In general, conventional back-up batteries (e.g., back-up battery systems used for wireless or other large format back-up systems) have the strength of being low cost and the weaknesses of having a low rate and being slow to charge and easily damaged by high rate demand or charge. Thus, conventional back-up battery systems are best utilized when power is off for extended time, and do not function well for load leveling.
What is needed is a new back-up battery system that takes advantage of the strengths of conventional back-up batteries and functions well for load leveling.
Provided is a parallel power back-up system comprising a performance battery, a bulk energy storage system, and a controller. The performance battery has a rate greater than 2C, for example, 5-8C; and a cycle life greater than 300 cycles, for example, 450-550 cycles, at C rate. The performance battery and the bulk energy storage system are connected in parallel through the controller and when power to a load fails, the controller initially provides power from the performance battery and then provides power from the bulk energy storage system.
Other objects, advantages and novel features of the present invention will become apparent from the following detailed description of the invention when considered in conjunction with the accompanying drawings.
When power from electrical grid 10 fails, module 50 provides a backup to load 30. Specifically, controller 80 senses the power failure and activates performance battery 60, which supplies power through a diode (not illustrated). Performance battery 60 continues to supply power to bus 40 until controller has determined that bulk battery 100 has warmed-up and starting functioning at its operating level. Controller 80 then operates relay 70 to switches the power from bulk energy system 100 to load 30. Although not illustrated in
The bulk energy storage system can be a bulk storage battery. The performance battery and the bulk storage battery can each be 24 volt batteries. The bulk storage battery can have a cycle life less than 400 cycles, for example, 200-300 cycles, at C rate. The performance battery (cells) can have a voltage less than 2 volts, for example, 1-1.5 volts, at C rate between 20-80% State of Charge; and the bulk storage battery (cells) can have a voltage greater than 2.0 volts, for example, 2.5-3.5 or 4.5-5.5 volts, at 0.25C rate between 20-80% State of Charge. The performance battery has a rate greater than 2C, for example, 5-8C; and a cycle life greater than 300 cycles, for example, 450-550 cycles, at C rate.
Conventional back-up system use one or more bulk energy storage systems. The parallel power back-up system disclosed herein provides a performance battery that works with a bulk energy storage system as used in conventional back-up systems (e.g., back-up battery systems used for wireless or other large format back-up systems) to create a parallel power back-up which creates a synergetic system with strengths of both the performance battery and the conventional bulk energy storage system. The performance battery does the work of load leveling and thereby protects the bulk energy storage system (e.g., the bulk storage battery) conventionally used as a back-up from constant damage as a load leveler. As a result, the life of the bulk energy storage system can be extended (e.g., doubled) and the capacity (run time) of the performance battery can be added to the parallel power back-up system. Additionally, the performance battery can provide a constant voltage as a load leveler to protect customers from antenna signal variation, which happens with conventional back-up systems. While the performance battery may be considered too expensive to provide the full back-up run time, the performance battery in conjunction with the conventional bulk energy storage system saves money, improves reliability, and reduces maintenance. Additionally, the parallel power back-up system disclosed herein solves a problem of existing alternate bulk energy storage systems, which require time to activate (i.e., warm up, reduce internal resistance and start functioning) before they can be put into service without damage and start feeding their power. In particular, bulk energy storage systems such as, for example, a fuel cell, flow cell, ultra capacitor, flywheel, pumped water, compressed air, superconducting magnetic energy, or generator, require time (e.g., 10 seconds to 5 minutes) to activate in order to be able to deliver energy.
Thus, the parallel power back-up system disclosed herein is an uninterruptible power supply (UPS) system that separates the load leveling function (i.e., attributable to the performance battery) and the back-up power function (i.e., attributable to the bulk energy storage system) of the UPS to improve performance and reduce size and cost of the system. The parallel power back-up system has more capacity per volume than does the bulk energy storage system, as the parallel power back-up system has a higher energy density. While the parallel power back-up system is larger than the bulk energy storage system, the run time of the parallel power back-up system is greater than a run time which would be accounted for by the increase in size. Similarly, while the parallel power back-up system costs more initially, the parallel power back-up system is cheaper over the life of the parallel power back-up system since the parallel power back-up system lasts over twice as long as the bulk energy storage system but does not cost twice as much as the bulk energy storage system. The performance battery performs power leveling and intermittent support that is used to protect a much larger and less expensive per WHr bulk energy storage system (used for power outages) to extend the life and performance of the bulk energy storage system.
The performance battery and the bulk energy storage system are connected in parallel through a controller which adjusts voltage and/or current flow between the performance battery and the bulk energy storage system to improve overall performance. The performance battery can be much smaller than (e.g., less than one quarter or one tenth the size of) the bulk energy storage system. The performance battery can be much less expensive than (e.g., less than one half the cost of) the bulk energy storage system. The bulk energy storage system can cost less than $0.50/Whr, for example, less than $0.25/Whr, less than $0.16/Whr, or as low as $0.04/Whr. Conversely, the performance battery will typically cost greater than $0.50/Whr, but could costs as low as, for example, $0.25/Whr.
In an embodiment, the bulk energy storage system is a bulk storage battery. For batteries (either bulk storage or performance), the primary factor in cost is the chemistry utilized. The bulk storage battery can comprise a chemistry selected from the group consisting of lead-acid, nickel-iron, sodium-sulfur, and zinc-manganese dioxide. In an embodiment, the bulk storage battery comprises a chemistry that is not environmentally friendly such as, for example, lead-acid.
The performance battery can comprise a chemistry selected from the group consisting of nickel-metal hydride, nickel-zinc, silver-zinc, nickel-cadmium, lithium-ion, and lithium-polymer. In an embodiment, the performance battery comprises an environmentally friendly chemistry such as, for example, nickel-metal hydride or lithium-polymer.
The performance battery, in addition to having a high rate (i.e., greater than 2C), has a long life on float voltage, which can be estimated by long cycle life (e.g., life greater than 10 years on constant voltage float at RT). Conversely, the bulk storage battery has short life on float voltage, for example, less than 10 years at RT. The illustrative examples of the performance battery are intended to be non-limiting.
When controller 80 determines that the power grid has failed (“Yes” path out of decision step 310), then controller 80 causes performance battery 60 to be switched onto bus 40 and controller 80 starts a timer (step 315). The timer is set for an amount of time required for the bulk energy power system to warm up, and this time period can be, for example, 5 minutes. While the timer is running, controller 80 continues to determine whether the grid power has come back online (step 320). When the grid power has come back online (“Yes” path out of decision step 320), then controller 80 resets the timer, disconnects the performance battery from bus 40 and continues to monitor the grid power (step 305).
When the grid power has not come back online (“No” path out of decision step 320) and when the timer has expired (“Yes” path out of decision step 325), then controller 80 causes switch 70 to connect the bulk energy system 100 to bus 40 (step 330). Controller 80 then continues to determine whether the grid power has come back online (step 335). When the grid power has come back online (“Yes” path out of decision step 335), then controller 80 causes switch 70 to disconnect the bulk energy system from bus 40 (step 340) and then continues to monitor the power grid (step 305).
When the bulk energy voltage level falls below the threshold level (“Yes” path out of decision step 410), then controller 80 causes switch 70 to pass the grid power to bulk energy system 100 (step 415). Controller 80 then starts a timer (step 420). The timer is set for a period of time required to ensure that the bulk energy voltage is stable at a desired level, which can be, for example, 30 minutes. As long as the timer continues to run (“No” path out of decision step 425), then controller 80 continues to allow recharging of the bulk energy system 100 (step 430). When the timer has expired (“Yes” path out of decision step 425), then controller 80 causes switch 70 to disconnect bulk energy system 40 from the bus, which also disconnects bulk energy system 100 from the grid power (step 435).
The foregoing disclosure has been set forth merely to illustrate the invention and is not intended to be limiting. Since modifications of the disclosed embodiments incorporating the spirit and substance of the invention may occur to persons skilled in the art, the invention should be construed to include everything within the scope of the appended claims and equivalents thereof.
Many modifications of the exemplary embodiments disclosed herein will readily occur to those of skill in the art. Accordingly, the parallel power back-up system disclosed herein is to be construed as including all structure and methods that fall within the scope of the appended claims.
This application claims the benefit of U.S. Provisional Application No. 61/164,595 filed Mar. 30, 2009.
Number | Name | Date | Kind |
---|---|---|---|
5978236 | Faberman et al. | Nov 1999 | A |
6064179 | Ito et al. | May 2000 | A |
20040053082 | McCluskey et al. | Mar 2004 | A1 |
20060246328 | Willets et al. | Nov 2006 | A1 |
20060292443 | Ogg et al. | Dec 2006 | A1 |
20070108946 | Yamauchi et al. | May 2007 | A1 |
Number | Date | Country | |
---|---|---|---|
20100253147 A1 | Oct 2010 | US |
Number | Date | Country | |
---|---|---|---|
61164595 | Mar 2009 | US |