101


and configure the image formation apparatus


100


to send the information of the option apparatus


102


to the option apparatus


101


.




According to the flow charts shown in

FIGS. 3A

to


3


C, the image formation apparatus


100


can turn on the power to the option apparatus


101


installed one step upstream and the option apparatus


101


can turn on the power to the option apparatus


102


installed one step upstream. Furthermore, the image formation apparatus


100


can recognize the information and connection state of the upstream option apparatuses


101


and


102


and the option apparatus


101


can recognize the information and connection state of the option apparatus


102


one step upstream.




In this embodiment, the option apparatuses


133


and


134


connected downstream from the image formation apparatus


100


operate in the same way as the option apparatuses


101


and


102


except that the powering-on sequence changes from upstream to downstream. That is, by replacing the processing of sequentially turning on power from the image formation apparatus


100


in an upstream direction and sequentially receiving option apparatus information by the processing of sequentially turning on power in a downstream direction and sequentially receiving option apparatus information, it is possible to turn on power to all option apparatuses and recognize the information and connection states.




Furthermore, in the configuration in which a plurality of option apparatuses other than the paper feed option apparatuses


101


,


102


and the paper ejection option apparatuses


133


,


134


are connected upstream or downstream, the operation is the same.




In this case, it is optional to decide whether to recognize all option apparatuses connected upstream from the image formation apparatus


100


and then recognize option apparatuses connected downstream or vice versa. Furthermore, if the image formation apparatus


100


can receive apparatus information from an upstream option apparatus and apparatus information from a downstream option apparatus independently, it is also possible to turn on power to both apparatuses simultaneously.




(Sheet Transport (Supply) Processing)





FIGS. 4A

to


4


D and

FIGS. 5A

to


5


C are flow charts that show sheet transport processing of the image formation apparatus


100


, option apparatuses


101


and


102


, and option apparatus upstream from the option apparatus


102


(not shown in FIG.


1


).




FIG.


4


A and

FIG. 5A

show the operation of the image formation apparatus


100


, FIG.


4


B and

FIG. 5B

show the operation of the option apparatus


101


, FIG.


4


C and

FIG. 5C

show the operation of the option apparatus


102


, and

FIG. 4D

shows the operation of the option apparatus upstream from the option apparatus


102


.




Followings are the description of operations in the case when sheet


1


(sheet


106


in

FIG. 1

) is fed from the option apparatus


101


, sheet


2


(sheet


107


in the same figure) is fed by the option apparatus


102


via the option apparatus


101


to the image formation apparatus


100


, and sheet


3


(not shown) is fed by the option apparatus upstream from the option apparatus


102


via the option apparatus


102


and option apparatus


101


to the image formation apparatus


100


.




First, in step S


400


, the image formation apparatus


100


sends sheet transport information to the option apparatuses


101


and


102


and the option apparatus upstream from the option apparatus


102


.




Sheet transport information specifies any one of the option apparatuses


101


and


102


and option apparatus upstream from the option apparatus


102


and instructs the specified apparatus to feed sheets, and also instructs the downstream apparatus to transport the sheets. If the option apparatus is instructed to feed a plurality of sheets, each of the option apparatuses is controlled so that the each sheet will be fed to the image formation apparatus


100


in the instructed order.




The option apparatus


101


receives and recognizes the transport information of sheets


1


,


2


, and


3


from the image formation apparatus


100


in step S


500


. The option apparatus


101


also stores the received transport information of sheets


1


,


2


, and


3


in the RAM


207




b


. Since the option apparatus


101


transports sheet


2


from the option apparatus


102


, it receives the transport information of sheet


2


. In addition, since the option apparatus


101


transports sheet


3


from the option apparatus upstream from the option apparatus


102


, it receives the transport information of sheet


3


. The option apparatus


101


then starts to transport sheet


1


(step S


501


). In addition, the option apparatus


101


starts the timer


207




c


. In the following, the timers in the respective apparatuses are set for determining the timing of transport of sheets in transporting the respective sheets, and are used for transport control.




On the other hand, the option apparatus


102


receives and recognizes the transport information of sheet


2


from the image formation apparatus


100


in step S


600


, and since the option apparatus


102


transports sheet


3


from the option apparatus upstream from it, it receives the transport information of sheet


3


. The option apparatus


102


also stores the received transport information of sheets


2


and


3


in the RAM


214




b


. The option apparatus


102


then starts to transport sheet


2


(step S


601


). In addition, the option apparatus


102


starts the timer


214




c.






When the option apparatus


101


starts to transport sheet


1


in step S


501


, the image formation apparatus


100


checks the transport of sheet


1


according to the sensor information input from the sensor input circuit


203


when sheet


1


is transported to the image formation apparatus


100


and starts transport control (step S


401


). Alternatively, the image formation apparatus


100


may have been driven the roller pair


118


so as to transport sheet


1


without detection of the sensor signal.




In step S


502


, the option apparatus


101


determines with the timer


207




c


whether sheet


1


has reached the confluence (1)


131


just before the roller pair


117


or not and if sheet


1


has reached the confluence, the option apparatus


101


stops the transport of sheet


1


in step S


503


. However, if no other sheet exists at the confluence (1)


131


, it is possible to continue to transport sheet


1


without stopping.




Then, in step S


504


, the option apparatus


101


sends data to notify the image formation apparatus


100


of the stoppage of transport of sheet


1


and in step S


402


, the image formation apparatus


100


receives and recognizes the data indicating that the transport of sheet


1


has been stopped. The image formation apparatus


100


also stops the transport of sheet


1


in the image formation apparatus


100


.




The option apparatus


102


that started the transport of sheet


2


in step S


601


determines with the timer


214




c


in step S


602


whether sheet


2


has reached the confluence (2)


132


just before the roller pair


119


or not and if sheet


2


has reached the confluence, the option apparatus


102


stops the transport of sheet


2


in step S


603


. However, if no other sheet exists at the confluence (2)


132


, it is possible to continue to transport sheet


2


without stopping.




Then, the option apparatus


102


sends the data to notify the stoppage of transport of sheet


2


to the option apparatus


101


in step S


604


. This data is received by the option apparatus


101


(step S


505


) and the option apparatus


101


recognizes that the transport of sheet


2


has been stopped.




In step S


403


, the image formation apparatus


100


determines whether sheet


1


can pass through the confluence (1)


131


in the image formation apparatus


100


or not and if sheet


1


can pass through the confluence, the image formation apparatus


100


moves on to step S


404


and sends to the option apparatus


101


the data to indicate that it is possible to transport sheet


1


.




In step S


506


and step S


507


, the option apparatus


101


monitors communication data, and when it is determined that the data output by the image formation apparatus


100


in step S


404


shows that sheet


1


can pass through the confluence (1)


131


, the option apparatus


101


moves on to step S


508


.




In step S


508


, the processing of transporting sheet


1


in the option apparatus


101


restarts, and in step S


405


, the processing of transporting sheet


1


in the image formation apparatus


100


restarts.




When sheet


2


is allowed to pass through the confluence (2)


132


just before the roller pair


119


, the option apparatus


101


sends the data indicating that sheet


2


can pass through the confluence to the option apparatus


102


(step S


509


). The option apparatus


102


monitors the communication in order to detect whether sheet


2


whose transport has been stopped in step S


604


is allowed to pass through the confluence (2)


132


or not (steps S


606


, S


607


), and after confirming the reception of the data indicating that sheet


2


is allowed to pass through the confluence (2)


132


from the option apparatus


101


, the option apparatus


102


restarts to transport sheet


2


in step S


608


.




When sheet


1


is ejected from the option apparatus


101


, data indicating the completion of ejection of sheet


1


is sent to the image formation apparatus


100


(step S


510


) and the image formation apparatus


100


receives and recognizes sheet


1


ejection completion data in step S


406


.




Then, the image formation apparatus


100


performs image formation processing on sheet


1


transported into the image formation processing


100


in step S


407


.




On the other hand, the option apparatus


101


that has completed the ejection of sheet


1


starts to transport sheet


2


transported from the option apparatus


102


to the option apparatus


101


(step S


511


).




When the ejection of sheet


2


is completed, the option apparatus


102


sends the data indicating the completion of ejection of sheet


2


to the option apparatus


101


in step S


610


and the option apparatus


101


receives the data indicating the completion of ejection of sheet


2


in step S


512


.




In step S


408


, when the image formation apparatus


100


detects through a signal from the sensor input circuit


203


that sheet


2


has been transported to the image formation apparatus


100


, the image formation apparatus


100


starts to transport sheet


2


. Alternatively, the image formation apparatus


100


may have been driven the roller pair


118


so as to transport sheet


2


without detection of the sensor signal.




In step S


513


, the option apparatus


101


determines whether sheet


2


has reached the confluence (1)


131


just before the roller pair


117


and if sheet


2


has reached the confluence, the option apparatus


101


stops the transport of sheet


2


in step S


514


(FIG.


5


B). However, if there is no other sheet at the confluence (1)


131


, the option apparatus


101


can also continue to transport sheet


2


without stopping.




In step S


515


, the option apparatus


101


sends data to notify the image formation apparatus


100


of the stoppage of transport of sheet


2


and the image formation apparatus


100


receives and recognizes this data indicating the stoppage of transport of sheet


2


. Then, the image formation apparatus


100


stops transporting sheet


2


in the image formation apparatus


100


(step S


409


).




In step S


410


, the image formation apparatus


100


determines whether sheet


2


can pass through the confluence (1)


131


in the image formation apparatus


100


or not and if sheet


2


can pass through the confluence, the image formation apparatus


100


moves on to step S


411


and sends to the option apparatus


101


data indicating that it is possible to transport sheet


2


.




In step S


517


, the option apparatus


101


monitors communication data, and when it is determined in step S


518


that sheet


2


can pass through the confluence (1)


131


, the option apparatus


101


moves on to step S


519


.




In step S


519


, the option apparatus


101


restarts the processing of transporting sheet


2


in the option apparatus


101


, and in step S


412


, the image formation apparatus


100


also restarts the processing of transporting sheet


2


.




In step S


521


, when the option apparatus


101


ejects sheet


2


, the data indicating the completion of ejection of sheet


2


is sent to the image formation apparatus


100


through communication processing.




The image formation apparatus


100


that has received this data in step S


413


performs image formation processing on sheet


2


in step S


414


.




The transport control for sheets


1


and


2


has been explained in the above description. As with sheet


2


, sheet


3


is sequentially transported from the option apparatus located upstream from the option apparatus


102


to the option apparatus


102


one step downstream from the option apparatus, to the option apparatus


101


further downstream, and then to the image formation apparatus


100


, as shown in steps S


620


to S


628


. Eventually, in steps up to steps S


419


, S


529


, and S


619


, sheet


1


,


2


, and


3


are transported to the image formation apparatus


100


in this order, and image formation is conducted.




According to sheet transport and monitoring processing shown in the flow charts in

FIGS. 4A

to


4


D and

FIGS. 5A

to


5


C, the image formation apparatus


100


first sends sheet transport information to all of the connected option apparatuses


101


and


102


and option apparatus upstream from the option apparatus


102


, and performs sheet transport control and monitoring of only the option apparatus


101


one step upstream after sheet transport processing is started, the option apparatus


101


performs sheet transport control and monitoring of only the option apparatus


102


one step upstream, and the option apparatus


102


performs sheet transport control and monitoring of only the option apparatus one step upstream, and in this way it is possible to carry out image formation processing and transport processing on all sheets.




Furthermore, also in the configuration in which a plurality of paper feed option apparatuses are further connected upstream, each apparatus performs sheet transport control and monitoring of the option apparatus one step upstream from itself, thus making it possible to carry out image formation processing and transport processing on all sheets.




(Sheet Transport (Ejection) Processing)





FIGS. 6A

to


6


C and

FIGS. 7A

to


7


C are flow charts to show sheet transport processing of the image formation apparatus


100


, option apparatuses


133


and


134


.




FIG.


6


A and

FIG. 7A

show the operation of the image formation apparatus


100


, FIG.


6


B and

FIG. 7B

show the operation of the option apparatus


133


and FIG.


6


C and

FIG. 7C

show the operation of the option apparatus


134


.




Followings are the description of the operation in case when the sheets


1


and


2


are transported from the image formation apparatus


100


through the option apparatus


133


to the option apparatus


134


at which the sheets


1


and


2


are ejected and loaded.




First, in step S


700


, the image formation apparatus


100


sends sheet transport information to the option apparatuses


133


and


134


. Sheet transport information instructs sheet ejection and load by specifying the option apparatus to which the sheet(s) is(are) to be loaded, and also instructs the downstream apparatus to transport the sheets.




The sheet transport information is received by the option apparatuses


133


and


134


in step S


800


and step S


900


, respectively.




In step S


701


, data is sent to inquire whether it is possible to eject sheet


1


to the option apparatus


133


connected right downstream from the image formation apparatus


100


. The option apparatus


133


receives this inquiry data in step S


801


and determines whether it is possible to transport sheet


1


in step S


802


. If it is impossible to transport the sheet, the option apparatus


133


notifies this to the image formation apparatus


100


in step S


803


and if it is determined that it is possible to transport the sheet, the option apparatus


133


notifies this to the image formation apparatus


100


in step S


804


. These notifications are both received by the image formation apparatus


100


, which is monitoring the communication (step S


702


).




Based on the notification received in step S


702


, the image formation apparatus


100


determines in step S


703


whether sheet


1


can pass through the ejection port


125


of the image formation apparatus


100


or not and if sheet


1


can pass through the ejection port


125


, the image formation apparatus


100


moves on to step S


704


. On the other hand, if sheet


1


cannot pass through the ejection port


125


, the image formation apparatus


100


continues communication monitoring processing in step S


702


until the option apparatus


133


notifies that it is possible to transport the sheet.




In step S


704


, the image formation apparatus


100


sends an advance notice that sheet


1


will be ejected to the option apparatus


133


, and then in step S


705


, the image formation apparatus


100


starts to eject sheet


1


. The option apparatus


133


receives the advance notice of ejection of sheet


1


in step S


805


and then starts to transport sheet


1


in step S


806


.




Then, in step S


807


, the option apparatus


133


inquires the option apparatus


134


located downstream about whether sheet


1


being transported in the option apparatus


133


can be ejected or not.




This inquiry data is received by the option apparatus


134


in step S


901


, and it is determined in step S


902


whether sheet


1


can be transported or not. If sheet


1


cannot be transported, the option apparatus


134


notifies this to the option apparatus


133


in step S


903


. If sheet


1


can be transported, the option apparatus


134


notifies that sheet


1


can be transported in step S


904


.




The option apparatus


133


monitors the communication in step S


808


and determines in step S


809


whether sheet


1


can be ejected or not based on the notification received from the option apparatus


134


. If sheet


1


can be ejected, the option apparatus


133


moves on to the next step S


810


, notifies the image formation apparatus


100


of the start of the ejection of sheet


1


. Then, in the following step S


811


, the option apparatus


133


sends the option apparatus


134


an advance notice of ejection before sheet


1


is ejected from the option apparatus


133


.




Upon reception of the advance notice of ejection from the option apparatus


133


in step S


905


, the option apparatus


134


starts to transport sheet


1


transported to the option apparatus


134


(step S


906


).




When the ejection of sheet


1


is completed, for example, the image formation apparatus


100


inquires the option apparatus


133


whether it is possible to eject sheet


2


or not (step S


707


).




The option apparatus


133


receives this inquiry in step S


812


and determines in step S


813


whether the option apparatus


133


can transport sheet


2


or not. If sheet


2


cannot be transported for such a reason that the processing of sheet


1


is in progress, the option apparatus


133


notifies this to the image formation apparatus


100


in step S


814


. If sheet


2


can be transported, the option apparatus


133


notifies that sheet


2


can be transported to the image formation apparatus


100


in step S


815


. This determination result of the option apparatus


133


is received by the image formation apparatus


100


in step S


708


and the image formation apparatus


100


determines whether sheet


2


can pass through the ejection port


125


or not based on the received determination result (step S


709


). If it is determined that sheet


2


cannot pass through the ejection port


125


, the image formation apparatus


100


waits until it is determined that sheet


2


is allowed to pass through the ejection port


125


. On the other band, if the image formation apparatus


100


is notified from the option apparatus


133


that sheet


2


can pass through the ejection port


125


, the image formation apparatus


100


sends an advance notice of sheet ejection to the option apparatus


133


in step S


710


. This notice is received by the option apparatus


133


in step S


816


and the option apparatus


133


recognizes the advance notice of the ejection of sheet


2


.




Following the advance notice of the ejection of sheet


2


, the image formation apparatus


100


starts to eject sheet


2


in step S


711


and the option apparatus


133


also starts to transport sheet


2


in step S


817


.




In step S


818


, the completion of ejection of sheet


1


in the option apparatus


133


is notified to the image formation apparatus


100


and received and recognized by the image formation apparatus


100


in step S


712


. Then, the option apparatus


133


inquires the option apparatus


134


in step S


819


about whether sheet


2


can be ejected or not.




This inquiry is received by the option apparatus


134


in step S


907


and the option apparatus


134


determines in step S


908


whether sheet


2


can be transported or not. The determination result is notified to the option apparatus


133


in step S


909


if sheet


2


cannot be transported or in step S


910


if sheet


2


can be transported.




In step S


820


, the option apparatus


133


receives from the option apparatus


134


the determination result of whether it is possible to transport sheet


2


or not. Then, in step S


821


, the option apparatus


133


determines whether the option apparatus


134


has notified as to whether sheet


2


can be ejected or not and waits until the notification is received.




When the preceding sheet


1


is ejected from the option apparatus


134


, the option apparatus


134


notifies this to the option apparatus


133


(step S


911


). In step S


822


, upon reception of a notice that the option apparatus


134


has completed the transport of sheet


1


, the option apparatus


133


notifies the image formation apparatus


100


in step S


823


that sheet


1


has been ejected from the option apparatus


134


and sends an advance notice of ejection of sheet


2


to the option apparatus


134


in step S


824


.




The option apparatus


134


receives and recognizes the advance notice of ejection of sheet


2


from the option apparatus


133


in step S


912


. Then, in step S


913


, the option apparatus


134


starts to transport sheet


2


based on the advance notice of ejection received in step S


912


.




On the other hand, in step S


825


, the option apparatus


133


starts to eject sheet


2


following the advance notice of the ejection output in step S


824


. When the transport of sheet


2


in the option apparatus


133


is completed, the option apparatus


133


notifies this to the image formation apparatus


100


in step S


826


. The image formation apparatus


100


receives and recognizes this notice in step S


714


.




When the ejection of sheet


2


is completed, the option apparatus


134


notifies this to the option apparatus


133


and completes the processing in step S


914


. Upon reception of the notice of the completion of ejection of sheet


2


by the option apparatus


134


in step S


827


, the option apparatus


133


notifies the image formation apparatus


100


that the option apparatus


134


has ejected sheet


2


in step S


828


. Then, the image formation apparatus


100


receives and recognizes the completion of ejection of sheet


2


by the option apparatus


134


in step S


715


and a series of ejection processing is completed.




According to sheet transport control and monitoring processing shown in the flow charts in

FIGS. 6A

to


6


C and

FIGS. 7A

to


7


C, the image formation apparatus


100


first sends sheet transport information to all the connected option apparatuses


133


and


134


, performs sheet transport control and monitoring of only the option apparatus


133


one step downstream after sheet transport processing is started and the option apparatus


133


performs sheet transport control and monitoring of only the option apparatus


134


one step downstream, thus making it possible to carry out image formation processing and transport processing on all sheets.




Furthermore, also in the configuration in which a plurality of paper ejection option apparatuses other than the paper ejection apparatuses


133


,


134


are connected downstream, each apparatus performs sheet transport control and monitoring of the option apparatus one step downstream from itself, thus making it possible to carry out transport processing on all sheets, on which images are formed.




Second Embodiment




Then, the sheet transport processing operation of the image formation apparatus and option apparatuses according to a second embodiment of the present invention will be explained using the flow charts shown in

FIGS. 8A

to


8


C and

FIGS. 9A

to


9


C.

FIGS. 8A

to


8


C and

FIGS. 9A

to


9


C are the flow charts that show sheet transport processing in the image formation apparatus


100


and the option apparatuses


133


and


134


. FIG.


8


A and

FIG. 9A

show the operation of the image formation apparatus


100


, FIG.


8


B and

FIG. 9B

show the operation of the option apparatus


133


and FIG.


8


C and

FIG. 9C

show the operation of the option apparatus


134


.




In this embodiment, the configuration of the image formation apparatus itself is the same as that of the first embodiment, and therefore explanations thereof will be omitted. Furthermore, in sheet transport processing, which will be explained below, suppose sheet


1


and sheet


2


are ejected from the option apparatus


134


via the option apparatus


133


as in the case of the first embodiment.




First, in step S


716


, the transport information of sheet


1


and sheet


2


is sent from the image formation apparatus


100


to the option apparatuses


133


and


134


. This transport information is received by the option apparatuses


133


and


134


in step S


829


and step S


915


, respectively. Upon reception of the transport information, the option apparatuses


133


and


134


send information on the time required until the own apparatus is allowed to transport sheet


1


and sheet


2


to the corresponding apparatus connected upstream in steps S


830


and S


916


, respectively.




The option apparatus


133


receives the sheet


1


,


2


transport wait time data from the option apparatus


134


in step S


831


and sends this data together with the wait time of the option apparatus


133


to the image formation apparatus


100


in step S


832


.




The image formation apparatus


100


receives the sheet


1


,


2


transport wait time of the option apparatus


133


in step S


717


and receives the wait time of the option apparatus


134


in step S


718


.




In step S


719


, it is determined whether sheet


1


can pass through the ejection port


125


or not. Based on the transport wait time for sheet


1


and sheet


2


received in step S


717


, it is determined that sheet


1


can pass through the ejection port


125


after the timer


200




c


in the image formation apparatus


100


counts the time corresponding to the transport wait time.




Here, the method of calculating the transport wait time will be explained. The time after a certain sheet (called a “preceding sheet”) is transported and carried into the option apparatus


133


or the option apparatus


134


until the option apparatus


133


or


134


can accept the next sheet (called the “following sheet”) (the time during which the transport or post-processing of the preceding sheet is not affected and the following sheet does not catch up the preceding sheet), that is, the transport wait time can be determined according to the transport distance up to the sheet ejection port in the option apparatus, length of the sheet transported, transport speed and post-processing operation time.




Therefore, it is possible to calculate the transport wait time by storing the transport wait time determined by a combination of these elements in a non-volatile storage medium such as ROM in the option apparatus beforehand or referencing or calculating this stored transport wait time in real time using these values.




This embodiment will be explained assuming that upon reception of the sheet transport information, the option apparatuses


133


and


134


will calculate the sheet transport wait time of their own sheets. When two option apparatuses


133


and


134


are connected to the image formation apparatus


100


as in the case of this embodiment, the ejection wait time at the image formation apparatus


100


can be calculated as follows.




That is, suppose the transport wait time calculated by the option apparatus


133


is T


1


[S], the transport wait time calculated by the option apparatus


134


is T


2


[S], then when the option apparatus


134


sends the own transport wait time T


2


[S] to the image formation apparatus


100


via the option apparatus


133


, the option apparatus


133


sends the transport wait time to the image formation apparatus


100


assuming that:




When T


1


≧T


2


, the transport wait time of the image formation apparatus


100


is T


1






When T


1


<T


2


, the transport wait time of the image formation apparatus


100


is T


2






Of course, it is also possible to configure the system unlike that shown in

FIGS. 8A

to


8


C, so that each option apparatus


133


,


134


directly sends T


1


[S] or T


2


[S] to the image formation apparatus


100


individually and the image formation apparatus


100


makes the above decision (calculation).




Furthermore, when three or more option apparatuses are connected, it is possible to determine the transport wait time of the image formation apparatus


100


in the like manner based on the option apparatus with the longest transport wait time.




The time required for a communication between the apparatuses should be normally short enough compared to the transport wait time, so even if an upstream apparatus calculates the transport wait time step by step, the number of option apparatuses does not affect the time required to calculate this transport wait time. However, in the case where an option apparatus with extremely low calculation performance is mixed in, it is also possible to configure the system so that when the image formation apparatus


100


recognizes that option apparatus, the transport wait time is directly sent to the image formation apparatus


100


.




When the transport wait time has elapsed, the image formation apparatus


100


starts to eject sheet


1


in step S


720


and at the same time sends an advance notice of transport to the option apparatus


133


.




In step S


833


, when the option apparatus


133


receives the advance notice of transport that the image formation apparatus


100


sent in step S


720


, the option apparatus


133


starts to transport sheet


1


. In step S


834


, a sensor, which is not shown in the figure, detects whether sheet


1


has reached a predetermined position near the ejection port or not by detecting the position of the end of the sheet, and when the sensor detects that sheet


1


has reached the predetermined position, the option apparatus


133


starts to eject sheet


1


(step S


835


). Furthermore, simultaneously with the start of ejection of sheet


1


, the option apparatus


133


sends an advance notice of ejection to the option apparatus


134


.




Upon reception of the advance notice of ejection that the option apparatus


133


sends in step S


835


, the option apparatus


134


starts to transport sheet


1


in step S


917


.




When the ejection of sheet


1


is completed, the option apparatus


133


sends this information to the image formation apparatus


100


in step S


836


and the image formation apparatus


100


receives this notice in step S


721


and recognizes that sheet


1


has been ejected from the option apparatus


133


. Then, in step S


722


, the image formation apparatus


100


determines whether following sheet


2


can pass through the ejection port


125


or not. Based on the transport wait time of sheet


2


received in step S


718


, after the timer


200




c


in the image formation apparatus


100


counts, it is determined that following sheet


2


can pass through the ejection port


125


. Once it is determined that following sheet


2


can pass through the ejection port


125


, the image formation apparatus


100


starts to eject sheet


2


in step S


723


and at the same time sends an advance notice of transport to the option apparatus


133


.




In step S


837


, upon reception of the advance notice of transport that the image formation apparatus


100


sent in step S


723


, the option apparatus


133


starts to transport sheet


2


. Then, in step S


838


, a sensor, which is not shown in the figure, detects whether sheet


2


has reached a predetermined position near the ejection port and when the sensor detects that sheet


2


has reached the predetermined position, the option apparatus


133


starts to eject sheet


2


(step S


839


). Furthermore, simultaneously with the start of ejection of sheet


2


, the option apparatus


133


sends an advance notice of ejection to the option apparatus


134


.




On the other hand in step S


918


, upon reception of the advance notice of ejection that the option apparatus


133


sent in step S


839


, the option apparatus


134


starts to transport sheet


2


. Furthermore, in step S


919


, when sheet


1


is ejected from the option apparatus


134


, the option apparatus


134


notifies this to the option apparatus


133


, the upstream apparatus.




The option apparatus


133


receives the notice of the ejection of sheet


1


at the option apparatus


134


in step S


840


and notifies the image formation apparatus


100


of the ejection of sheet


1


from the option apparatus


134


in step S


841


. The image formation apparatus


100


recognizes in step S


724


that sheet


1


has been ejected from the option apparatus


134


.




Then, in step S


842


, the option apparatus


133


notifies the image formation apparatus


100


that sheet


2


has been ejected from the option apparatus


133


and the image formation apparatus


100


recognizes this in step S


725


.




When sheet


2


has been ejected last, the option apparatus


134


notifies this to the option apparatus


133


in step S


920


. This notification is received by the option apparatus


133


in step S


843


and then transmitted to the image formation apparatus


100


in step S


844


. Then, the image formation apparatus


100


recognizes in step S


726


that the ejection of sheet


2


from the option apparatus


134


has been completed.




As described in this embodiment, it is possible to reduce the processing load by the image formation apparatus receiving the information of the time required until it is possible to sequentially eject sheets from a plurality of option apparatuses connected downstream and by the option apparatuses connected downstream from the image formation apparatus performing sheet transport control and monitoring processing.




Similarly, it is possible to reduce the processing load also in the configuration in which in addition to the paper ejection apparatuses


133


,


134


, a plurality of paper ejection option apparatuses are connected downstream.




Third Embodiment




Next, the sheet transport operations of the image formation apparatus and option apparatuses according to a third embodiment of the present invention will be explained. In this embodiment, with regard to the processing in step S


104


and step S


106


explained using the flow charts in

FIG. 3A

to


3


C, the image formation apparatus


100


acquires the apparatus information from the option apparatuses


101


and


102


as to whether it is possible to perform sheet transport control and monitoring processing of other option apparatuses connected upstream as communication data, and in step S


105


and step S


107


, the image formation apparatus


100


determines the processing capacities of the option apparatuses


101


and


102


and directly performs sheet transport control and monitoring processing of the option apparatus


102


upstream from the option apparatus


101


without the intermediary of the option apparatus


101


, which cannot control or monitor the option apparatus


102


.




Furthermore, with regard to the option apparatuses


133


and


134


connected downstream from the image formation apparatus


100


, though not shown in the figure, the image formation apparatus


100


also directly perform sheet transport control and monitoring processing.




The processing in that case will be explained using the flow charts shown in

FIGS. 10A

to


10


C.

FIGS. 10A

to


10


C are modifications of the sheet transport (feeding) processing explained using the flow charts shown in

FIGS. 4A

to


4


D in the first embodiment and shows the processing after the image formation apparatus


100


determines that the option apparatus


101


cannot perform sheet transport control and monitoring processing of the upstream option apparatus


102


. In

FIGS. 10A

to


10


C, the same processes as those in

FIGS. 4A

to


4


D will be assigned the same step numbers and detailed explanations thereof will be omitted.




In step S


409


, the image formation apparatus


100


performs processing equivalent to step S


505


in FIG.


4


B and directly controls the sheet transport state of the option apparatus


102


. Likewise, in step S


411


, the image formation apparatus


100


performs the processing in step S


509


in FIG.


4


B and instructs the option apparatus


102


to restart to transport sheet


2


while monitoring sheet


1


.




Furthermore, in step S


413


, the image formation apparatus


100


performs processing equivalent to that in step S


512


in

FIG. 4B

, that is, the image formation apparatus


100


recognizes that sheet


2


has been ejected from the option apparatus


102


and recognizes that the option apparatus


101


will continue to transport sheet


2


.




Hereafter, the image formation apparatus


100


performs transport control and monitoring processing of sheet


2


in the option apparatus


101


.




This embodiment only describes the processing of the sheet supply option apparatuses, but with regard to the sheet ejection option apparatuses connected downstream from the image formation apparatus


100


, the image formation apparatus


100


can also perform similar processing by directly controlling without the intermediary of an option apparatus with low processing performance.




As described above, according to this embodiment, the image formation apparatus acquires the processing performance of each option apparatus connected by the communication means after power is turned on and when it is determined that an option apparatus connected upstream or downstream cannot perform control or monitoring of other option apparatuses, the image formation apparatus can directly control the option apparatus connected one step upstream (or downstream) from the option apparatus.




Other Embodiment




The first to third embodiments above describe the cases where two option apparatuses are installed upstream from the image formation apparatus


100


, two option apparatuses are installed downstream and two sheets are transported, but the configuration is not limited to this and the number of option apparatuses connected, the number of sheets transported and timings of image formation processing or ejection completion processing, etc. can all be set arbitrarily.




Moreover, the method of communications between the image formation apparatus and the option apparatuses is not limited to a particular method, but any protocol can be used.




Furthermore, the above embodiments only describe option apparatuses involved in sheet transport, but the effects of the present invention can be implemented with any option apparatuses serially connected from the image formation apparatus even if they are not sheet transport option apparatuses.




Furthermore,

FIGS. 3A

to


3


C illustrate the case where a timer is started when power is turned on and power to the downstream option apparatuses is turned on when the timer times out, but it is also possible to configure the system so that power to the downstream option apparatuses is turned on upon completion of predetermined processing such as initialization processing carried out after powering-on is completed, for example.




The present invention can also be applied to a system configured by a plurality of devices (for example, host computer, interface device, reader, printer, etc.) or to a standalone apparatus (for example, copier, facsimile apparatus, etc.).




Furthermore, it goes without saying that the object of the present invention can be attained by supplying a storage medium (or recording medium) that records program codes of software implementing the functions of the aforementioned embodiments to a system or apparatus and allowing a computer (or CPU or MPU) of the system or apparatus to read and execute the program codes stored in the storage medium. In this case, the program codes read from the storage medium themselves implement the functions of the aforementioned embodiments and the storage medium that stores the program codes make up the present invention. Furthermore, it goes without saying that the present invention includes not only the case where the functions of the aforementioned embodiments are implemented by executing the program codes read by the computer but also the case where the operating system (OS), etc. operating on the computer performs part or the whole of actual processing and the functions of the aforementioned embodiments are implemented through this processing.




Furthermore, it goes without saying that the present invention also includes the case where after the program codes read from the storage medium are written in memory provided on a function expansion card inserted into the computer or a function expansion unit connected to the computer, the function expansion card or the CPU, etc. provided on the function expansion unit performs part or the whole of actual processing and the functions of the aforementioned embodiments are implemented through this processing.




When the present invention is applied to the above storage medium, the program codes corresponding to the flow charts explained above (shown in at least one of

FIG. 3A

to

FIG. 10

) are stored in the storage medium.




As explained above, according to the image formation apparatus and option apparatuses of the present invention, it is possible to distribute control of the entire apparatus by allowing each apparatus to perform monitoring or control of the operation of an option apparatus immediately upstream and/or immediately downstream, thus reducing the processing load of the image processing apparatus or option controller, preventing the processing load of the image processing apparatus from drastically increasing even if the number of option apparatuses connected changes, and thereby having the effect of making it possible to configure the image processing apparatus without using expensive circuit parts with high-speed processing capability.




The present invention has been described above based on the preferred embodiments. However, these embodiments are intended to contribute to a better understanding of the present invention and it goes without saying that the present invention is not limited to the scope disclosed in the above described embodiments. The present invention is intended to include any variations made possible by those skilled in the art without departing from the spirit of the present invention specified in the following claims.



Claims
  • 1. An option apparatus of an image formation apparatus connectable to the image formation apparatus directly or via an intermediate option apparatus, adapted for connecting to a remote option apparatus while being connected to said image formation apparatus, comprising:directly connected communication means for communicating with at least one of the image formation apparatus and said intermediate option apparatus; and option apparatus controlling means for controlling operation of said option apparatus; and monitoring means for monitoring a state of said at least one of the image formation apparatus and said intermediate option apparatus; wherein said option apparatus controlling means controls the operation of said option apparatus based on the monitored state of said at least one of the image formation apparatus and said intermediate option apparatus.
  • 2. The option apparatus of the image formation apparatus according to claim 1, further comprising power supply controlling means for performing power supply control on said remote option apparatus,wherein said power supply controlling means turns on the power to said remote option apparatus a predetermined time after power to said option apparatus is turned on or after predetermined processing is completed.
  • 3. The option apparatus of the image formation apparatus according to claim 1, wherein said option apparatus determines whether it is possible to control and/or monitor the operation of said remote option apparatus and sends said determination result to said image formation apparatus or said intermediate option apparatus.
  • 4. The option apparatus of the image formation apparatus according to claim 1, wherein said option apparatus is an option apparatus that transports the recording medium to said image formation apparatus and/or ejects a recording medium from said image formation apparatus.
  • 5. An image formation apparatus capable of connecting 1 stage and/or multi-stages of the option apparatus of the image formation apparatus according to claim 1, comprising image formation controlling means for controlling image formation processing using said option apparatus,wherein said image formation controlling means monitors and/or controls the operation of a directly connected option apparatus and monitors the state of the option apparatuses connected through said directly connected option apparatus onward through a communication with said directly connected option apparatus.
  • 6. A recording medium that stores a program executable by a computer apparatus, wherein the apparatus that executes said program is allowed to function as the image formation apparatus according to claim 5.
  • 7. A recording medium that stores a program executable by a computer apparatus, wherein the apparatus that executes said program is allowed to function as an option apparatus for the image formation apparatus according to claim 1.
  • 8. An image formation system comprising an image formation apparatus and an option apparatus connectable to the image formation apparatus directly or via an intermediate option apparatus, adapted for connecting to a remote option apparatus while being connected to said image formation apparatus,said option apparatus comprising: directly connected communication means for communicating with at least one of said image formation apparatus and said intermediate option apparatus; monitoring means for monitoring a state of at least one of the image formation apparatus and said intermediate option apparatus; and option apparatus controlling means for controlling operation of said option apparatus based on the monitored state of said at least one of the image forming apparatus and said intermediate option apparatus.
  • 9. The image formation system according to claim 8, said image formation apparatus further comprising main unit power supply controlling means for performing power supply control over said directly connected option apparatus,said option apparatus further comprising option apparatus power supply controlling means for performing power supply control over said remote option apparatus directly connected away from said image formation apparatus, wherein said main unit power supply controlling means turns on the power to said directly connected option apparatus, and said option apparatus power supply controlling means turns remote option apparatus a predetermined time after power is turned on or after predetermined processing is completed.
  • 10. The image formation system according to claim 8, wherein said option apparatus determines whether it is possible to control and/or monitor the operation of said remote option apparatus and sends said determination result to said image formation apparatus or the intermediate option apparatus.
  • 11. The image formation system according to claim 10, wherein when said image formation controlling means collects said determination results of all option apparatuses in the system and when said determination results show that there exists an option apparatus whose control and/or monitoring is impossible, said image formation controlling means directly controls the determined option apparatus separate from other option apparatus connected to said option apparatus.
  • 12. A recording medium that stores a program executable by a computer apparatus, wherein the apparatus that executes said program is allowed to function as the image formation apparatus in the image formation system according to claim 8.
  • 13. A recording medium that stores a program executable by a computer apparatus, wherein the apparatus that executes said program is allowed to function as an option apparatus in the image formation system according to claim 8.
  • 14. An image forming system comprising:a plurality of recording medium handling apparatus including an image formation apparatus, at least one recording medium supplying apparatus for supplying a recording medium and at least one recording medium ejecting apparatus for ejecting a recording medium; and communicating means for connecting said plurality of recording medium handling apparatus, wherein each recording medium handling apparatus, to which another recording medium handling apparatus is directly connected on a side corresponding to the upper stream of the transportation path of the recording medium (upper recording medium handling apparatus), comprises: sending means for sending a permission signal to said communicating means indicating a recording medium is acceptable; first conveying controlling means for controlling a conveyance of the recording medium transported from said upper recording medium handling apparatus, and wherein each recording medium handling apparatus, to which another recording medium handling means is directly connected on a side corresponding to the lower stream of the transportation path of the recording medium (lower recording medium handling apparatus), comprises: monitoring means for monitoring said permission signal sent from said lower recording medium handling apparatus via said communicating means without intervention of another recording medium handling apparatus; and second conveying controlling means for controlling, based on said permission signal, a conveyance of the recording medium to said lower recording medium handling apparatus.
Priority Claims (1)
Number Date Country Kind
2000-074828 Mar 2000 JP
US Referenced Citations (4)
Number Name Date Kind
5317366 Koshi et al. May 1994 A
5420667 Kaneko et al. May 1995 A
6028675 Fields et al. Feb 2000 A
6078400 Mizutani Jun 2000 A